Loading...
HomeMy WebLinkAbout20141169 All Versions_Final Meeting Minutes_20140326PAT MCCRORY CeovERlYoR me STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION Thomas Steffens Travis Wilson Steve Sollod Jim Speer Ed Eatmon Omar Azizi David Harris March 26, 2014 Gary Jordan Chris Militscher David Wainwright Ron Lucas Chris Rivenbark Brian Yamamoto From: Paul Atkinson, PE—� Project Manager— TIP East ANTHONY J.TATA SECRFTARY Subject: Final Minutes of the Permit Drawing Review "4C" Meeting for R- 2514C: US 17 from North of Maysville to South of NC 58 near Pollocksville. The "4C" Meeting for R -2514C was held on February 20, 2014 from 2:30 PM to 3:30 PM in the NCDOT Hydraulic Design Conference Room at the Century Center Complex in Raleigh, NC. The following were in attendance. Participants: Team Members Paul Atkinson, NCDOT Hydraulics (Present) Thomas Steffens, USACE (Present) Gary Jordan, USFWS (Present) Travis Wilson, NCWRC (Present) Chris Militscher, EPA (Absent) Steve Sollod, NCDCM (Present) David Wainwright, NCD WR (Present) Ron Lucas, FHWA (Absent) Other Attendees Brook Anderson, NCDOT Hydraulics (Present) Erik Seiler, NCDOT Hydraulics (Present) Mark Staley, NCDOT -REU (Present) Gordon Cashin, NCDOT -NES (Present) Vasim Barudawala, Roadway Design (Present) Karen Compton, USFS (Phone) Sonia Carrillo, NCDWR (Present) MAILING ADDRESS: NC DEPARTMENT OF TRANSPORTATION HYDRAULICS UNIT 1590 MAIL SERVICE CENTER RALEIGH NC 27699 -1590 TELEPHONE: 919- 707 -6700 FAX: 919 - 250 -410B WESSITE: WWWNCOOT.ORG/OON/ Support Staff Jim Speer, Roadway Design (Present) Brian Yamamoto, PDEA (Present) Ed Eatmon, Division 2 (Present) Chris Rivenbark, PDEA -NES (Present) David Harris, Roadside (Absent) LOCATION: CENTURY CENTER COMPLEX BUILDING B 102G BIRCH RIDGE DRIVE RALEIGH NC The 4C meeting began with Paul Atkinson ( NCDOT) giving a brief introduction of the project. Paul went through the permit drawings, discussing each pert-nit site by plan sheet. Specific comments are listed below by Roadway plan sheet number. Sheets 4 &5• No comments Sheet 6: Ed Eatmon stated that the pond on parcel 20 may need to be filled for utilities or controlled access fencing. Chris Rivenbark said utility plans are not yet complete. David Wainwright said if the pond was filled, the surface water impact would be non- mitigable and to include footnote on summary sheet. Sheets 7 &8: No comments Sheet 9: There was general discussion concerning the wildlife crossing construction and limits of the wildlife crossing fence. Gary Jordan stated woody debris would not be required in the 48" pipes, only in the larger 72" pipes. Ed Eatmon recommended putting a specification in the contract specifying which pipes are to be backfilled and what type of material is to be used. Sheets 10 -15: No comments Sheet 16 There was a group discussion about Site I and whether the buffer zones should be arced around the beginning of the stream. The buffers are currently shown ending at the edge of existing transportation facility. The discussion ended with David Wainwright stating he would get back to NCDOT Hydraulics on the topic. It was decided after the mecting that the buffer zone lines will be shown arcing around the end of the pipe but impacts will not be shown under the existing roadway facility. Sheet 17 David Wainwright stated that Site 19, where the retaining wall is being replaced with rip rap, can be shown as temporary impacts. In addition, he said hatching could be removed from areas within the buffer zone that are already impacted due to existing buildings or concrete /asphalt driveways. Paul Atkinson stated the TDE at Site 19 had been added after the permit drawings had been completed for the meeting. An additional I Oft of temporary surface water impacts will be added and the buffer zone impacts will include this area for the final drawings. Sheets 22 &23: No comments Sheet 26: No comments General Comments: Karen Compton asked for a separate Summary Sheet just for Forestry Service impacts. Chris Rivenbark said he could provide one for her.