Loading...
HomeMy WebLinkAboutNCC214083_Notice of Termination_20220216Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 2/16/2022 11:37:08 AM (NOT Submittal) Approve by Morman, Alaina 2/21/2022 11:01:29 AM (NOT Request Review - NCC214083) • The task was assigned to Morman, Alaina. The due date is: February 21, 2022 5:00 PM 2/16/2022 11:37 AM NORTH CAROLINA Rrf OmFkm&tral Qualrly Certificate of NCC214083 Coverage (COC) No.* Enter the Certificate of Coverage Number 2020 Annual Fee Status 2021 Annual Fee Status May be blank (if not yet billed). 2022 Annual Fee May be blank (if not yet billed). Status Information associated with this permit: Project Name Idle Line 139 Removal Address US Hwy 13/Governors Road, Windsor, NC County Bertie Latitude 36.0000 Longitude -77.0000 Permittee Listed Virginia Electric and Power Company d/b/a Dominion Energy North Carolina Legally Responsible Mark Allen Individual NC Reference No. NCG01-2021-4083 E&SC Plan ID Berti-2022-001 Original NOI Tracking 58811 No. Date COC Issued 7/15/2021 Prior Rescission Date Date populates only if COC was already rescinded at time of submittal. Reason for Rescission/Termination Request: Reason for Project Closed -Out Termination of Sale (Another Owner/Operator obtained new COC) Coverage* Mistake or Invalid Coverage Other Additional More information about the basis of this request, if needed. Explanation Supporting Upload Supporting Documentation if applicable. Documentation Must be PDF format Project Close-out Information: Final Close-out 2/14/2022 Inspection Approval Project Close-out 20220214 sed insp report BERTI-2022-001 idle line Approval 456.05KB 139 removal.pdf Documentation Must be PDF format North Carolina General Statute 143-215.613 (i) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). * I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. "This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCGO10000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Mark Allen Title * Director, ET Project Development & Execution Organization * Virginia Electric and Power Company Date* 02/16/2022 Email for chelsea.l.sachs@dominionenergy.com Confirmation * Contact Telephone* 8047731046 NOT Certification NCG01 Notice of Termination (NOT) Certification Form 646.99KB Form.pdf Must be PDF Format Is this COC Already Ensure this COC has not been rescinded since submittal! Rescinded? Additional Email CC'd on Notification Emails (Optional) james.e.clay@dominionenergy.com Original Permittee CC'd on Notification Emails Email Mark.Allen@dominionenergy.com Original Site Contact cc'd on Notificaiton Emails Email james.e.clay@dominionenergy.com