HomeMy WebLinkAbout20140296 Ver 1_CAMA Application_20140320r�
MCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Pat McCrory Braxton C. Davis John E. Skvarla, III
Governor Director Secretary
L
March 18, 2014 @L;:551, Novi
q
LNWR--. AR 2 1 2014 '
MEMORANDUM: �
WA p u,aur,
TO: Karen Higgins
Division of Water Resources
FROM: Doug Huggett
Major Permits Processing Coordinator
SUBJECT: CAMA/DREDGE & FILL Permit Application Review
Applicant: Robert Hudgins, Jr.
Project Location: Carteret County, West Bay S/D, Lot #4, in Harkers Island.
Proposed Project: Proposes to provide a private residential 6 -slip docking facility for his family.
Proposed are 6 boatlifts at the terminus of a 300' dock, and the placement of
granite rip rap adjacent to an existing bulkhead in order to stabilize the
shoreline.
Please indicate below your agency's position or viewpoint on the proposed project and return this form by
April 7, 2014. If you have any questions regarding the proposed project, please contact Ryan Davenport,
Permit officer at (252) 808 -2808. Ext. 210. When appropriate, in -depth comments with supporting data is
requested.
REPLY: This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This 'agency approves of the project only if the recommended changes are
incorporated. See attached.
This agency objects to the project for reasons described in the attached comments.
SIGNED DATE
400 Commerce Ave, Morehead City, NC 28557
Phone- 252 -808 -28081 FAX- 252 - 247 -3330 Internet www nccoastalmanagement net
An Equal Opportunity 1 Affirmative Action Employer
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1• APPLICANT'S NAME: Robert Hudgins Jr.
2. LOCATION OF PROJECT SITE: West Bay Subdivision Lot #4 Harkers Island
Photo Index - 2000: 50 -610 grids (T- 16,17)(U- 16,17)
2006: 39 -6341 grids (E- 14)(F -14)
State Plane Coordinates - X: 36071.89 Y: 277685.5
Longitude: 76 °42'02.77" Latitude: 34 °33'38.16"
3. INVESTIGATION TYPE: CAMA
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 3/12/14
Was Applicant Present — No
5. PROCESSING PROCEDURE: Application Received — 3/10/2014
Application Complete- 3/10/2014
Office — Morehead City
6. SITE DESCRIPTION:
(A) Local Land Use Plan — Carteret County dated 12/20/2010
Land Classification from LUP — Limited Transition
(B) AEC(s) Involved: EW, PTA
(C) Water Dependent: (yes)
(D) Intended Use: private
(E) Wastewater Treatment: Existing — Private sewer
Planned - None
(F) Type of Structures: Existing — bulkhead
Planned — pier with 6 slips, rip rap
(G) Estimated Annual Rate of Erosion: N/A
Source — N/A
7. HABITAT DESCRIPTION:
DREDGED FILLED OTHER
(A) Open Water (docks) N/A
(B) Open Water (rip rap) N/A
(D) Total Area Disturbed: 4,616ft2
(E) Primary Nursery Area: No
(F) Water Classification: SA Open: No
8. PROJECT SUMMARY: In an effort to provide private residential docking facilities for
his family Mr. Robert Hudgins has applied for a 6 -slip docking facility. There are 6
proposed boatlifts at the terminus of a 300' dock. Additionally, the applicant has proposed
to place granite rip rap adjacent to an existing bulkhead in order to stabilize the shoreline.
N/A
3,816Ft2qIncorp.
2,396Ft2
800Ft2
8. PROJECT SUMMARY: In an effort to provide private residential docking facilities for
his family Mr. Robert Hudgins has applied for a 6 -slip docking facility. There are 6
proposed boatlifts at the terminus of a 300' dock. Additionally, the applicant has proposed
to place granite rip rap adjacent to an existing bulkhead in order to stabilize the shoreline.
Field Investigation Report:
Mr. Robert Hudgins
Page 02
9. Narrative Description
The Robert Hudgins project is located at Lot #4 in West Bay Subdivision on Harkers
Island. This subdivision is located by traveling east along Island Rd. and turning north
onto Old Ferry Dock Rd. West Bay Subdivision is near the end of Old Ferry Dock Rd. on
Westbay Circle. Mr. Hudgins owns property on both sides of Westbay Cir. His property
is bordered on both sides by unimproved residential lots within the subdivision.
Mr. Hudgins property is .442 acres in its entirety, has a shoreline length of 100' and is an
average of 3' above NHW. Presently there is an existing bulkhead along this tract. The
bullheaded area is experiencing erosion due to wave action. There are no coastal wetlands
on this tract. The high ground vegetation consists of various grasses and woody vegetation.
Mr. Hudgins's residence is located on a separate lot located on the south side of Westbay
Circle.
The Carteret County Land Use Plan classifies this property as Limited Transition, with all
AEC's classified Conservation. This section of the West Mouth Bay is not designated as
Primary Nursery Area, is open to the taking of shellfish and carries a water classification
Of SA/HQW. The substrate in this area is mostly sand and silt. Water depths along the
shoreline are shallow ( <1') but increase to 3' around 300' offshore. No SAV's or shellfish
beds were observed within the proposal project area. There is no channel within the project
vicinity and the width of the waterbody in this area is — .5mi.
10. Proiect Description:
Mr. Robert Hudgins is proposing to construct a 6 -slip private residential docking facility.
Extending off of an existing bulkhead would be a 5'X300' dock. Mean High Water is
along the bulkhead alignment. Constructed at the end of the dock would be an
11'X36'platform and two 5'X20' finger piers. Four 12'X12' boatlifts would be placed
along the offshore side of the platform and two 12'X12' boatlifts would be placed along
the inshore side of the platform creating a total of 6 slips. Water depths in the area of the 6
slips range from -2.5' to -.3' at mean low water. There are no SAV or shellfish beds in the
area of the slips.
Mr. Hudgins also proposes to place large granite rip rap along the existing bulkhead in
order to prevent erosion from wave action. The rip rap would be placed along the entire
length of the 100' shoreline and would extend an average and maximum of 8' into the
water body. A 2:1 slope (4'heightX8'base) of the rip rap will be maintained. There are no
Coastal Wetlands, SAV or shellfish beds within the proposed rip rap location.
Field Investigation Report:
Mr. Robert Hudgins
Page 03
11. Anticipated Impacts:
The proposed pier and platform would shade 2,396Ft2and incorporate 3,816ft2 of open
waters. The setting of pilings would cause temporary turbidity. There would be no
hindrance to navigation due to the fact that there are no official designated navigation routes
or channels in this area and near shore shallow water depths(< -2') would discourage boating
traffic. The total pier length, which includes the platform and finger piers, would be a
distance of 331'offshore within a .5mi wide waterbody.
Name: Ryan Davenport Date: 3/14/14
Morehead City
9
State
Ife, I ffC,
FAX No.
ZIP
2. Agent/Contractor Information
9. Primary Applicant( Landowner Information
Business Name
Business Name
Project
ame (if applicable)
MI
Last N
Mme
Applicant 1: First Name
MI
Last Ni
e
Last Naime
a
j
Mailing Address
PO Bo'
City
Applicant 2: First Name
Ml
Last N
e
S '
If additional applicants, please attach an additional page(s) with names listed.
ZIP
Mailing Address _ �t PJBo
City
Phone No. 2
ZIP Country Phone No
" 6C,4-111-6
ext.
FAX No.
ia °
F
Street Address (if different from above)
Street Address (if different from above)
City
1
State
State
Email
�Qy +
r�- o
it I5 ! I %�/
3
��.
�1 q
' 0 s �' r
�'+i 'I
State
Ife, I ffC,
FAX No.
ZIP
2. Agent/Contractor Information
Business Name
-990 CS =: �. ,
, _,
Agent/ Contractor 1: First Name
MI
Last N
Mme
Agent/ Contractor 2: First Name
MI
Last Naime
a
j
Mailing Address
PO Bo'
City
State
view
S '
i 4c
ZIP
Phone No. 1
Phone No. 2
ext.
- ext.
FAX No.
Contractor #
Street Address (if different from above)
City
State
ZIP
�Qy +
Email
���/e/y } ,,
�y�j
BSI 464�
<Form continues on back> MAR 10 201
MANED CfrY
V
i
a , Form DCM MP -1 (Page 2 of 4) APPLICATION for
Major Development Permit
3, Project Location
County (can be multiple)
~-• - •i ��-"W ��
Street Address
i+Q/ A � F �,a++•AIFK�.�'y�f"s'
l�
Ct164�' A�'���
State Rd. #.
Subdivision Name
City .
c. Size of individual lot(s)
d
State
Zip
Phone No.
Lot No
s) (if many, attach additional page with list)
- - ext.
{
i
a. In w�hicch NC river basin is the project located?
b. Nan
a of body of water nearest to proposed project
f. Man -made features and uses now on tract
c. Is thh water body identified in (b) above, natural or manmade?
d. Name
i
the closest major water body to the proposed project site.
Il�fNatural []Manmade ❑Unknown
h. How does local government zone the tract?
e. Is proposed w rk within city limits or planning jurisdiction?
❑Yes
f. If applicable, list the planning jurisdiction or city limit the proposed
o
work falls within.
compliance certificate, if applicable)
4//A-
4. Site Description
a. Total length of shoreline on the tract (ft.)
b_ SizeJof
entire tract (sq.ft.)
Tel
c. Size of individual lot(s)
d
d. Approximate
NWJ
elevation of tract above NHW (normal high water) or
(normal water level)
(if many lot sizes, please attach additional page with a list)
[VNHW or ❑NWL je
e. Vegetation on tract
{
i
f. Man -made features and uses now on tract
I -
g. Identify and describe the existing land uses ad scent to the proposed project site-
Pe- �I
dd
i�e- 6 r? t p ;L
h. How does local government zone the tract?
1. Is the pry
)oninn
posed project consistent with the applicable zoning?
{ o ¢q
(Attach
[]Yes 17N.
compliance certificate, if applicable)
❑NA
j. Is the proposed activity part of an urban waterfront redevelopment proposal?
R6es ❑No
k. Has a professional archaeological assessment been done for the tract? If yes!
attach a copy. ❑Yes o ❑NA
If yes, by whom?
I. Is the proposed project located in a National Registered Historic District or doe
it involve a Dyes o DNA
National Register listed or eligible property?
<Form continues on nel t page>
Mll
MAR 10 2014
DMMCrly
Form DCM MP -1 (Page 3 of 4)
APPLICATION for
Major Development Permit
m. (i) Are there wetlands on the site?
❑Yes o
(ii) Are there coastal wetlands on the site?
❑Yes ONo
(iii) If yes to either (i) or (ii) above, has a delineation been conducted?
❑Yes [--]No
(Attach documentation, if available)
en complete.
n. Describe existing wastewater treatment facilities.
1 "
° —e23
o. Describe existing drinking water supply source.
ent to be used during construction, the number of each type
a
p. Describe existing storm water management or treatment systems.
F
�F�
5. Activides and Impacts
a. Will the project be for commercial, public, or priyate use?
t
r
DCommercial OPublic/Government
i(nvate
/Community
b. Give a brief description of purpose, use, and daily operations of the project M
en complete.
a� & oek vies
c. Describe the proposed construction methodology, types of construction equip
of equipment and where it is to be stored,.
ent to be used during construction, the number of each type
d. List all development activities you propose.
`e
e. Are the proposed activities maintenance of an existing project, new work, orb
tl
-- - --
a��
f. What is the approximate total disturbed land area resulting from the proposed
roject? 28q.Ft or []Acres
g. Will the proposed project encroach on any public easement, accesswa
public
that the public has established use of?
or other area ❑Yes o DNA
h. Descnbe location and type of existing and proposed discharges to waters oft
- s ,
a state.
6
I. Will, wastewater or stormwater be discharged into a wetland?
DYes MNo ONA
It yes, will this discharged water be of the same salinity as the receiving water
❑Yes ❑No ONA
j. Is there any mitigation proposed?
DYes Wo DNA
If yes, attach a mitigation proposal.
<Form continues on ack> r8 MAR I O 2.014
Form DCM MP -1 (Page 4 of 4)
APPLICATION for
Major Development Permit
6. Additional information
In addition to this completed application form, (MP -1) the following items below, i
applicable, must be submitted in order for the application
package to be complete. Items (a) — (f) aie always applicable to any major deve
pment application. Please consult the application
instruction booklefon how to properly prepare the required items below.
a. A project narrative.
b. An accurate, dated work plat (including plan view and cross - sectional drawings)
drawn to scale. Please give the present status of the
proposed project. Is any portion already complete? If previously authorized iA
ork, clearly indicate on maps, plats, drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel ur
familiar with the area to the site.
d. A copy of the deed (with state, application only) or other instrument under whic
1 the applicant claims title to the affected properties.
e The appropriate application fee. Check or money order made payable to DEN
R.
f. A list of the names and complete addrdsses of the adjacent waterfront (riparia
) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Su
:h landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal I
Aanagement.
Name.
Phone No.
Name 'F6ig62IY
o �si"
Phone No.
d
Address
Name
Phone No.
Address
g. A list of previous state or federal permits issued for work on the project tract.-
3
nclude permit numbers, permittee, and issuing dates.
h. Signed consultant or agent authorization form, if applicable.
i. Wetland delineation, if necessary.
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must
a signed by property owner)
k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S.
13A 1 -10), if necessary. If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compli
nce with the North Carolina Environmental Policy Act.
7, Certification and Permission to Enter on Land
I understand that any permit issued in response to this application will al ow only the development described in the application
The project will be subject to the conditions and restriction's contained in the permit.
I certify that I am authorized to grant,and do in fact grant permission to presentatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating inforr iation related to this permit application and follow -up
monitoring of the project.
I further certify that the information provided in this application is truthful to the best of my In wledge.
Date "-r. 4 `° 6 Print Name `` i ��'
Signature
Please indicate application attachments pertaining to your proposed
❑DCM MP -2 Excavation and Fill Information ❑D
❑DCM MP -3 Upland Development ;
❑DCM MP -4 Structures Information I
F
S
t
z
f'
Bridges and Culverts
MAR 10 2014
2 -27 -2014
In reference to the proposed project at West Bay for Robert Ht
is to acquire the desired depth of water to accommodate six bi
Six boat lifts are needed to accommodate the families needs.
ins, the purpose of extending the dock
lifts.
�i✓i��
MAR 14 2014
`SCI NERD CITY
r
W
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
secarnQt a licable_
a. () Is the docking facility /marina: �� b. (ij Will the facil' be open to the general public?
❑Commercial ❑PubliGGovemment t1�Private/Community QYes o
c. () Dock(s) and/or pier(s)
d. (i) Are Finger Piers included? []No
(ii) Number,
If yes:
(ii) Length
(ii) Number _
(iv) Width s�_
(ii) Length d
(v) Floating []Yes WNo
(iv) Width 157'
(v) Floating []Yes No
e. () Are Platforms included? 53Yes QNo
f. () Are Boatlifts included? O es []No
If yes:
If yes:
H Number � _ _
n Number
(iii) Length - -
(ir) Length
(iv) Width ��
(iv) Width / p
(v) Floating []Yes 21140
Note. Roofed areas are calculated from dapline dimensions.
g. (i) Number of slips'proposed
h. Check all the types of services to be provided.
Q Full service, including travel lift and/or rail, repair or
(ii) Number of slips existing
maintenance service
0
Q Dockage, fuel, and marine supplies
Q Dockage (wet slips') only, number of slips:
❑ Dry storage; number of boats:
Q Boat ramp(s); number of boat ramps:
Q Other, please describe:
i. Check the proposed type of siting:
j] land cut and access channel
❑Open water; dredging for basin and/or channel
QOpen water; no dredging required
Qt)ther; please describe:
k- Typical boat length:
M. @ Will the facility have fie pilings?
❑Yes QNo
01) If yes number of tie pilings?
j. Describe the typical boats to be served (e.g., open runabout,
charter boats, sail boats, mixed types).
I. 0) Will the facility be open to the enefa b c2
[]Yes [Ao
MAR 10 2014
DOINI•N:HD CITY
25 33 -2808 ;a I- W84RCCAST ;z r �r ft �a s� < e revised.
1a P
m Is the marinaldocking facility proposed within a primary or secondary nursery area?
❑Yes (]No
j n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area?
,[jYes []No
o. Is the marinaldockin facility F g proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bott om
(SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected.
❑CW ❑SAV ❑SB
j]WL ❑None
P. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes ❑No
If yes, give the name and address of the Ieaseholder(s), and give the proximity to the lease.
a. (i) Is the boathouse structure(s):
❑Commercial ❑Public/Govemment ❑Private/Community
(IQ Number
(iii) Length
(iv) Width
Note. Roofed areas are calculated from dripline dimensions.
a. (i) Number
(ii) Length
(III) Width
a. Length
C. Maximum distance beyond NHW, NWL or wetlands
a. Is the structure(s):
❑Commercial ❑Public/Govemment ❑Private/Community
c. Distance to be placed beyond shoreline
Note: This should be measured from marsh edge, if present
e. Arc of the swing
b. Average distance from NHW, NWL, or wetlands
b. 'Number
d. Description of buoy (color, inscription, size, anchor, etc.)
i�AR 0 7n14
ON NHD M
252 -808-2808 :. I-88"RCOAST :,
Joan- MW MP-4 43,u-uetures, Page 4 of 4)
a. Proximity of structure(s) to adjacent riparian property lines b. Proximity qf,structure(s) to adjacent docking facilities.
100 M-
9
Note., For buoy or mooring piling, use arc of swing including length
of vessel.
c. 'Width of water body
e. (i) Will navigati nqf aids be required as a result of the project?
Oyes ;?
0 ❑NA
(ii) If yes, explain what type and how they will be implemented.
a. Give complete descripliah:
d. Water depth at waterward end of structure at NLW or NWL
J/
MAR 10 2014
DCM-Mfl-D CITY
252-808-2808 n ll-W84RCOAST revised- 12-27106
Date 1— eZ t-
Name of Property Owner Annivino for - Pormmi t-
��a�awss..w a -"� - - - --
I certify that I have authorized (agent) � to act on my
behalf, for the purpose of applying
and obtaining all LAMA Permits necessary to
install or construct (activity)
at (my property Iocated at)
This certification is valid thru (slate) �(
Property Owner Signature
Date
A "Mcflum
DCM- -MHD CITY
1
Foam DCM MP -2
,"{'.. Y` cL� �L � ''�, pT .4 � S^` iY'iU ��.y�.y Yi y MCtR yy
1,x.A} 'C,v.tA L EA AN 't i .-z!= rn y^.^. '�, ri w '&� :i'� 51 1F
(Except for bridges and culverts)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project Please include all supplemental information.
Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet.
9.
Access
UKhis section not applicable
a
Amount of material to be excavated from below NHW or NWL in
b
Other
Channel
(NLW or
Canal
Boat Basin
Boat Ramp
Rock Groin
Rock
Breakwater
(excluding
shoreline
NWL )
or other wetlands (WL)? If any boxes are checked, provide the
stabilization
Length
number of square feet affected
❑CW ❑SAV ❑SB
�0 /
Width
OWL ❑None
(u) Describe the purpose of the excavation in tnese areas
%
Z.
DISPOSAL OF EXCAVATED MATERIAL
5aThis section not applicable
a
Location of disposal area,
b
Dimensions of disposal area
Avg. Existing
(i) Do you claim title to disposal area?
d
(i) Will a disposal area be available for future maintenance?
N A
NA
❑Yes ❑No ❑NA
Depth
(ii) If no, attach a letter granting permission from the owner
(ii) If yes, where?
e.
(i) Does the disposal area include any coastal wetlands /marsh
f.
(i) Does the disposal include any area in the water?
Final Project
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
❑Yes ❑No ❑NA
or other wetlands (WL)? If any boxes are checked, provide the
Depth
number of square feet affected.
(u) If yes, how much water area is affected?
N A
NA
9.
EXCAVATION
UKhis section not applicable
a
Amount of material to be excavated from below NHW or NWL in
b
Type of material to be excavated
cubic yards
c
(i) Does the area to be excavated include coastal wetlands /marsh
d
High- ground excavation in cubic yards
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected
❑CW ❑SAV ❑SB
OWL ❑None
(u) Describe the purpose of the excavation in tnese areas
Z.
DISPOSAL OF EXCAVATED MATERIAL
5aThis section not applicable
a
Location of disposal area,
b
Dimensions of disposal area
c
(i) Do you claim title to disposal area?
d
(i) Will a disposal area be available for future maintenance?
❑Yes ❑No ❑NA
❑Yes ❑No ❑NA
(ii) If no, attach a letter granting permission from the owner
(ii) If yes, where?
e.
(i) Does the disposal area include any coastal wetlands /marsh
f.
(i) Does the disposal include any area in the water?
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
❑Yes ❑No ❑NA
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
(u) If yes, how much water area is affected?
❑CW ❑SAV ❑SB
OWL ❑None
(ii) Describe the purpose of disposal in these areas
tMAR
10 20- 14
$
Dcm-muff
orM 7A)CAA P -2 (Exr-1va: ion avid Fill, 2 of 2)
3. SHORELINE STABILIZATION ❑This section not applicable
(if development is a wood groin, use MP -4 — Structures)
a Type of shoreline stotization. b. Length
❑Bulkhead 921�iprap ❑Breakwater /Sill ❑Other Width s
c Average distance waterward of NHW or NWL: d Maximum distance waterward of NHW or NWL
9l' 7
e Type of stabilization material- f. (i) Has there been shoreline erosion during preceding 12
,,m��o //nths?
t"Yes ❑No ❑NA
(i) If yes, state amount of erosion and source of erosion amount
information
g Number of square feet of fill to be placed below water level h Type of fill material
Bulkhead backfill Riprap
Breakwater /Sill Other C7
i. Source of fill material
/
4. OTHER FILL ACTIVITIES (his section not applicable
(Excluding Shoreline Stabilization)
a (t) Will fill material be brought to the site? []Yes ❑No [I NA b 0) Will fill material be placed in coastal wetlands /marsh (CW).
If yes,
(it) Amount of material to be placed in the water
(m) Dimensions of fill area
(iv) Purpose of fill
submerged aquatic vegetation (SAV), shell bottom (SB), or
other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected
❑CW ❑SAV ❑SB
❑WL ❑None
(ii) Describe the purpose of the fill in these areas
5. GENERAL
a How will excavated or fill material be kept on site and erosion b What type of construction equipment will be used (e g , dragline,
controlled? backhoe, or hydraulic dredge)?
c (i) Will navigational aids be required as a result of the project?
❑Yes ❑No ❑NA
(u) If yes, explain what type and how they will be implemented
d (i) Will wetlands be crossed in transporting equipment to project
site? ❑Yes []No []NA
(it) If yes, explain steps that will be taken to avoid or minimize
environmental impacts
/o- lwvcd
Date Appli Name
Project Name MAR Ai ` O% Applicant Signatur��
V1.
ZA
Pv�
lx�- dvo
4aw
/00 5 P4,4C OVA
/� I d Uf 9
go s e-
PIZ
7
r
IS-
"10
o
MAR 10 2014
if
Golly � �"res
6/
MAR 10 2014
f s,Cr�f-
r� a �x-8
i�� 51-af so ,0,00 -0 '
1 3
V
^ i
I
1
la
�i
1p�
t�
vo
1
1
T
O
3
411
1
MAR 10 2014
y.J4A�A'AYdIt.� A,�3 A �
0
-rb
b �
A
0
HAI
3(7rX14
Google Maps
I 5,-
'n T &
67�
4 cote
MAR 10 M4
DCMIM CII-Y
Ap� eq,
J -Z
-.9fite- L-22.
ot
CV,
httm-lAmAworw-nlc- rwvn/nvwm/fM'A4 FnPR70A -7A.cA"7A4l47 414