Loading...
HomeMy WebLinkAbout20211696 Ver 1_16-22 DCM Permit_20220218Permit Class NEW Permit Number 16-22 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission etmit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to Nicholas and Deirdre Sarif, 22965 Burris Rd. Albemarle, NC 28001 Authorizing development in Brunswick County at adj. to the AIWW, at 343 Serenity Lane in Holden Beach , as requested in the permittee's application dated 10/11/21, including attached workplan drawings (4), Sheets 1,2,4 of 4 dated 10/14/21 and Sheet 3 of 4 dated 12/20/20. This permit, issued on February 18, 2022 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Docking Facility 1) This permit authorizes only the boatlift and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification. 2) This permit authorizes 1 additional formalized boat slips for a maximum of 3 formalized boat slips at this docking facility. (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2025 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chair of the Coastal Resources Commission. Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Nicholas and Deirdre Sarif ADDITIONAL CONDITIONS Permit No. 16-22 Page 2 of 2 The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. The authorized structure and associated activity shall not cause an unacceptable interference with navigation and shall not exceed the dimensions shown on the attached permit drawings. This permit does not authorize the interference with any existing or proposed Federal project, and the permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. Sedimentation and Erosion Control In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses or properties. General This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. All construction debris associated with the removal or construction of the permitted docking facilities shall be contained within the authorized project area and disposed of in an approved upland location. 10) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 4175 and assigned the project DWR Project No. 20211696. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (910) 796-7215 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal high-water level. NOTE: An application processing fee of $250 was received by DCM for this project.