Loading...
HomeMy WebLinkAbout20220211 - Agency Meeting C203649   Agency Meeting: Gum Branch Widening    Project: C203649         U‐4906  40255.3.3      Date: 2/11/2022  Attendees: NCDOT‐ Daniel Waugh, Dave Monro, Shane Lofton, Anneliese  Westphal, Hanna Sprinkle & Sophia Gingrich – Barnhill: Terry Lanier ‐ Hendrix‐ Barnhill: Seth Partington    Pump around at Rock Creek ‐Y5‐ and ‐L‐ Site’s 4 & 3   Ensure end of pipe is protected from erosion, do not create any issues in these areas   No additional impacts allowed    Trenching Utilities in Wet Land Areas where allowed   Keep material separated by soil type (Topsoil goes back on top)  March 22nd 2022 NWP expires there is a 1 year extension to March 22nd 2023, New Permit  Required March 23rd, 2023.   Site 2 (Permit Drawing Sheet 14) is complete.  Directional Drilling   Wattles and Silt fence at bore pits.                    Additional Items Discussed: