SUBJECT: Response to Notice of Violation & Intent To Assess Civil Penalty
Tracking Number: NOV-2021-LV-0874
Permit No. NC0049867 - Cleveland WWTP -Rowan County
Dear Mr. Basinger:
DEC 6 2021
WQROS
MOORESVILLE REGIONAL OFFICE
Limit Exceedance Violations: 1/9/21, 1/23/21, 1/30/21 and 1/31/21 - Effluent Coliform, Fecal
MF, MFC Broth, 44.5 C (31616) Weekly and Monthly Geometric Mean Exceeded. The monthly
average test results since February 13 have been between 10.8 to 52.2.
Over the last six months of 2020, we have had several problems exceeding the coliform, fecal
limits. This started with our new Wastewater Treatment Plant (WWTP) operator who felt that the
problem was due to having a chlorine contact chamber that was too small. After he left our
employment in February 2021, we discovered that the bypass valve was not being sometimes
closed all the way. The bypass valve was used to clean the contact chamber. The cleaning
procedure has been used since the WWTP has been in service. It was part of the design of the
WWTP. We certainly did not intend to leave it open or cracked.
The corrective action to prevent any further use of this contact chamber clean -out procedure is:
(1) Discontinue bypass usage and seal valve. (2) Install a temporary pump to be used to recycle
back to the oxidation ditch to clean the contact chamber. This would occur between 5 and 7 a.m.,
our lowest flow rate time. The cleaning should occur as needed, probably once per month.
(3) Proceed with installing a second chlorine contact chamber as soon as possible. See the
attached current engineering action.
Our objective is to operate the Cleveland WWTP within the quality limits and maintain close
follow through with environmental protection.
Patrick Phifer
Mayor
cc: Commissioner Gerald Osborne
enc
SENT VIA EMAIL — corey.basinger@ncdenr.gov
SENT VIA EMAIL — roberto.schellernncdenr.gov
HARD COPY SENT FIRST CLASS MAIL
TOWN OF CLEVELAND
MONTHLY PROJECT
STATUS
mcgill
REPORT
PROJECT DATE: REPORT NO.
Wastewater Treatment Plant Improvements.
10/08/21
5
PROJECT NO. PROJECT PHASE: PROJECT MANAGER:
CLIENT CONTACT:
21.01125
Design
Doug Chapman, PE
Cathy Payne, Town Clerk
PROJECT SCOPE:
The scope of the project includes survey, design, permitting, bidding, and construction phase services
for construction of a new chlorine contact basin to parallel the existing basin and replacement of the
existing clarifier return sludge pumps
WORK THIS PERIOD: September 2021
Continue with final design and preparation of construction documents.
WORK ANTICIPATED FOR NEXT PERIOD: October 2021
Finalize construction documents and submit to NCDEQ for Quthorization to Construct.
ISSUES IMPACTING PROJECT COST:
ISSUES IMPACTING PROJECT SCHEDULE:
PROJECT BUDGET
Initial Probable Construction Estimate
PROJECT SCHEDULE
Authorization to Proceed Date
Contingency Amount
Design
Engineering Services
Bidding/Award
Materials & Geotechnical Testing Budget
Construction
Legal and Administrative Costs
Changes or Additions to Project Cost
TOTAL PROJECT BUDGET ESTIMATED COMPLETION DATE
Wastewater Treatment Improvements.xlsx