Project: Tryon International F,questiian Center- Phase I
County: Poll:
USACE #: 2013 -02262
WQ permit #: 13 -1200
EEP #:21153
Amount Paid: $216,920 00
Check Number: epayment- 140225 13 150587
/m3lzao
The North Caiohna Ecosystem Enhancement Program (NCEEP) has received a check as indicated above as payment for the
compensatory mitigation requirements of the 401 Water Quality Certification /Section 404 /LAMA Pernut(s) issued for the above -
teferenced project This receipt serves as notification that your compensatory mitigation requirements assigned to NCEEP associated
with the authot razed activity as specified below have been satisfied. You must also comply with all other conditions of this
certification and any other state, federal or local government permits or authorization associated with this activity including SL 2009-
337, An Act to Promote the Use of Compensatory Mitigation Banks, as amended by S,L 201 1 -343
The NCEEP, by acceptance of this payment, acknowledges that the NCEEP is tesponsible for the compensatory mitigation
requirements indicated below associated with the project permit and agrees to provide the cormpensatoiy mitigation as specified in the
Permit Mitigation responsibility assigned to the NCEEP is nontransferable. The mitigation will be performed in accordance with the
N C. Department of Environment and Natural Resources' Ecosystem Enhancement Program In -Lieu Fee Instrument dated July 28,
2010
River Basin
Stream Credits
Wetland Credits
Buffer 1& II
HUC
(linear feet)
(acres)
(Sq Pt }
Cold
Cool
Warn
Riparian
Non - Riparian
Coastal Marsh
Broad
0
0
580
0
0
0
0
03050105
Refunds of payments made to NCEEP are only approved under certain conditions. All refund iequest,; must be submitted in
accordance with ESP's refund policy at www nceep net. If you have any questions or need additional information, please contact
Kelly \X illiams at (9 19) 707 -8915.
Sincerely,
r ,VIicF7ae1 E14son
Director
CC' Katen Higgins, NCDWR Wetlands /401 Unit
Steve Kichefski, USACE- Asheville;Tyler Crumbley, USACE - Raleigh
Chuck Cranford, NCDWR
Paul Petitgout, agent
File
kutorli tg... Ed"... Prot"' sta g
North Carolina Ecosystem Enhancement Program, 1652 Mail Service Center, Raleigh, NC 27699 -1652 / 919 - 707 -8976 / www nceep net
U.S. ARMY CORPS OF ENGINEERS
Wilmington District
Compensatory Mitigation Responsibility Transfer Form
Permittee; Tryon Equestrian Partners LLC / Attn: Jeff Brown Action ID: SAW- 2013 -02262
Project Name: Tryon Equestrian Center County: Polk
Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved
Mitigation Bank or the North Carolina Ecosystem Enhancement Program (NCEEP), who will then sign the form to verify the
transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to
ensure that to the U.S. Army Corps of Engineers (USAGE) Project Manager identified on page two is in receipt of a signed
copy of this form before conducting authorized impacts, unless otherwise specified below. If more than one mitigation
Sponsor will be used to provide the mitigation associated with the permit, or if the impacts and /or the mitigation will occur
in more than one 8 -digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms
for each Sponsor and /or HUC must be provided to the appropriate mitigation Sponsors.
Instructions to Sponsor: The Sponsor must verify that the mitigation requirements (credits) shown below are available at
the identified site By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of
whether or not they have received payment from the Permittee. Once the form is signed, the Sponsor must update the
bank ledger and provide a copy of the signed form and the updated bank ledger to the Permittee, the USACE Project
Manager, and the Wilmington District Mitigation Office (see contact information on page 2) The Sponsor must also comply
with all reporting requirements established in their authorizing instrument.
Permitted Impacts and Compensatory Mitigation Requirements:
Permitted Impacts Requiring Mitigation* 8-digit HUC and Basin: 03050105, Broad River Basin
Stream Impacts (linear feet)
Wetland Impacts (acres)
Warm
Cool
Cold
Riparian Riverme
Riparian Non - Riverine
Non - Riparian
Coastal
290
*If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor.
Compensatory Mitigation Requirements: 8 -digit HUC and Basin: 03050105, Broad River Basin
Stream Mitigation (credits)
Wetland Mitigation (credits)
Warm
Cool
Cold
Riparian Rfverme
Riparian Non - Riverine
Non - Riparian
Coastal
580
Mitigation Site Debited: NCEEP
(List the name of the bank to be debited. For umbrella banks, also list the specific site. For NCEEP, list NCEEP, if the NCEEP
acceptance letter identifies a specific site, also list the specific site to be debited)
Section to be completed by the Mitigation Sponsor
Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation
transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for
providing the mitigation identified in this document (see the table above), associated with the USAGE Permittee and Action
ID number shown. I also verify that released credits (and /or advance credits for NCEEP), as approved by the USAGE, are
currently available at the mitigation site identified above Further, I understand that if the Sponsor fads to provide the
required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to
ensure compliance associated with the mitigation requirements.
Mitigation Sponsor Name:' l_. l r 1 1
Name of Sponsor's Authorize Representative: 1�-
� I
Signature of onsof " uthorized Representative Date of Signature
Page 1 of 2 Form Updated 23 October, 2013
USACE Wilmington District
Compensatory Mitigation Responsibility Transfer Form, Page 2
Conditions for Transfer of Compensatory Mitigation Credit:
• Once this document has been signed by the Mitigation Sponsor and the USACE is in receipt of the signed form, the
Permittee is no longer responsible for providing the mitigation Identified in this form, though the Permittee remains
responsible for any other mitigation requirements stated in the permit conditions.
• Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only
after the USACE is In receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has
accepted responsibility for providing the mitigation requirements listed herein. For authorized impacts conducted by
the North Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon
permit issuance, however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of
permit issuance, NCDOT remains fully responsible for the mitigation untll'the USACE has received this form, confirming
that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein
• Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE
administrative records for both the permit and the Bank /1LF Instrument. It is the Permittee's responsibility to ensure
that the USACE Project Manager (address below) is provided with a signed copy of this form.
• if changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to
the USACE, the Sponsor must obtain case -by -case approval from the USACE Project Manager and /or North Carolina
Interagency Review Team (NCIRT). If approved, higher mitigation ratios may be applied, as per current District
guidance and a new version of this form must be completed and included in the USACE administrative records for both
the permit and the Bank /ILF Instrument.
Comments /Additional Conditions:
This form is not valid unless signed below by the USACE Project Manager and by the Mitigation Sponsor on Page 1. Once
signed, the Sponsor should provide copies of this form along with an updated bank ledger to. 1) the Permittee, 2) the
USACE Project Manager at the address below, and 3) the Wilmington District Mitigation Office, Attn: Todd Tugwell,
11405 Falls of Neuse Road, Wake Forest, NC 27587 (email. todd.tugwell @usace.army.mil). Questions regarding this form
or any of the permit conditions may be directed to the USACE Project Manager below.
USACE Project Manager: Steve Kichefski
USACE Field Office: Asheville Regulatory Field Office
US Army Corps of Engineers
151 Patton Avenue, Room 208
Asheville, North Carolina 28801 -5006
Email: steven.l.kichefski@usace.army.mil
lcu L December 23, 2013
USACE Pro ct Manage Signature Date of Signature
Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and
mitigation bank location and availability, and credit classifications (Including stream temperature and wetland groupings) is
available at http. / /ribits usace army.mil.
Page 2 of 2
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the
Customer Satisfaction Survey located at our website at http • /Iregulatc)rV.usacesurvey.com/ to complete the survey online