HomeMy WebLinkAbout20140279 Ver 1_CAMA Application_2014032420140279
ODES
North Carolina Department of Environment and Natural Resources
Division of Coastal Management.
Pat McCrory Braxton C. Davis John E. Skvarla, III
Governor Director Secretary
March 19, 2014
MEMORANDUM: BAR 4 2014
_ UALU
TO: Karen Higgins�r
W
Division of Water Resources
FROM: Doug Huggett
Major Permits Processing Coordinator
SUBJECT: CAMA/DREDGE & FILL Permit Application Review
Applicant: John Cannon
Project Location: 102 Bayview Blvd., Atlantic Beach
Proposed Project: Proposes the reconfiguration of the existing one -slip dock, the addition of a
boatlift and maintenance excavation.
Please indicate below your agency's position or viewpoint on the proposed project and return this form by
April 8, 2014. If you have any questions regarding the proposed project, please contact Heather.Styron,
Permit officer at (252) 808 -2808. Ext. 216. When appropriate, in -depth comments with supporting data is
requested. IQ*
REPLY: This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are
incorporated. See attached.
This agency objects to the project for reasons described in the attached comments.
SIGNED DATE
400 Commerce Ave., Morehead City, NC 28557
Phone: 252- 808 -28081 FAX: 252 - 247 -3330 Internet: www.nccoastaimanagement.net
An Equal Opportunity 1 Affirmative Action Employer
20140
279
MAR 2 4 2014
DIVISION OF COASTAL MANAGEMENT A�ITrr
FIELD INVESTIGATION REPORT ..,a;; I atI r a1ar,d+
1. APPLICANT'S NAME: John Cannon, 102 Bayview Blvd., Atlantic Beach, Carteret
County
2. LOCATION OF PROJECT SITE: Adjacent to a manmade canal connecting to Bogue
Sound at 102 Bayview Blvd., Atlantic Beach, Carteret County
-Photo Index - 2000: grids 40 -511 N (2), O (2)
2006: grids 40 -8086 N (2 &3)
State Plane Coordinates = X: 272409.65 Y: 35949.796
Longitude: 76 °44'00.29 Latitude: 34 °42'03.06
3. INVESTIGATION TYPE: CAMA/D &F
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 3/6/2014 and 3/12/14
Was Applicant Present — No
5. PROCESSING PROCEDURE: Application Received Complete -3/5 /2014
Office — Morehead City
6. SITE DESCRIPTION:
(A) Local Land Use Plan — Town of Atlantic Beach - 7/24/2008
Land Classification from LUP — Single Family Residential /Conservation
(B) AEC(s) Involved: EW, PTA, ES
(C) Water Dependent: (yes)
(D) Intended Use: Private
(E) Wastewater Treatment: Existing — Onsite Septic
Planned — None
(F) Type of Structures: Existing — House with driveway, vinyl bulkhead, one -slip
private dock
Planned — maintenance excavation, reconfigure existing
dock and add boatlift
(G) Estimated Annual Rate of Erosion: N/A
Source — N/A
7. HABITAT DESCRIPTION:
D12FA1Q- 'FD FILLED OTHER
(A) Open Water
N/A
N/A
315 ft' Shaded
561 ft2lnc.
(B) Shallow Bottom
950 ft2
N/A
N/A
(36cy)
(C) High Ground
N/A
N/A
128 ft
(D) Total Area Disturbed: 1,639ft2
(E) Primary Nursery Area: No
(F) Water Classification: SA/HQW
Open: No
Field Investigation Report:
John.Cannon
102 Bayview Blvd
Page 02
PROJECT SUMMARY:
The project proposed is for the reconfiguration of the existing one -slip dock, the addition
of a boatlift and maintenance excavation.
9. Narrative Description
The John Cannon project is located on the west side of the terminus of an existing
manmade canal that is continuous to Bogue Sound at 102 Bayview Blvd. in Atlantic
Beach. The project area is found by turning off of Highway 70 East in Morehead City
(Arendell Street) onto the on -ramp for Atlantic Beach. Follow the Atlantic Beach
Causeway to the four -way stop light intersection then turn left onto East Fort Macon Road
and left onto Bayview Blvd. The site is the first house on the right (approximately 50 from
the beginning of the road).
The property is .12 acres (5123.73 sf) in its entirety and is 2' above NHW/MHW. The
shoreline length for this property is 50'. The site currently has an existing single family
residence, driveway, bulkhead and a permanent one -slip dock. The high ground portion of
the tract is covered with typical yard grasses and landscape shrubbery. The proposed
development is a private project and currently has one existing slip. The docking facility
has been in place since before 1982 according to the 8/7/95 survey by Donald C.
Clemments Jr. More than 50% of the dock was removed inadvertently by a marine
contractor as observed by DCM staff on 5/1/13 however since the dock existed prior to
May of 1982, The Division of Coastal Management determined it would meet the
nonconforming requirements of 15A NCAC 07J.0211 and therefore may be replaced as
long as they followed the following guidelines;
A non - conforming structure is any structure within an AEC other than Ocean Hazard and
Inlet Hazard AECs that is inconsistent with current CRC rules, and, was built prior to the
effective date(s) of the rule(s) with which it is -inconsistent.
Replacement of such structures shall be allowed when all of the following criteria are met:
(1) the structure will not be enlarged beyond its original dimensions;
(2) the structure will serve the same or similar use;
(3) there are no practical alternatives for replacing the structure to provide the same or
similar benefits in compliance with current rules; and
(4) the structure will be rebuilt so as to comply with current rules to the maximum extent
possible.
There are developed residential properties to the north and a commercial property to the
south of the site. The Town of Atlantic Beach's Land Use Plan classifies this property as
Field Investigation Report:
John Cannon
102 Bayview Blvd
Page 03
Single Family Residential with all parts of the AEC classified Conservation. The manmade
canal connecting to Bogue Sound, which is coastal waters, is not designated as Primary
Nursery Area and is closed to the taking of shellfish. The canal within this area carries a
water classification of SA/HQW and has an average width of 73.5' within the project area.
The water depths within the project area range from -.9'to -2.2' nlw /mlw and have been
field verified. The tidal amplitude within this area is approximately 2.5'. The lines of
division of the areas for riparian access are wedged or pie- shaped, because of the location
of the properties in the terminus of the canal. There were no shellfish beds or SAV
observed within the project area. The substrate in the project area is mostly mud (silt).
There are coastal wetlands to the south of the project area but would not be impacted by
the proposal.
10. Project Description:
The previously existing development is private and with has one existing docking space
and is located at the southern terminus of a manmade canal. The existing dock has been in
place since before May of 1982 according to the 8/7/95 Clemments survey. The applicant
previously hired a contractor for the repair of the existing dock; however, on 5/1/13 DCM
staff observed more than 50% of the structural framing members were removed. DCM was
concluded a general permit could not be issued at that time due to the fact the proposal
would encroach into the adjacent riparian access areas which is inconsistent with 15A
NCAC 07H.1205 (effective Marchl, 1984). The Division of Coastal Management
determined the proposal would meet the requirements for non - conforming development
(15A NCAC 07J.0211). A May 3, 2013 letter from DCM was sent to the applicants
explaining the criteria to replace the structure. The current proposal would meet 15A
NCAC 07J.0211 (1 -5). The proposal would not be enlarged beyond the original
dimensions of the structure as described in the 8/7/1995 survey by Donald C. Clemments
Jr.; the proposal would serve the same or similar use for the facility; there are no practical
alternatives for replacing the structure to provide the same or similar benefits in
compliance with the current rules; and the proposed structure would be re -built to comply
with the current rules to the maximum extent possible as depicted in the work plan
submitted to the Division for a permit determination. No additional slips would be added
to the one -slip docking facility.
The applicant is proposing to construct the dock and platforms partially over high ground
and partially over open water in order to accommodate a 20' -25' open runabout type boat.
They are also proposing a 12' x 13' boatlift and maintenance excavation. All portions of
the docking facility would remain within the Cannon riparian area, Due to the non-
conforming designation; a riparian access line waiver would not be required. The water
depth within the proposed boatlift area is an average of -1.3' nlw /mlw. While the 8/7/95
survey depicts an "existing boatlift ", there was not a boat lift or apparent support piles in
Field Investigation Report:
John Cannon
102 Bayview Blvd
Page 04
place at the time of DCM staff visit 5/1/13.
The proposed southern platform ( #2 on drawings) would start approximately 3' from the
southern property corner and would be located partially over high ground and partially
over open water. The platform is irregularly shaped and would be a width of 5.6' -10.4' and
a length of 7' -8.46' depending on location. The widest portion of platform #2 would not
exceed a distance of 6' beyond the existing vinyl bulkhead (nhw). The southern platform
would connect to a side -to dock that would also be located 4' over high ground and 1.2'
over open water. The dock would be 5.2' x 15' and would not exceed a distance of 1.2'
beyond the bulkhead (nhw). It would connect to the final irregular shaped platform ( #1) to
the north. This platform would be a width of 5.2' -10' and a length of 10' -12' depending on
location. It would not extend more than 7', at its widest point, beyond the existing
bulkhead and would be 15' from the northern riparian access line.
The applicant is also proposing a 12' x 13' boatlift and a 12" x 12.2' "catwalk" (stringer).
The catwalk would extend from the southern platform ( #2) and follow along the riparian
access line for 12' were it would intersect the most eastern boatlift piling. The farthest
point for the catwalk would not exceed a distance of 12' from the bulkhead and would stay
within the Cannon riparian access -area. The boatlift would be located along the northern
platform ( #1) and would be angled in order to stay within the riparian area. The southeast
boatlift piling would not exceed a distance of 12' beyond the bulkhead with the northeast
piling a maximum distance of 17' from the bulkhead into a 73.5' wide canal. The
maximum 1/4 distance allowed within this area of the existing canal is 18.4'. All portions of
the dock and boatlift would be a distance of 15' from the northern riparian access line. The
proposal would not be enlarged beyond its original dimensions and would not increase the
number of existing docking spaces.
The applicant is proposing maintenance excavation of the canal along his property. The
existing water depths within this area of the canal are an average of -1.8' nlw. The
connecting water depths are - 2.8'nlw.
A total of 36 cubic yards of material would be removed from this portion of the canal with
an excavation area of 25' x 38'. The final depth for the all the excavation areas would be —
2.8' feet below NHW. The excavation would be done by bucket to barge and taken offsite
to a pre- approved spoil location.
Anticipated Impacts:
The proposed excavation would increase turbidity temporarily and cause 950 square feet
Field Investigation Report:
John Cannon
102 Bayview Blvd
Page 05
of disturbance to shallow bottom habitat. The proposed boatlift, catwalk, dock and
platforms would shade 315 ft' and incorporate 561 ft2 of open water. The increase in
suspended sediment and turbidity levels from the pier placement would be temporary, and
occur while the dock is constructed. All work proposed would be a maximum of 17' water
ward of the bulkhead in a water body with a width of 73.5'. The maximum 1/4 distance
allowed within this area of the existing canal is 18.4'. There would be no increase in the
number of slips or docking spaces. Due to the non - conforming status of the docking
facility, a waiver for the encroachment of the 15' riparian access line would not be
required. The coastal wetlands to the south of the project area would not be impacted. The
proposal would be within its original dimensions, or less than, as depicted in the 8/7/98
Clemments survey.
Name: Heather Styron Date: 3/19/14 Morehead City
alor Permit Fee ScheduUe
Circle One
37/
Check cil
Amount Project Name:
development that does not
involve the filling or
excavation of aay wetlands
or,open water areas
11 W-11111.1
Ill. For Developmeritthat
involves the filling and/or
excavation of up to 1 acre
of wetlands and/or open
wate�r areas, determine if
if General Water Quality
Certification No. 3490 (See
,attached) can be applied
Quality Ckfication No.
3490 (See attached)
cahnot-be applied
37/
Check cil
Amount Project Name:
Narrative
Major CAMA Application
Sound View Isles, Lot 20 Block 12
Owner:
John D. Cannon
1676 Highway 135
Eden, NC 27288
(336) 627 -4093
Engineer:
Stroud Engineer, P.A.
Ginger Y. Turner, PE
107 B Commerce Street
Greenville, NC 27858
(252) 756 -9352, Ext. 233
t REMo
qp
n'j•
MAR 0 6 2014 3
r
of c
E,eoe ®0eeoe�' ®000
®oe T H C4 9'000
440 ° °e.eeeee•e O oo,
e�OF -ss�o•
A °2 °
S�qt r;
6970 e
04 ® °o tto assts ® ° °,
J
s
The dilapidated dock, which existed prior to May 1982, was removed for maintenance, however
too much was removed and the new dock must now conform to the current rules. The proposal meets
the criteria found within the letter provided by Ted Tyndall of the NC Division of Coastal Management,
dated May 3, 2013. The dock and boat lift proposed are to serve the same or similar purpose as the
original dock.
The original irregular dock had approximately 266sf of decking over water and encroached the
northern 15' setback by 35. The proposal for the rebuild consists of two platforms with an
interconnecting dock. The irregular platforms are #1- 10'x7'x12'x8.46' and #2 5.2'x5.6'x10'x10.4'. The
proposed dock measures 5.2'x15' and boat lift is 12'x13'. The location of the dock is proposed mostly
over high ground with only 85 square feet of decking over water. There is also a 1x stringer proposed
from the southern portion of the dock to the corner of the boat lift to lay a 1x12" board during times of
maintenance to the lift.
The owner is also proposing to dredge the canal around his proposed dock and boat lift. The
dredging depth is proposed at -2.8' NHW which is consistent with connecting water depths. The
excavation is approximately 36 cubic yards and is proposed as being disposed of by the dredging
contractor.
IBM UP-1
FAR'"
NOW Development Permit
y.
(last revised 12127/06)
kJo-Vr CaroliTa DIVISION OF COASTAL MANAGEMENT
niary PP &andoiqner ' In orryiAtiop
Business Name
Project Name (if applicable)
Applicant 1: First Name
John
Ml
D.
Last Name
Cannon
Applicant 2• First Name
Ml
Last Name
If additional applicants, please attach an additional page(s) with names listed.
Mailing Address
1676 Highway 135
PO Box
1
City
Eden
State
NC
ZIP
27288
Country
Phone No.
336 - 627 - 4093 ext
FAX No.
Street Address (if different from above)
City
State
ZIP
Email
jcannon1@triad.rr.com
2: "r ---A��iiiitIC6n'-tia6tliiorma ion-,
,
Business Name
Stroud Engineering,P.A.
Agent/ Contractor 1: First Name
Ml
Last Name
Ginger
Y.
Turner
Agent/ Contractor 2: First Name
Ml
Last Name
Mailing Address
PO Box
City
State
107 B Commerce Street
I
I Greenville
NC
ZIP
Phone No. 1
Phone No. 2
27858
252 - 756 - 9352
ext. 233
ext
FAX No
Contractor #
252 756 2345
Street Address (if different from above)
City
State
ZIP
Email
Rr
"C
gturner@stroudengineer.com
FEB 2 0 2094
<Form continues on back>
M
' IM
Dr" RD mv
252-808-2808 :: 1-888-4RCOAST :: www. ncc oasta I management. net
Form DCM MP-1 (Page 2 of 4)
APPLICATION for
I-ac BUD Major Development Permit
-3 iectlo&kibn
County (can be multiple)
Street Address Dcm-hwc "f
State Rd. #
Carteret
102 Bayview Blvd
c. Size of individual lot(s)
Subdivision Name
City
City
State
Zip
Sound View Isles
FAtlyartic Beach
NC
I
28512-
Phone No.
Lot No.(s) (if many, attach additional page with list)
ext.
h. How does local government zone the tract?
a. In which NC river basin is the project located?
b. Name of body of water nearest to proposed project
White Oak
East Canal
c. Is the water body identified in (b) above, natural or manmade?
d. Name the closest major water body to the proposed project site.
❑Natural NManmade ❑Unknown
Bogue Sound
e. Is proposed work within city limits or planning jurisdiction?
f. If applicable, list the planning jurisdiction or city limit the proposed
ZYes ❑No
work falls within.
Town of Atlantic Beach
<Form continues on next page>
252-808-2608 :: 1-888-4RCOAST :: www.nccoastaimanagement.net
a. Total length of shoreline on the tract (ft)
b. Size of entire tract (sq.ft.)
50 FT
5123.73 SF+/-
c. Size of individual lot(s)
d. Approximate elevation of tract above NHW (normal high water) or
NWL (normal water level)
(If man; lot sizes, please attach additional page with a list)
—2- EDNHW or ❑NWL
e. Vegetation on tract
Grass and landscaping
f. Man-made features and uses now on tract
Single family residence, remnants of existing dock and exisitng bulkhead
g. Identify and describe the existing land uses adjacent to the proposed project site.
Residential
h. How does local government zone the tract?
i. Is the proposed project consistent with the applicable zoning?
R1
(Attach zoning compliance certificate, if applicable)
UYes ❑No ❑NA
j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes MNo
k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes MNo ❑NA
If yes, by whom?
I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ZNo ❑NA
National Register listed or eligible property?
<Form continues on next page>
252-808-2608 :: 1-888-4RCOAST :: www.nccoastaimanagement.net
Form DCM MP -1 (Page 3 of 4)
APPLICATION for
Major Development Permit
m. (i) Are there wetlands on the site? ❑Yes NNo
(ii) Are there coastal wetlands on the site? ❑Yes NNo
(iii) If yes to either (i) or (ii) above, has a delineation been conducted? []Yes [-]No
(Attach documentation, if available)
n. Describe existing wastewater treatment facilities
Private onsite septic system
o Describe existing drinking water supply source
Provided by the Town of Atlantic Beach
p. Describe existing storm water management or treatment systems.
N/A
5. Acfivifies'-and m acfs� -
- : 7
a.
Will the project be for commercial, public, or private use?
❑Commercial ❑Public/Government
N Private /Community
b.
Give a brief description of purpose, use, and daily operations of the project when complete
Private use of dock and boat lift
c.
Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored.
Barge equipped with pile driving equipment
d.
List all development activities you propose.
Construction of a dock and boat lift
e.
Are the proposed activities maintenance of an existing project, new work, or both?
Reconstruction of old dilapitaed dock
f.
What is the approximate total disturbed land area resulting from the proposed project?
Minimal ❑Sq.Ft or ❑Acres
g.
Will the proposed project encroach on any public easement, public accessway or other area
❑Yes NNo ❑NA
that the public has established use of?
h
Describe location and type of existing and proposed discharges to waters of the state.
None known
i.
Will wastewater or stormwater be discharged into a wetland?
❑Yes ❑No NNA
If yes, will this discharged water be of the same salinity as the receiving water?
❑Yes ❑No NNA
j.
Is there any mitigation proposed?
❑Yes ❑No;;; NNAEiVED
If yes, attach a mitigation proposal.
ihys
f;. FEB 2 0 20114
<Form continues on back>
252 -808 -2808 .. 1- 888- 4RCOAST .. www.necoastalmanagement.net
Form DCM MP -1 (Page 4 of 4)
fl�1,1 1 APPLICATION for
Major Development Permit
MAR 0 6 2014
6 _1dditional; Infor►na_ Zion - -
In;additiori``to this'com+`leted a lication• form,. MP -1 tire following items below,• if applicable, n'order._or_ the application;
acka e`to tie com /ete Items a - are:alwa s a /cable to an ma ordeJelo inenCapplica
to a titlnsult the' a fi atJon
i =.
insfr "ruction booklefon hoiv fo properly prepare "fhe required iteriis below: • :_
a. A project narrative.
b. An accurate, dated work plat (including plan view and cross - sectional drawings) drawn to scale. Please give the present status of the
proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties.
e. The appropriate application fee. Check or money order made payable to DENR.
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management.
.Name Martfia B`a "le - _ - Phone No. (252),,726- 7226'r
g , Y:
"`:;r
7 9'Clifford Road'Gar n e N 6 C 27529
Name Sue Floyd Gardner Phone No.
Address 3302A Hogan Court, Morehead City NC 28557
- *Name Darrel Eawrence'etux Patricia,`
N.
A 1 n i� B 'ach NC 2851
2" -
'E".F 'Ma'con Road t a t c e
ess'309 ort,
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates.
#7949 Harry Bain Jr., 4/5/1991
h. Signed consultant or agent authorization form, if applicable.
i. Wetland delineation, if necessary.
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner)
k. A statement of compliance with the N C. Environmental Policy Act (N.C.G.S. 113A 1 -10), if necessary. If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act.
I understand that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow -up
monitoring of the project.
I further certify that the information provided in this application is truthful to the best of my knowledge.
Date 3 - S -/41 Print Name John D. Cannon
Signature �� - �``°� �'�''"�" ^-5
Please indicate application attachments pertaining to your proposed project.
®DCM MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges and Culverts
❑DCM MP -3 Upland Development
®DCM MP -4 Structures Information
252 - 808 -2808 :: 1- 888- 4RCOAST :: wrww.necoastaimanagement.net
Form ®CM MP-2
(Except for bridges and culverts)
MAR 0 6 2094
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all othgM&IM the Joint
Application that relate to this proposed project. Please include all supplemental information.
Describe below the purpose of proposed excavation and /or fill activities. All values should be given in feet.
-rrw`
4-
-
This i sect ier'rno't`a licatile`
1: 'EXC.4VATlOillz = ;
-_ .. _;= += . = %_.i -•.: , - �;,.: r>r _: r: "�: }� - � - - .l - - "- 'tit'. °' - -`'.i'° -
a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated•
cubic yards. silty sand
36CY from below NHW
c. (i) Does the area to be excavated include coastal wetlands /marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
❑WL ®None
(ii) Describe the purpose of the excavation in these areas.
maintenance
d. High - ground excavation in cubic yards.
N/A
® ISPOS: 4L'OF- EXCA!lATED�i�1�4TERlAL:- p.Th s�sect on o`t a� t cab e
- �� • .;ter - = ,�.�,: � -
a. Location of disposal area. b. Dimensions of disposal area.
to be determined by dredging contractor to be preapproved by NCDCM
C. (i) Do you claim title to disposal area? d. (i) Will a disposal area be available for future maintenance?
❑Yes ®No ❑NA ❑Yes ®No ❑NA
(ii) If no, attach a letter granting permission from the owner. (ii) If yes, where?
(i) Does the disposal area include any coastal wetlands /marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
OWL ®None
(ii) Describe the purpose of disposal in these areas:
f. (i) Does the disposal include any area in the water?
❑Yes ®No ❑NA
(h) If yes, how much water area is affected?
252 -808 -2888 :: 1- 888- 4RCOAST :: www.nccoastalmanagement.net revised: 12/26/06
Access
Other
Channel
Canal
Boat Basin
Boat Ramp
Rock Groin
Rock
(excluding
(NLW or
Breakwater
shoreline
NWL )
stabilization
Length
38'
Width
25'
Avg. Existing
Depth
-1.8'
l NA ,
NALL`
Final Project
-2.8
Depth
},
-rrw`
4-
-
This i sect ier'rno't`a licatile`
1: 'EXC.4VATlOillz = ;
-_ .. _;= += . = %_.i -•.: , - �;,.: r>r _: r: "�: }� - � - - .l - - "- 'tit'. °' - -`'.i'° -
a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated•
cubic yards. silty sand
36CY from below NHW
c. (i) Does the area to be excavated include coastal wetlands /marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
❑WL ®None
(ii) Describe the purpose of the excavation in these areas.
maintenance
d. High - ground excavation in cubic yards.
N/A
® ISPOS: 4L'OF- EXCA!lATED�i�1�4TERlAL:- p.Th s�sect on o`t a� t cab e
- �� • .;ter - = ,�.�,: � -
a. Location of disposal area. b. Dimensions of disposal area.
to be determined by dredging contractor to be preapproved by NCDCM
C. (i) Do you claim title to disposal area? d. (i) Will a disposal area be available for future maintenance?
❑Yes ®No ❑NA ❑Yes ®No ❑NA
(ii) If no, attach a letter granting permission from the owner. (ii) If yes, where?
(i) Does the disposal area include any coastal wetlands /marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
OWL ®None
(ii) Describe the purpose of disposal in these areas:
f. (i) Does the disposal include any area in the water?
❑Yes ®No ❑NA
(h) If yes, how much water area is affected?
252 -808 -2888 :: 1- 888- 4RCOAST :: www.nccoastalmanagement.net revised: 12/26/06
For': ir' VC 3-V!, 3 @iCs; 1t 0r'v c."3 ij, P^?' 2 -o' F1
3.__- SF60RELIAIE:STi�9lU7r4TlOti� _ to This_section not applicable'
` lfdevelo mentis.a:wood roin useMP =4.= Structures
a. Type of shoreline stabilization:
[]Bulkhead ❑ Riprap ❑Breakwater /Sill ❑Other:
c. Average distance waterward of NHW or NWL:
e. Type of stabilization material:
g. Number of square feet of fill to be placed below water level.
Bulkhead backfill Riprap
Breakwater /Sill Other
i. Source of fill material.
D. Lengtn:
Width:
d. Maximum distance waterward of NHW or NWL:
f. (i) Has there been shoreline erosion during preceding 12
months?
❑Yes []No ❑NA
(ii) If yes, state amount of erosion and source of erosion amount
information.
h. Type of fill material.
4 - -- OTHER FILL ill C77F1/YIES_ =.: ° _' : _ = . ®.This section.riof applicatile._
6 i4di Shbreline:Stabilization
a- (i) Will fill material be brought to the site? ❑Yes ❑No ❑NA b. (i) Will fill material be placed in coastal wetlands /marsh (CW),
If yes,
(ii) Amount of material to be placed in the water
(iii) Dimensions of fill area
(iv) Purpose of fill
submerged aquatic vegetation (aAV), sneu ooaom tars), or
other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
OWL ❑None
(ii) Describe the purpose of the fill in these areas:
a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline,
controlled? backhoe, or hydraulic dredge)?
no fill material will be placed on the property backhoe and trackhoe
c. (i) Will navigational aids be required as a result of the project?
❑Yes ®No ❑NA
(ii) If yes, explain what type and how they will be implemented.
d. (i) Will wetlands be crossed in transporting equipment to project
site? ❑Yes ®No ❑NA
(ii) If yes, explain steps that will be taken to avoid or minimize
environmental impacts.
rR ar_Yry(, *,T
252-808-2808 .e -8884RC 5T , �tir�a:, "����a�sA�3��arr�� ;.ate:_= vt�s6Nf cevz 3ed: 12/26!03
Form ®CM MP-4
`t
� EN 12e
CE.WBID
MAR - 6 2014
(Construction within Public Trust Areas)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
~ FIARACTEIa1STICS-:
1 `'DOCi! RVG- FACILITY/MAI�Ii\►A C
a. (i) Is the docking facility /marina: b.
❑Commercial ❑Public/Government ®Private /Community
c. (i) Dock(s) and /or pier(s) d.
(ii) Number 1
(iii) Length 15'
(iv) Width 5.2'
(v) Floating ❑Yes NNo
e. (i) Are Platforms included? ®Yes ❑No f.
If yes:
(ii) Number 2
(iii) Length #1-10'&12',#2-T&8.46'
(iv) Width #1 -52' to 10', #2 -5.6' to 10.4'
(v) Floating ❑Yes NNo
Note: Roofed areas are calculated from dripline dimensions.
g. (i) Number of slips proposed h
1
(ii) Number of slips existing
i. Check the proposed type of siting:
❑ Land cut and access channel
®Open water; dredging for basin and /or channel
❑Open water; no dredging'required
❑Other; please describe:
k• Typical boat length: 20' -25'
m. (Q Will the facility have tie pilings?
❑Yes NNo
(ii) If yes number of tie pilings?
- pTfiissecfion not applicable''
(i) Will the facility be open to the general public?
❑Yes NNo
(i) Are Finger Piers included? ®Yes ❑No
If yes:
(ii) Number 1- stringer
(iii) Length 12.2'
(iv) Width 12"
(v) Floating ❑Yes NNo
(i) Are Boatlifts included? ®Yes ❑No
If yes:
(ii) Number 1
(iii) Length 12'
(iv) Width 13'
Check all the types of services to be provided.
❑ Full service, including travel lift and /or rail, repair or
maintenance service
❑ Dockage, fuel, and marine supplies
❑ Dockage ( "wet slips ") only, number of slips:
❑ Dry storage; number of boats:
❑ Boat ramp(s); number of boat ramps:
❑ Other, please describe:
j. Describe the typical boats to be served (e.g., open runabout,
charter boats, sail boats, mixed types).
open runabout
I. (i) Will the facility be open to the general public?
❑Yes NNo
252 - 808 -2808 :: 1- 888 -4iRC€ AST :: wrwrwr.nccoastalmanagement.net revised: 12/27/06
Form 0CMMP-4 (Structures, Page 2 of 4)
D This section not -a
a. Check each of the following sanitary facilities that will be included in the proposed project.
O Office Toilets
��R ��?nt8
[]Tm��mrvom,n�wumuoc_____ Location: " " - �v"
El Showers
^^�r
[]ooa�o�ingmokpumpoutG�n� location:
b. Describe treatment type and disposal location for all sanitary wastewater.
o. Describe the disposal nf solid waste, fish offal and trash.
d. How will overboard discharge nf sewage from boats hocontrolled?
o. (i) Give the location and number of "No Sewage Discharge" signs proposed.
(ii) Give the location and number of^Pumpout Available" signs proposed.
[ Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products.
g Where will residue from vessel maintenance be disposed of?
h. Give the number of channel markers and "No Wake" signs proposed.
i Give the location of fuel-handling facilities, and describe the safety measures planned to protect area water quality.
]
What will b* the marina policy on overnight and live-aboard dockage?
k. Describe design measures that promote boat basin flushing?
i |f this project iaan expansion ofan existing marina, what types of services are currently provided?
m. Is the marina/docking facility proposed within a primary or secondary nursery area?
OYon Owo
revised:
Form DCM MP-4 (Structures, Page 3 of 4)
n. Is the marina /docking facility proposed within or adjacent to any shellfish harvesting area?
❑Yes ®No
o. Is the marina /docking facility proposed within or djacen to coastal wetlands /marsh (CW), submerged aquatic vegetation (SAV), she]LYO
(SB), or other wetlands (WL)? If any boxes are c e-cked, provide the number of square feet affected.
®CW 200 SF ❑SAV ❑SB
OWL ❑None MAR
p. Is the proposed marina /docking facility located within or within close proximity to any shellfish leases? ❑Yes ®No
If yes, give the name and address of the leaseholder(s), and give the proximity to the lease.
3.'-BOATHOUSE includi'n `coveretl lifts . ®TFiis section'not d 1icable`.
( 9 ) PP
a. (i) Is the boathouse structure(s):
❑Commercial ❑Public/Government ❑Private /Community
(ii) Number
(iii) Length
(iv) Width
Note: Roofed areas are calculated from dripline dimensions.
4;''(9ROIAI: e: wood sheet rIe etc:. If a`r- k roui'�use MP -2` Ezcavation`andFill: ' =- ®This-section notAap }licable':
9 - I?_
a. (i) Number
(ii) Length
(iii) Width
:`
`
':,- This section'not'a' `licatile''
5'BftEA'�A:TEFt " e: `wood '`sheet'�ile "etc: �®
(. 9 =� R ) � PR-
„u.
i
a. Length b. Average distance from NHW, NWL, or wetlands
c. Maximum distance beyond NHW, NWL or wetlands
A`;' iiflOOR1iNG PIL1iVCS ana►
This'section not a� °licable�:
a. Is the structure(s):
❑Commercial ❑Public/Government ❑Private /Community
C. Distance to be placed beyond shoreline
Note: This should be measured from marsh edge, if present
e. Arc of the swing
b. Number
d. Description of buoy (color, inscription, size, anchor, etc.)
I
+4 ^y t r
7
252 - 808 -2808 :: 1- 888- 4RCOAST :: www.nccoastaimanauement.net revised: 12/27i06
Form DCM MP -4 (Structures, Page 4 of 4)
a. Proximity of structure(s) to adjacent riparian property lines
North side -15', East side -0'
Note: For buoy or mooring piling, use arc of swing including length
of vessel.
c Width of water body
73.5'
e. (i) Will navigational aids be required as a result of the project?
❑Yes ®No ❑NA
(ii) If yes, explain what type and how they will be implemented.
b. Proximity of structure(s) to adjacent docking facilities.
Approximately 12' to the east and approximatley 20' to the
north
d. Water depth at waterward end of structure at NLW or NWL
-1.3' NLW
MAP 6
is section not a� licable
a. Give complete description*
The existing dilapidated dock was removed for maintenance, however too much was removed and must now conform
to the current rules. The original irregular dock had approximately 266sf of decking over water and encroached
the northern 15' setback by 35. The proposal for the rebuild consists of two platforms with an interconnecting dock.
The irregular platforms are #1- 10'x7'x12'x8 46' and #2- 5.2'x5.6'x10'x10.4'. The dock measures at 5.2'x15'. The location
of the dock is proposed mostly over high ground with only 85sf of decking over water. There is also a 1x stringer
proposed from the southern portion of the dock to the corner of the boat lift to lay a 1x12" board during times of
maintenance to the lift
252 - 808 -2808 :: 1- 888- 4LCOAST :: www.necoastaimanagement.net revised: 12/27/06
,o`
I
mi
\ I /
IVNVO d31N33
ISV3 3AI80 GNnoS 3QO 9
III
11-1-11
OV3H38ON zatt as
I
PA ig
0
cl)
ii7m MOM
�Mmmm
M
I
311 AN318-9
-j
co
z
nV39
rEtj 2, u 22014
ca
u
z
NIa z
i
`'AO Cj9
i fo:a z
za
co
z
z
z
n �
m
x
EO
CL]
z
0
A
O
.P
m
O
Ll
x
a
0
0
z
ro
A
a
m
x
M
A
0
c
z
a
x
0
x
A
a
0
x
a
U)
r
z
e
Co 0 i
®�
yb
W/
%igloo
BA Y VIF D
PUBLIC VV
N07° 00' 0O" E
49.99
-BLVD 1
OF WAY
- -- - - - -- _ MAR 0 2014
Z:
s y �.
.�+
--10
m0
Z r
0)>
0
\�/
�•
S^® •,'ia g°
% %o �
Bggg
m o O 9 o z
N
�°
N•
N
g
< 0 O
A
a s
�A!
ar
f2
mm *mZ
«
z �
®
L,
'<
77
x
a mam
vr° 0
w
W
------------------ '
1
m Nam
ozymt,
NA z
a
jz
D
0. m
yzj�
!'�
rri
°am
N
9wz
p
z
°
z
vow
I
C)
I.-C
o'llm
i o 0
:0
75 AEC
Ir-
Ln m
0 z
O ct.0,
0
- -__
K
0--1 X
„cr
G> Z
mo�n9 e
(m -1
1
Z
Dp\
oamC, m :
r- Z
<p
• o
m<
mn
v�•n
�crT� Z B
n•
..
ZZ
o
Zn3
mrD
0•
N
O
zna° ---$
rm
I
N
-nm
N
Z'�a
�szoAM
! lV i
c')
w D
1
N
0
®
mono
<000 r 0 0*
c
w
NDm
cn0�
•
-noo mmmo
r <0c)0
0
•-$•.�
°
mC;cv
e•�• rZ
BUFFER
on
vmmmmm••m
z AA
.�+
--10
m0
co
\�/
�•
00
ra
rz
a A
N•
N
fm
=�
O
a s
�A!
ar
f2
mm *mZ
cn m
®
'•b z
'<
o m m= m
x
a
W
z
z
r
! p..� 1
ozymt,
NA z
a
jz
D
0. m
O O
!'�
o
°am
N
9wz
p
z
°
z
vow
I
C)
I.-C
o'llm
i o 0
W •
vmmmmm••m
z AA
.�+
aam
Woloozo
?
s°ozrn
WOO \m
N•
a
oTN
L•
T
a A
N
o mz
TXmf�9
! I no
O
a s
�A!
N °o i
w p
O
s'sro
'•b z
a
W
z
z
r
! p..� 1
ozymt,
NA z
a
jz
\�/
0. m
O O
!'�
o
°am
N
9wz
p
z3 a
z
I
0
,t .
I.-C
�C)
:0
j; y
Ir-
0 z
O ct.0,
0
- -__
a z
z a
I
Z
x c0
U)
1
• o
o
0•
N
O
N
O
I
N
N
O
�szoAM
K.
vmmmmm••m
z AA
.�+
aam
Woloozo
WOO \m
N•
a
oTN
L•
�aN•
U °D UIS
N
o mz
gRl.4
! I no
O
a s
�A!
N °o i
w p
O
K.
o
moo-
a
aj
gRl.4
! I no
., cn
�A!
'0
w p
m
N\
jz
o
x
v -�
!'�
ocni
°am
c •
N
r�
Ln
;0
z
I.-C
�C)
:0
Ir-
I
w;
4
trl
i
I
I
i
vmm
orx
c') O
7c D N
z
a c')
0
0
To
80(3[JE S®LTND
fl, F ,
co N CD Z
ra-<0
o r
0• C)
7,xr••
-°Mzr*m
ivmzx
. _
moon
mao-i
xom--
mZ
Wc') mc)
- -4 — -1
1--1n
0 <ozz
Z -n
c') f-) E!
o cn -+
Z-I-I
v -xo
:- -+oz
r C N
-ma
0 0 --q z ma
N N Z X
00M
Nc2Z
czz
Comm
< m.'Jo
m <mo
jmzx
03EOCn
a c
mLn-<
v r cn c*m
m --<
L N t
c• a-V
mr =o
0—<
0nv
N �
0
LA
com
�
x
71 L
D Z MB 4 PG 2A /
00 NORTH
H18ON
° VZ Od b 9w
W
IL Z
31 � N
F
W
O
J 1
Z
II
M
-- W
�Qa
N
0 1
a
u�m
Iflfjlllllllll
m 1 I
V1Y
' /1111111tft1t11
'r�''tl
1
/111
1
U
1 I
X �
LL e'(K
1.1.1
124
z—
W m
li
E-+ W
•
z °
II
'IN
1
1 I
f �~
W
IL Z
31 � N
83idne xz,
F
W
O
J 1
Z
II
M
-- W
�Qa
N
0 1
a
u�m
O ^
m 1 I
V1Y
r
1
�
1
U
1 I
X �
LL e'(K
1.1.1
124
z—
W m
li
E-+ W
F
z °
II
'IN
1
1 I
f �~
H N
�°
IM
°
Z
W
zm o
F
®MM
5MUTAIn
fl
a
1 1 N
tl 1�0 N NI
83idne xz,
°a
W
O
-CM
Z
II
M
-- W
�Qa
N
W °N
1- x�
u�m
O ^
R
V1Y
r
xLL
1
x z
X �
LL e'(K
1.1.1
124
z—
W m
li
F
z °
II
'IN
f �~
U a+
IM
W
zm o
F
JI
7 .NQpI
F-I
CQ
w�autim
o,
U ,-
"'�
...
~I
z W
O
~ J
a�mQe=
In
(D
CQ
LLz 1m a
~a rY
¢
Qm
z
¢o °wiz
�
mo V) 0
I
O
;-
LLI
d1L
v z
z
�
i kD
¢
z�mm
G
O
QOM
I
X
U>Ud
-I
°u'
U
°aC%I
N
aI
Ik-' O'fV
x
%
I
NI `O N
x � �
o
N
z uo ¢
Ip O
I
O
0 0
a
x�Ero
A
z
e.
o=
W 0m
W
¢
(n
'nW Q2U
H H
�
Q (r
F
0.
NOU
M
cr0
O OLD
Ocr
XJO
O
0-<
W W'-' WW
W L�0
z x 3:
N NJ N0
aY oz
�'�.•
V¢XOOOLLm
a CL a --
IL
cro
Z.
wo ¢�
a. o a m a cn
83idne xz,
33V • S1'
J
EDQW
z 1�S
^zl--
OWU
� 0 0
X(n
W r-
W N
It
- -
--------------
66.6
00,0 N a 31
FEB 2 0 20 VAA
d® 114E)IgI
AY ��
F-
W
O
-CM
o
N
eOeeeeeeee°
M
co
�Qa
N
W °N
u�m
O ^
R
J
�1 QLL2
xLL
x z
LL e'(K
1.1.1
124
z—
z:
M
33V • S1'
J
EDQW
z 1�S
^zl--
OWU
� 0 0
X(n
W r-
W N
It
- -
--------------
66.6
00,0 N a 31
FEB 2 0 20 VAA
d® 114E)IgI
AY ��
•O W z
U)
z
eJ O
to
2
W
v "
-CM
o
N
eOeeeeeeee°
`� ,eO
Cs.
CJ
ch
F
z °
W
U a+
W
zm o
F
x
in
7 .NQpI
CQ
w�autim
"'�
...
Uzoaa•+
O
In co
a�mQe=
cv E-
CQ
LLz 1m a
p
¢
Qm
z
¢o °wiz
...
C -
I
1
v z
z
�
rn
¢
z�mm
G
O
I
X
U>Ud
U
°aC%I
f
r1
A
z uo ¢
a
x�Ero
A
e.
o=
W 0m
W
¢
(n
'nW Q2U
O
�
va_az
0.
i a
M
O
�'�.•
V¢XOOOLLm
IL
Z.
•,1,,•
-..
U
x
O
---
- - - - --
—4
•1.
Y
�•f
F
A
a
o:
�
a
------------
z
Z
90
=ccm
Off:N
x
W
e
eoz •
1 ---- C(asr -- -__
a JJO^
WLLSV
a n „=
to
BM
•M
z
U
Ain Gp
O
•O W z
U)
z
eJ O
to
2
W
Ze}
-CM
e
eOeeeeeeee°
`� ,eO
w 0� 0
b+y W
oo
(A
W N cv
V
Z
z az
Z xF�,
A �ca�;
a
® zxia
x . ww
0 t
Q
• cNi�o� j
v'�a 7d
N x
P. C:
pm
ca
E E E
z a
G1
►'%•
E f E F
z
NNp
E kE E E
X
2
i�
FEE.fEFEFEE
r
z
I
M
E E E F E F'
d
E
>
E fQE E F
Q
f E E f E
•
n
E F E E
FXf f f E E f
0
rn
.a
0
B�
m - - - -�
a Lo
° ® O
«3
0
x
z
ro ®�
a
a
a
m �
7C �
�-3 to
z
'C
M
O
n
a
0
Z
a
•o a 0 ro
x d� �
z �z o
ro
va �
Mj
wa30`o ° I
�rwx
(,a °x d I
on <0 C
°m to hn a G7 r
Wowo a 0
xrZ
< ro ..
° t" Cl
z• a
z
CD o
to C
*z
Do
--4m
rn m
�n
r
x
c�
x
MA 0 2014
X
I
N
O
x
Q
Ul
0
C-nz
ZmO
MK :m
�XK
Z—>
- (n'—'
Z-iZ
O — -i
z D
n z
N
(n --I D
-i x 0
mcm
cC-)0
C7-ic
-i c D
c m --I
:10mm
m cn
0(/)
-I
-0 D
m
m r)
<m
m
Z
MB PG 2A
NORTH
E E E
i
E f E F
E kE E E
X
FEE.fEFEFEE
O
I
E E E F E F'
E fQE E F
Q
f E E f E
•
E F E E
FXf f f E E f
• 00
I
I
E'er E f E
Q Ep Q E��E
CrF
:rn
E
E f E E
F F E E
E
E
F F E E
E F E
O
X
E
E E F E
'
E F F
.0m
•
N
\ O C-)
co
m
. \ \ I X m
O
x
0—
O
`� \
`�
ON
0-4
\ DO
mm
c�
ern
D'"
vI N
r {
W'
;
o0
"
X
I
N
O
x
Q
Ul
0
C-nz
ZmO
MK :m
�XK
Z—>
- (n'—'
Z-iZ
O — -i
z D
n z
N
(n --I D
-i x 0
mcm
cC-)0
C7-ic
-i c D
c m --I
:10mm
m cn
0(/)
-I
-0 D
m
m r)
<m
m
Z
MB PG 2A
NORTH
PROP �" /S b
ERT L LINE Gk `0
{ . e0q T
-0-4 _
p� m
� f
--4 E)</STING z
`�J o BOAT L ►FT A
co
� o
D
Z
�7
h
D
F- :l
m I
� w
m`
4 -
I 10
D �
b
z ro
n O
m a
fat X
x a
m
C
V!
�+Ir
alf
y j
i N
A
61
Z Q
c
A i
n
``\`fit ttlil it lff 7 /�f�'' y
IV
?y 1 cn
_f- D.�
OR
l ois-
i
v
N m D
s r
n
N z
A
V8 L
O rD- y
c w
m
1
n
S m
m �
T
m <
p
a E
O b
I Z
I
10
O I m
(D � (n
�? I
{ I
G I
CD
I
I
I
rn�^ BAYVIE.W BLVD.
cn
A -
- 'm ANAL
•
--
UJ
o mz BROCK- ^TRFET n 'n'
o•
m
HdGAldTJt +
Q
cf)
I
N. B A!
N LOT
J I 2.4T'
j
5 1. 26'��
F
NOTE
PROP �" /S b
ERT L LINE Gk `0
{ . e0q T
-0-4 _
p� m
� f
--4 E)</STING z
`�J o BOAT L ►FT A
co
� o
D
Z
�7
h
D
F- :l
m I
� w
m`
4 -
I 10
D �
b
z ro
n O
m a
fat X
x a
m
C
V!
�+Ir
alf
y j
i N
A
61
Z Q
c
A i
n
``\`fit ttlil it lff 7 /�f�'' y
IV
?y 1 cn
_f- D.�
OR
l ois-
i
v
N m D
s r
n
N z
A
V8 L
O rD- y
c w
m
1
n
S m
m �
T
m <
p
a E
O b
I Z
I
10
O I m
(D � (n
�? I
{ I
G I
CD
I
I
I
N.C. DIVISION OF COASTAL. MANAGEMENT
AGENT AUTHORIZATION FORM
]Date <J -- /0 _ 20 �
Flame of Property Owner Applying for Permit:
Jam
Mailing Address:
1 certify that 1 have authorized (agent)
to act on my
behalf, for the purpose of applying for and obtaining all LAMA Permits necessary to
r'
install or construct (activity)
at (my property located at)
This certification is valid thru (date) _
T
Property Owner Signature
. .I E, D
V,
FEB 2 �01A
T
) 6 - C�--L �)
Date