LETTER OF APPROVAL
City of Concord
Attention: Lloyd W. Payne Jr, City Manager
Post Office Box 308
Concord, North Carolina 28026
RE- Project Name: 12" Public Sewer Extension Phase I
Acres Approved: 1.03
Project ID: CABAR-2021-079
County: Cabarrus
City: Concord
Address: Roberta Church Road
River Basin: Yadkin-PeeDee
Stream Classification: Other
Submitted By: City of Concord
Date Received by LQS: June 7, 2021
Plan Type: New
Dear Mr. Payne:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby
issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan approval
shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is
required by Title 15A NCAC 48 .0129.
As of March 1, 2019,.all new construction activities are required to complete and submit an electronic Notice of Intent
(NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit.
This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project.
The NOI form may be accessed at deq.nc.gov/NCGO L Please direct questions about the NOI form to Annette Lucas at
Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form,
a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the
NCGOI permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the
DEMLR Stormwater Central Office in Raleigh.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job
site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO I permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Mooresville Regionat Office'. 610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115
t" 704-663-1699
Letter of Approval
City of Concord
June 29, 2021
Page 2 of 2
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance
with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural
resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General
Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure
compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,
regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity.
This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility
Form, which you provided. You are requested to file an amended form if there,is any change in the information included
on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project.
Your cooperation is appreciated.
Sincerely,
Christopher Graybeal
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval