Loading...
HomeMy WebLinkAboutSW5211201_Supplement-EZ Form_20220221SUPPLEMENT-EZ COVER PAGE 1,0FINIS LGti! ! C PROJECT INFORMATION 1 Project Name Dollar General 2 Project Area ac 2.00 3 Coastal Wetland Area (ac) 4 Surface Water Area (ac)- 5 Is this project High or Low Density? High 6 1 Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1003j4) 7 Width of vegetated setbacks provided (feet) _ Will the vegetated setback remain vegetated? _ N/A l N/A J �� 8 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d ? No 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 0 0 12 Bioretention Cell 13 Wet Pond 1 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting RWH 0 18 Green Roof 0 19 Level Spreader -Filter Stri LS-FS 0 20 Disconnected Impervious Surface (DISI 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 BIter_ _ 0 26 1 Filterra 0 FORMS LOADED !DESIGNER CERTIFICATION 27 Name and Title: Matt Lowder, PE 28 Organization: Bowman North Carolina, Ltd. 29 Street address: 4004 Barrett Drive Suite 101 30 City, State, Zip: Raleigh, NC 27609 31 Phone number(s): 919-553-6570 32 Email: mlowder@bowman.com Certification Statement: I certify, under penalty of law that this Supplement EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer SEAL 24434 �r } #0 Was VQ ff�/!!!llri11111�, Seal igna,.,e Designer W�� /'0111Z� Date DRAINAGE AREAS 1 Is this a hi h density project? Yes 2 If so number of draina a areas/SCMs 1 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION 1Entire Site 1 4 Type of SCM - Wet Pond 5 Total drainage area (sq ft) 87223 sf 53402 6 Onsite drainage area (sq ft 87223 sf 53402 7 Offsite drainage area (sq ft 8 Total BUA in project (sq ft 38890 sf 38890 sf 9 New BUA on subdivided lots (subject to permitting) sq ft 10 New BUA not on subdivided lots (subject to ermittin s 1 Offsite BUA s ft 11 12 f Breakdown of new BUA not on subdivided lots: - Parkin (s ft Sidewalk (sq ft 1720 sf 1720 sf - Roof (sq ft 10640 sf 10640 sf Roadway (sq ft) 26530 sf 26530 sf Future (sq ft Other, please specify in the comment box below (sq ft 13 New infiltrating permeable pavement on subdivided lots (sq ft 14 New infiltrating permeable pavement not on subdivided lots (sq ft 15permitting) Existing BUA that will remain (not subject to s ft 16 Existing BUA that is already permitted (sq ft 17 Existing BUA that will be removed (sq ft 18 Percent BUA 45% 73% 19 Design storm inches 1.0 in 20 Design volume of SCM cu ft 3139 cf 21 1 Calculation method for design volume Simple Method ADDITIONAL INFORMATION 22 Please use this space to provide any additional information about the drainage area(s): WET POND 1 Drainage area number 3 2 Minimum re uired treatment volume cu ft 3139 cf GENERAL MOC FROM 02H AM 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM (H:V)? 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No Are the inlets, outlets, and receiving stream protected from erosion 7 (I0-yearstorm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes 9 What is the method for dewatering the SCM for maintenance? Pump (preferred) 10 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC 8 ? Yes 12 Does the drainage easement COMRIX with General MDC (9)? Yes If the SCM is on a single family lot, does (will?) the plat comply with 13 General MDC 10 N/A 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 15 Is there an O&M Plan that com lies with General MDC 12 ? Yes 16 Does the SCM follow the devicespecific MDC? Yes 17 Was the SCM deli ned an NC licensed rofessional? Yes 18 Slzing method used SA/DA 19 Has a stage/storage table been provided in the calculations? Yes 20 Elevation of the excavated main pool depth (bottom of sediment removal) (fmsl 252.00 21 Elevation of the main pool bottom (top of sediment removal) (fmsl) 253.00 22 Elevation of the bottom of the vegetated shelf fmsl 258.50 23 Elevation of the permanent pool fmsl) 259.00 24 Elevation of the top of the vegetated shelf fmsl 259.50 25 Elevation of the tempos pool (fmsl) 259.90 26 Surface area of the main permanent pool (square feet) 2205 27 Volume of the main permanent pool cubic feet) 5821 cf 28 Average depth of the main pool feet 3.41 ft 29 Average depth equation used Equation 3 30 If using equation 3, main pool perimeter (feet) 188.0 ft 31 If using equation 3, width of submerged veg. shelf (feet) 3.0 It 32 Volume of the forebay (cubic feet) 1104 cf 33 Is this 15-20% of the volume in the mainpool? Yes 34 Clean -out depth for forebay (inches) 24 in 35 Design volume of SCM cu ft 3139 cf 36 Is the outlet an orifice or a weir? Orifice 37 If orifice, orifice diameter (inches) 1.00 in 38 If weir, weir height (inches) 39 If weir, weir length (inches 40 Drawdown time for the temporary ool (days) 2.02 41 Are the inlet(s) and outlet located in a manner that avoids short- circuiting? _ Yes 42 Are berms or baffles provided to improve the flowpath? Yes 43 Depth of forebay at entrance (inches) 36 in 44 Depth of forebay at exit (inches) 30 in 45 Does water flow out of the forebay in a non -erosive manner? Yes 46 Width of the vegetated shelf (feet) 6 ft 47 Slope of vegetated shelf (H:V) 6:1 48 Does the orifice drawdown from below the top surface of the permanent pool? Yes 49 Does the pond minimize impacts to the receiving channel from the 1 r 24-hr storm? Yes 50 Are fountains proposed? (If Y, please provide documentation that MDC(9) is met. No 51 Is a trash rack or other device provided to protect the outlet system? Yes 52 Are the dam and embankment planted in non -clumping turf grass? Yes 53 Species of turf that will be used on the dam and embankment Bermuda 54 Hasa planting 21an been provided for the ve etated shelf? -Hybrid Yes ADDITIONAL INFORMATION 55 Please use this space to provide any additional information about the wet pond(s): Wet Pond 1 1:47 PM 10/13/2021