Loading...
HomeMy WebLinkAboutWQ0016165_Staff Report_20220222DWR Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources WATER QUALITY REGIONAL OPERATIONS SECTION NON -DISCHARGE APPLICATION REVIEW REQUEST FORM January 21, 2022 To: WSRO-WQROS: Lon Snider / Jenny Graznak From: Chloe Lloyd, Water Quality Permitting Section - Non -Discharge Branch Permit Number: WQ0016165 Permit Type: Wastewater Irrigation Applicant: City of Lexington Project Type: Renewal Owner Type: Municipal Owner in BIMS? Yes Facility Name: City of Lexington WWIS Facility in BIMS? Yes Signature Authority: Steve Craver Title: WWTP Superintendent Address: 28 W. Center St., Lexington, NC 27292 County: Davidson Fee Category: Non -Discharge Minor Fee Amount: $0 - Renewal Comments/Other Information: sccraver@lexingtonnc.gov Attached, you will find all information submitted in support of the above -referenced application for your review, comment, and/or action. Within 45 calendar days, please take the following actions: ® Return this form completed. El Return a completed staff report. n Attach an Attachment B for Certification. Issue an Attachment B Certification. When you receive this request form, please write your name and dates in the spaces below, make a copy of this sheet, and return it to the appropriate Central Office Water Quality Permitting Section contact person listed above. 1.— Lbutti DIICIIoc3490II1uSigne9dLatitt- 9by: RO-WQROS Reviewer: �' Date: 2/17/2022 FORM: WQROSNDARR 09-15 Page 1 of 1 XigIEC:V? State of North Carolina Division of Water Resources Water Quality Regional Operations Section Staff Report February 17, 2022 To: DWR Central Office — WQ, Non -Discharge Unit Attn: Chloe Lloyd Application No.: WQ0016165 Facility name: City of Lexington WWI From: Caitlin Caudle Winston-Salem Regional Office Note: This form has been adapted from the non -discharge facility staff report to document the review of both non -discharge and NPDES permit applications and/or renewals. Please complete all sections as they are applicable. I. GENERAL AND SITE VISIT INFORMATION 1. Was a site visit conducted? ® Yes or ❑ No a. Date of site visit: 2/17/2022 b. Site visit conducted by: C. Caudle c. Inspection report attached? ® Yes or ❑ No d. Person contacted: Steve Craver and their contact information: scraver@lexingtonnc.gov II. EXISTING FACILITIES: MODIFICATION AND RENEWAL APPLICATIONS 1. Are there appropriately certified Operators in Charge (ORCs) for the facility? ® Yes ❑ No ❑ N/A ORC: Jeff Walser Certificate #: 1000476 Backup ORC: Steve Craver Certificate #:11241 2. Are the design, maintenance and operation of the treatment facilities adequate for the type of waste and disposal system? ® Yes or ❑ No 3. Are the site conditions (e.g., soils, topography, depth to water table, etc) maintained appropriately and adequately assimilating the waste? ® Yes or ❑ No 4. Has the site changed in any way that may affect the permit (e.g., drainage added, new wells inside the compliance boundary, new development, etc.)? n Yes or ® No 5. Is the residuals management plan adequate? ® Yes or n No 6. Are the existing application rates (e.g., hydraulic, nutrient) still acceptable? ® Yes or No 7. Is the existing groundwater monitoring program adequate? n Yes ❑ No ® N/A 8. Are there any setback conflicts for existing treatment, storage and disposal sites? n Yes or ® No 9. Is the description of the facilities as written in the existing permit correct? ® Yes or ❑ No 10. Were monitoring wells properly constructed and located? ❑ Yes ❑ No ® N/A 11. Are the monitoring well coordinates correct in BIMS? n Yes n No ® N/A 12. Has a review of all self -monitoring data been conducted (e.g., DMR, NDMR, NDAR, GW)? ® Yes or ❑ No Please summarize any findings resulting from this review: There was a violation for missing TP in 2020 and the annual fee was overdue in 2019. 13. Are there any permit changes needed in order to address ongoing BIMS violations? ❑ Yes or ® No 14. Check all that apply: ® No compliance issues ❑ Current enforcement action(s) ❑ Currently under JOC n Notice(s) of violation n Currently under SOC n Currently under moratorium Have all compliance dates/conditions in the existing permit been satisfied? ® Yes ❑ No ❑ N/A FORM: WQROSSR 04-14 Page 1 of 2 Are there any issues related to compliance/enforcement that should be resolved before issuing this permit? nYes ❑No®N/A III. REGIONAL OFFICE RECOMMENDATIONS 1. Do you foresee any problems with issuance/renewal of this permit? ❑ Yes or ® No 2. Recommendation: ❑ Hold, pending receipt and review of additional information by regional office ® Hold, pending review of draft permit by regional office ❑ Issue upon receipt of needed additional information ❑ Issue ❑ Deny (P1e�asktg„rmmons: ) 3. Signature of report preparer: Signature of regional supervisor: Date: 2/22/2022 (At& —8B834968199D49D... IV. ADDITIONAL REGIONAL STAFF REVIEW ITEMS See attached inspection report. DocuSlgned by. c 145B49E225C94EA... FORM: WQROSSR 04-14 Page 2 of 2 Compliance Inspection Report Permit: WQ0016165 Effective: 07/02/18 Expiration: 07/31/22 Owner : City of Lexington SOC: Effective: Expiration: Facility: City of Lexington WWIS County: Davidson 500 Glendale Rd Region: Winston-Salem Contact Person: Tom Johnson Lexington NC 27292 Title: Phone: 336-248-3926 Directions to Facility: from 1-85 N go 3.1 mi, take exit #91 go 0.2 mi, turn left on Cotton Grove Rd. go 0.4 mi, turn left on Glendale Rd. go 0.8 mi, arrive at the site on the left. System Classifications: SI, Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: NC0055786 City of Lexington - Lexington Regional WWTP Inspection Date: 02/17/2022 Entry Time 10:04AM Exit Time: 11:40AM Primary Inspector: Caitlin Caudle Phone: 336-776-9699 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Wastewater Irrigation Facility Status: Compliant ❑ Not Compliant Question Areas: Miscellaneous Questions Record Keeping End Use -Irrigation (See attachment summary) Page 1 of 4 Permit: WQ0016165 Owner - Facility: City of Lexington Inspection Date: 02/17/2022 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On February 17, 2022, DWR staff person Caitlin Caudle conducted a scheduled compliance inspection and permitting visit Steve Craver and Jeff Walser were present during the entire inspection. A review of records, irrigation fields, and pumping equipment was completed. This review reflected compliance with the subject permit. The treatment plant was not inspected. The following observations were made: • Irrigation equipment has not been calibrated this permit cycle. A new meter was installed in 2013 and it appeared a calibration check was completed on June 14, 2017. A new permit was issued on July 2, 2018, after a permit modification request. Mr. Craver stated that a new effluent flow meter will be purchased. • Influent is measured at the head of the treatment plant, and effluent is measured using a flow meter on the irrigation pump. • There is no effluent storage at this facility. The treatment plant also has a discharge permit and a compost facility. Irrigation is not the primary disposal manner. Irrigation is only completed after the "reuse pump" has been turned off. • Irrigation is completed when weather allows and when the 12 month floating total allows it. The system is winterized from approximately November to April. Irrigation was initiated in April of last year and stopped at the end of October. • Irrigation is 100% manual. A separate pump must be turned off and the irrigation pump turned on. There is not a wet well. The irrigation pump is located after the chlorine contact chamber. • Some of the irrigation field perimeter has public access restricted, but Mr. Craver stated they will be adding additional signage. • Some I&I is present in the collection system. • 9,000 GPD was determined based on the 30 in/yr irrigation limit. • The Operation and Maintenance Plan and Spill Plan are tied into the NPDES permit. Ms. Caudle requested that some language be added to the Spill Plan concerning emergencies in the irrigation field. Mr. Craver stated that something will be posted in the building with the irrigation control panel. • All residuals from the treatment plant are composted. • The influent flow meter is calibrated quarterly. • There are no high water alarms related to the irrigation pump as there is not a wet well or any storage. • Domestic wastewater accounts for 42% of the permitted flow and industrial wastewater accounts for 3% of the permitted flow. • The chlorine contact chamber will be reviewed during the next inspection. Page 2 of 4 Permit: WQ0016165 Owner - Facility: City of Lexington Inspection Date: 02/17/2022 Inspection Type : Compliance Evaluation Reason for Visit: Routine Type Reuse (Quality) Infiltration System Lagoon Spray, LR Single Family Spray, LR Activated Sludge Spray, LR Activated Sludge Spray, HR Activated Sludge Drip, LR Recycle/Reuse Single Family Drip Record Keeping Is a copy of current permit available? Are monitoring reports present: NDMR? NDAR? Are flow rates less than of permitted flow? Are flow rates less than of permitted flow? Are application rates adhered to? Is GW monitoring being conducted, if required (GW-59s submitted)? Are all samples analyzed for all required parameters? Are there any 2L GW quality violations? Is GW-59A certification form completed for facility? Is effluent sampled for same parameters as GW? Do effluent concentrations exceed GW standards? Are annual soil reports available? # Are PAN records required? # Did last soil report indicate a need for lime? If so, has it been applied? Are operational logs present? Are lab sheets available for review? Do lab sheets support data reported on NDMR? Do lab sheets support data reported on GW-59s? Are Operational and Maintenance records present? Were Operational and Maintenance records complete? Has permittee been free of public complaints in last 12 months? Is a copy of the SOC readily available? Yes No NA NE El Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ • ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Page 3 of 4 Permit: WQ0016165 Owner - Facility: City of Lexington Inspection Date: 02/17/2022 Inspection Type : Compliance Evaluation Reason for Visit: Routine No treatment units bypassed since last inspection? Comment: No lime was needed. End Use -Irrigation Are buffers adequate? Is the cover crop type specified in permit? Is the crop cover acceptable? Is the site condition adequate? Is the site free of runoff / ponding? Is the acreage specified in the permit being utilized? Is the application equipment present? Is the application equipment operational? Is the disposal field free of limiting slopes? Is access restricted and/or signs posted during active site use? Are any supply wells within the CB? Are any supply wells within 250' of the CB? How close is the closest water supply well? Is municipal water available in the area? # Info only: Does the permit call for monitoring wells? Are GW monitoring wells located properly w/ respect to RB and CB? Are GW monitoring wells properly constructed, including screened interval? Are monitoring wells damaged? Comment: Monitoring wells are not requried by the permit. • ❑ ❑ ❑ Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ ❑ • • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ • ❑ • ❑ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ Page 4 of 4