Loading...
HomeMy WebLinkAboutNC0021733_PAR Narrative 2021_20220216Town of Marshall North Carolina Wastewater Treatment Facility Industrial Pretreatment Program 2021 Pretreatment Annual Report Narrative 1 February 2022 I. General Program Information • Pretreatment Program Information Sheet - The information sheet as provided by the PERCS Unit is accurate at this time. • Major Pretreatment Program Elements Headworks Analysis – The headworks analysis report was approved to the PERCS Unit on May 2015 • Enforcement Response Plan – The Town of Marshall WWTP has an approved Emergency Response Plan of file at this time • Sewer Use Ordinance - The Town of Marshall adopted the model SUO March 21, 2013 • Industrial Waste Survey – The Town of Marshall WWTP performed an Industrial Waste Survey on December 15, 2018 II. General Permit Information • IUP – The Industrial User Permit for Derringer Ney Manufacturing was renewed on April 15th, 2020. The IUP is to be renewed April 15th 2025. This is the Town’s only active IUP. • IUP Changes – There have been no additions or changes for SIU during the year 2021 III. SIU Information • SUI’s in SNC – There were no industrial users in SNC during 2021