HomeMy WebLinkAbout20211578 Ver 1_15-22 DCM Permit_20220218Permit Class
NEW
Permit Number
15-22
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
etmit
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
Excavation and/or filling pursuant to NCGS 113-229
Issued to Janie and Hobby Greene, 107 SW 9th Street, Oak Island, NC 28465
Authorizing development in Brunswick County at adj. to Davis Canal, at 110 SW 9th Street in
Oak Island , as requested in the permittee's application dated 8/6/21,
including attached workplan drawings (5), Sheets 3-7 of 7, all dated 9/24/21.
This permit, issued on February 18, 2022 , is subject to compliance with the application (where
consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation
of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
Docking Facility
1) This permit authorizes only the docks, piers, covered platform, and other structures and uses located
in or over the water that are expressly and specifically set forth in the permit application. No other
structure, whether floating or stationary, shall become a permanent part of this docking facility
without permit modification. No non -water dependent uses of structures shall be conducted on, in or
over Public Trust waters without permit modification.
2) This permit authorizes a maximum of 6 formalized boat slips.
(See attached sheets for Additional Conditions)
This permit action may be appealed by the permittee or other
qualified persons within twenty (20) days of the issuing date.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2025
In issuing this permit, the State of North Carolina agrees that
your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DEQ and the Chair
of the Coastal Resources Commission.
Braxton C. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Janie and Hobby Greene Permit No. 15-22
Page 2 of 3
ADDITIONAL CONDITIONS
No portion of the authorized docking facility, including tie piles, shall extend more than one quarter of
the width of the water body. Measurements to determine width of the water body shall be made from
the normal high water line or the waterward edge of any coastal wetland vegetation which borders the
water body, whichever is more restrictive.
Should the eastern adjacent lot be sold prior to the initiation of construction of the docking facility, the
permittee shall obtain a written agreement from the new owner(s) waiving the minimum setback, and
authorization to construct the portion of the docking facility within the property owner's riparian
setback, and submit it to the Division of Coastal Management prior to initiating construction of the
docking facility.
The pier, covered platform, and associated structures shall have a minimum setback distance of 15 feet
between any parts of the structure and the western adjacent property owner's area of riparian access.
The authorized covered platform shall be single story, and shall not be designed to allow for second
story use.
The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent
reflectors shall be attached to the structure in order to make it more visible during hours of darkness or
inclement weather.
Any portion of the permitted access pier and docking facilities built over wetlands shall not exceed six
feet in width and shall be elevated a minimum of three feet above the wetland substrate as measured
from the bottom of the decking.
The authorized structure and associated activity shall not cause an unacceptable interference with
navigation and shall not exceed the dimensions shown on the attached permit drawings.
10) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the
mooring. Any sewage discharged at the docking facility shall be considered a violation of this permit
for which the permittee is responsible. This prohibition shall be applied and enforced throughout the
entire existence of the permitted structure.
Standard Dredging Moratorium
11) The authorized project is located within a primary nursery area (PNA). Therefore, in accordance with
NCAC 15A:07H.0208 of the Rules of the Coastal Resources Commission, no new dredging or
excavation within the PNA shall be permitted. Dredging in any manner, including "kicking" with boat
propellers, is not authorized. This prohibition shall be applied and enforced throughout the entire
existence of the permitted structure.
Janie and Hobby Greene Permit No. 15-22
Page 3 of 3
Sedimentation and Erosion Control
12) In order to protect water quality, runoff from construction shall not visibly increase the amount of
suspended sediments in adjacent waters.
13) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to
ensure that eroded materials do not enter adjacent wetlands, watercourses or properties.
General
14) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
15) All construction debris associated with the removal or construction of the permitted docking facilities
shall be contained within the authorized project area and disposed of in an approved upland location.
16) The permittee and/or his or her contractor shall meet with a representative of the Division prior to
project initiation.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water
Quality Certification 4175 and assigned the project DWR Project No. 20211578.
NOTE: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (910) 796-7215 prior to the commencement of any
such activity for this determination. The permittee is further advised that many non -water
dependent activities are not authorized within 30 feet of the normal high-water level.
NOTE: An application processing fee of $250 was received by DCM for this project.