Loading...
HomeMy WebLinkAboutNCC220843_ESC Approval Submitted_20220222ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director Cannon 35 of KM, LLC Attention: Dean Harrell 5615 Potter Road Matthews, North Carolina 28104 RE: Project Name: Cannon 35 Acres Approved: 45.33 Project ID: CLEVE-2022-005 f Y g NORTH CAROLINA Environmental Quality February 9, 2022 LETTER OF APPROVAL County: Cleveland, City: Kings Mountain Address: Margrace Road River Basin: Broad Stream Classification: Other Submitted By: Cannon 35 of KM, LLC Date Received by LQS: February 7, 2022 Plan Type: Revised Dear Mr. Harrell: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGO 1. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Mooresville Regional Office 1610 East Center Avenue, Suite 301 I Mooresville, North Carolina 28115 704-663-1699 Letter of Approval Cannon 35 of KM, LLC February 9, 2022 Page 2 of 2 Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land - disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, James Moore James Moore Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval NCGO1 Fact Sheet cc: Inspection Department cc: Eagle Engineering, Attn: Matt Kirchner, 2013A Van Buren Avenue, Indian Trail, NC 28079 Letter of Approval Cannon 35 of KM, LLC February 9, 2022 Page 3 of 2