Loading...
HomeMy WebLinkAboutNCC211162_NOT Closeout Documents_20220222North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center, Raleigh, NC 27699 (919) 791-4200 County: Johnston Project: Access Road and WRF Site Early River basin: Neuse Person financially responsible: Town of Clayton - JD Soloman, Interim Town Project #: JOHNS-2021-020 Manager Address: PO Box 879, Clayton, NC 27528 1. Project Location: O'Neil Street, Clayton Pictures: No 2. Weather and soil conditions: Sunny, dry, workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Mark Scaer and Joe Verley Title: Inspection report: Sent Report Date given/sent: February 07, 2022 9. Corrective action needed: 10. Comments: Project work is complete. Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process Reported by: Lauren Garcia Date of inspection: February 04, 2022 cc: Others present: Time arriving on site: 11:00 AM Time leaving site: 11:30 AM