Loading...
HomeMy WebLinkAboutSW5211201_Design Calculations_20220221Storm Wafer & Erosion Control Design Calculations February 21, 2022 Dollar General Store W. NC Highway 97 Middlesex, NC Nash County Prepared for: Glandon Forest Equity, LLC 3825 Barrett Drive, Suite100 Raleigh, NC 27609 (919) 459-2601 Prepared by: Bowman North Carolina, Ltd. (Formerly Triangle Site Design, PLLC) 4004 Barrett Drive, Suite 101 Raleigh, NC 27609 (919) 553-6570 Firm#F-1445 TRIANGLE S I T E DES 1 G N a Bowman company TABLE OF CONTENTS OVERVIEW STORMWATER NARRATIVE FIGURES SOILS SURVEY & SOIL INFORMATION USGS TOPOGRAPHIC MAP FEMA FIRM MAP SURFACE WATER CLASSIFICATIONS HUC NOAA POINT PRECIPATION FREQUENCY ESTIMATES WATER QUANTITY/QUALITY WET POND DESIGN SUPPLEMENT NUTRIENT CALCULATIONS CN VALUES PRE -DEVELOPMENT HYDRCGRAFHS POST -DEVELOPMENT HYDROGRAPHS TIME VS. VOLUME (STORAGE) TIME VS. ELEVATION (STAGE) ELEVATION -VOLUME -FLOW SUMMARY POND OUTLET/STRUCTURE SUMMARY EROSION CONTROL CALCULATIONS RIP -RAP APRON SKIMMER BASIN ANTI -FLOTATION CALCULATIONS TEMPORARY DIVERSION DITCH OVERVIEW Background This report contains the storm water and erosion control calculations for the proposed Dollar General retail site. The project site is located at W. NC Highway 97 in Middlesex, Nash County near the intersection with NC Hwy 97 and NC Hwy 231 is currently a residential development. The proposed project site consists of 2.00 acres and approximately 1.77 acres will be disturbed as part of this project for the construction of the site improvements. The development of the site will result in an impervious area of 38,890sf (0.89ac - 44.59% impervious). The proposed Dollar General parcel is not located within a FEMA designated flood zone as shown on FEMA FIRM Panel 3720274600J with an effective date of 11/3/04. Flood zones are subject to change by FEMA. There are no existing stream or wetland features on the proposed property. The proposed site is within the Neuse river basin. The site must also meet Neuse Watershed Nutrient requirements. The TN export for the pre —developed conditions is 4.00 Ibs/yr which is a rate of 2.00 Ibs/ac/yr for the project area. The increase in impervious area will result in a TN export rate of 20.20 Ibs/yr which is at a rate of 10.10 Ibs/ac/yr. Since the rate is above the 10.Olbs/ac/yr threshold, a stormwater BMP system will be required to reduce the TN export from the site. A wet pond is proposed for the project to capture the runoff from the developed areas of the property and treat it for water quality and water quantity control. The TN export rate for the site after the BMP will be 14.56 Ibs/yr which is a rate of 7.28 Ibs/ac/yr. The proposed storm water management facility (wet pond) outlined in this report has been designed to treat the impervious areas of the development. The site grading and storm drainage systems are designed to convey stormwater runoff from the impervious areas of the site to the wet pond. The pond is designed to detain a drainage area of 1.23ac with an impervious area of 0.90ac. The balance of the site is open space and will by—pass the proposed pond. Erosion Control Erosion control measures have been designed in accordance with NCDEQ erosion control standards and regulations to minimize sediment laden runoff from exiting the site. Silt fence will be installed along the low sides of the site prior to construction. The construction entrance will be installed prior to construction commencing. Inlet protection will be installed around all existing inlets and will be utilized for the proposed curb inlets and drop inlets. A skimmer basin will be used to treat stormwater runoff prior to leaving the site. Accumulated sediment within the project site will need to be removed and the pond constructed to final design conditions prior to final acceptance of the project. Soils The County Soils Survey indicates that Norfolk, Georgeville, and Faceville soils are present on the site. Site Stabilization After final grading is completed, permanent vegetation shall be applied in accordance with the seeding requirements and landscape plan for this site. FIGURES 35° 51' 36' N 35° 51' 31' N Hydrologic Soil Group —Nash County, North Carolina a Map Scale: 1:791 If pUed on A portralt (8.5' x 11') st>eet. a N 0 id 2C} 47 A 0 � 35 70 140 210 Map prDWJOn: Web Menator CaT'ff 000rtrates: WGS84 Edge bLs: UM Zone 17N WGS84 l d). Natural Resources Web Soil Survey 9/20/2021 Conservation Service National Cooperative Soil Survey Page 1 of 4 35° 51' 35' N 35° 51' 31' N N 0 NC64 O O N N N Y m U O a) tm mo a) U m a� ^L m v N 2 1 O U 3Co O a m T o C U N N Q (6 Z O V O L N� E v m U O N C a) `O d j E (n N '~ N _ Q N C Y a) Z O C U O —0O O N L N •3 U E N .N .0 O O S. a3 N N (9 .L.. a 7 6 N U O C O U O N N w a) a) N C E m 3 L N Z a) (� 0 L O d d Z O O N N 'L 7 0 L N .n 10 l0 N O a) L N N O Q _ O (a/ N U m O N L O W N N C 2 o S C S �p o D L �p 10 2 C N 0.0 O 0 L N E N L la U O _Q 2 0 O C O a) C C z o N U l` Gl O N Q Q N N >` > y 0 0 w _ C> O C 7 U N T N o a) U .L.. >` O) Q N O Q E >+ Z c a) d C 2 O L O a) Z U .0 a) m C NO a N a) m E d Q E C O a7 a a U a N 7 N U 0 jn O O n� � v N a N N L N d E 7 N O N L 3 rL Q U m m E co" E U Qoo� O J my N Q C O co�Q$c li la Z d m .J O a)o_n ''' W E Cl L .L.. N Z O N Q N fa •c dy N a0. fa d aNi N O" a .0 N C N -C T.. L `J ` 10 L� fa U OW, (a .y C m Ao L1J N . m '� O Ol N w0 Q Q y O co C la N N a� E O C T M CO w w 3 1p 7 .� Q �N, UI o Co G N E p, ` m l0 E 7 N� E m U O O U O O` > 7 0 m 0 m a) •C 01 C a a) N_ C N N N N ` 7 N O N U C N Q .a, al Q O N 7 T (n o _ ? E _ O jp ;5 N �,- O Q C 01 F- N la W E U N N a E co U .m U (7� Q Q m = L .� H O 0 7 to to O �!% c4 �vQ la lf7 o N L p£— F- U .— N T N 2 0 4) 'o 2� w � a, o u) Q 0 co N N C N L a O U C U (Ta L C O m la E m f a m f0 o dO Z U () O m Z (n O d' O m 16 Jo < Q = 0 9 7 Z W � t � lL 0 a C O Y �. V F * F m W J m m a m Q o co N a) OC m ~O C a C N C O O _0 `O v L n a Q a) c a ImQ C o O a m m C) e o z mQ < m m e o G z IL a) a m m n . C } w N wN� N I�1 y l t N V Q C 0 C N '= m d' _Z m y 7 N w C l6 O ZU Hydrologic Soil Group —Nash County, North Carolina Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI NrB Norfolk, Georgeville, A 2.3 100.0% and Faceville soils, 2 to 8 percent slopes Totals for Area of Interest 2.3 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition USDA Natural Resources Web Soil Survey 9/20/2021 ;'� Conservation Service National Cooperative Soil Survey Page 3 of 4 mm Q Q 12 C N y0 U- m m m a _ m m m i H L L E m a > ¢ o m. m = 3 3 s m N J ¢ as > > o m b .2 °° O w a v O X 7 a N W m mm U U m 0 O d a -j y W s a N y w C C O m m O WCm N y-0 m o c 2 = 'aU00p m Zw m� W O C C C U LL r N Y U- m m Q m U 3 3 OT = r L 3 L y m m m m O C m m +y N m N `1 m i t_ � W LL OJ a QOQ I�Q�J W Q it 0 W W O IL N m O _O LL m c O m Z N U X d ' t a in r m N O 2 o li E_ a m m C E C O m Y � O J C y m .2 CLL `m m LL 3 w ti > > Fi m m L LL E m >° m O o U y W a m y' U c O m U m 10 m a c 1 O ~_ d m CL ( gy(pp t is O O 0 C O � N m LL O ° m 4i p3 b0 m y a O m m m m > O f0 m N E m N U COO U a d 2 � Iy � m ~O Er W w U x CC) LL 2 r o F � � f 4 �` 1 � (0 2- 2� IL Q m N Y E C y mCL m o c O CD 3 m ECD aL. ~ °c v .0 o o m E a m -0a y a O O E m m m t a m m O r L N VCL ym� a Y m 7 m L m > C O O E Y L y a w m 9 T W a p ° LL a >` O a C m Y - C 9 L m m E m OE @ p Q W C y 0 m m W ' c E :O d 0 :-• m m E a ° N U> U m p �0 CD O -0. a a a LL m yL >> QNL �> 0 E E a) -y 0 0. % m CO 0 a > u! 0 CL +'.I y o m �0 C C m m a 'pp E o z° = y 7 .� ''M Q m wo'a C V "m0 2 C'JE ° m O E a CD «2m-" LL c L y LL c m 0 m a U m C tom � °3NEma'' oammo F a m m 0 E L C= m ° m a m a j CD y m E LL C m m J LU v e '�° M j CD C Z a im�pp C m Q Z a 0 m a a 20 L m y a y y c m Q Eye 2 z `o mf'i~ E E 0 CLCL d Q N m= L.mL m L y m N V L 7 m m E m y E .2 E O L m Opp C m H a H m H m O H N m lLL Z fV In M 3 M 0 Y Q LL Q 1 O N 0 0 0 C. C 0 0 LO 0 LO N r � d . � ¥ z * � CD � % n \ !WC _ Cif a j �I u 9$H , \\ :t}ym IRON 0 y wite �� I ��� E - - -- ■ ƒ 0ƒ f 0 uu / k 0 0 o \ \2 E§ k § ) 2 %��& d J a 2 2 . � _ ..� J p . � E 0 .. • \ ,� / &/ $ ° 2 . k } ƒ ` ~ 0 \ \ \ ) E ƒ / W ©vm r u 9/20/21, 2:05 PM Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 Location name: Middlesex, North Carolina, USA' i Latitude: 35.8606°, Longitude:-78.1783° l Elevation: 272.62 fr' € 'source: ESRI Maps source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G M Bonnin, D Martin, B Lin, T Parzybok, M Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval (years) Quration �00 10 25 50 100 200 500 1000 5�r1in F-O-.4-0-171 0.461 0.518 0.592 0.663 0.725 0.780 0.831 0.888 0.946 (0 365-0.442 0 421-0 15 5 0.72-0.G67 0-539-0 643 0.601-0.728 0.655-0.794 01700.0:853 0:741-0.91❑ 0.786-0 975 (0 829-1.04 1.06 -71 10�rlin 0.584-0.706 .673-0908 0.756.0909 0. 63-1 4 0.958--1116 1.041626 1. 1� 3G 1. 831�44 1 2441154 1 3141.64 0.801 15{rlin 0 729 0883 0. 46-21602 0.957---515 1 09--1031 1 21-31447 1 3241660 1.41--1771 (1.4861682 1 57 1.94 (1.64-2.06 30�rlin 021) 8 1001 (117---1.40] (136-1963] (1.5874 90} 1 0-- (217} (1. 92041] : (25-20) 2 (231-83 2.493.09 (2653 .33) 3 6 60�»in 1 4 1 2 1 25-1.51 1 47---1.76) (1.7-0209 (2.Ofi 24E 2 39 2 6989) (2.327) (2.J73S2] 3,246398} :4 37 43 3. 8 486 1.60 1.88 2.26 2.72 3.24 3.74 4.21 4.72 5.38 6.02 2-hr 1 44-1.T7 1 71-2.06) 2.05.2.49) 2.48-2.99 (2 91-3 55 (3.35A.10) [3.75-4.61 {A.17-5 17 4 715.90 522.6.62 3-hr 1.69 (1 53-1.88) 1.99 (1.81-2.21) 2.41 (2:19-2.67) 2.92 (2.64.3.22 3.51 (3 15-3.86) 4.08 1 (3.85.4 49) 4.64 1 (4.12-5 11) 5.25 6.08 1 (5.29-6.68) 6.89 (5:92-7.60) 6-hr B 1.850325 (2. 8 2964] 2.6383.19) 3 83086} 3.81-464 4.425 41 5 01 fi518] {5.6347101 6.47 8615] 7. -9032 2. 12-hr 2_63) a (2.58 3109 3. 2 3.76 78-4.57 4.575.53 5. 3-G 49 G.08--T481 6.87.8.53 7. 5210.0 8.99-161 5 24-hr 8.28 2 63 3305 3. 8 3?7A 4 05-0 72 4.757-5.5G 5.79 6978 6.52-7.82 7 8894 {8.464 0 2 (9.82-12.0) 1(10 9- 3.6 2�ay 3.G43753) : 3a-4 26 (4,65 5 39) 1 (5 44-6.3? 7 6.55-67 7.4718.8t} 8 44 0.0 9.46 11 4 (10 9-13 4] 12 13 5 1 3�ay (3 24 3.74 3.68 (390--4.5a) 4.42 4.91?5.fi6 5.54 -(6.62] (5.7 6.45 (6.8543.7.99 7.75 7, 0 9913 8.82 (8 9 6-2-7 0.4) 9.97 $ 80 181.i 11.2 (11 3-13 71 12.9 4.1 (1214-15.4) 14.4 4�ay 3 43-3.94 4,13-4 74 5.17-5 94) ( 6.00.6.91 (7 17.8.301 8.12-9.47 9 11-10 7Y 11 6-14.0 12 8-15 7 4.28 5.13 6.35 7.34 8.74 9.89 11.1 12.4 14.2 15.6 play (4.00 4:5B) 1 (A.80.5.49) (5.93.6.80) 1 (6.85.7.86) j (8.12.9 36) 1 (9.13-10.8) 1 [102-11.9) 1 (12 8-15.3) (14 0-17 0) 4.89 5.83 7.12 8.15 1 9.59 10.8 12.0 13.2 15.0 16.5 10�tay 4.58 5.21 5.47-8.72 5.67-7 53 7 63 H.6d 5 84-10.2 9:98=11:5 11 1-12.8) (12 1-14.2 13 7-16.2 (14 9-17 8 20{lay 619 6.98 7, 5�8.29 8.8139.94 9 97 111 3 11 6-13 1 12.8-14.5 14 1-161 1514-17 8 1.7 17.18-0 1 1825-21 9 8.16 9.64 11.4 12.8 14.6 16.1 17.5 19.0 21.1 22.6 30�ay 7.71-8.64 9.11-10.2 10 8-12 1 12 0-13.5 13 7-15.5 15.0.17-0 16 4-18.6 17 7-20.3 19 4-22.5 (20.8.24.3 45�1ay 3.20:5] 4-7 4-28 (9.84.1❑.9) (11 6-12.9) [1314- 5 0) (1419- 6.6) (1618-18 8) [18 (1927.22 3) [21�2 24.0) (23?6.26.4) (24 2) 60�1ay 11 B2 3 1 (13.9-15 3) 1519--187 6 i 715- 9 4 1926- 1.8 L.2-23.b 2274-25.4 24 2527 2 2629 29 fi (272 -31 4] Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS) Numbats in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval The probability that precipitation frequency estimates (fora given duration and average reCUTrenaL irderval] will be grealer than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against provable rreximum pre oipitatton (PMP) estimates and may be higher Than currently valid PMF'values. Please refer to NOAA Atlas 14 document for more information Back to Tap PF graphical hftps://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.8606&Ion=-78.1783&data=depth&units=english&series=pds 1/4 WATER QUALITY/QUANTITY Nitrogen Calculations (on -site areas) Item Proposed Site Information On -Site Area Off -Site Area Total 1 Total ro'ed acres a 2.00 0.00 2.00 2 Total proposed impervious area 0.89 0.00 0.89 3 Existin impervious area 0.08 0 0.08 4 New impervious area Item 2 Item 31 0.81 0 0.81 5 Permanent y protecte undisturbed open space 0 0 0 6 Permanently protecte mana ed open space 1.11 0.00 1.11 Exjstlhq Conditions LoadI(On-site areas Type of Land Cover Area acres TN export/coeffrc/ent lbs/a r) TN export from use (lbs/yr) Permanently protected undisturbed open space 0 0.6 0.00 Permanently protected managed open sace 1.920 1.2 2.30 Impervious surfaces 0.08 21.2 1.70 Total 2.000 Item 7 _ 4.00 Item 8 Nitrogen Loading Rate (Ibs/ac/yr) 2.00 Proposed Development Areas On -Site areas TN export/coeliicient TV export from use T e of Land Cover Area (acres) lbs act r Ibs/ r ermanen y pro e e undisturbed open space Item 5 0 0.6 0.00 ermanen y pro e e managed open space* Item 6 1.110 1.2 1.33 Impervious surfaces Item 4 0.890 21.2 18.87 Total 2.000 20.20 Item 7 Item 8* Nitrogen Loading Rate (Ibs/ac/yr) 10.10 Post -Development Load/no after Offset falvments Item Description Pre -Developed +Post - Developed Loading 8 Total TN export (lb/yr) 14.56 Post -De ve% ment Loadin after Offset Payments Item Description Nitrogen Loading Rate Ibs ac r 9 Post -Developed TN Load 10 Nitrogen load offset by 3.68 payments Item 9 - 3.6 Amount of Offset (buy -down loading rate x apportioned site area)(lbs/yr): 7.36 30-Year Offset Amount (Pounds of Nitrogen x 30 Years)(lbs): 220.72 NCEEP Offset Payment Rate ($/Ib) $24.77 NCEEP Offset Payment Amount• $5,467.14 N C O V O 7 O r, O O N O O r` O N O O" O O ID N fM M a o g o rii oM E o In o 0 0 w a z H v v v c c c n c c 0c m E o rn o o 0 C. X N N a a+ c C) N N U A v v c c 0 0 a a v v 0 0 v o O O N N .-1 N N O O O a n o pMi rn o 0 0 o Ce C1 a y V O O N lJ O U d O '^ m N '� m O 0 L c m y n O1 c c_ ro v n m n m o, toy c c E m U UN v o E v N v o oYn c� a U v v a n d omto _� v v v �� J W v r_co N N> N m r_co — N> v f0 aJ ❑ � O VI � 2 0 uj � D_ v v E n nL° y —Lon nM O� �w O cn.>, U —��, �=i1 O d C m 0 T C m =O T 0 f O r_ E tni v 3 E m 3 Q) lb a E> a E.">_ o a n LQ v 0 N SUPPLEMENT-EZ COVER PAGE i c- LOAOEG PROJECT INFORMATION 1 Project Name Dollar General 2 Project Area (ac) 2.00 3 Coastal Wetland Area ac - 4 Surface Water Area ac - 5 Is this project High or Low Density? High 6 Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1Q63(4j 7 Width of vegetated setbacks provided feet _ Will the vegetated setback remain vegetated? N/A N/A 8 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003(4).(c-d)? No 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 0 12 Bioretention Cell 0 13 Wet Pond 1 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting (RWH) 0 18 Green Roof 0 19 Level Spreader -Filter Stri LS-FS 0 20 Disconnected Impervious Surface (DIS 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 1 Bayfilter 0 1.26 1 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Matt Lowder, PE 28 Organization: Bowman North Carolina, Ltd. ' 29 Street address: 4004 Barrett Drive, Suite 101 30 City, State, Zip: Raleigh. NC 27609 j 31 _ Phone numbers : v— — Email: 919-553-6570. � mlowder@bowman.com mlowder@bowman.com Certification Statement: I certify, under penalty of law that this Supplement FZ form and all supporting information were prepared under my direction or supervision; thatthe information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. ARO SERE. � 24434 46 fry lrr rrlriltltt\1 Seal ionaiure df Designer . Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so, number of drainage areas/SCMs 1 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 4 Tyee of SCM - Wet Pond 5 Total draina a area (sq ft 87223 sf 53402 6 Onsite drainage area (sq ft 87223 sf 53402 7 Offsite drainage area sq 8 Total BUA in ro'ect s ft 38890 sf 38890 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft 10permitting) New BUA not on subdivided lots (subject to (s 11 Offsite BUA (sq ft 12 Breakdown of new BUA not on subdivided lots: Parking (sq ft Sidewalk (sq ft 1720 sf 1720 sf Roof (sq ft 10640 sf 10640 sf Roadway s ft 26530 sf 26530 sf Future �sq ft) Other, please specify in the comment box below (sq ft 13 New infiltrating permeable pavement on subdivided lots (sq ft 14 New infiltrating permeable pavement not on subdivided lots (sq ft 15permitting) Existing BUA that will remain (not subject to s ft 16 Existing BUA that is already permitted (sq ft 17 Existing BUA that will be removed (sq ft 18 Percent BUA 45% 73% 19 Design storm inches 1.0 in 20 Desi n volume of SCM cu ft 3139 cf 21 Calculation method for design volume Simple Method ADDITIONAL INFORMATION 22 Please use this space to provide any additional information about the drainage area(s): WET POND area number GENERAL MDC FROM 02H .1050 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM (H: ? 3:1 Does the SCM have retaining walls, gabion walls or other 6 engineered side slopes? No Are the inlets, outlets, and receiving stream protected from erosion 7 10- ear storm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes What is the method for dewaterin the SCM for maintenance? Pum referred) If a licable, will the SCM be cleaned out after construction? A Yes Does the maintenance access comply with General MDC (8)? Yes 12 Does the drainage easement comply with General MDC (9)? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? N/A 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 15 Is there an O&M Plan that complies with General MDC 12 ? Yes 16 Does the SCM follow the devicespecific MDC? Yes 17 Was the SCM designed by an NC licensedprofessional? Yes knAlrO1i-A!iImlL:..I�qLpri ce 18 SWng method used SAIDA 19 Has a stage/storage table been provided in the calculations? Yes 20 Elevation of the excavated main pool depth (bottom of sediment removal) (fmsl 252.00 21 Elevation of the main pool bottom (top of sediment removal) (fmsl) 253.00 22 Elevation of the bottom of the vegetated shelf (fmsl) 258.50 23 Elevation of the permanent pW sl 259.00 24 Elevation of the top of the vegetated shelf (fmsl) 259.50 25 Elevation of the temporary pool (fmsl) 259.90 26 Surface area of the main permanent pool (square feet 2205 27 Volume of the main permanent pool (cubic feet) 5821 cf 28 Average depth of the main pool (feet) 3.41 ft 29 Average depth euation used Equation 3 30 If using equation 3, main pool perimeter (feet) 188.0 ft 31 If using equation 3, width of submerged ve . shelf (feet) 3.0 ft 32 Volume of the foreba (cubic feet) 1104 cf 33 Is this 15-20% of the volume in the main,pool? Yes 34 Clean -out depth for foreba inches 24 in 35 Design volume of SCM cu ft 3139 cf 36 Is the outlet an orifice or a weir? Orifice 37 If orifice, orifice diameter inches 1.00 in 38 If weir, weir height inches 39 If weir, weir length inches 40 Drawdown time for the temporary pool (days) 2.02 41 Are the inlet(s) and outlet located in a manner that avoids short- circuitin Yes 42 Are berms or baffles provided to improve the flowpath? Yes 43 Depth of forebay at entrance (inches) 36 in 44 Depth of forebay at exit (inches) 30 in 45 Does water flow out of the forebay in a non -erosive manner? Yes 46 Width of the vegetated shelf (feet) 6 ft 47 Slope of vegetated shelf (H:V) 6:1 48 Does the orifice drawdown from below the top surface of the permanentpool? Yes 49 Does the pond minimize impacts to the receiving channel from the 1 r, 24-hr storm? Yes 50 Are fountains proposed? (If Y, please provide documentation that MDC 9 is met.) No 51 Is a trash rack or other device provided to protect the outlet system? Yes 52 Are the dam and embankment planted in non -clumping turf grass? Yes 53 S ecies of turf that will be used on the dam and embankment H brid Bermuda 54 Hasa lantin Ian been rovided for the ve etated shelf? Yes ADDITIONAL INFORMATiON Please use this space to provide any additional information about 55 the wet pond(s): Wet Pond 1 1:47 PM 10/13/2021 W+ z• 4.. oupvnJ 4!-N 'zerolPD!Mle s I � rg a ca • '- a will��N E �,r 3g f6 3yE I I J �. r r: �+ f _ !� r r rI�- i 0 I 8 N xz o N E w o U 1r a 3� 6 EQ S a 6yg a�G k� g� 5 E a 9 q J _ = ¢ G O L7 a = �^ AfurwO 4aDN � E N K °uU—J 4 -N '--IPPIN �. a 3 z o 16 A-451H ON A W h i � �8� �710a alit X AIRP F�� ii § E Ey€� 1FIgLI • F¢ gIR@®e 3 l fix `pE .3ij • . • • .. • • k c tl tl A f Y e ! E ! • R A Y I I I r II I I, I� l I 1 I t I I I I I f I 1 V k O Z o Z I ¢ j� F �9 i tl �iF �� � @ � � �A�� � g� ! �•tl i �R ��� � tl '��� tl i SS;i Fxg l R k - Hil till eF pp k� 4I i ppg � Fk �rr CD Z Fk @CRC B 1pg W . e .. $ i! CD HIM sill 2 ■g p p � i.i p ZfA oz�y0���• V zg� C5 B@zF�3 3 � Fk W ■Fp[ Q N !p p 0 � �8 e0p[ @@ O� i. 90 i S}k � Je�Ra�tlFl� I R i TW[YI mil - r- MAY• nY 44 I Rr , I 6 AVD03 4"WI `� E -11=3 4WN '--IPP111 S 8 U Ae 461H DN 'MVIA § 5 ye � 0 IaRM,�a J R �e 09 'fal 1 gFE 109 H 'oi a 'i8 A @ e I Zs � Za i e �cl U 'I � ag f� e E ix� !• p � � evil ig R E ■ yy iEi �ilFieig�i r Z 901��gEgEgoga 1 i w >! W B • 9i A 2 ■� p � ��g U W g N 66 gg O EBg@ p I I I I I I I I I I I I I I I I r Jlr 1 Nil �� mr i t 4 4 � I R 1 Triangle Site Design, PLLC Curve Number Calculation (CN) Pre -Developed Conditions (Overall Site) Drainage Area (acres): 2.00 Existing Soil Groups: Soil Grown Map Symbol Soil Description Acres Percent of DA A NrB Norfolk, Georgeville, and Faceville 2.00 100% Proposed Land Uses Land Use Description Existing Soil Group Acres Curve # Weighted CN Wooded - Good A 1.92 54 51.8 Impervious A 0.08 98 3.9 Cumulative Curve # = 55.8 Triangle Site Design, PLLC Curve Number Calculation (CN) Post -Developed Conditions (Wet Pond) Drainage Area (acres): 1.23 Existing Soil Gros: Soil Grouo Man Symbol Soil Description Acres Percent of DA A NrB Norfolk, Georgeville, and Faceville 1.23 100% Proposed Land Uses: Land Use Description Existing Soil Group Acres Curve # W_ _erghted CN Wooded - Good A 0.00 54 0.0 Open Space -Good A 0.33 55 14.8 Impervious Area A 0.90 98 71.7 Cumulative Curve # = 86.5 Triangle Site Design, PLLC Curve Number Calculation (CN) Post -Developed Bypass Conditions Drainage Area acres): 0.77 Existing Soil Groups: Soil Group Map Symbol Soil Description Acres Percent of DA A NrB Norfolk, Georgeville, and Faceville 0.77 100% Proposed Land Uses: Land Use Description Existing Soil Group Acres Curve # Weighted CN Wooded - Good A 0.00 54 0.0 Open Space - Good A 0.77 55 55.0 Impervious Area A 0.00 98 0.0 Cumulative Curve # = 55.0 Proposed Wet Pond Project Information Project Name: Dollar General - Middlesex Project #: Designed by: CID Date: 10/13/2021 Revised by: Date: Checked by: Date: Site Information Sub Area Location: Drainage To Proposed Wet Pond Drainage Area (DA) = 1.23 Acres 53,402 sf Impervious Area (IA) = 0.90 Acres 38,890 sf Percent Impervious (1) = % 72.82 % Required Surface Area Permament Pool Depth: 3.41 ft Non -Coastal County SA/DA = 2.44 Min Peq'd Surface Area = 1,303 sf (at Permanent Pool Required WQv Storage Volume Design Storm = inch Non -Coastal County Determine Rv Value = 0.05 + .009 (1) = 0.705 in/in Storage Volume Required = 3.139 cf (above Permanent Pool) Elevations Top of Pond Elevation = 262.00 ft Temporary Pool Elevation = 259.90 ft Permanent Pool Elevation = 259.00 ft Shelf Begining Elevation = 259.50 ft Forebay Weir = 258.00 ft Shelf Ending Elevation = 258.50 ft Bottom Elevation = 253.00 ft Permanent Pool Area Area @ Top of Permanent Pool = 2,205 sf Volume of Temporary Storage = 3,560 cf Is Permenant Pool Surface Area Sufficient (yes/no)? ( 2205 > 1303 ) sf Volume of Storage for Design Storm = as ( 3560 > 3139 ) cf Incremental Drawdown Time STORMWATER POND INCREMENTAL DRAWDOWN METHOD -Water Quality Volume Project Information Project Nar Dollar General - Middlesex Project #: asigned by: CID Date: 10/13/2021 iecked by: Date: Water Quality Orifice . Incremental Determination of Water Quality Volume Drawdown Time Zone 2 Orifice Diameter (D) = Cd = Ei = Zone 1 Range = Zone 2 Range = Zone 3 Range = Q3 = 0.0437 CD . D2 (Z-D/24-Ei)^('2) Q2 = 0.372 Co' D"(Z-Ei)n('rz) Q,=0 1 in 0.6 259 Orifice Inv. 0.00 to 259 259 to 259.1 259.1 to 260 Incremental Drawdown Method Countour Contour Area Incremental Volume Stage, Z Zone Q Drawdown Time sq ft cu ft ft cfs min 259.00 3 250 0 0.00 2.00 0.000 259.50 4095 1.836 0.50 3.00 0.018 1.724 259.90 4525 1.724 0.40 3.00 0.024 1,183 Total -- 3.560 -- - — 2,907 Drawdown Time = Incremental Volume / Q / 60sec/min Summary Total Volume = 3,660 cf Total Time = 2,907 min Total Time = 2.02 days Between 2 & 5 10/13/2021 Prop Wet Pond- new design -Middlesex 1 of 1 Project: Pond #1 Date: 10/13/2021 Main -Pond Contours -Volumes Elevation Main -Pond Incremental Vol. Accumulated Vol. Description 259 21205 968 5,821 A2 (Perm —Pool) 258.5 1,665 791 4,854 Al (Bottom —Shelf) 258 1,500 1,343 4,063 257 1,185 1,045 2,720 256 905 780 1,675 255 655 548 895 254 440 348 348 253 255 0 0 A3 (Bottom —Pond) Forebay Contours -Volumes Elevation FBI FB2 FB3 Total -Areas Incremental Vol. Accumulated Vol. 259 875 875 400 1,104 258.5 725 725 326 704 258 580 580 378 378 257 85 90 175 0 0 Forebay Volume Average Depth (Option 1) Average Depth Calculation (Option 2) Vpp permeter of shelf width of shelf Al (Bottom —Shelf): Average Depth = 19.0% *Between 15% & 20% 2.92 *At least 3' average depth 5,821 188 3 1,665 3.41 Proposed Wet Pond #1 Dct Information Project Name: Dollar General - Middlesex Project #: Designed by: CID Date: 10/13/2021 Revised by: Date: Checked by: Date: Information Sub Area Location: Drainage to Proposed Pond Drainage Area (DA) = 1.23 Acres Impervious Area (IA) = 0.90 Acres Percent Impervious (1) = 72.82 % (Drainage Area) ce Sizing Orifice Size = 1.00 in (Diameter) Drawdown Time = 2.02 days (Incremental Draw Down Method) less than 5 days (yes/no) ? yes greater than 2 day (yes/no) ? yes -Flotation Device 4' x 4' Outlet Structure Area: 16.0 sf Volume: _ 2272.0 cf Weight: 141773 Ibs Factor of Safety 1.20 IT Req'd of Anti -Flotation Device: 170,127 Ibs Volume of Concrete Req'd: 1134.2 cf (Water Displaced - Top of Pond to Bottom of Pond) (Unit WT of Concrete = 150 pcf) Volume Provided: 85.5 cf (4'x4' riser x 3.0'=48.Ocf, 5'x5' footing x 1.5'=37.5cf) Z tz i J � O zz 0 -STAGE/STORAGE TABLE STAGE ELEVATION CONTOUR (FT) (FT) AREA (SF) 0.0 259.0 3250 0.5 259.5 4095 0.9 259.9 4525 1.0 260.0 4635 2.0 261.0 5760 3.0 262.0 6880 STORMWATER RIVER BASIN: RECEIVING STREAM: STREAM INDEX: CLASSIFICATION: HUC: LATITUDE/LONGITUDE: MANAGEMENT WET POND DESIGN SUMMARY DESIGN NEUSE TURKEY SWAMP 27-86-14-3-(1) C; NSW 03020203 N35.859314', W-78.177350' INCREMENTAL TOTAL STORAGE (CF) STORAGE (CF) 0 0 1836 1836 1724 3560 (WQv) 458 4018 5198 9216 6320 15536 DRAINAGE AREA TO WET POND: 1.23 ACRES SITE IMPERVIOUS AREA TO WET POND: 0.90 ACRES OFF -SITE DESIGN IMPERVIOUS AREA TO WET POND: 0.00 ACRES TOTAL DESIGN IMPERVIOUS AREA TO WET POND: 0.90 ACRES PRE -DEVELOPED TO POST -DEVELOPED POST -DEVELOPED POST -DEVELOPED POST -DEVELOPED POND TO POND THRU RONRCOMBINED DRAINAGE AREA: 2.00 AC 1.23 AC 0.77 AC CURVE NUMBER: 55.5 86.5 55.0 TIME OF CONCENTRATION: 10 MIN 5 MIN 10 MIN 1.0" STORM EVENT: 0.182 CFS 0.011 CFS 1-YEAR STORM EVENT: 0.123 CFS 3.210 CFS 0.028 CFS 0.034 CFS 0.062 CFS 10-YEAR STORM EVENT: 2.831 CFS 7.306 CFS 1.181 CFS 1.022 CFS 2.203 CFS 100-YEAR STORM EVENT: 8.707 CFS 12.83 CFS 7.593 CFS 3.246 CFS 10.84 CFS �W -El; !ME W99 1*9L a N -L 11 RISER STRUCTURE 4" PVC SCREW CAP —_ FOR CLEANING ACCESS 12" MIN. EXTEND 4" IPVC THROUGH RISER STRUCTURE 4"x4" PVC PERM. POND ELEV.=259.0 12" MIN. 1"DIA. HOLE DRILLED INTO BOTTOM CAP PVC DRAIN OUTLET TAD AC CTDU6TURE NOT SHOWN FOR CLARITY TRASH RACK) OUTLET CONTROL STRUCTURE -- INCREMENTAL WEIR Pond Report s Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Oct 13, 2021 Pond No. 1 - Wet Pond Pond Data Contours - User -defined contour areas. Average end area method used for volume calculation. Begining Elevation = 259.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 259.00 3,250 0 0 0.50 259.50 4,095 1,836 1,836 0.90 259.90 4,525 1,724 3,560 1.00 260.00 4,635 458 4,018 2.00 261.00 5,760 5,198 9,216 3.00 262.00 6,880 6,320 15,536 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 15.00 1.00 Inactive Inactive Crest Len (ft) = 1.00 15.00 Inactive Inactive Span (in) = 15.00 1.00 0.00 0.00 Crest El. (ft) = 260.30 260.80 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El. (ft) = 259.00 259.00 0.00 0.00 Weir Type = Rect Broad --- --- Length (ft) = 28.00 1.00 0.00 0.00 Multistage = Yes Yes No No Slope (%) = 1.79 0.50 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 Stage (ft) 3.00 2.00 1.00 a'TaTa7 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control Weir risers checked for orifice conditions (ic) and submergence (s) Stage / Discharge Elev (ft) 262.00 261.00 260.00 25900 0.00 1.00 200 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 Total Q Discharge (cfs) Hydrograph Summary Rep 'Ffydraflow Hydrographs Extension for AutoCAD® Civil 3D0 2009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 0.123 2 726 1,267 ------ - Pre -Developed -Overall Site 2 SCS Runoff 3.210 2 716 6,506 ------- - — ------ Post Developed to Pond 3 Reservoir 0 028 2 1440 6,049 2 260.24 5,273 Post Through Pond 4 SCS Runoff 0.034 2 730 438 - - - - — Post Developed Bypass 6 SCS Runoff 0.182 2 150 880 -- - - SCM Post -Developed 7 Reservoir 0.011 2 366 810 6 259.21 776 1.0-in Storm Thru Pond Wet Pond_Middlesex.gpw Return Period: 1 Year Wednesday, Oct 13, 2021 z Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2009 by Autodesk, Inc. v6.066 Hyd. No. 1 Pre -Developed -Overall Site Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 2.000 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 2.83 in Storm duration = 24 hrs Q (cfs 0.50 — 0.50 0.45 - — 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Wednesday, Oct 13, 2021 Peak discharge = 0.123 cfs Time to peak = 726 min Hyd. volume = 1,267 cuft Curve number = 55.8 Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type II Shape factor = 484 Pre -Developed -Overall Site Hyd. No. 1 -- 1 Year Ri Hydrograph Report HydraFlow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 1.230 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 2.83 in Storm duration = 24 hrs Q (cfs) 4.00 3.00 2.00 1.00 0.00 0 120 240 — Hyd No. 2 Wednesday, Oct 13, 2021 Peak discharge = 3.210 cfs Time to peak = 716 min Hyd. volume = 6,506 cuft Curve number = 86.5 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 Post Developed to Pond Hyd. No. 2 -- 1 Year 360 480 600 720 840 960 Q (Cfs) 4.00 3.00 'r O M 1.00 0.00 1080 1200 1320 1440 Time (min) Hydrograph Report 4 Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2009 byAutodesk, Inc. v6.066 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Storm frequency = 1 yrs Time interval = 2 min Inflow hyd. No. = 2 - Post Developed to Pond Reservoir name = Wet Pond Storage Indication method used M 11 2.00 1.00 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Wednesday, Oct 13, 2021 = 0.028 cfs = 1440 min = 6,049 cuft = 260.24 ft = 5,273 tuft Post Through Pond Hyd. No. 3 -- 1 Year 600 1200 1800 2400 3000 3600 4200 4800 5400 Hyd No. 3 Hyd No. 2 ® Total storage used = 5,273 cuft Q (cfs) 4.00 MR 2.00 1.00 0.00 6000 Time (min) 0 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2009 by Autodesk, Inc. v6.066 Hyd. No. 4 Post Developed Bypass Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 0.770 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 2.83 in Storm duration = 24 hrs Q (cfs) 0.10 - — 0.10 0.09 0.09 0.08 - 0.08 0.07 - 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 -I - 0.02 0.01 — 0.01 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 4 Wednesday, Oct 13, 2021 Peak discharge = 0.034 cfs Time to peak = 730 min Hyd. volume = 438 cuft Curve number = 55 Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type II Shape factor = 484 Post Developed Bypass Hyd. No. 4 -- 1 Year Hydrograph Report 7 Hydraflow Hydrographs Extension forAutoCADS Civil 3D® 2009 byAutodesk, Inc. v6.066 Wednesday, Oct 13, 2021 Hyd. No. 6 SCM Post -Developed Hydrograph type = SCS Runoff Peak discharge = 0.182 cfs Storm frequency = 1 yrs Time to peak = 150 min Time interval = 2 min Hyd. volume = 880 cuft Drainage area = 1.230 ac Curve number = 86.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 1.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 SCM Post -Developed Hyd. No. 6 -- 1 Year 60 120 180 240 300 360 Hyd No. 6 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 420 Time (min) Hydrograph Report 0 HydraFlow Hydrographs Extension for AutoCAD® Civil 3D®2009 byAutodesk, Inc. v6.066 Hyd. No. 7 1.0-in Storm Thru Pond Hydrograph type = Reservoir Storm frequency = 1 yrs Time interval = 2 min Inflow hyd. No. = 6 - SCM Post -Developed Reservoir name = Wet Pond Storage Indication method used Q (cfs 0.50 - 0.50 0.45 0.45 0.40 0.40 0.35 - 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 2400 2640 2880 3120 Hyd No. 7 Hyd No. 6 ® Total storage used = 776 cult Time (min) Wednesday, Oct 13, 2021 Peak discharge = 0.011 cfs Time to peak = 366 min Hyd. volume = 810 cuft Max. Elevation = 259.21 ft Max. Storage = 776 cuft 1.0-in Storm Thru Pond Hyd. No. 7 -- 1 Year `11 Hydrograph Summary Rep❑ —Ffydraflow Hydrographs Extension for AutoCAD®Civil 3DO 2009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) --- Total strge used (cuft) Hydrograph description 1 SCS Runoff 2.831 2 722 8,287 ------ - — Pre -Developed -Overall Site 2 SCS Runoff 7.306 2 716 15,311 - - - Post Developed to Pond 3 Reservoir 1.181 2 726 14,734 2 260.79 8,136 Post Through Pond 4 I SCS Runoff 1.022 2 722 3,043 ------ ----- Post Developed Bypass I 6 SCS Runoff 0.000 2 n/a 0 - -- -----•• — SCM Post -Developed 7 Reservoir 0.000 2 n/a 0 6 259.00 0.000 1.0-in Storm Thru Pond Wet Pond_Middlesex.gpw Return Period: i Wednesday, 10 Year Oct 13, 2021 11 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO2009 byAutodesk, Inc. v6.066 Hyd. No. 1 Pre -Developed -Overall Site Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval - 2 min Drainage area = 2.000 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 5.15 in Storm duration - 24 hrs Q (cfs) 3.00 2.00 1.00 Wednesday, Oct 13, 2021 Peak discharge = 2.831 cfs Time to peak - 722 min Hyd. volume = 8,287 cuft Curve number - 55.8 Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type II Shape factor = 484 Pre -Developed -Overall Site Hyd. No. 1 -- 10 Year 120 240 360 480 600 720 840 Hyd No. 1 Q (cfs) 3.00 2.00 1.00 0.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report iM Hydraflow Hydrographs Extension for AutoCADO Civil 3DO2009 byAutodesk, Inc. v6.066 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 1.230 ac Basin Slope = 0.0 % Tc method - USER Total precip. = 5.15 in Storm duration - 24 hrs M 4.00 2.00 M Wednesday, Oct 13, 2021 Peak discharge = 7.306 cfs Time to peak = 716 min Hyd. volume = 15,311 cuft Curve number = 86.5 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 Post Developed to Pond Hyd. No. 2 -- 10 Year 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 2 Q (cfs) 8.00 . �� 4.00 2.00 0.00 1320 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Storm frequency = 10 yrs Time interval = 2 min Inflow hyd. No. = 2 - Post Developed to Pond Reservoir name = Wet Pond Storage Indication method used. M 4.00 2.00 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage 13 Wednesday, Oct 13, 2021 = 1.181 cfs = 726 min = 14,734 tuft = 260.79 ft = 8,136 cuft Post Through Pond Hyd. No. 3 -- 10 Year 480 960 1440 1920 2400 2880 3360 3840 4320 4800 Hyd No. 3 Hyd No. 2 ® Total storage used = 8,136 cuft Q (cfs) 8.00 W41 4.00 2.00 0.00 5280 Time (min) 14 Hydrograph Deport Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 4 Post Developed Bypass Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 0.770 ac Basin Slope = 0.0 % Tc method = USER Total precip. - 5.15 in Storm duration = 24 hrs Q (cfs) 2.00 1.00 Wednesday, Oct 13, 2021 Peak discharge = 1.022 cfs Time to peak = 722 min Hyd. volume = 3,043 cuft Curve number = 55 Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type II Shape factor = 484 Post Developed Bypass Hyd. No. 4 -- 10 Year 120 240 360 480 600 720 840 960 Hyd No. 4 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) 17 Hydrograph Summary Re pC Oyraflow Hydrographs Extension for AUtoCAD® Civil 3DO 2009 by Autodesk, Inc. v6.066 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval peak volume hyd(s) elevation strge used description (origin) (cfs) (min) (min) (cult) (ft) (cuft) 1 SCS Runoff 8.707 2 722 22,964 --- -- -- Pre -Developed -Overall Site 2 SCS Runoff 12.83 2 716 27,889 - - Post Developed to Pond 3 Reservoir 7.593 2 722 27,290 2 261.33 11,238 Post Through Pond 4 SCS Runoff 3.246 2 722 8,582 ------ --- - Post Developed Bypass 6 SCS Runoff 0.000 2 n/a 0 ------ ------ - SCM Post -Developed 7 Reservoir 0.000 2 n/a 0 6 259.00 0.000 1.0-in Storm Thru Pond Wet Pond_Middlesex.gpw I Return Period: 100 Year I Wednesday, Oct 13, 2021 18 Hydrograph Report Hydraflow Hydrographs Extension forAutoCAD® Civil 3DO2009 byAutodesk, Inc. v6.066 Hyd. No. 1 Pre -Developed -Overall Site Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 2.000 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 8.28 in Storm duration = 24 hrs Q (cfs) 10.00 M . K It 4.00 2.00 M Wednesday, Oct 13, 2021 Peak discharge = 8.707 cfs Time to peak 722 min Hyd. volume = 22,964 cuft Curve number = 55.8 Hydraulic length = 0 ft Time of cone. (Tc) = 10.00 min Distribution = Type II Shape factor = 484 Pre -Developed -Overall Site Hyd. No. 1 -- 100 Year Q (cfs) 10.00 M 4.00 2.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 1 Hydrograph Report ■V Hydraflow Hydrographs Extension for AutoCAD® Civil 31D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 1.230 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 8.28 in Storm duration = 24 hrs Q (cfs) 14.00 12.00 10.00 e Me] 4.00 2.00 w Wednesday, Oct 13, 2021 Peak discharge = 12.83 cfs Time to peak = 716 min Hyd. volume = 27,889 cuft Curve number = 86.5 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 Post Developed to Pond Hyd. No. 2 -- 100 Year 120 240 360 480 600 Hyd No. 2 Q (cfs) 14.00 12.00 10.00 e we] 4.00 2.00 0.00 720 840 960 1080 1200 Time (min) Hydrograph Report 20 Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2009 by Autodesk, Inc. v6.066 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Storm frequency = 100 yrs Time interval = 2 min Inflow hyd. No. = 2 - Post Developed to Pond Reservoir name = Wet Pond Storage Indication method used. Q (cfs) 14.00 12.00 10.00 ee . We 4.00 2.00 0.00 0 Post Through Pond Hyd. No. 3 -- 100 Year Wednesday, Oct 13, 2021 Peak discharge = 7.593 cfs Time to peak = 722 min Hyd. volume = 27,290 cuft Max. Elevation = 261.33 ft Max. Storage = 11,238 cuft Q (cfs) 14.00 12.00 10.00 ie, AM, 4.00 2.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Hyd No. 2 Total storage used = 11,238 cult Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2009 by Autodesk, Inc. v6.066 Hyd. No. 4 Post Developed Bypass Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 0.770 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 8.28 in Storm duration = 24 hrs Q (cfs) 4.00 3.00 2.00 1.00 Post Developed Bypass Hyd. No. 4 -- 100 Year 120 240 360 480 600 720 840 Hyd No. 4 21 Wednesday, Oct 13, 2021 Peak discharge = 3.246 cfs Time to peak = 722 min Hyd. volume = 8,582 cuft Curve number = 55 Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type II Shape factor = 484 Q (cfs) 4.00 3.00 2.00 1.00 0.00 960 1080 1200 1320 1440 1560 Time (min) EROSION CONTROL CALCULATIONS EROSION CONTROL. CALCS (RIP -RAP CALCULATIONS) Project Information Project Name: Project #: Designed by: Revised by: Checked by: Dollar General Pipe Diameter Pipe Slope Manning's number Flow Velocity Date: Date: Date: d= 15 s= 1.18 n= 0.013 Q= 4.92 cfs V = 5.28 ft/s Dissipator Dimensions * Zone = Stone Filling Class = B Entry Width ( 3 X Do ) _ Length ( 6 X Do ) _ Width (La + Do) _ Min. Thickness = Min. Stone Diameter= * All units are in feet ** Dissipator pad designed for full flow of pipe 3. 1 2 3.8 ft 7.5 ft 8.8 ft 22 inches 6 inches �14 7.5 8.8 * All units are in feet ** Dissipator pad designed for full f RIP -RAP -Middlesex 10/13/2021 Page 1 of 3 RI_p-Rap_ Apron#2 Pipe Diameter Pipe Slope Manning's number Flow Velocity d= 12 s= 0.95 n= 0.013 Q= 4 1.62 cfs V = 3.75 ft/s Dissipator Dimensions * Zone = Stone Filling Class = B Entry Width ( 3 X Do ) _ Length ( 6 X Do ) _ Width (La + Da) _ Min. Thickness = Min. Stone Diameter= 2 3.0 ft 6.0 ft 7.0 ft 22 inches 6 inches 6.0 1 1 * All units are in feet ** Dissipator pad designed for full f RIP -RAP -Middlesex 10/13/2021 Page 2 of 3 Rip —Rap Apron#3 Pipe Diameter Pipe Slope Manning's number Flow Velocity d= 15 s= 3.21 n= 0.01 3 4 Q= 4 1.58 cfs It V = 1.29 ft/s Dissipator Dimensions * Zone = 4 Stone Filling Class = Entry Width ( 3 X Da ) _ Length ( 6 X Do ) _ Width (La + Dc,) _ Min. Thickness = Min. Stone Diameter= 0 2 3.8 ft 7.5 ft 8.8 ft 22 inches 6 inches 7.5�� * All units are in feet ** Dissipator pad designed for full f RIP -RAP -Middlesex 10/13/2021 Page 3 of 3 EROSION CONTROL CALCS (SKIMMER BASINS) Project Information Project Name: Dollar General Project #: Designed by: Date: Revised by: Date: Checked by: Date: Skimmer Basin #1 Drainage Area Total, AT= 1.B Ac Disturbed, Ac= 18 Ac 10-year Runoff (Q10) C = d 50 T. = 5.00 min 1100 7.10 in/hr 01e = 6.4 cfs Surface Area Required SA = 325sf x 010 SA= 2,077 sf Volume Required VR = 1800 cf/Ac x Ac VR = 3,240 cf Sediment Trap Dimensions L = 66 ft (Spillway Length) W = 32 ft (Spillway Width) D = 2.0 ft (Depth of Storage) Side Slopes = 2 :1 4W= L,. = 74 ft Lba= 58 ft W W1p, WI-P= 40 ft Lpp= Wb.1= 24 It LAN Ratio= 2.1 :1 (must be 2:1 to 6:1) Elevations Description Elevation Top of Berm 263.00 (allow 1 ft freeboard above spillway flow height) Emergency Spillway 261,50 Sediment Storage 261.00 Cleanout Mark 260.00 (half of storage height) Bottom 25900 Provided SAP= 2,112 sf > 2,077 Vp = 3,504.0 cf > 31240 Emergency Spillway - 10 Year Storm 110 = 7.10 in/hr Q10 = 6.39 cfs h = 0.5 ft Cw = 3 LR,= 10 ft Calculate Skimmer Size Basin Volume in Cubic Feet 3,504 Cu.Ft Skimmer Size 1.s Inch Days to Drain* 3 Days Orifice Radius 0,6. Inch[es] Orifice Diameter 1.2 Inch[es] 'In NC assume 3 days to drain Estimate Volume of Basin Let)gth Width Top of water surface in feet 66 32 Feet VOLUME 3504 Cu. Ft. Bottom dimensions in feet 58 24 Feet Depth in feet 2 Feet EROSION CONTROL CALCS (SKIMMER BASINS) Project Information Project Name: Project #: Designed by: Revised by: Checked by: Anti -Flotation Device 4' x 4' Outlet Structure Area: Top of Basin Elev.: Bottom of Basin Elev.: Volume: Weight: Factor of Safety WT Req'd of Anti -Flotation Device: Volume of Concrete Req'd: Volume Provided Dollar General 16.0 sf 261.0 259.0 320 cf 1997 Ibs 1.20 2,396 Ibs 16.0 cf 69.5 cf Date: Date: Date: (Water Displaced - Top of Pond to Bottom of Pond) (Unit WT of Concrete = 150 pcf) (4'x4' riser x 2.0' = 32cf, 5'x5' footing x 1.5'=37.5cf) 10/7/21, 3:15 PM NORTH AMERICAN GREEN CHANNEL ANALYSIS > > > Igi17124L3fY Ditch#1 Name Temporary Ditch#1 Discharge 2.7 Channel Slope 0.0219 Channel Bottom Width 1 Left Side Slope 2 Right Side Slope 2 Low Flow Liner Retardence Class C 6-12 in Vegetation Type None Vegetation Density None Soil Type None C125 ECMDS 7.0 North American Green 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 Tel. 800.772.2040 > Fax 812.867.0247 www.nagreen.com ECMDS v7.0 Phase Reach Discharge Velocity Normal Mannings N Permissible Calculated Safety I Remarks Staple Depth Shear Stress Shear Stress Factor Pattern C125 Straight 2.7 cfs 3.09 ft/s 0.46 ft 0.031 2.3 Ibs/ft2 0.62 Ibs/ft2 3.69 STABLE D Unvegetated Underlying Straight 2.7 cfs 3.09 ft/s 0.46 ft 0.031 0.53 Ibs/ft2 0.39 Ibs/ft2 1.36 STABLE D Substrate https://ecmds.com/project/139235/channel-analysis/211986/Show# 1/1 10/7/21, 3:16 PM ECMDS 7.0 NORTH North American Green AMERICAN 5401 St. Wendel -Cynthiana Rd, Poseyville, Indiana 47633 GREEN Tel. 800.772.2040 > Fax 812.867.0247 www.nagreen.com ECM DS v7.0 CHANNEL ANALYSIS > > > 1=P2.W Ditch#2 Name Temporary Ditch#2 Discharge 2.5 Channel Slope 0.0205 Channel Bottom Width 1 Left Side Slope 2 Right Side Slope 2 Low Flow Liner Retardence Class C 6-12 in Vegetation Type None Vegetation Density None Soil Type None C125 Phase Reach Discharge Velocity Normal Depth Mannings N Permissible Shear Stress I Calculated Shear Stress Safety I Factor Remarks Staple Pattern C125 Straight 2.5 cfs 2.95 ft/s 0.45 ft 0.031 2.3 Ibs/ft2 0.57 Ibs/ft2 4.03 STABLE D Unvegetated Underlying Straight 2.5 cfs 2.95 ft/s 0.45 ft 0.031 0.53 Ibs/ft2 0.36 Ibs/ft2 1.48 STABLE D Substrate hops://ecmds.com/project/139235/channel-analysis/211986/show 1/1