Loading...
HomeMy WebLinkAboutNC0049867_LV-2021-0364 Response_20211206erfiche RECEIVED/NCDEQ/DWR Town of Cleveland 302 East Main Street Cleveland, NC 27013 (704)278-4777 December 1, 2021 W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section NCDEQ-Mooresville Regional Office 610 East Center Ave., Suite 301 Mooresville, NC 28115 SUBJECT: Response to Notice of Violation & Intent To Assess Civil Penalty Tracking Number: NOV-2021-LV-0874 Permit No. NC0049867 - Cleveland WWTP -Rowan County Dear Mr. Basinger: DEC 6 2021 WQROS MOORESVILLE REGIONAL OFFICE Limit Exceedance Violations: 1/9/21, 1/23/21, 1/30/21 and 1/31/21 - Effluent Coliform, Fecal MF, MFC Broth, 44.5 C (31616) Weekly and Monthly Geometric Mean Exceeded. The monthly average test results since February 13 have been between 10.8 to 52.2. Over the last six months of 2020, we have had several problems exceeding the coliform, fecal limits. This started with our new Wastewater Treatment Plant (WWTP) operator who felt that the problem was due to having a chlorine contact chamber that was too small. After he left our employment in February 2021, we discovered that the bypass valve was not being sometimes closed all the way. The bypass valve was used to clean the contact chamber. The cleaning procedure has been used since the WWTP has been in service. It was part of the design of the WWTP. We certainly did not intend to leave it open or cracked. The corrective action to prevent any further use of this contact chamber clean -out procedure is: (1) Discontinue bypass usage and seal valve. (2) Install a temporary pump to be used to recycle back to the oxidation ditch to clean the contact chamber. This would occur between 5 and 7 a.m., our lowest flow rate time. The cleaning should occur as needed, probably once per month. (3) Proceed with installing a second chlorine contact chamber as soon as possible. See the attached current engineering action. Our objective is to operate the Cleveland WWTP within the quality limits and maintain close follow through with environmental protection. Patrick Phifer Mayor cc: Commissioner Gerald Osborne enc SENT VIA EMAIL — corey.basinger@ncdenr.gov SENT VIA EMAIL — roberto.schellernncdenr.gov HARD COPY SENT FIRST CLASS MAIL TOWN OF CLEVELAND MONTHLY PROJECT STATUS mcgill REPORT PROJECT DATE: REPORT NO. Wastewater Treatment Plant Improvements. 10/08/21 5 PROJECT NO. PROJECT PHASE: PROJECT MANAGER: CLIENT CONTACT: 21.01125 Design Doug Chapman, PE Cathy Payne, Town Clerk PROJECT SCOPE: The scope of the project includes survey, design, permitting, bidding, and construction phase services for construction of a new chlorine contact basin to parallel the existing basin and replacement of the existing clarifier return sludge pumps WORK THIS PERIOD: September 2021 Continue with final design and preparation of construction documents. WORK ANTICIPATED FOR NEXT PERIOD: October 2021 Finalize construction documents and submit to NCDEQ for Quthorization to Construct. ISSUES IMPACTING PROJECT COST: ISSUES IMPACTING PROJECT SCHEDULE: PROJECT BUDGET Initial Probable Construction Estimate PROJECT SCHEDULE Authorization to Proceed Date Contingency Amount Design Engineering Services Bidding/Award Materials & Geotechnical Testing Budget Construction Legal and Administrative Costs Changes or Additions to Project Cost TOTAL PROJECT BUDGET ESTIMATED COMPLETION DATE Wastewater Treatment Improvements.xlsx Page lof 1