Loading...
HomeMy WebLinkAbout20140285 Ver 1_Application_20140324�dM.'AATE'o,� STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAT L. MCCRORY GOVERNOR March 10, 2014 U. S. Army Corps of Engineers Wilmington Regulatory Office 69 Darlington Avenue Wilmington, NC 28402-1890 ATTN: Ms. Liz Hair NCDOT Coordinator ANTHONY J. TATA SECRETARY SUBJECT: Application for Section 404 Individual Permit, Section 401 Water Quality Certification, and Isolated Wetlands General Permit for the proposed NC 24/27 Troy Bypass from west of SR 1138 (Dairy Road) to just east of Little River, Montgomery County, Division 8. TIP No. R-0623. Debit $570.00 from WBS Element No. 34352.1.1 Dear Madam: The North Carolina Department of Transportation (NCDOT) proposes to construct the NC 24/27 Troy Bypass from west of SR 1138 (Dairy Road) to just east of Little River, Montgomery County, for a total of 6.65 miles. In addition to this cover letter, the application package consists of an ENG Form 4345, NCEEP acceptance letter, Interagency Hydraulic Design Review meeting minutes (Concurrence Points 4B and 4C), Stormwater Management Plan, permit drawings, utility drawings, and half-size roadway plan sheets. This project calls for a Let date of November 18, 2014 and a review date of September 30, 2014. However, the Let date may advance as additional funds become available. PURPOSE AND NEED The purpose and need for this project is based on current and projected traffic volumes, particularly the high volumes of truck traffic (7% to 10%) traveling through downtown Troy. The proposed bypass would provide additional roadway capacity, accommodate projected traffic volumes, reduce congestion on main arteries in downtown Troy and provide better access to NC 24/27. NEPA DOCUMENT STATUS An Environmental Assessment (EA) and Finding of No Significant Impact (FONSI) for R-0623 were completed in January 2007 and March 2009, respectively, and have been provided to the appropriate agencies. The EA and FONSI are available on the NCDOT Website at MAILING ADDRESS: LOCATION: NC DEPARTMENT OF TRANSPORTATION TELEPHONE: 919-707-6000 CENTURY CENTER, BUILDING B PROJECT DEVELOPMENT & ENVIRONMENTAL ANALYSIS UNIT FAX: 919-212-5785 1020 BIRCH RIDGE DRIVE 1598 MAIL SERVICE CENTER RALEIGH NC 27610 RALEIGH NC 27699-1548 WEBSITE:NCDOT.GOV https://connect.ncdot.gov/resources/Environmental/Pages/default.aspx, under Quick Links > Environmental Documents. The subject project is in compliance with 23 CFR Part 771.111(f), which lists the Federal Highway Administration (FHWA) characteristics of independent utility of a project: (1) The project connects logical termini and is of sufficient length to address environmental matters on a broad scope; (2) The project is usable and a reasonable expenditure, even if no additional transportation 4 improvements are made in the area; (3) The project does not restrict consideration of alternatives for other reasonably foreseeable transportation improvements. RESOURCE STATUS Wetland delineations within the R-0623 project study area followed the field delineation method outlined in the 1987 Corps of Engineers Wetland Delineation Manual (USACE, 1987) and the Interim Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Eastern Mountains and Piedmont Region (USACE, 2010). Stream identification and classification followed the Methodology for the Identification of Intermittent and Perennial Streams and Their Origins (NC Division of Water Resources [NCDWR], 2010 and 2005). A jurisdictional determination (JD) for R-0623, dated October 11, 2005, was received from USACE. The JD expired on October 11, 2010. Jurisdictional features were last re -verified by USACE Regulatory Specialist Ronnie Smith and NCDWR representative David Wainwright on March 7, 2012. Following the re -verification site visit, a request packet for the final JD was submitted to the USACE on March 20, 2012. The corresponding JD, dated June 19, 2012, was received from the USACE for the re -verification of R-0623. This project lies within the Piedmont Physiographic Province in the Yadkin -Pee Dee River Basin (Hydrologic Unit Code 03040104). Jurisdictional features within the R-0623 project study area that will be impacted include 2 unnamed tributaries (UT) to Rocky Creek (NCDWR Classification C; HQW; NCDWR Index No. 13-25-30-[0.5]), Warner Creek and 7 UTs to Warner Creek (NCDWR Classification C; NCDWR Index No. 13-25-30-2), 3 UTs to Turkey Creek (NCDWR Classification C; NCDWR Index No 13-25-25), Smithermans Creek and 5 UTs to Smithermans Creek (NCDWR Classification C; NCDWR Index No. 13-25-21), Long Branch (NCDWR Classification C; NCDWR Index No. 13-25-28), Little River (NCDWR Classification C; NCDWR Index No. 13-25-[19]), 3 ponds, 19 riparian wetlands, and 1 non -riparian (isolated) wetland. Besides the 2 UTs to Rocky Creek, no other designated High Quality Waters (HQW) are found within the project study area. HQWs including Rocky Creek and Little River are within 1.0 mile downstream of the project study area. There are no designated Outstanding Resource Waters (ORW), Water Supply I (WS-I), Water Supply II (WS-II) waters, or waters listed on the 2012 303(d) Final List of Impaired Waters within the project study area or within 1.0 mile of the project area. R-0623 Individual Permit Application 2 IMPACTS TO WATERS OF THE UNITED STATES Surface Waters Total surface water impacts for R-0623 are 4,867 linear feet of permanent stream impacts, 747 linear feet of temporary stream impacts, and 1.37 acres of pond impacts. The jurisdictional stream impacts are summarized below in Table 1. There will be no impacts to surface waters from utilities for R-0623. Table 1. R-0623 Stream Impacts Impacts Impacts Permit Stream UP Impact Permanent requiring USACE requiring Temp Name/JD Flow Impacts USACE Mitigation NCDWR Impacts Site No. packet H) Status Type (ft) mitigation Ratio' mitigation (ft) ft ft UT to Fill 136 136 1:1 03 16 1 Rocky I Creek/S 1 BS 11 OZ 03 0 UT to 2 Rocky I Fill 39 39 1:1 03 34 Creek/S2 UT to 3 Warner P Fill 294 294 2:1 294 24 Creek/S3 UT to 4 Warner P Fill 271 271 2:1 271 73 Creek/S5 UT to Fill 295 295 2:1 295 17 5 Warner P Creek/S6 BS 62 OZ 62 0 UT to 5B Warner I Fill 500 500 1:1 03 0 Creek/S 8 7 Warner P BS 43 OZ 04 0 Creek/S 18 UT to 7A Warner P BS 16 O2 04 0 Creek/S 17 UT to 7B Warner P Fill 355 355 2:1 355 72 Creek/S 13 UT to 8 Warner P Fill 0 0 0 10 Creek/S76 UT to Fill 322 322 2:1 322 83 11 Turkey P Creek/S37 BS 15 OZ 15 0 UT to IIA Turkey P Fill 91 91 2:1 04 41 Creek/S36 UT to 12 Turkey P Fill 499 499 2:1 499 38 Creek/S40 R-0623 Individual Permit Application Table 1. R-0623 Stream Impacts continued Impacts Impacts Permit Stream UP Impact Permanent requiring USACE requiring Temp Name/JD Flow Impacts USACE Mitigation NCDWR Impacts Site No. Packet ID Status Type (ft) mitigation Ratio' mitigation (ft) ft ft UT to Fill 229 229 1:1 03 60 14 Smithermans I BS 12 OZ 03 0 Creek/S50 UT to Fill 370 370 370 31 15 Smithermans P Creek/S53 BS 13 OZ 04 0 UT to Fill 280 280 2:1 280 57 17 Smithermans P BS 21 Oz 21 0 Creek/S57 UT to Fill 297 297 1:1 03 44 18 Smithermans I BS 22 OZ 03 0 Creek/S59 UT to 19B Smithermans P Fill 0 0 0 17 Creek/S60 Smithermans Fill 340 340 2:1 340 0 19C Creek/S64 P BS 9 O2 9 0 Fill 0 0 0 112 21 Little River P BS 75 OZ OQ 0 Long Fill 240 240 1:1 03 18 24A Branch/S77 I BS 10 Oz 03 0 TOTALS (ft) 4,867 4,558 3,147 747 Notes: P = Perennial; I = Intermittent; BS = Bank Stabilization. 'Determined from USACE during verification site visit on March 7, 2012. 'Mitigation for bank stabilization not required by USACE. 'Intermittent streams grandfathered from NCDWR mitigation. 'Mitigation not required by NCDWR (less than 150 linear feet of steam). Wetlands There will be a total of 1.22 acres of permanent riparian wetland impacts associated with this section. These impacts will result from 1.17 acres of permanent fill and 0.05 acres of excavation. There will also be 0.37 acres of wetland impacts due to hand clearing. An additional 0.03 acres of temporary fill will occur in the hand clearing areas due to the placement of erosion control measures. Permanent wetland impacts are summarized below in Table 2 for R-0623. Table 2. R-0623 Wetland Impacts Permit Site No. JD Package ID Permanent Fill (ac) Excavation (ac) Total Impacts (ac) 1 W1 0.13 0.13 2 W 2 <0.01 <0.01 3 W5 0.01 0.01 4 W52 0.02 0.02 5A W 11 0.04 0.04 5B W53 0.01 0.01 5 C W 13 0.02 0.02 0.04 6 W54 0.08 0.08 7B W55 0.16 0.16 R-0623 Individual Permit Application 4 Table 2. R-0623 Wetland Impacts continued Permit Site No. JD Package ID Permanent Fill (ac) Excavation (ac Total Impacts ac 8 W56 <0.01 <0.01 9* W57 0.03 0.03 10 W25 0.14 <0.01 0.14 13 W62 0.05 0.05 16 W63 0.14 0.14 17 W63 0.10 0.01 0.11 18 W64 0.11 <0.01 0.12 19 W67 0.04 0.04 19A W68 0.01 0.01 20 W50 0.05 0.05 24 W71 <0.01 <0.01 24A W72 0.04 1 0.04 TOTALS (ac) 1.17 1 0.05 1.22 Notes: Totals are rounded based upon sum of actual impacts. *The wetland at Permit Site 9 is an isolated and therefore, a non-404 regulated wetland. Mitigation for this site will only be required by NCDWR at 2:1 ratio. A total of 0.05 acres of temporary excavation in wetlands will occur due to open -trench excavation for installation of a water line. An additional 0.05 acres of hand clearing in wetlands will occur for overhead power -line clearing. These utility impacts are detailed in the attached Utility Permit Drawings. MITIGATION OPTIONS The USACE has adopted, through the Council on Environmental Quality (CEQ), a wetland mitigation policy that embraces the concept of "no net loss of wetlands" and sequencing. The purpose of this policy is to restore and maintain the chemical, biological, and physical integrity of the waters of the United States. CEQ has defined mitigation of wetland and surface water impacts to include: avoiding impacts, minimizing impacts, rectifying impacts, reducing impacts over time, and compensating for impacts (40 CFR 1508.20). The NCDOT is committed to incorporating all reasonable and practicable design features to avoid and minimize jurisdictional impacts, and to provide full compensatory mitigation of all remaining, unavoidable jurisdictional impacts. Avoidance measures were taken during the planning phase and minimization measures were incorporated as part of the project design. Minimization includes the examination of appropriate and practicable steps to reduce the adverse impacts. Avoidance and Minimization Avoidance and minimization has been employed in the project area to the maximum extent practicable. The following measures were implemented for the project: R-0623 Minimization Measures NCDOT's Best Management Practices (BMPs) for the Protection of Surface Waters will be enforced; Use of Design Standards in Sensitive Watersheds for western (Rocky Creek drainage) and eastern (HQW section of Little River drainage) ends of the project; R-0623 Individual Permit Application • Grass swale treatment will be utilized in drainage systems discharging into HQW streams; • Impacts to wetlands, streams, and protected species (i.e., Schweinitz's sunflower) were avoided and/or minimized by adjusting alignments and slopes; • 2:1 slopes or less are used in most wetland areas; • All storm drainage will be diffused and designed for non -erosive velocities before entering stream and wetland areas to the maximum extent practicable; • Rip rap stabilization on banks of jurisdictional streams will be implemented to prevent erosion; • Reduction of permanent stream impacts by bridging Warner Creek and Little River; no deck drains will be used for these crossings to avoid direct discharges to these surface waters. Deck drainage will be collected in storm drain systems off the ends of the bridges and discharged into either grassed ditches or grassed swales before entering the streams. Permitted stream impacts (4,867 linear feet) for R-0623 decreased from the impacts calculated for the FONSI (6,420 linear feet for Alternative E). This decrease is due to fewer permitted stream crossings (21) compared to the FONSI-listed stream crossings (24) that will be impacted. Also impacts to 14 of the FONSI-listed streams have been either avoided or reduced. Final permitted wetland impacts (1.25 acres) for R-0623 increased from the impacts calculated from the FONSI (0.78 acres). The increase is primarily due to 13 new wetlands found during the 2012 re -delineation survey that were not calculated in the FONSI. Compensatory Mitigation Compensatory mitigation requirements for R-0623 are summarized below in Table 3. This project will permanently impact 4,867 feet of warm water streams. Of these 4,867 feet, there are 309 feet of bank stabilization that do not require mitigation by the USACE, resulting in 4,558 feet of stream impacts requiring USACE mitigation. The USACE is requiring 2:1 mitigation for 3,117 feet and requiring 1:1 mitigation for 1,441 feet of stream impacts. NCDWR is requiring 1:1 mitigation for 3,147 feet. Therefore, the total USACE mitigation requirement exceeds the NCDWR requirement. The mitigation requirements of 4,558 feet of permanent warm water stream impacts will be provided by the NCEEP for R-0623 (Table 3) This project will also permanently impact 1.22 acres of wetlands. The wetland at Permit Site 9 (0.03 acres) does not require mitigation by USACE due to its isolated status. However, this wetland will require mitigation by NCDWR at 2:1 ratio. The overall USACE mitigation requirement is 1.19 acres at 2:1 ratio while the overall NCDWR mitigation requirement is 1.22 acres at 2:1 ratio. The NCDWR wetland mitigation requirement exceeds the USACE requirement. The mitigation requirements of 1.19 acres of permanent riparian wetland impacts and 0.03 acres of permanent non -riparian wetland impacts will be provided by the NCEEP for R-0623 (Table 3). Table 3. R-0623 Required Compensatory Mitigation Summary Stream Impacts (ft) Wetland Impacts (ac) Impacts Requiring Mitigation 4,558 1.22 Required EEP Mitigation 3,117 2:1 1.19 2:1 Riparian 1,441 1:1 0.03 2:1 Non -riparian Total EEP Mitigation 7,675 2.38 Riparian 0.06 Non -riparian R-0623 Individual Permit Application 6 FEDERALLY PROTECTED SPECIES Plants and animals with a Federal classification of Endangered (E) or Threatened (T) are protected under provisions of Section 7 and Section 9 of the Endangered Species Act (ESA) of 1973, as amended. As of December 26, 2012, the U.S. Fish and Wildlife Service (USFWS) lists three federally protected species for Montgomery County: red -cockaded woodpecker (Picoides borealis), Schweinitz's sunflower (Helianthus schweinitzii), and smooth coneflower (Echinacea laevigata). No habitat exists within the project study area for red -cockaded woodpecker. The most recent surveys for Schweinitz's sunflower and smooth coneflower were conducted by NCDOT biologists on September 13, September 25, and September 27, 2012 in areas of suitable habitat. Individuals of Schweinitz's sunflower were found in the same area recorded in 2008. No specimens of smooth coneflower were found within the project study area. The biological conclusion of No Effect still remains valid for both red -cockaded woodpecker and smooth coneflower. The biological conclusion of May Affect -Likely to Adversely Affect also remains valid for Schweinitz's sunflower. During formal consultation with USFWS, a Biological Assessment (BA) was completed for Schweinitz's sunflower in December 2012. The BA was followed up by a Biological Opinion (BO) issued by the USFWS in January 2013. A Plan is being developed to salvage all the Schweinitz's sunflowers affected by this project. The sunflowers which occur within the project clearing limits will be dug up in the Fall of 2014 just prior to Let. The plants will be moved to a location with appropriate habitat within the Uwharrie National Forest. The selection of the relocation area will be coordinated with the U.S. Forest Service and the North Carolina Plant Conservation Program (NCPCP). A permit will be obtained from the NCPCP for this work. CULTURAL RESOURCES Two historic structures that are listed on or are eligible for the National Register of Historic Places (NRHP) include the Wooley-Sanders House and the Neal Clark House. In a May 16, 2006 concurrence form (Appendix A.6 of EA), the North Carolina Department of Cultural Resources, State Historic Preservation Office (HPO) concurred that the proposed project will have no adverse effect on the both the Wooley-Sanders House and the Neal Clark House. Based upon an intensive archaeological survey and evaluation conducted in 2008, it was determined that one site, Site 31MG1910, was eligible for the NRHP. It was also determined that avoidance of this site was not feasible. Coordination with HPO determined that impact minimization would include the development and implementation of a data recovery plan for the site. In accordance with Section 106 of the National Historic Preservation Act of 1966 (NHPA) (36 CFR 800), the NCDOT filed an "Adverse Effect Determination" with the Advisory Council on Historic Preservation (ACHP) and developed a Memorandum of Agreement (MOA) between the Federal Highways Adminstration (FHWA), HPO, NCDOT, and the Catawba Indian Nation regarding the data recovery plan and other courses of action for the archaeological site adversely affected by the proposed bypass. Correspondence from the ACHP, dated February 19, 2009, and the final MOA are included in Appendix B of the FONSI. FEMA COMPLIANCE There are streams within the project limits that are within Federal Emergency Management Agency (FEMA)-designated flood zones. Coordination between the NCDOT Hydraulics Unit and FEMA will occur prior to Let to ensure that NCDOT is in full compliance with applicable floodplain ordinances. R-0623 Individual Permit Application 7 INDIRECT AND CUMULATIVE EFFECTS An Indirect and Cumulative Impacts (ICI) Assessment of R-0623 was completed in April, 2006. The main function of the proposed project is to provide additional roadway capacity through the county and to improve safety and traffic flow on NC 24/27, primarily by diverting through -travelers and truck traffic around the Town of Troy. Subsequently, the report concluded that the proposed project is not anticipated to cause any substantial ICIs or create substantial changes in population projections or future land use. While potential ICIs could result from some improved accessibility of the project study area, the extent of these effects would be significantly tempered by the project study area's slow growth rate and the limited increase in access created by the project. Partial control of access and the use of superstreet intersections along the proposed bypass would further aid in maintaining traffic flow as well as limit the accessibility and attractiveness of adjacent land. The Town of Troy provides water and sewer within town, but currently does not plan to expand service to undeveloped and rural portions of the project study area; another factor that would largely inhibit growth along the bypass. The proposed bypass is consistent with, and included on, the latest version of the County Wide Land Use Plan (approved by the Montgomery County Commissioners in July, 2010). WILD AND SCENIC RIVERS This project will not impact any designated Wild and Scenic Rivers or any rivers included in the list of study rivers (Public Law 90-542, as amended) or North Carolina Natural and Scenic Rivers. ESSENTIAL FISH HABITAT The project will not impact any essential fish habitat afforded protection under the Magnuson -Stevens Act of 1996 (16 U.S.0 1801 et seq.). REGULATORY APPROVALS Application is hereby made for a Department of the Army Section 404 Individual Permit as required for the above -described activities for the proposed T.I.P. Project R-0623. We are also hereby requesting a Section 401 Water Quality Certification and an Isolated Wetlands General Permit from NCDWR. In compliance with Section 143-215.3D (e) of the NCAC, we will provide $570.00 to act as payment for processing the Section 401 permit. We are providing two copies of this application to NCDWR for their review and approval. A copy of this permit application and its distribution list will be posted on the NCDOT website at https:Hconnect.ncdot.gov/ esources/Environmental/Pages/default.aspx. Thank you for your time and assistance with this project. Please contact Greg Price at either wgwprice@ncdot.g_o_v or (919) 707-6148 if you have any questions or need additional information. Sincerel , - Richard W. Hancock, P.E., Manager Project Development and Environmental Analysis Unit Cc: NCDOT Permit Application Standard Distribution List R-0623 Individual Permit Application 8 U.S. ARMY CORPS OF ENGINEERS APPLICATION FOR DEPARTMENT OF THE ARMY PERMIT OMB APPROVAL 003 EXPIRES: 28 FEBRURUARY RY 20 2013 33 CFR 325. The proponent agency is CECW-CO-R. Public reporting for this collection of information is estimated to average 11 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of the collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters, Executive Services and Communications Directorate, Information Management Division and to the Office of Management and Budget, Paperwork Reduction Project (0710-0003). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to either of those addresses. Completed applications must be submitted to the District Engineer having jurisdiction over the location of the proposed activity. PRIVACY ACT STATEMENT Authorities: Rivers and Harbors Act, Section 10, 33 USC 403; Clean Water Act, Section 404, 33 USC 1344; Marine Protection, Research, and Sanctuaries Act, Section 103, 33 USC 1413; Regulatory Programs of the Corps of Engineers; Final Rule 33 CFR 320-332. Principal Purpose: Information provided on this form will be used in evaluating the application for a permit. Routine Uses: This information may be shared with the Department of Justice and other federal, state, and local government agencies, and the public and may be made available as part of a public notice as required by Federal law. Submission of requested information is voluntary, however, if information is not provided the permit application cannot be evaluated nor can a permit be issued. One set of original drawings or good reproducible copies which show the location and character of the proposed activity must be attached to this application (see sample drawings and/or instructions) and be submitted to the District Engineer having jurisdiction over the location of the proposed activity. An application that is not completed in full will be returned. (ITEMS 1 THRU 4 TO BE FILLED BY THE CORPS) 1. APPLICATION NO, 2. FIELD OFFICE CODE 3. DATE RECEIVED 4. DATE APPLICATION COMPLETE (ITEMS BELOW TO BE FILLED BYAPPLICANT) 5. APPLICANT'S NAME 8. AUTHORIZED AGENT'S NAME AND TITLE (agent is not required) First - Richard Middle -W. Last - Hancock First - Middle - Last - Company - NCDOT-PDEA Company - E-mail Address - E-mail Address - 6. APPLICANT'S ADDRESS: 9. AGENT'S ADDRESS: Address- 1598 Mail Service Center Address - City - Raleigh State - NC Zip - 27699 Country -USA City - State - Zip - Country - 7. APPLICANT'S PHONE NOs. WAREA CODE 10. AGENTS PHONE NOs. WAREA CODE a. Residence b. Business c. Fax a. Residence b. Business c. Fax 919-707-6001 STATEMENT OF AUTHORIZATION 11. 1 hereby authorize, to act in my behalf as my agent in the processing of this application and to furnish, upon request, supplemental information in support of this permit application. SIGNATURE OF APPLICANT DATE NAME, LOCATION, AND DESCRIPTION OF PROJECT OR ACTIVITY 12. PROJECT NAME OR TITLE (see instructions) R-0623 13. NAME OF WATERBODY, IF KNOWN (if applicable) 14. PROJECT STREET ADDRESS (if applicable) Rocky, Warner, Turkey, & Smithermans Cr., Long Br, Little River Address 15. LOCATION OF PROJECT Latitude: -N 35.334610 Longitude: -W 79.903305 City - State- Zip- 16. OTHER LOCATION DESCRIPTIONS, IF KNOWN (see instructions) State Tax Parcel ID Municipality Section - Township - Range - ENG FORM 4345, OCT 2012 PREVIOUS EDITIONS ARE OBSOLETE. Page 1 of 3 17. DIRECTIONS TO THE SITE Please see attached vicinity map and cover letter. 18. Nature of Activity (Description of project, include all features) R-0623 proposes to construct the NC 24/27 Troy Bypass from west of SR 1138 (Dairy Road) to just east of Little River in Montgomery County, NC for a total of 6.65 miles. 19. Project Purpose (Describe the reason or purpose of the project, see instructions) The purpose and need for this project is based on current and projected traffic volumes, particularly the high volumes of truck traffic (7% to 10%) traveling through downtown Troy. The proposed bypass would provide additional roadway capacity, accommodate projected traffic volumes, reduce congestion on main arteries in downtown Troy and provide better access to NC 24/27. USE BLOCKS 20-23 IF DREDGED AND/OR FILL MATERIAL IS TO BE DISCHARGED 20. Reason(s) for Discharge Impacts will result from widening the roadway and shoulders, construction of roadway on new location, and bridge construction. 21. Type(s) of Material Being Discharged and the Amount of Each Type in Cubic Yards: Type Type Type Amount in Cubic Yards Amount in Cubic Yards Amount in Cubic Yards See attached cover letter. 22. Surface Area in Acres of Wetlands or Other Waters Filled (see instructions) Acres See attached cover letter. or Linear Feet See attached cover letter. 23. Description of Avoidance, Minimization, and Compensation (see instructions) See attached cover letter. ENG FORM 4345, OCT 2012 Page 2 of 3 24. Is Any Portion of the Work Already Complete? Yes nNo IF YES, DESCRIBE THE COMPLETED WORK 25. Addresses of Adjoining Property Owners, Lessees, Etc., Whose Property Adjoins the Waterbody (if more than can be entered here, please attach a supplemental list). a. Address- See attached permit drawings. City - State - Zip - b. Address - City - State - Zip - c. Address - City - State - Zip - d. Address - City - State - Zip - e. Address - City - State - Zip - 26. List of Other Certificates or Approvals/Denials received from other Federal, State, or Local Agencies for Work Described in This Application. AGENCY TYPE APPROVAL` IDENTIFICATION DATE APPLIED DATE APPROVED DATE DENIED NUMBER Would include but is not restricted to zoning, building, and flood plain permits 27. Application is hereby made for permit or permits to authorize the work described in this application. I certify that this information in this application is complete and accurate. I rther certify that I possess the authority to undertake the work described herein or am acting as the duly authorized agent of the applicant. . / i4ckcj Vd UJ , t 1�V�cdc y 9YNA T OF APPLICANT DATE SIGNATURE OF AGENT DATE The Application must be signed by the person who desires to undertake the proposed activity (applicant) or it may be signed by a duly authorized agent if the statement in block 11 has been filled out and signed. 18 U.S.C. Section 1001 provides that: Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly and willfully falsifies, conceals, or covers up any trick, scheme, or disguises a material fact or makes any false, fictitious or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false, fictitious or fraudulent statements or entry, shall be fined not more than $10,000 or imprisoned not more than five years or both. ENG FORM 4345, OCT 2012 Page 3 of 3 ~r Ecosystem PROGRAM March 7, 2014 Mr. Richard W. Hancock, P.E. Manager, Project Development and Environmental Analysis Unit North Carolina Department of Transportation 1548 Mail Service Center Raleigh, North Carolina 27699-1548 Dear Mr. Hancock: Subject: EEP Mitigation Acceptance Letter: R-0623, Troy Bypass — NC 24 / 27 from SR 1138 (Dairy Road) to East of the Little River, Montgomery County The purpose of this letter is to notify you that the Ecosystem Enhancement Program (EEP) will provide the compensatory stream and wetland mitigation for the subject project. Based on the information supplied by you on March 6, 2014, the impacts are located in CU 03040104 of the Yadkin River basin in the Southern Piedmont (SP) Eco-Region, and are as follows: Yadldn Stream Wetlands Buffer (Sq. Ft.) 03040104 Non- Coastal Sp Cold Cool Warm Riparian Zone 1 Zone 2 Riparian Marsh Impacts (feet/acres) 0 0 4,558.0 1.19 0.03 0 0 0 *Some of the stream and wetland impacts may be proposed to be mitigated at a 1:1 mitigation ratio. See permit application for details on the mitigation ratio proposal. EEP is proposing to provide riparian wetland mitigation for all wetland impacts associated with this project. This mitigation acceptance letter replaces the mitigation acceptance letter issued on February 25, 2014. EEP commits to implementing sufficient compensatory warm stream mitigation and riparian wetland mitigation credits to offset the impacts associated with this project as determined by the regulatory agencies in accordance with the N.C. Department of Environment and Natural Resources' Ecosystem Enhancement Program In - Lieu Fee Instrument dated July 28, 2010. If the above referenced impact amounts are revised, then this mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from EEP. 8420. cc: If you have any questions or need additional information, please contact Ms. Beth Harmon at 919-707- Sincerely, nt Supervisor Ms. Liz Hair, USACE — Wilmington Regulatibry Field Office Mr. David Wainwright, Division of Water Quality, Wetlands/401 Unit File: R-0623 Revised RP.StOrwg... ...-pnot2Our Rate, V-�� NCDENR North Carolina Ecosystem Enhancement Program, 1652 Mail Service Center, Raleigh, NC 27699-1652 / 919-707-8976 / htto://oortal.ncdenr.org/web/eep Subject: Team Members: Draft Meeting Minutes from 4B Preliminary Drainage Design Review May 16, 2012 for R-0623 in Montgomery County Ronnie Smith-USACE Gary Jordan-USFWS Travis Wilson-NCWRC Felix Davila-FHWA Chris Militscher-EPA Mason Herndon-NCDWQ Greg Brew -Roadway John Olinger -Division 8 Derrick Weaver-PDEA Mack Bailey -Structures Rachelle Beauregard-NES (present) (present) (present) (absent) (present) (absent) (present) (absent) (absent) (absent) (present) Participants: Marshall Clawson, NCDOT Hydraulics Bill Zerman, NCDOT Hydraulics Ronnie Smith, USACOE Travis Wilson, NCWRC Gary Jordan, USFWS Ahmad Al-Sharawneh, NCDOT PDEA Chris Militscher, USEPA Greg Price, NCDOT NES Rachelle Beauregard, NCDOT NES David Wainwright, NCDWQ Kevin Fisher, NCDOT Structure Design Lonnie Brooks, NCDOT SMU Matthew Harvey, Mulkey E & C Bill Stephens, Mulkey E & C Greg Brew, NCDOT Roadway Design Mark Staley, NCDOT REU Kevin Aldridge, NCDOT Roadway Design Imad Younis, NCDOT Roadway Design Wayne Davis, NCDOT TPB Art King, NCDOT Division 8 John Nigro, NCDOT Utilities Phil May, Carolina Ecosystems Introductions were initiated by Marshall Clawson . Introductions were made by all in attendance. Bill Stephens proceeded with the review. General • Project falls within the Yadkin -Pee Dee River Basin in which riparian buffer rules are not applicable. • The project has six major structures. The major structures consist of 2 bridges and 4 culverts. Plan Sheet 5 (Site 1) • Impacts to surface waters from proposed roadway cross pipe, fill in wetlands from proposed roadway fill. • Both forks of the stream coming into the proposed pipe at —L1- 28+00 +/- left are jurisdictional streams (JS). Location and Surveys should label the smaller fork to the left as a JS. Plan Sheet 5 (Site 2) • Impacts to surface waters from proposed roadway fill and cross pipe. • Location and Surveys should label this stream as a JS. • It was suggested to move the proposed outlet pipe slightly at this location so as to not discharge directly into the stream. Plan Sheet 7 (Site 3) • Impacts to surface waters and wetlands from the proposed 2 @ 8'x 6' RCBC and roadway fill. Existing 5'x 6' box culvert will be removed. Plan Sheet 8 (Site 4) • Impacts to surface waters and wetlands from proposed roadway fill and proposed cross pipe. • The stream branch flowing in from the north at approximate —L- Sta. 71+50 left and labeled S75 is a JS. Location and Survey should label this stream as a JS. Plan Sheet 9 (Site 5) • Impacts to surface waters and wetlands from proposed roadway fill and 2 @ 10'x 7' RCBC. Existing 6'x6' box culvert will be removed. • Baffles are proposed for the box culvert due to its slope. • It was questioned if the portion of the JS being covered by proposed roadway fill at —L- Sta. 76+00 right could be relocated outside of the fill slope. Mulkey E & C will consider during design process. Plan Sheet 9 (Site 6) new delineation(small triangle near station 79+92.68 label) • Impacts to surface waters (pond) and wetlands from proposed roadway fill. • Excavation in wetlands from proposed lateral ditch. • It was asked if a natural stream design could be incorporated into the proposed lateral ditch from —L- Sta. 77+00 to 86+00 right to mitigate the loss of the JS (S8). Due to the business on the right, existing utilities and the steepness of the terrain, a natural stream design would not be feasible. • Treatment of stormwater drainage will be obtained from proposed roadway and median grassed ditches/swales and the proposed lateral ditch/swale on the right. Plan Sheet 12 (Site 7)-new delineation • Proposed bridge over Warners Creek • Warner Creek is a FEMA Regulated stream. • Impacts to surface waters and wetlands from proposed roadway fill. • It was asked if the proposed bridge could be shifted to the east and lengthened to span the area of wetlands on the east side of the creek. NCDOT Hydraulics Unit indicated that the bridge would be sized hydraulically so as not to raise the 100 yr water surface elevation more than 1 foot. It was determined that shifting the bridge would not avoid the wetland areas due to the end bent fill slopes and the bridge will not be shifted and lengthened to avoid the wetland area. Plan Sheet 13 (Site 8)-new delineation • Impacts to surface waters and wetlands from proposed roadway fill. • Mulkey E & C is proposing that the fill slopes be adjusted from 2:1 to 1.5:1 to eliminate/reduce the impacts to the stream and wetlands. 1.5:1 fill slope will be rock plated to protect slope. Plan Sheet 13 (Site 9)-new delineation • Impacts to wetlands from proposed roadway fill. Plan Sheet 14/15 (Site 10) • Impacts to wetlands from proposed roadway fill. • Small area of wetlands outside the cut slope at —L- Sta. 149+80 right should be considered a take due to its proximity to the proposed roadway cut slope. • A dry detention pond may be proposed in this area to reduce discharges to an existing farm pond downstream to the left of the project. Stormwater BMP's should not be placed in wetland areas or Historic Properties. Plan Sheet 17 (Site 11) • Impacts to surface waters from proposed roadway fill and cross pipe. • Do not ditch through the wetlands on the north side of the project as was shown on the preliminary drainage plans to join the two streams. Possibly use a second pipe and junction into the proposed cross pipe. Plan Sheet 18/19 (Site 12) • Impacts to surface waters from proposed roadway fill and 2 @ I V x 8' RCBC. • It was noted that this stream was not Turkey Creek, it is a tributary to Turkey Creek. Plan Sheet 20-new delineation • Impacts to surface waters from proposed roadway fill —L- Sta. 218+00 to 219+00 right. • Mulkey E & C is proposing that the fill slopes be adjusted from 2:1 to 1.5:1 and rock plated to eliminate impacts to the JS. Plan Sheet 20 (Site 13)-new delineation • Impacts to wetlands from proposed roadway fill. Plan Sheet 21 (Site 14) • Impacts to surface waters from proposed roadway fill and cross pipe. Plan Sheet 22 (Site 15) • Impacts to surface waters from proposed roadway fill and cross pipe. Plan Sheet 23 (Site 16)-new delineation • Impacts to surface waters and wetlands due to roadway fill and cross pipes. • It was noted that the drain line through the wetland area on the left is not a JS. Plan Sheet 23/24 (Site 17)-new delineation • Impacts to surface waters and wetlands due to roadway fill and cross pipe. Plan Sheet 24/25 (Site 18)-new delineation • Impacts to surface waters and wetlands from proposed roadway fill and 2 @ 12' x 7' RCBC. • There is a Green Sheet commitment for a small animal crossing at this location. Since the proposed structure is a 2-barrel box culvert, the second high flow barrel can be utilized as the animal crossing and no other separate floodplain pipe is required. • The small tributary entering Smithermans Creek from the west starts as a JS on sheet 24 at the bend in the stream at approximately —L- 282+60 left. Location and Surveys should revise JS limits. Plan Sheet 27 (Site 19) • Impacts to wetlands from proposed roadway fill. Plan Sheet 29 (Site 20) • Proposed bridge over the Little River. • There is a Green Sheet commitment to provide a 25 ft setback from the proposed endbent slope to the top of the bank on the west side of the river for a future greenway. Plan Sheet 30 (Site 21) • Impacts to surface waters (pond). • Existing pond is in proposed right of way and is proposed to be drained. Plan Sheet 31 (Site 22) • Impacts to surface waters (pond). • Existing pond is in proposed right of way and is proposed to be drained and filled to the right of way line. Plan Sheet 33 (Site 23) • Impacts to surface water and wetlands from proposed roadway fill, cross pipe and lateral ditch. • The JS starts on the downstream (south) side of the area of wetlands on the north side of —Y7-. • On the south side of —Y7-, the channel branch on the west side is not a JS. The east channel is a JS and should be labeled as such by Location and Surveys. • There is a pond on the north side —Y7-. Location and Surveys is to pick up pond to show on the plans. Meeting Adjourned. Subject: Team Members: Final Meeting Minutes from 4C Preliminary Permit Review May 16, 2013 for R-0623 in Montgomery County Ronnie Smith-USACE Gary Jordan-USFWS Travis Wilson-NCWRC Felix Davila-FHWA Chris Militscher-EPA David Wainwright-NCDWQ Greg Brew -Roadway Rueben Blakley-Division 8 Derrick Weaver-PDEA Mack Bailey -Structures Greg Price-NCDOT NES (present) (absent) (absent) (absent) (absent) (present) (absent) (present) (absent) (absent) (present) Participants Present: Marshall Clawson, NCDOT Hydraulics Bill Zerman, NCDOT Hydraulics Charles Smith, NCDOT Hydraulics Ahmad Al-Sharawneh, NCDOT PDEA Kevin Fisher, NCDOT Structure Design Dan Duffield, Mulkey E & C Bill Stephens, Mulkey E & C Kevin Aldridge, NCDOT Roadway Design Imad Younis, NCDOT Roadway Design John Nigro, NCDOT Utilities Doumit Ishak, NCDOT Congestion Manag. Introductions were initiated by Marshall Clawson. Introductions were made by all in attendance. Bill Stephens and Dan Duffield proceeded with the review. General • For any ditches/swales that enter a wetland area, any rip rap should end at the wetland boundary and not be placed in the wetland area. • Bill Stephens pointed out that Site 1 and Site 2 were located in a HQW area. • NCDOT Hydraulics Unit is to coordinate with NCDOT Structures Unit to ensure that box culverts are backfilled with bed material to a depth of 1 foot and that this information is indicated on the culvert general drawings. Plan Sheet 5 (Site 1) • Include bank stabilization impacts to summary sheet for rip rap at outlet. — done included • Check stream impacts, separate stream impacts and bank stabilization. — done checked Plan Sheet 5 (Site 2) • Stream should be labeled as a JS stream. — done updated • Show any stream impacts on summary sheet — done updated Plan Sheet 7 (Site 3) • NCDOT Hydraulics Unit is to coordinate with NCDOT Structures Unit to ensure that box culverts are backfilled with bed material to the depth of the sill for the overflow barrel and 1 foot for the main barrel. This information should be indicated on the culvert general drawings. — DOT Task • The channel tie should be shown and should be the same depth of the existing. — Done — this tie is a transitional area and the tie for the main low flow barrel was tied into the stream as best as possible in a length that was designed to keep the stream stable both u/s and d/s. Plan Sheet 8 (Site 4) • At the inlet end of the proposed 60" pipe there are 2 stream branches that flow into the pipe. The southernmost branch that is existing from the existing 18" pipe is not a JS and the impacts should be removed from the summary. — done removed • The length of the tail ditch for the 60" pipe should be added to detail "T". — done added to detail. • Bank stabilization should be added to the summary sheet. - done • If the channel at the outlet is being re -shaped, the impacts should be included as a permanent impact. — done included as permanent • Extend the impacts to the C/A line - done Plan Sheet 9 (Site 5) • Site 5 is to be broken up into different areas (5, 5A, 5B, etc). NCDOT — NES is to coordinate this through NCDOT Hydraulics Unit. done • At the culvert outlet, no need to add bank stabilization in the area of channel improvements (permanent impacts). This is double counting impacts. done • Per NCDOT Utilities, add stream bank stabilization at the outlet end of the box culvert from the end of the permanent channel impacts to the R/W line. There is a proposed utility to be installed in this area. done • Include all of the wetlands in the pond as a total take (right of —L- Sta. 84+00+/-). done • The wetlands are isolated and the impacts are not subject to the 404 jurisdiction and should not be included in the 404 impact calculations. NCDOT • Need to make sure we have enough easement for a skimmer basin NCDOT Plan Sheet 12 (Site 7) • Site 7 to be broken up into subareas, NCDOT — NES is to coordinate this through the NCDOT Hydraulics Unit. done • Include bank stabilization with Site 7 where ditches meet the stream with rip rap at embankment. done • Need to adjust the SS line to stop at the approapate location and tie to the bridges sloping spill thru abutments. done Plan Sheet 17 (Site 11) • At the inlet end of the proposed 84" pipe, that is one wide stream and not 2 separate streams or a fork. Show impacts as one stream. done • The stream entering the proposed 54" pipe should be labeled "Site 11 F. done • Revise bank stabilization at the outlet of the proposed 96" pipe to Class II. done • Add bank stabilization along the stream where the lateral base ditch meets the stream at Sta. 188+00 right. Add the bank stabilization to the limits of the PDE. done Plan Sheet 18 (Site 12) • Remove bank stabilization at the outlet of the culvert since the channel improvements are considered permanent impacts. done Plan Sheet 20 (Site 13) • Investigate using 3:1 slopes in the wetland area. (Changing to 3:1 slopes may create the need for guardrail, a wider shoulder and the difference in wetland impacts may be minimal). Coordination with Roadway Design needed. done • The wetlands are isolated and the impacts are not subject to the 404 jurisdiction and should not be included in the 404 impact calculations. Plan Sheet 21 (Site 14) • Add cross section/pipe profile to permits.- in the past it was determined that any pipes 60" and less did not need a stream profile or cross section. A cross section will not be prepared for this site. • Need to make sure the TS is legible done Plan Sheet 22 (Site 15) • Summary is missing permanent stream impacts. done • Add stream bank stabilization at inlet where the 2 ditches tie into the stream. done Plan Sheet 23 (Site 17) • Add stream bank stabilization at the inlet where the 2 ditches tie to the stream, if the ditches cannot terminate before entering the wetlands. done • Add stream bank stabilization at outlet if the ditch cannot terminate before entering the wetlands. This will be a fill in wetlands not stream bank stabilization Plan Sheet 23 (Site 18) • Investigate using 3:1 slopes to reduce impacts to this wetland area. Coordination with Roadway design as needed. Slopes not changed Plan Sheet 24 (Site 19) • Subdivide Site 19 into subareas (19, 19A, 19B, etc). NE to coordinate with NCDOT Hydraulics unit. done • Add a note at the outlet that states a "portion of the stream channel is to remain open". Note this channel is consider a permanent impact and as such the rip rap shown is not to be consider stream bank stabilization as this would be considered double impacts. done Plan Sheet 25 (Site 19) • Add note "portion of the stream channel is to remain open". done • Add bank stabilization for ditch entering stream on inlet end of culvert. done • Extend sill boulders around 90 degree bend at inlet end of culvert. done Plan Sheet 29 (Site 21) • A causeway will be added to this permit sheet. Coordination is ongoing with NCDOT concerning the proposed causeway needs. done • The proposed ditches/swales shown draining into the Little River will be extended to the JS and stream bank stabilization will be added. done • The NCDWQ mentioned the possible need for hazardous spill basins on this sheet because the Little River upstream of the project crossing is classified as HQW. NCDWQ to verify this. NCDOT • NCDOT Utilities indicated there will likely be a major utility installed across the Little River along the north side of the roadway. NCDOT Plan Sheet 30 (Site 22) • JS impacts on the outlet end of the existing 30" cross pipe should be removed. done • The Site 21 label at the outlet of the 30" pipe should be removed. done • Stream impacts need to be revised on the impact summary sheet. No permanent stream impacts will be proposed. done Plan Sheet 31 (Site 23) • There are no JS impacts at this site. Plan Sheet 34(Site 24) • This site is to be subdivided into 2 Sites, NES to coordinate with NCDOT Hydraulics Unit done • On the outlet end of the proposed cross pipe, the west branch of the stream shown on the plans is not a JS. Remove impacts from permit sheet and summary. done • Extend stream at outlet on permit drawings. done Meeting Adjourned. w North Carolina Department of Transportation Highway p p � Store ►►tivater I Highway Stormwater Program STORMWATER MANAGEMENT PLAN (Version 1.2; Released July 2012) FOR LINEAR ROADWAY PROJECTS Project/TIP No.: 34352.1.1 Count (ies): Montgomery Page 1 of 2 General Project Information Project No.: 34352.1.1 Project Type: New Location Date: 4/16/2013 NCDOT Contact: Marshall Clawson, P.E. Contractor / Designer: Mulkey Engineers & Consultants - William T. Stephens, Jr, P.E. Address: Hydraulics Unit Address: 6750 Tryon Road 1020 Birch Ridge Road Cary, NC 27518 Raleigh, NC 27610 Phone: 919-707-6713 Phone: 919-858-1877 Email: mclawson@ncdot.gov Email: I bstephens@mulkeyinc.com City/Town: Troy Count (ies): Montgomery River Basin(s): Yadkin -Pee Dee CAMA County? I No Primary Receiving Water: Warner Creek see Environmental Summary for additional NCDWQ Stream Index No.: 13-25-30-2 NCDWQ Surface Water Classification for Primary Receiving Water Class C Supplemental: Suppl None Other Stream Classification: 303(d) Impairments: None Buffer Rules in Effect N/A Project Description Project Length (lin. Miles or feet): 6.65 miles —Surrounding Land Use: Mixed developed and rural Proposed Project Existing Site Project Built -Upon Area (ac.) 79.64 ac. 14.96 ac. Typical Cross Section Description: 4 Lane divided with grassed median and paved shoulders Average Daily Traffic (veh/hr/day): Design/Future: 18,200 Existing: 12,641 General Project Narrative: This project is located just to the south of the Town of Troy in Montgomery County and is in the Yadkin Pee -Dee River Basin. The project is a proposed four lane, shoulder section facility with a divided grassed median. The total project length is 6.65 miles. Approximately 1.3 miles of the beginning of the project and 0.9 miles of the end of the project are widening on existing location of NC 24/27. The remaining 4.5 miles of the project is on new location. The project drainage system will consist mainly of ditches, cross pipes, storm drainage systems and box culverts. There are also two bridge crossing locations on the project at Warner Creek and the Little River. Six named streams or their tributaries are affected by the proposed project: • Rocky Creek Index # 13-25-30-(0.5) Stream Classification C;HQW • Warner Creek Index # 13-25-30-2 Stream Classification C • Long Branch Index #13-25-28 Stream Classification C • Turkey Creek Index # 13-25-25 Stream Classification C • Little River Index # 13-25-(19) Stream Classification C;HQW (upstream of project) • Little River Index # 13-25-(19) Stream Classification C (downstream of project) • Smitherman Creek Index # 13-25-21 Stream Classification C Approximately 0.42 miles of the beginning of the project is located in the Rocky Creek drainage area which is listed as HQWs. The project crosses one unnamed tributary to Rocky Creek. Swales are proposed to carry surface water drainage from the project to this tributary. The section of the Little River on the north side of our project is considered HQW. A grassed swale is proposed on the north side of the project to treat surface water drainage before it enters the Little River. None of the streams listed are included on the 303(d) list for impaired streams. Cross pipes in jurisdictional streams will have the inverts buried a minimum of 20% of the diameter of the pipe size up to and including 60" diameter. For pipes 60" or greater and box culverts, the inverts will be buried 1.0'. At the two bridge crossings of Warner Creek and the Little River, no deck drains will be used in order to avoid direct discharges into the surface waters. Deck drainage will be collected in storm drain systems off the ends of the bridges and discharged into either grassed ditches or grassed swales before entering the streams. References Montgomery County, NC - DWQ Environmental Sensitivity Map 2010, NC Water Quality Classifications By NC River Basin -Yadkin Pee -Dee River Basin. Hi hWcl North Carolina Department of Transportation StOYt rvvatcr Highway Stormwater Program 0 STORMWATER MANAGEMENT PLAN (Version 1.2; Released July 2012) FOR LINEAR ROADWAY PROJECTS Project/TIP No.: 34352.1.1 County(ies): Montgomery Page 2 of 2 Swales Sheet No. Station (From / To) Stream Crossing Station Base Width (ft) Front Slope (H:V) Back Slope (H:V) Drainage Area (ac) Recommended Treatment Length (ft) Actual Length (ft) Longitudinal Slope M Q2 (cfs) V2 (fps) Q10 (cfs) V10 (fps) Rock Checks Used 4 -L1- 25+00 RT -1_1- 27+05 6.0 3 3 2.58 258 100 7.70 % 5.9 2.5 7.6 3.0 Yes -L1-26+00 RT 5 -1_1- 26+00 RT -1_1- 27+05 6.0 3 3 2.58 258 91 4.44 % 5.9 2.1 7.6 2.4 Yes -1_1-26+90 RT 5 -1_1- 26+90 RT -1_1- 27+05 6.0 3 3 4.32 432 35 2.90 % 10.6 2.5 13.5 2.8 Yes -L1-27+25 RT 5 -L1- 27+25 RT -1_1- 27+05 6.0 3 3 4.32 432 175 1 1.20 % 10.6 4.1 13.5 4.7 Yes -L1- 29+00 RT 5 -L- 30+50 RT -L- 30+50 RT 3.0 3 3 0.48 48 24 10.00% 2.0 1.9 2.6 2.2 No 29 -L- 339+63 LT -L- 339+50 6.0 3 3 3.85 385 4.00 % 9.6 2.7 12.3 3.0 Yes -L-340+50 LT 29 -L- 340+50 LT -L- 339+50 6.0 3 3 3.85 385 250 0.67% 9.6 1.3 12.3 1.5 No -L-343+00 LT 0 0 0 0 0 0 0 0 0 0 0 0 0 YES 0 No Have minimum design criteria, as presented in the NCDOT Best Management Practices Toolbox, Version 1 (March 2008), been met and verified? If No, provide further explanantion of why design criteria was not met. Additional Comments MEP were utilized in design. Highway North Carolina Department of Transportation 4k -=--Stormwater Highway Stormwater Program STORMWATER MANAGEMENT PLAN (Version 1.2; Released July 2012) FOR LINEAR ROADWAY PROJECTS Project/TIP No.: 34352.1.1 Count ies : Montgomery Page 1 of 2 General Project Information Project No.: 34352.1.1 Project Type: New Location Date: 4/16/2013 NCDOT Contact: Marshall Clawson, P.E. Contractor / Desi ner: Mulkey Engineers & Consultants - William T. Stephens, Jr, P.E. Address: Hydraulics Unit Address: 6750 Tryon Road 1020 Birch Ridge Road Cary, NC 27518 Raleigh, NC 27610 Phone: 919-707-6713 Phone: 919-858-1877 Email: mclawson@ncdot. ov Email: bste hens@mulke inc.com City/Town: Troy Count ies : Montgomery River Basin(s): Yadkin -Pee Dee CAMA County? No Primary Receiving Water: 1warner Creek see Environmental Summary for additional NCDWQ Stream Index No.: 13-25-30-2 NCDWQ Surface Water Classification for Primary Receiving Water Primary: Class C Supplemental: None Other Stream Classification: 303 d Impairments: None Buffer Rules in Effect N/A Project Description Project Length (lin. Miles or feet): 6.65 miles Surrounding Land Use: Mixed developed and rural Proposed Project Existing Site Project Built -Upon Area ac. 79.64 ac. 14.96 ac. Typical Cross Section Description: 4 Lane divided with grassed median and paved shoulders Average Daily Traffic (veh/hr/day): Design/Future: 18,200 Existing: 12,000 General Project Narrative: This project is located just to the south of the Town of Troy in Montgomery County and is in the Yadkin Pee -Dee River Basin. The project is a proposed four lane, shoulder section facility with a divided grassed median. The total project length is 6.65 miles. Approximately 1.3 miles of the beginning of the project and 0.9 miles of the end of the project are widening on existing location of NC 24/27. The remaining 4.5 miles of the project is on new location. The project drainage system will consist mainly of ditches, cross pipes, storm drainage systems and box culverts. There are also two bridge crossing locations on the project at Warner Creek and the Little River. Six named streams or their tributaries are affected by the proposed project: • Rocky Creek Index # 13-25-30-(0.5) Stream Classification C;HQW • Warner Creek Index # 13-25-30-2 Stream Classification C • Long Branch Index #13-25-28 Stream Classification C • Turkey Creek Index # 13-25-25 Stream Classification C • Little River Index # 13-25-(19) Stream Classification C;HQW (upstream of project) • Little River Index # 13-25-(19) Stream Classification C (downstream of project) • Smitherman Creek Index # 13-25-21 Stream Classification C Approximately 0.42 miles of the beginning of the project is located in the Rocky Creek drainage area which is listed as HQWs. The project crosses one unnamed tributary to Rocky Creek. Swales are proposed to carry surface water drainage from the project to this tributary. The section of the Little River on the north side of our project is considered HQW. A grassed swale in proposed on the north side of the project to treat surface water drainage before it enters the Little River. None of the streams listed are included on the 303(d) list for impaired streams. Cross pipes in jurisdictional streams will have the inverts buried a minimum of 20% of the diameter of the pipe size up to and including 60" diameter. For pipes 60" or greater and box culverts, the inverts will be buried 1.0'. At the two bridge crossings of Warner Creek and the Little River, no deck drains will be used in order to avoid direct discharges into the surface waters. Deck drainage will be collected in storm drain systems off the ends of the bridges and discharged into either grassed ditches or grassed swales before entering the streams. References Montgomery County, NC - DWQ Environmental Sensitivity Map 2010, NC Water Quality Classifications By NC River Basin -Yadkin Pee -Dee River Basin. HII hWa North Carolina Department of Transportation g Y Highway Stormwater Program STORMWATER MANAGEMENT PLAN •~"'°'^ ""�' (Version 1.2; Release FOR LINEAR ROADWAY PROJECTS Project/TIP No.: 34352.1.1 Count ies): Montgomery Page 2 of 2 Swales Sheet No. Station From / To Stream Crossing Station Base Width (ft) Front Slope (H:V) Back Slope (H:V) Drainage Area (ac Recommended Treatment Length ft Actual Length ft Longitudinal Slope % Q2 cfs V2 (fps) Q10 cfs) V10 (f s Rock Checks Used 4 L1 25+00 RT L1- 27+05 6.0 3 3 2.58 258 7.70% 5.9 �'.5r 7.6 3.0 Yes -L1- 26+00 RT 5 -L1- 26+00 RT -L1- 27+05 6.0 3 3 2.58 258 x 4.44% 5.9 2��> .: 7.6 2.4 Yes L1 26+90 RT 5 L1 26+90 RT L1- 27+05 6.0 3 3 4.32 432 2.90% 10.65a 13.5 2.8 Yes -L1- 27+25 RT 5 1-1 27+25 RT L1- 27+05 6.0 3 3 4.32 432 f 11.20% 10.6 B :' . 13.5 - Yes -L1- 29+00 RT 5 L 30+50 RT L- 30+50 RT 3.0 3 3 0.48 48 2.0 1.9 2.6 2.2 No 29 -L- 339+63 LT -L- 339+50 6.0 3 3 3.85 385 4.00 /° 9.6 2.Ti 12.3 3.0 Yes -L- 340+50 LT.> 29 L 340+50 LT -L- 339+50 6.0 3 3 3.85 385 r�� M 0. 67% 9.6 1.3 12.3 1.5 No -L- 343+00 LT 0 0 0 0 0 0 0 0 0 0 0 0 0 ❑ YES F,/] N0 Have minimum design criteria, as presented in the NCDOT Best Management Practices Toolbox, Version 1 (March 2008), been met and verified? If No, provide further explanantion of why design criteria was not met. Additional Comments MEP were utilized in design. c L E L a a T L ri N 0 L 1n u c 3 0 L 0 c 0 E c 0 L c w cc Lu a D 0 M_ 7I 0 O Lf Nor o= 0ff( See Sheet i-A For Index of Sheets CBBB6nNal1eMown 1311220 =+3 Okeewemee TA 13,0 1340 A 10E 1—— 1393 134J 3 59 002 34 94 1320 ,388 131E 13,8 IMQ I B 19 0 1- 13. END PROJECTT 395 312 ft4tt4B 1144 131111 1— 1336 133 1311 O IIN 1138 1139 1140 O. itfi 11 oad 503 1656 1 0 1813 BEGIN PROJECT I >s 1- 11 1fi60 3 , 1 e'er~ Is51 o 220 1s00 220 005 _ 1- 151 A 569 Cep s e seB 119 15�9 a. 19i9 168 ¢ 005 y(¢ 1fi49 f5L c� 3 o 1135 lo1515 211 1,-- A a Omit Wade v ll �=° p 15�o gses 005 sB 31 154 �Vyb ! • t616 1116 IS 6 1005 1fi59 AA0 VICINITY MAP THIS PROJECT IS WITHIN TBE MUNICIPAL BOUNDARY OF TROY BEGIN CONSTRUCTION TRAFFIC SIGNAL STATE OF NORTH CAROLINA DIVISION OF HIGHWAYS S MONTGOMERY COUNTY LOCATION: NC 24/27 TROY BYPASS FROM WEST OF SR 1138 (DAIRY ROAD) TO JUST EAST OF LITTLE RIVER TYPE OF WORK: GRADING, DRAINAGE, PAVING, STRUCTURES SIGNALS AND SIGNING FWET6M AND SURFACE WATER IMPACTS PERMIT -Y7- CAPELSM RD RELOCA77ON (SR 1519) NOTE: THIS PROJECT IS A PARTIAL CONTROLLED ACCESS PROJECT WITH ACCESS BEING LIMITED TO POINTS AS SHOWN ON THE PLANS CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III PERMIT DRAWING SHEET L OF 9/ PRELIMINARY PLANS M NOT USE FOR CONSTRUCTION GRAPHIC SCALES DESIGN DATA PROJECT LENGTH Prepored In the Office of: HYDRAULICS ENGINEER DIVISION OF HIGHWAYS ADT 2014 = 6610 - 12,641 DIVISION OF HIGHWAYS F NORTjj C4Qp 50 25 0 50 100 ADT 2040 = 9300 - 18,200 1000 Birch Ridge Dr., Raleigh NC, 27610 �� O DHV = 10 % LENGTH ROADWAY TIP PROJECT R-0623 = 6.518 MILES 2012 STANDARD SPECIFICATIONS y y PLANS D = 55 % Px SIGNATURE. o 50 25 0 50 100 T —_ 17 % V = 60 MPH * TTST =12% DUAL 5% LENGTH STRUCTURES TIP PROJECT R-0623 = 0.131 MILES RIGHT OF WAY DATE. JANUARY 30, 2013 G. E. BREW, P.E. rn o r PA A, f ROADWAY DESIGN ENGINEER PROJECT ENGBaM PROFILE (HORIZONTAL) TOTAL LENGTH OF TIP PROJECT R-0623 = 6.649 MILES 10 5 0 10 20 LETTING DATE: NOVEMBER 18, 2014 I.T. YOUNIS SiGMTURs: Pam' r OF TRpNSSo STATE OF NORTH CAROLINA FUNCTIONAL CLASSIFICATION RURAL ARTERIAL REGIONAL TIER PROJECT PROJECT DESIGN EAMWER PROFILE (VERTICAL) PROJECT z 0 V1 i OC W Lu tN V I- i Erb— \ FALSE SUMP Not to Scala) Mndian Ditch 9. 12' f5— ch Mbvlzv GI S=Ditch Slops fL Proposed Ditch FROM STA.28+88 CL FROM STA.34+10 CL FROM STA.35+85 CL KATIE OEATON TOE PROTECTION SEE DETAIL F LAT BASE DITCH SEE DETAIL RR W SITE 1 _ 5" MONOLITHIC CONC. ISLAND IOo' O' 100' 200' 300' \ GRAPHIC SCALE ® DENOTES EXCAVATION IN WETLAND \ DENOTES FILL IN WETLAND HD \ DENOTES HAND ` CLEARING O ry�cl \ ® DENOTES IMPACTS IN �ryp!5q! •+ �.3 SURFACE WATER \ ®DENOTES TEMPORARY 6Q LAARY TIDlpSON IMPACTS IN SURFACE WATER O WOODS X 21' PSRM PAD AC ZVV BST II y CONC WOO9ST BASE DITCH L M OONC SEE DETAIRR �� F \ NTL f 2'CONC WW �� `W \ • RING — f 0517 f \ ISFD Q _ S B RIP RAP PROPANE TANK SITE 2 v HC EST.2 TONS L_ O EST.7 SY f_ o CLASS 8 RIP RAP CLASS 8 RIP RAP S PERMANENT ROCK EST. 5 TONS EST TONS CHECK DAMS EST.14 SY GF EST.7 SY GFi I SEE DETAIL WW BANK STABILIZATION �)S BnsE SEE DIT I dFf � EST. 15 CYO +/ v CLASS IRIP RAP Q70=2.6c& EST. 33 TONS V10=2.OFps EST. 62 SY GF 'RIP RAP BANKS ONLY 6 JOE IKKtLEY JOE HURLEY FJP lAT BASE DITCH \ SEE DETAJ IWOODS lAT N' DITCH SEE DETAIL I O�� OSCAR LElDIDS EP BRENDA KEARNS RAV SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER DO NOT USE PC* commIICIloN FOR PROFILE OF LINE -L- SEE SHEET 36 FOR PROFILE OF LINE -L1- SEE SHEET 36 FOR PROFILE OF LINE 42- SEE SHEET 37 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS PERMIT DRAWING "00D5 SHEET a OF I j TREES ECKJ N e OAR BARRY LAMOIDS �Q BARRY LAM PLAT SLDE 3104 A / r th 0 0 i IL \ FALSE SUMP ( Not to Scale) Mwdi— Ditch 9" I2' ctwn salv"j —.ram gym--.{ GI S=Ditch Slope G Proposed Ditch 5" MONOLITHIC CONC. ISLAND 100' 0' 100' 200' 300' GRAPHIC SCALE ® DENOTES EXCAVATION N WETLAND L uncn i6.0% L 20' Over4.0% To 6.0% 40' DENOTES FILL IN WETLAND _ 30' Over 6.0% 50' FROM STA. 28+88 CL \ DENOTES HAND \ FROM $TA 34+10 CL CLEARING q<j FROM S7A.35+85 CL ® DENOTES IMPACTIN �� J3S \ SURFACE WATER Q DENOTES TEMPORARY �P \ LARRY Til01FSOM IMPACTS IN SURFACE WATER O KAT1E KATO TOE PROTECTION SEE DETAIL F SITE 1_-- W LLd to LLJ LLJ to 0 0 CV (n I J I W J p• `I LAT BASE DITCH SEE DETAIL RR 51 WOODS 6C 2V27 BSr 3, �c n W�9Fr BASE on 4' CONC NW SEE DETAIL 2'CONC WW L.TL..�;; 7r.�T�• $J SITE 2 CLASS B RIP RAP CLASS B RIP RAP PERMANENT ROCK EST.5 TONS EST. 14 SY GF EST.2 TONS EST. 7 SY GF, CHECK DAMS SEE DETAIL WW //�� i15 � DMW SE EST. 15 CY�ic/ � / v CLASS I RIP RAP 410=2.bcfs EST. 33 TONS VI0=2-p(P' EST. 62 SY GF .RIP RAP BANKS ONLY 6 JOE HLOM JOE HWM EP RIM UT BASE DITCH \ SEE DETAIL J .. - EtBO F el F PROJECT REFERENCE NO. 1 SHEEP NO. R-0623 5 PAY SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER FPRELIMWA RY PLANS DO NOT De 110 CO MUl7170N FOR PROFILE OF LINE -Ll- SEE SHEET 36 FOR PROFILE OF LINE -1-2- SEE SHEET 37 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS PERMIT DRAWING M0wS SHEET 3 OF 9L �L W i Lu I 'REMOVE TREES 1 TREES — CV) Ed REMOVE --- Fa N w I WOODS LAT N' DITCH SEE(/DBE\TJAIL I V OSCAF OSCAR LOIOlDS EIP EktEWA I(EARriS _CKJ e GAR Q BARRY LAMOWS �Q SAW PLAT SLDE 3N A Q / i ENLARGEMENT SHEET TOE PROTECTION SEE DETAIL F TRR J \.. TS ® DENOTES EX AVATION IN WET ND DEMO, F L IN LAT BASE DITCH w SEE DETAIL RR ® DENOTES CLEARI ®DENOTES WSIN SURFACE WATER ®DENOTES TEMPORARY IMPACTS IN SURFACE WATER 50' b' 50' 100, 62 SY GF RAP BANKS ONLY GRAPHIC SCAaE Inc, ul101 cv NC 24127 BST PROJECT REFERENCE NO. SHEET NO. R4623 5 RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMIN Y PLANS C FOR PROFILE OF LINE -L- SEE SHEET 36 FOR PROFILE OF LINE -Ll- SEE SHEET 36 FOR PROFILE OF LINE -1-2- SEE SHEET 37 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS PERMIT DRAWING --�— — — — — — — — F SHEET y OF qqh T T T T T T T — Q ram: = - ice r 1 . . 4P 8' X 21' PSRM PAD e-� INLET TYPICAL mr 70 brit[ Vr 1A ill ufO R1111iRY OL IN= 7-NATURAL MLIL edit .Ar �� iw rl EST. TONS 7�CRLASASBR'P = 40 TONS EST. I F6ERFMAT lT90YSY DBE - 300 CY OUTLET TYPICAL To SULK AJrt IN Aa�irLOOM prnrr EL ImLaw INS Li lit ■TM —NATURAL umvww WR7FEWH rr ■r r r m111��aa YQf � i EST. TONS CLASS 'Y = 50 TONS EST. FILTER FABRIC = 65 SY EST. COR FORE MATTIINYG = 60 SY BERM DITCH SEE DETAIL O BS( ROCK PLATE 1.5:1 FILL SLOPES SEE DETAIL ON SHEET 2-1 I~I.I Lu EDO _ --- �� T 15- WELBOW T �ytlp WMASS Ln �FS 2' HIM CO.___—_t__ _ ^r 1 IMTIAO fMTLIRI InWow In TFe T fl / Wa +j RCBC J I / I LAT BASE DITCH fl1Cd I4.IF SEE DETAIL G L1..1 GRASS 18' Z—���Ll�—© _ J 0 0 ��2 /�I` W�I 0 `bnB P RAP T. ONS / 1 SY GF T fl SITE 3 V I. q 1 `tN 4 Dare ISM) I / c J / rn rz SLL L WLLIAM MORTON L ri N t9 m 0 PROJECT REFERENCE NO. i SHEET NO. R-0623 7 100' 0' 100' 200' 300' PN! SHEET No. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER GRAPHIC SCALEtRZ�\ DENOTES IMPACTS IN SURFACE WATER \ENOTES. HAND PRELIMIN Y PLANS RING 110 NM T TEMPORARYSIN SURFACE WATER ES EXCAVATION IN WETLAND \ .EFFERY HAYWOOD FOR PROFILE OF LINE -Y2- SEE SHEET 51 FOR PROFILE OF LINE -L- SEE SHEETS 37 AND 38 \ SEE SHEETS 2& 2-I DI FOR DRAINAGE DITCH DETAILS PERMIT DRAWING ®THOMAS A FELDS SHEET '7 OF 1 TNOMAS IL LEMONS TREES / i '+ `\ ISFBUS i A GR I 1 t 72•,1D A.CNL 50/L ,y,, •• ' i GR i E 3 / L SITIseKeus T`��� t� SASS ry pp pAp ( lOcw• / M �FiTER FABFOC • I -_ I I OR I COHc P + $ ' TR ` 00 a FLl T T •. � a1RB $TOPS � � �\ � i ©flOflflflfl TA. •\` \+ ; \\ DE�YD N w _ EIP (bllV. ��_ ��-��� FS 55 AL erg'-- , •' —.� �-- W T /w i i� Mlm REM—� OF TOMN TRO REMOVE EXISTING BOX w (MTLAO - — T ; FS I REMOVES I — — — — — —Fas— — — 91 - I K *, I O toCONC AD BSI �1 T � CULVERT AND HEADWALLS ■D005 m w000S I \ S FS 2GI 3Gt-ALu < � I --� BDO 9. CLASS B RIP RAP----� I• EST.2 TONS EST.7 SY GF 1 I I yl i LAT BASE DITCH 0 DITCH SEE DETAIL P /. ra f `L`� `F I \ , B Rl RAP SEE DETAIL G / _ BK RET MALLow QQ=Q*LAX -' 1 I I ^ . / \ IF. BK RET ■ J. C SLOG JR :2 DETAIL C FALSE SUMP (Not to Scale) Medion DBch _ 9" I2" Ctw U6,n 20'G1 S=Ditch Slope 4 Proposed Ditch ' FROM STA. 52+15 CL FROM STA.57+85 CL DETAIL A h o DETAIL B FALSE SUMP FALSE SUMP I Wot ro sml.l c ( Not to Scale) Outside Ditch Outside Difsh 2 a T�Fl— i 20:7 2, GI " — —S— er<. $-Ditch Slope (Proposed Ditch S=Ditch Slope fk Proposed Dish FROM STA. 52+15 RT FROM STA. 52+15 LT FROM STA.57+85 LT FROM STA.54+87 RT 1 NC 2427 11 TROY BYPASS -L- 11,379 16,300 16,400 100 200 N 200 3GO ADT 2014 ADT 2040 ALEXANDER DR. JO / E•WD CIA t ® 1 ANTHONY HAiETON \\ 4• /// \ \ S 0 \\ lo 40'- 1±1 1"2 0 tY LT. ' 0 DAIEL ALEXANDER d;\� 9E1? FEAAE gENQ JO ELLHOLDER z Z O NLET TYPICAL IR Te SCAT Uri m 10101' Lerrr Res1rAM u rm _ NATURAL cATURA aRlrt _y �� P L IL _ -- �� r rwriiRi or EST. TONS CLASS 'r = 40 TONS ABRIC EST. ARL MAT LNG -90 SY DOE - 300 CY BERM DITCH SEE DETAIL O Bn — J I Lu Lu to --- T W Lu to co. ---� rr -- I --- O In LMTURI In T Fo—f -LTED Y toQ J LLJ Z GRASS ��—--G JT v 0 i U q 1 `t✓ $TEP$a a fl , C{WC I J VLLIAM MORTON OUTLET TYPICAL on LIFT n Owurw 90"Onw R u� Irt Wmrr PLI rr wawrs {4—..rnor mILuetar EST. TONS CLASS 'P = 50 TONS EST. FILTER FABRIC • 6S SY EST. COR O%R= AT = 60 SY so CY ROCK PLATE 1.5:1 FILL SLOPES SEE DETAIL ON SHEET 2-T BOO 15' w'E ` �� .1 .•UBP 2' HIGH 2 @ 8' . 6' /A/ LAT BASE DITI 01GI /+/F ` DETAIL v� B P RAP / ONS jE .1 SY GF • SITE 3 ti L ci N U) m 0 ItC SILL 100' 0' N)0' 200' 300' IWW GRAPHIC SCALE \ DENOTES IMPACTS IN SURFACE WATER ENOTES HAND CLEARING DE OTES TEMPORARY \ IMP TS IN SURFACE WATER ® DEN ES EXCAVATION IN WETLAND \ JEFFERY H1IYHOOD THOMAS 1 FELDS `-`0 TREES I �- " rp 15FBUS T SITE 3 .' SOILr eR ISEXBUS T $ colic L 1 1 I 4F- RRpp CONIC PARTFv via vvv1` I a i ane sTo REMOVE EXISTING BOX CULVERT AND HEADWALLS WOODS -----------—,T--�— — 6. WOODS THOMAS H.LEMONS WD k CHL C111, 0 ��!21 FS 2G1 -RIP -� -�—�� --� CLASS RAP � � E5T.2 TONS EST.7 SY GF 1 4 LAT BASE DITCH 0� 1 SEE DETAIBERM L P SEE DETAIL G SK RET WALL B RIP RAP ---- t EE TONS OFF . 7 SY GF ISBD 8K RET W ; J. C. �U� it .CC Cm ZmAt DETAIL C FALSE SUMP ( Not to $cola) Median Ditch _ �9 1I2' Cn t et�1M —.T.— 20' -- 1 GI S=Ditch Slope G Proposed Ditch DETAIL A FALSE SUMP I Nor+o sml.l in o d' Ouhide Ditch 2.a i-olf'�Flow \O.1 20:1 S=Dikh Slone � Proposed Ditch FROM STA 52+15 FIT FROM STA.57+85 LT u i0' Over STA. 52+15 CL STA_ 57+85 CL DETAIL B FALSE SUMP Flo- Dh.h (Hof S=Ditch Slope 4 Proposed FROM STA. 52+15 LT FROM STA 54R7 RT J NC 2427 11,369 TROY BYPASS _ L- 11,379 16,300 100 16,400 200 i ADT 2014 200 300 ADT 2040 ALEXANDER DR. JO ELLEN HOLDER / EW &AE 1• f ANTHONY HAMLTON ♦\ Y �/ / \ P �±2 / d3 40 N 40' LT. PN! SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINRY PLANS DO N07'� CDGR1W1'RIImoN FOR PROFILE OF LINE -Y2- SEE SHEET 51 FOR PROFILE OF LINE -L- SEE SHEETS 37 AND 38 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS PERMIT DRAWING SHEET $ OF ql OR I. , IRADEAO N W Ljj W - e to 1O. AV ZVV \ T %0 I \ s y I J 7 4.\, BEl? FUE r f,/ JO BAN HDLOER ® \DANEL ALEXAIQER .................................................................................................... .................................................................................................... .................................................................................................... .................................................................................................... .................................................................................................... .................................................................................................... .................................................................................................... .................................................................................................... .................................................................................................... .................................................................................................... ........r....ton.................... .................................................................................................... r...................moon..ton....................................... ............................................................................................on....... .................................................................................................... ................................................................................................1...0 .........................:.......................................................................... .........................:J..............................................................ton......... 000000000 .........................:�1............................ .............................t...................■.............. MEN .......L7fL"f.7i.�L"71Y4.t�f.Sf..J.L'i........ �1.:..moon..moonmoon.ton........�11...moon..moon..moon.moonmoon.moon.ton ....................................,\........... .a►. �0000.u.000.■.r.uoou.0000.o..00u000._uo.00000.00u.n,o.nus=..ct _�7RF.....................G7ilG►.............mot.................��]D�1......................�...1:f..a.1: SITE 4 PERMIT DRAWING SHEET /f OF �I/ TOE CL MOODS CLASS B RIP RAP 1 EST'2 TONS) EST.7 SyGIF TDE LAT BASE DITCH SEE DETAIL J STD. BASE DITCH SEE DETAIL S j • I it LAT BASE DITCH ISFD SEE DETAIL U DETAIL A F DETAIL FALSE SUMP FALSE SUMP 1N.M (Not to Sce ) Outside Ditch QuWdt D h Troft Flow �0t) —Traffic AoJw20:1 z.o 2' ci GI etc. Q• 5=Ditch Slop,Proposed Ditch S—Ditch Slope fE Proposed Ditch 2FROM STA.65+65 RT FROM STA.65+65 LT O THOMIS IL LEMONS r r IFD t � CK L I AI J GR 7 \ W $PECtAL CUT DIII 4Y \•---------- N © - H WLLJ .. .. zz N -- 0 O T ■ AC EY/8 BS( _ — — — — cN J Z .r DETAIL C FALSE SUMP I Not to Scole) Medien DBch _ 9" 2' t awn wey—.ram zo' -4 GI t5— S=Ditch Slope ¢ Proposed Ditch FROM STA.65+65 CL FROM STA. 72+68 CL FROM STA. 75+14 CL —�lsr _ r EE:4 S.».ri�CJ-Je€�' I BASE DITCH SEE DETAIL U ®� b ROOM OFTM \ A ® \.ID ELLEN BOLDER EST.8 MOODS EST. 21 A%LE _01113 SAT 'VDEAIL ' TTAIL D SEE D 1 � GU f I . SPECIAL CUT DITC i SEE DETAIL J� 7 EIOP 7� LAT k r LAT EASE DrT)CHH SEE DETAIL V CLASS I RIP RAP EST. 3 TONS MCRAE INDUSTRIES Ill I :-pi 100' RA4 SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PIT- I N.�RY PLANS W N07 llte *�� •DNrlA9C110x FOR PROFILE OF LINE —L— SEE SHEET 38 FOR PROFILE OF LINE —Y3— SEE SHEET 51 SEE SHEETS 2—H & 2-1 FOR DRAINAGE DITCH DETAILS PERMIT QjAWIiTG SHEET j3 OF 3/ BOW IWIFT'ON all 1t ON STD. BASE DITCH SEE DETAIL T CLASS I RIP RAP EST. 40 TONS EST. 75 SY GF EST.8 CY DDE 11CRAE MOUSTRES MC. ®DENOTES TEMPORARY IMPACTS IN SURFACE WJ IMPACTS IN ®DENOTES SURFACE WATER ® DENOTES HAND CLEARING DENOTES FILL IN ® WETLAND 100' 200' 300' I IN Lu LLJ Ln it DETAIL A FALSE SUMP Q�s_p INotb SN.� TmfF� Flow �p� 20:1 o ci S=Ditch Slop* 4 Proposed Ditch FROM STA.65+65 RT THOMAS H.LEMONS ..A S` DETAIL C FALSE SUMP I Notto Scale) Medicn Ditch _ 9" 2' Ciwrl Mloxj -T- 20'�t GI — S-Ditch Slope CL Proposed Ditch FROM STA.65+65 CL FROM STA. 72+68 CL FROM STA. 75+14 CL 3/ BENNY HAIPTON MCRAE INDUSTRIES W— WW SHEET NO, ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINY PLANS no xor >n �oN.ILL ox FOR PROFILE OF LINE -L- SEE SHEET 38 FOR PROFILE OF LINE -Y3- SEE SHEET 51 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS PERMIT DRAWING SHEET& OF qj ®DENOTES TEMPORARY IMPACTS IN SURFACE WI ®DENOTES IMPACTS IN SURFACE WATER ® DENOTES HAND CLEARING ® DENOTES FILL IN WETLAND 200' 300' r LLJ LJJ N LLJ LLJ N —Ij LLJ _____________________________________________________________________________________________________________________________________________________________________� l o 0 o u o 0 0■ o■ o 0 0 0 0 0 0 0■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ o■ o■ o■■ o 0 0 0 0 0 0 0 0 0 0 0 0 0 0■ o ■woo ■ o o u■■ o 0 0■ o 0 0 0■ o 0 o w o I, w o ����������������������������_������C�C�������������������������■■fit■■■■�■■■w■■■t■tttttttttttl o■ o 0 o u o 0 o u■ o o w o o uno M o n: o G d■ o■ o o■■■■■■■■■■■■■■■ w o 0 0 o w w■ o w w w w o■ o 0 0 0■ 1 ■o■u000■o■oo■oo■■■o■■■o■oo■■o■ ■■■■■■■■■■■■■■■oO■■■O■■■■■■■■■■t■■■■■o■■■■■■■■■■■■■■■oo■■■■■■■■■■■■■t■o■t■■■■■■■■O■■■tttl3tto■o■■■w■■■wwwwoarra�oo�o���_�����w■■■■tt1L■■O■■■■■■■■■■■LY■■■■■w.���___������.+nowt■O■■■Ilfwn■■■■o■■■■■■■■■■■toot■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■1 0000■u0000■oo■ oo■ 000■o■■0000■■G%■oo■u0000■■nunl rH l■■iI oo■oo■oou■ovaouoou■u u■I/e o■o■oo■■ouoo■■lon l n.ln■■■■oo■uerroo■o■■oo■■ouuo■■ou000■u■o■oo■uom ■■■■■■■■■■■■■■■■■■■■■■o■tt■■■tt■tt■■■■■■■■■oO■■■■■■■■■■■■■■■■■■■■■■■■■■t■■■■■■■■■■■■■■■■■OE��'_==ai�ww_■_■_■_■_t_t_t_ttttt��MEMMEMEMEM...ii:aipt■F.__ ■■o■OOO■■■w■■■■■■■■■■■■■o■■■■■■■■■■■■■■■■■■■■■■O■Ot■■t■t■■t■■■■■t■t■■■■O■■■■■■O■■■teaG•���___������oov��woww■w■■■■■■o■tt� ■t■toot■O■■■■O■w_v_::w■��ii.�i�pp�jj ■I•■■u��=ms.Wwmw ■■■wawa__s:�w■■EOMM■■oo■o■■■■owwiiiiiiii■Fv,G'.�■■■■■■■■■■■■■■■■■■■■■■t■■■■t■■■■■■■O■■■■■■■■■■■■■■■■1 jp�jj■■■■■■■■■■t■h:iL'atttt■■tttt■tttt■tttttttt■t■■■t■■■■t■ttt■ttt■t■ttt■t■tl ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■t■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■C���■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■t■���t���:����ww■t ■■■■to■■■Ow■■■■■■■■■■■■■■■■■■■■■■■■■■■O■■■■■■O■■■■■■■■■■■■■■■tO■■■■■■■■■■■■■■■■■■■■��■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■�■�■ttgPt■wt■O■o■■■■o■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■hl-iL'•J■■■■■■■■■■■■■■t■■■t■t■t■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■1 t■■■o■■■■■■OOOt■w■■■■■■■1:JG�■■■■■■■■■■O■■■■■■O■■■■■■O■■■■■■■Oo■■■■oo■O■ol -��■■■ ■■■■■■■■■■■■■■■■■■■■■■■■0000000■o■00000uoou■o■o■o■ou■rnt■e.■ou0000u0000u000000■oo■0000■oo■o■o■ou■■rorou■uo■■■o■■o■o■o■u■o■ot■■ofoo■►�G�o■oo■■000■uouo■u■u■u■uo■0000uom so SEEMS ■fit■■���[Cw:C•t■■■■■■o■■■■■■■■■■■■■■■■■■■■■000■■■■t■I.ry�yoo■■■■■O■■O■■t■■■■■w■■■■■■■■■■■■■■■■■■■■■■■■■■■■■1 INLET TYPICAL wr 1• RV�IT Ul RRo MML40 �— Gram NATURAL FFJ� all m Fmm IIIIRA \� wor ° AM I'nrs arOF EST TONS CLASS 'P = 50 TONS EST FL FABRIC = IOO SY EST. COR MATING = NO SY EST = IO50 CY FROM STA. 81+33 U FROM STA 84+13 C 3/ Bow wirm OUTLET TYPICAL LEFT To Fa�R mai�iMifr \\ `GROM \\ Y fFAi OTFAt V1 e� \ ��— ousrRrr ,� V Il1R Fi �Ar Rtt=I F1 woo EST TONS CLASS 'P = 75 TONS E.ST FILTER FABRIC = 100 SY EST. SC FBER DWATTS G = 50 SY FROM STA.86+34 RT MCRAE HXMTRIES B1C. IIIU U IUU CVU JUU GRAPHIC SCALE DENOTES FILL IN ® WETLAND ® DENOTES HAND CLEARING IMPACTS IN ®DENOTES SURFACE WATER h IMPACTS IN �Q ®DENOTES SURFACE WATER (POND) ®DENOTES TEMPORARY Q IMPACTS IN SURFACE WATER DENOTES EXCAVATION I ® N WETLAND I FROM STA. 81+33 CL FROM STA 54+13 CL FROM STA 86+34 CL WAYNE© TREES SEE SHEETS 2-H & 2-1 FOR PROJECT REFERENCE NO. i SHEET NO. DRAINAGE DITCH DETAILS R4623 9 SEE SHEET 2-1 FOR PREFORMED KW SHEEf NO. ROADWAY DESIGN HYDRAULICS SCOUR HOLE DETAIL ENGINEER ENGINEER BRLW LASSITER PRELIMUN DO NOT IIf� PO Y PLANS OON8T3IVC17ON FOR PROFILE OF LINE -L- SEE SHEETS 38 AND 39 FOR PROFILE OF LINE -Y12- SEE SHEET 54 PERMIT DRAWI G SHEET/y OF f / / A- i 6,SI'4A E J\ MOODS •, l� I N ly . ,IONN C. KING BERM DITCH SEE DETAIL X SV 2G/ I \ \ O co SPECI H I 2\ SEE L ZZ , �y V _ 5" MONOLITHIC CONC. ISLAND C INLET TYPICAL arr n Iw aaTO �msnur NATLRAL u IIRtI,s Ram�offm )-4 div i 6/p� �r La arr EST TONS CLASS 'r = 50 TONS OUTLET TYPICAL am 10 I✓Kr 10 �i =OoTum \\ -NATURAL aaaAo ww low \\ Y lta trinw Ttrr \ _ W FILM FINIC IAIRtTRY or RIB W Ri rol doorRill ttel o r EST TONS CLASS 'r = 75 TONS EST FILTER FABRIC = 100 SY EST. COR FIBER WATTS = 50 SY EST. COR FIBERF MATTIIGAOYSY EST DDE = 1050 CY DETAIL eiP 4 DETAIL B FALSE UM FALSE SUMP I ( Not to Scab) O utside Ditch �uhide pitch zo Tro.ffic Flow ZO:T Z, — G GI Itch Slope R Proposed Ditch S=Dikh Slope q Proposed Ditch FROM STA. 81+33 LT FROM STA. 84+13 LT FROM STA. 86+34 IT SEE SHEETS 2-H & 2-1 FOR PROJECT REFERENCE NO. I SHEET NO. nlU V IVU LVU ]VU DRAINAGE DITCH DETAILS R-0623 9 RAS SHEET NO. SEE SHEET 2-1 FOR PREFORMED GRAPHIC SCALE SCOUR HOLE DETAIL ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER ® DENOTES FILL IN WETLAND ® DENOTES HAND BRWI LASSI ER CLEARING DENOTES IMPACTS IN PRBLIMIN Y PLANS ® SURFACE WATER DO NOT DO CONTMUCIYON DENOTES IMPACTS IN ® SURFACE WATERDENOTDENOTES li" TEMPORARYIMPACTS IN SURFACE WATER FOR PROFILE OF LINE -L- SEE SHEETS 38 DENOTEEXCAAVAATION ANDIN 39 ND \ ?* ♦ FOR PROFILE OF LINE -Y12- SEE SHEET 54 PERMIT DRAWING �wrTj `♦�♦♦`�\� SHEETJOCCOF ■AYNE MCNTYRE L n ♦♦♦♦` _ ��? ` It -/ Jr 0- TREES dirgV• " `4r . ♦GR GRASS �� ` / / � It © aLmArm FRIG GRASS mm lAA / 3/ 0 TEto � KENT NEWPORT / II f`3 � / --_ BENNY 1 QAss'dRD'/ LAT SAS DITCH f (� ttr RETAIN EXISTING DITCIjj SEE DET L EE TO �Y ice' � �� ���i P�•'- LAT BASE DITCH DRAWLED KMD ' BERM DI AS I © N La SEE DETAIL M SEE DETAIL I �M C. Km SITE 5 EtP i / -� -. <�� -- � Fs _� I B P¢ _ RCPERO TZ \ ovr- 2 BERM DITCH B 10 x 7 SITE 5A // ` r�rss 6 GI SEE 121 DETAIL X ♦� CRASS 1 :\ PC Z4/0 !x I SITE 5C CO TOE PROD CTIIO F MR/ SITE 5B VIP P18\1r.r. fs �� ,�./ �Q �\` v� y VE EXIST. BOX // E E 1s' \► �SPE� CI 3 HEAD—­ SEEl ZZ O T I N 2 E1B0 ��F. ( CLASSQN P EST.3 TONS ✓:y EST. 10 SY .. E C SEE DETAIL Z `CH "L D lAT BASE DITCH, S AIL AM / /` SEE DETAIL J / RETAIN � ` 1P�� p�ETS --RETAI SO J� aa C •� m N.RROV LIENS -- C6"&JIILP RAP_ �L / of - s • \ CLASS I RIP RAP •` I (� O ` 0--- --- E� RSFTS / 1\ L ♦ CLASS IRIP RAP _ EST. EST. 3 TONS , EST. 3 TONS '� EST.7 SY GF fAV �♦ EST.7 SY GF,sE� E�}pA,6^•� RV \ R / �N LAT BASE DITCH � � %�� •. t ; � SEE DETAIL Y CLAss 7� pP RAP ',% //� \� BST PATSY 0. N10 FAMILY LLC -2 1 W/ FILTER FABRICGR INCLUDES IMPACTS FOR PROPOSED UTILITIES ' BANK STABILIZATION 1 -'� \ YTL 40 Polo MCRAE WUSTRES NC. 1L \ B57 r5,15 COAC \� G11 p i BSr _ 5" MONOLITHIC CONC. ISLAND ................................................................................rr........o.o....o...o..ol n.l........................r.............................................................................1 SCGL:1LSS3II� ..........................................................r.....om.........o...o...n.n.l n.n...n.nr........o.ol oou.u..u.uuo anal Yrr...iu.n.nun.nn.■nnnnnn.n■n..n.......Doll.o...o.o.....o.■........■...o..o... ............................uu..u...ru.■ o............u..........o....... mom no momilm oouou.uuu..u.000.uuoou..nuoouoouu.uou.0:0 e.nnoouoo oo..0000u0000uon■ .....�ceeesseeeeeuunuuoo.o.0000.o.o.ouunuo.rn.ru.nuuon.unuuoo..00.ouoo.l oo■ oou.uuuuuou.ouoo.o.. No ou..mumuo... o.o onuunuoon ...........................n■nn.n........n..nnr.■.nr...o.o..Doll.o.o.......o.o.......o.o..n.n..n.nnn.n..ol ............................................n.....n.n.n.n..n.Nunn.mm�nmmnnmmn..nn.nnn.n..nn.n..n.nnn.n...l .............■non.■.n.o...o■......o.o..Doll.o.o.o.Dollo.Doll..u..........o.o.......o.O....00.o...o.o.ol ......ouo.u.ouuunu.uunuo.■ nuuoono uuuoo.00 Dolan. u...u.0 uuuuu uounuuuu uuuuu■ oouo.uoo ouu.uuuo 000.ouo.unu.00u.0000 uuuuu ouol oum o.o.ouuuunuuouu000uuuo.000uoo.00 ..000uoo.00.o.00.uI...o.mmnn mmu.uouuo uuuuu oouoo.0000. ■........0.............u......u. o.nuuu0000uoon nnu..l ......................... .m..... ....m...............Do.0D111 .o.o■.D .n.nn..nn uuuuu Nola n.nnnn.o...o...o....o.o III o1 n...Oo.o.■nuMo...o....nn■no.n III ..111 .o. o111 .o.■.oOo...■ .......n.. ■.....o....or. nounoo .....o...o.o0.1 n..on.o...o.o.a .....o.....o...o........mom...n.mom.n.nn.n.n.null.nulln.null.nn■.....n..n..o...n.o.....o....nn.n.n.n.nnnnl .....Doll..Dolloo.......Om...n.nun.n.nn.n...nn.....rn.n....o...non...Doll.o.....o.......nn.nn.nnnnn.nn.a .nonunn ■nun■ Nunn n.nnO.r....o...o.o..o.o..n.o. oO..non. n.nnn Nunn n..nn non nn..nOO...o..00..O.ol ........■.....moo.......■....nn.nun.n.nnr.r..n.r.n.....o....o....o....00...o... .non.mnM Uon noon rrnnr...o...o.moo.o..o.o....000uuu m.o......nn.nnnnnn.nnr.. n.nn.nunn n..nnnun nnmoonso..o..o..mn.o..ul o, .....om.......nn..ill.................o.o..o.o....o.o.....o...uuuuu.00...o...uuuuu........o.n..111 ..n........o..............u.■n.n■n.nr■n.o....o.o.....o....Millon.mm.00...o.....00..uOuunn......n..ol .o, .nOOn.■nn...on.............o...o.o.00n.nnm. ..o.000........o..nn.Nunn.n..nn.nnn.n..n..Doll.o■.........■.o....Noll.00...........n.n.nnn.nr.n..n...... uum.uo m.mnuuMO ■...u000O................ n.nn a of uuuuu nuo oouuo.o.uou uuu.u...u. MOMMom n:...n..nn.oun.n.no..u:....n.n:.u:..o..n.nu..o.n:n:o::o::.:o::n:.i.�.....:: u.........uuoouo.un000uoouoououuu., uu■:. nn.:n.o:.n:noo:.:..o:oo n:.00:.:..o:nu:n.:.u:.:.00:.:.oo.._.u_o.000:...n.�:..f nu.:.ni�.o..n�..Rom No .Onn.o.0 n.nnnounn..no u ....n.n.un.n illm MEN O. o o....n.nn�..�.�.o9o,.o u.uuuuu. ::: ::::::::::n: .....111 . ::o: : .....noon..nmom...o......o..nommnnnmmn.mmn.n O n ..........V o:::::::. EMIMMUMo mm.....o...00..u...n...........O l,:�l' .........................................................._._..^.�ill.n.n..n.n.nnn.n.n.n.....n!iYo.o......ol 7A.n nano nnun.l unnnonnl ..On..nn n.nnn n..nn non.. n.nnono..nnn.nO.ou ........................Dolln.Ouon.nno.n.��_�i...�...00..oO....o....o.�T�G.YoHolm un.o..-. i.Gnn.n.n. nn..n.n.nn n.n.n.oY ........................._._......�__.--:....o.Dollo.onn........Cif..................o.o...o.o.........onol .........uuunnn.o�_�.%_ill■���i...�� ............. ....n9_�Y ................on.nom....00.........o..l .....o.�--__�......._se�Y3-7-�C�P_�9�T .on..�.........�.�0 C�Li..n.o...00....o....00.o.o...o.o.......Oo.nnn �................ 1 ....Ou.E n.n...l .On.n...........o.., :............a...!S..m.momm.mm.nnOnn.nn.nn.n.nn■0 0 0 0.O.00..o.00.Oo...o.o.......uu.n. Moms n.n.l Ergii:.nnCif.4Y..nnuMOMMOMMOMMEM n On.On.o...o..o....III ..o.0 'Mom.o.o000.00unnnnuO. MOM nn..mou. mnn.n........00.o...o.Oa .nun..R7..n.n.n.....rrun....n.n.n.n.mn.nn.n.nnnnnnn.nn...nnnnn.n.. .....em...o.....o..00nn.nO nrrr.o.Doll.o..On...n...o...........O...00.o.n...o.o.00oonrnon nn..n.nnf. I Imno... momnun.nnn.n.nnl ....... 1 ._7Yoou000.o onono..00n..m.ouo.0 ..nm000.....o......mnon.n.n n.on.on..o..O..n ..On..nn n.n.n.no. n.O.o.o......o.o.uuu.Orounnuu. uuuuu On.O.... u.ou.o u000.u.ouuo o.O.o.o...O.o.......o...u. ■Onnun..Onuuu..nnnn uuuuu mn.u.nmmo mmrmo roo...o.00.o..O.nn uuu, ml a ........■.......oO..n.nn.n.nn.n.n.n.n.n...nrr.n■...n.n...■.m.......■on.moo..o. unn n..nn n.uun..■ onOnno....o.Mom.o.. 0 .unonOnun..OnnnOn.. o....n.no n.nnnuo. N00111 nn.n..n.nnn....a .n a ...■.00.........00..o.o..o.o....o.o..n..nourn.■..n.....o.00....o.o■...n..o.o. .innnmom n.n.oOOOO....o..o.o.o.o...Onn.Onon.00u.Onnnn.no■.nnnon..nrOn.o.o...o.00....O.nna n.....o.o...o.00..nn.n..ol .....00.....o.uuu.o.nun.nn.n.Nollr■..DollNollDoll..o.o..Doll.o.Doll....o.....nn.nnn..nn..n.nno... un■n..r■..O.r.on■.o.o.....■.......o MIN l ...............n....nnnnuuu..................■....nno.o■.o..■.o.o..Doll.o.o.nn.n. unOOOO.o...00.........O.o.oMMOMMMUMM.oO.n 0■n.n�n.�on.n�n.n..Onn■■.nonunnon...nnonn.o.....o.n.ounna NNW Oman K Nunn uuuuu.........�un Nunn n.rn. n..o...o............un.a MEN n.nnn.n..n...n.n.nl u....n..n.....n....nnnn.nn.nn.n.uuu......Do��o.Do��o.o..Do��.o.o..Do��..r..nn..n.n ...■onto. O...o.00..o.....O.o.o..O.n■uuuuu...■MM n.nnnuuum..n.rr.o..o.....O...o.00.nn.nna NORM .n.nn......o..ol .....m...nnuuu.■.n.nn.nun.n.n.n...rr......o.o.ono...o.o..o.........Do��..n.nnn..n.n.nnn.n.nn.no..o..ol unn.O. nOo.o.00■......On..o.o.o.o........o.o. o.o..O.n. nOO.MOO.r..ono..o..........o..o.o...o..a ..n.nnn..nnn.n.nuuu.....null...run..■.....o.o.■.DollDoll.oO ..rnnn...n..o.o.00......Doll..Doll..n.nn.n..n.Nolln.n.n.nn.n.O.rn.untonn.n....n..........o..n..n..nn..nml ..............nnnn..n.n.nnn.n.rnr.o...o..ol u...nu. non.n.n..■.unn.n.n.Or.no.........o.o. o.uoo 00000 0oo...uuuuu. o.o...oO..o.......M ru.u.ououoou.o.00u0000uoo.00 n.n....Mo nn..n.onn norm no.u..o..ol uuuoo.uon nun...u.uoo.u.00..u.00.00 ..n..nuuu....uuu...n...00.O.o.........o. uuuuu uuuuu.ron.on o.omonooO.00.O.nnn..n.n.nn Noonan o0000 0000.. O.o..o.o....o.ol uum Dolloo....o.o.00......o....O.nnn.un ..n..nu..uO.n.unonn.n...00n.o.o. n.ouo.. uuuO.n no.o....o. o..oOOn ■o.r..O..no.........00.o.o..O.O.00 nuOur� n...uunn nn..n.n.nn nno..O...o.o.ol uuna ..n.noo.O.nno.00...o..o.o..00nn.n.nn.n.n.O..un.ounnn...On.00..rm.Moon..... .o...o.o......o.o....o....uuu...o.o..o.Doll.o.■..o.o.DollDollo.DollMoo.o.o.mom.mom..n.nn..on.....o.o.ol MEMO .OMEMO n.n.n.l .o..00.Doll...Doll...o..o.Doll..nun.n.nn.n.n.nulln.n.urn.O.o.On..O..00.o.o. ..nn.n...nMMMM nn.nn.nmumnn.■.omo■.o.o.o..o..o.oO..n.nnn.O..unOn.n.nn MOM .o.o.o...rOn..n.mom un.nOu.r.n.00.....o.o.a .n.na ouo.0 0000.. o.o.u.unon uuuoo.ou0000n nuoouo.uuu nuo ............................uuu uuuuu o0000 uuuuu uounnnr o.o.ou.nouoo n.o.uo uuuuu ononl Dual noun■.........mo...n.00...o...o.o..o.o.o....uuu..O.n...nn ...n..n...n.nn..nnnn..nnn....nn.nun.n.■n.n noon. uuuuu Don uo. uuuuu ..............r..n..n..........■.n.n.n.n.nn.n..nn.n..n.nnn.n.nn 000..0 000u.■ ..............o...o........00.o...o.o.a uuuu.uu000uoouuuu000u.uui ...moomo.o.o..Doll...o........n..nn.n.nn.n.n.n.nun.n.n.nrO..nno..o.o.000mmo...o.o.n..o....n..n.n.nn.nna .On..nO nn.nnunOunnnuuunn.nn■n.o..O..o.o...o.o.O.nun.Oon..O.OuuuOEESE Mnnnon.o...o.n..I uoo.o.o.uoo.00.00uuuuu00000uuuuuuuuuuuuuuuoomom uo.00 o.ovon noun unto uuuuu 0000.uoouuuououuuoouunon on oouvua non.. u.ou.o.uun uuuou0000uoo.00.uuDun 01101001 nn.nun..nun.nn.n.n.rn.Doll..Doll...o.o...o.o....O....n..n..nnnnnn.n...n..nn.nu..o.......o.o..ol uuuuu uuuuu u.n.no.u.uo.uMoM oouuuuuuooa o.o.ouoo.ou Nola.uuu.u.uu.ouo.uuouuuo.uo......ouo n..o oouuouuuoon SITE 5 PERMIT DRAWING SHEET,'t,'ZOF q -2 0 -1 0 -100 -56 510 100 150 260 ■,,,40 Vial■■■&HAN011■y► ■■■■ ■■■■*■a■■■■z■■■■■■��[t■■■■■■■■■■■■■■■■OMEN ■MENU 7■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■iii'r■■■■■■I■■■I■■■�f/■■■■■■I■■■■■■�I/III■■■Ii■iiril�ii:i■►■■WI■�1'i`�■JCiWIL'I�Wrli■■■�1■■■■■■■II■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■A■\■■■■■■■■■I■■■I■■■//■■■■■�1■■■■■■�I■1!■'a.■■■■■■■litl\Qi■■■■■i■�■■■■■■■■�'ii\■■■■■■►I■■■■■■■1.71flll:iiill�■■■■■■■■■■■■■ L:�1 If 111■■■■■■■■■I■■�I■■■/I■■■■■li■■■®■■�iilA'lilt■■■■■■■■1■\l�■■■■■■■ii■=■'1�■■■■\\■■■■■II■■■■■■■■■■■■■r■■■■■■■■■■■■■ no -no nNl■ uus offim-MR. ■,umr..■ I I I I I I I I I I I I I I I I I I I VIV IIVIYn LJIILIL I I I I I f I I I I I 1 1 14 11 1 -f 11 -I° 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1'\I I I I I I I I I I I I I I I I I I I I I I I I I I- I I I L._I PROJECT REFERENCE NO. 1 SHEET NO. r— r— F— W W N W Lu N O O V I 1� Lr� r N I Lu Z J V F— N DETAIL A DETAIL B FALSE SUMP FALSE SUMP Outside Ditch ( Not to Scale) a ' Traffic Flow i< ow ,�01 20;1 Y. 2 � Efth S=Ditch Slope Proposed FROM STA.116+15 RT FROM STA. 116+15 LT FROM STA, 121+25 RT FROM STA 120+8 LT 100, 0' 100' 200, 300' GRAPHIC SCALE ® DENOTES FILL IN WETLAND ®DENOTES IMPACTS IN SURFACE WATER ®DENOTES TEMPORARY IMPACTS IN SURFACE WATER DETAIL SUMP 1P ( Not to Smle) Medien Ditch 9" 2' cx�t R.bi--•ram za•� GI S=DRd� Slope 4 Proposed Ditch Ditch ra L Mitch Gr • L 0.U% To 2.0% 20, Orer 4.0% To 6.0%4 40' 30' 1 Owr 6.0% 50' FROM STA.116+15 CL DWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELINIJINARY PLANS DO NM Di Nt CONMUCnON FOR PROFILE OF LINE —L— SEE SHEET 40 SEE SHEETS 2—H & 2-1 FOR DRAINAGE DITCH DETAILS 0--77 RELATIONTYPE BRIDGE IN • PAVEMENT SKETCH SHEET N Z O _N I aC 1 t u 2 U E 4 0 SDRFAI;E WATER ®DENOTES TEMPORARY IMPACTS IN SURFACE WATER DETAIL A DETAIL B FALSE SUMP FALSE SUMP I rra w z�.1 ( Not to Scale) Oatside Ditch - OuH'da Dikh Traffic Flow T�fra flow `0� 20:1 2 GI f �-S— atc. S=Ditch Slo E Proposed Dixh S=Ditch Slope 4 Proposed Ditch FROM STA 116+15 RT FROM STA.116+15 LT FROM STA. 121+25 RT FROM STA.120+15 LT DETAIL C FALSE ( Not to Scale) Median Ditch 1. 2 ct-, rley —.T.— 20•GI S-D'dch Stops 4 Proposed Ditch c L Di • L 0. To 2. 20' Over 4. To c.0% All 30' 1 Owr 6.0% 50, FROM STA.116+15 CL 1S OA Z RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO NOT um 001IeTRUC170N iEE SHEET 40 & 2-1 ;H DETAILS LWING T TYPE It I//4.IIIIIIIII %//.v�r��.�a, RELATIONBRIDGE IN • PAVEMENT SKETCH DETAIL A DETAIL B - FALSE SUMP FALSE SUMP I rra a x wl (Not to SM.) O�dside Ditch Outside Ditch TralOcFlow rTo Flow �Q.� Y0:7 zo 2' GI ek. S=Dikh Slope4 Proposad Ditch S-Ditch Slope fL Proposed Dikh FROM STA. 137+35 LT FROM STA. 137+35 RT FROM STA. 140+85 LT FROM STA. 140+85 RT WOODS c P F L L u u u c Lc a 1— a F- u^ J Lu Z J F— MADBJK ALLEN DETAIL C FALSE SUMP I Not to Scale) Median Ditch _ '. 9' 2' 2W GI. S-Ditch Slope 4 Proposed Ddch 100' 0' 100' 200' 300' GRAPHIC SCALE ® DENOTES FILL IN WETLAND ®DENOTES IMPACTS IN SURFACE WATER ®DENOTES TEMPORARY IMPACTS IN SURFACE WATER FROM STA.129+85 CL FROM STA. 133+55 CL FROM STA. 137+35 CL FROM STA.140+85 CL s m c� oQ Z O CwwLM MGM CUTOVER )JECT REFERENCE NO. SHEET NO. R-0623 13 RW SHEET NO. DWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIM N Y PLANS DO Nm un " CONMUCTION FOR PROFILE OF LINE -L- SEE SHEETS 40 AND 41 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS PERMIT DRAWING SHEET 30 OF q[ DETAIL p g FALSE SUMP LSE S i.X I— ro Smbl '^ � FALSE SUMP OL Wde Ditch I Not to Scale) _ Ouhidd�� Ditch Traffic Flow �Trat�c Fbvr `O� 20:t z'0 - 2' � I f nc _5s etc. S=Ditch Slap, E Prose opd Ditch Ii S-Ditch Slope fE Proposed Ditch FROM STA.137+35 LT FROM STA. 137+35 RT FROM STA 140+85 IT FROM STA 140+85 RT WOODS P F L L 7 u u u C Lf 4 CC n r- a J Lu Z J gU 2 MADE1rE ALLEN DETAIL FALSE SUMP (Notfo Scale) Media, 91tb--r 9' 2' w .S�20 — GI S=DlopcSe 4 Proposed Ditch 100' 0' 100' 200' 300' GRAPHIC SCALE IT%l.%I DENOTES FILL IN WETLAND ICL!!l.LLQ DENOTES IMPACTS IN SURFACE WATER ®DENOTES TEMPORARY IMPACTS IN SURFACE WATER FROM STA.129+85 CL FROM STA133+55 CL FROM STA.137+35 CL FROM STA.140+85 CL C1 o1 c� oQ Z O owe ES MOM CUTOVER DWAY DESIGN HYDRAULICS ENGINEER ENGINEER IPRELIMu N Y PLANS I DO NOT l/Qma CONR'PROQIION FOR PROFILE OF LINE —L— SEE SHEETS 40 AND 41 SEE SHEETS 2—H & 2-1 FOR DRAINAGE DITCH DETAILS PERMIT DRAWING SHEET 31 OF IL J PROJECT REFERENCE NO. 1 SHEET NO. DETAIL A FALSE SUMP I tia s. smbl '? 0 ich 2. ,0� 20:7 S=Dikh Slope rE Proposed Ditch FROM STA.144+35 LT FROM STA. 147+85 LT B ® DENOTES FILL IN WETLAND 100' 0' 100' 200' 300' DETAIL B FALSE SUMP ( Not to Scole) Outrde Ditch TrorFl,- 2' GI S=Ditch Slope fL Proposed Ditch O CHARM WMAII FROM STA.144+35 RT FROM STA.147+85 RT DETAIL C FALSE SUMP ( Not to Scale) Median Ditch _ 1. 12' chat e.w,{ .... — 20m--.{ ZGIS=Dikh Slope 4Proposedc Dit Grp . L Dikh Grade L 0.0% To 2.0% 20' Over 4.0% To 30' 1 Over 6. 1 50' FROM STA 147+85 CL ENGINEER I ENGINEER px�B 2�2oT�Pd o A S I FOR PROFILE OF LINE —L— SEE SHEETS 41 AND 42 SEE SHEETS 2—H & 2-1 FOR DRAINAGE DITCH DETAILS PERMIT DRAWING SHEET ,q OF 31 _ 5- MONOLITHIC CONC. ISLAND GRAPHIC SCALE DETAIL A FALSE SUMP n I naa swi.l � 0 dt zoi— c 20:1 S=Ditch Slope Proposed DiMi FROM STA.144+35 LT FROM STA.147+115 LT 2 sU 2 s ® DENOTES FILL IN WETLAND 100' 01 100, 200' 300r DETAIL FALSE SUMP (Net ro Sco1e) Outside Ditch Troffi< Flow 2' GI r5— etc. S=Ditch Slope tE Proposed Ditch O CHAFLES MORAY FROM STA.144+35 RT FROM STA.147+65 RT DETAIL C FALSE SUMP ( Not to Scale) Mediea Ditch_ 9" 2' tn.n R.Ia..{ �� xo• � GI S=Ditch Stop. 4 Proposed Ditch FROM STA.147+85 CL R W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIM3N4RY PLANS DO NOY VS commuormix FOR PROFILE OF LINE -L- SEE SHEETS 41 I AND 42 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS PERMIT DRAWING SHEET 3,5-OF 11 _ 5" MONOLITHIC CONC. ISLAND GRAPHIC SCALE 0 PROJECT REFERENCE NO. 1 SHEET NO. O GIARLES MORAM SITE 10 PASTURE 0-8.6ds V1 0=2.Ofps BASE I SEE DETAIL 'XX' E DITCH SEE DETAIL 'XX' CLASS B RIP RAP EST. TONS EST.10 SY GF Ljj 2� Z 0 O W Lu F CLASS B R P Q EST.3 TONS 0 EST. 10 SY GF r N to Lu �---\� �7y �A \ 'ENDOFED£ n` v .C1IARLES 1 C E 0 I �jV END fENL£ 'r•• / :;♦ • IDD' 0' 100, 200, 300' GRAPHIC SCALE ® DENOTES FILL IN 0 WETLAND DENOTES HAND CLEARING ® DENOTES EXCAVATION Q IN WETLAND Z NZY 44 CAROLYN PLOW" ENGINEER IPRELIMIN4RY PLANS DO N07 UN M OONMUC77ON FOR PROFILE OF LINE -Y6- SEE SHEET 51 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS PERMIT DRAWING SHEET 3j OF 91 / C C ---C_ _ C Cld --- C --- — z C FELD MOODS —0� FELD 2GI �FS m �C� _=�� TREES r 2GLD S 75• ,,::r>FS —I D J 2GI Or - DI S' X 21' PS PAD Ln T 2GI O N m 2GI-A m \\, 2GI FS N FS FIELD m 5" MONOLITHIC CONC. ISLAND 8 CAIIOLYN PLOW" PEKIN RD. ADT 2014 SR 1005 ADT 2040 1_,910 2,000 300 I 600 30V �00 6.610 -L- 6,910 9,300 9,6DO 300� 33DO 1,431 1,700 PEKIN RD. SR 1005 DETAIL A' FALSE SUMP I Nab Sty:.) inD T-RiicFloww zo 2D:1 S=Ditch Slop, DBdi FROM STA 155+10 PT FROM STA 158+15 RT FROM STA. 162+55 RT DETAIL B FALSE SUMP (Not to Style) Outside Ditch Traffic Flow 2' tc f$— etc. FROM STA.155+10 LT FROM STA. 158+15 LT PROJECT REFERENCE NO, 1 SHEET NO. O \EDOAR PARNELL ♦ - WOODS F F --- F / -F m EDOARR PARIEI.L n n i "a E a a L N m tP o /O 0DETAIL FA x /Ditch C Ou ic- `0.Y 20:1 2. w f S=Ditch SIo 4� Proposod Ditch w FROM STA. 185+65 RT a n / WOODS DETAIL C FALSE SUMP (Notto Scab) Medie�Ditch 9" Chaet Mlevj �� 20 — .-S S-Ditch Slope CL P Ditche L Ditch C 0r096 To o.0i6 20' or 4.0 a 30' 1 Owr FROM STA 180+65 CL FROM STA. 183+65 CL FROM STA. 185+65 CL FROM STA.189+85 CL DORTW CAIALE 100' 0' 100' 200' 300, GRAPHIC SCALE ®DENOTES IMPACTS IN SURFACE WATER ®DENOTES TEMPORARY IMPACTS IN SURFACE WATER Qy O� �Y SITE 11A BASE DITCH LAT BASE DITCH DETAIL L rSEE DETAIL G M00DS `���r3iM!/ SITE 11 SPECIAL JB wMH CL 8 RIP RAP EST. 3 TONS ` ` •. --- WOODS F' EST. 10 SY GF. ` `'• WOODS i� ♦ ~� CLASS I RIP RAP EST. 10 TONS SITE 11 EST. 14 SY GF ___ 'LAT RIP RAP BANICS_C �S �� O BASE DITCH ' SEE DETAIL G lS .: BASE DITCH SEE DETAIL HH CLA55 I RIP RAP BANK STABILIZATION EST. 50 CY DOE EST.8 TONS EDOAR PARNELL EST. 25 SY PSRM EST. 11 SY GF \ RIP RAP BANKS ONLY \ DOffrW CALIME I \Dikh L K 40' 50' \ MOODS BERM DITCH SEE DETAIL AA CLASS 8 RIP RAP EST.2 TONS ETSY GF ENGINEER I ENGINEER PITL MIIQ�.RY PLANS DO N07 17>B �OR7lERIIC170N FOR PROFILE OF LINE -L- SEE SHEET 43 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS PERMIT DRAWING SHEET A10 OF N O N ---- F m CA m WOODS CAPELAND R ESTATE DEVELOPMENT CORPORATION PROJECT REFERENCE NO. 1 SHEET NO. 100, of 100' 200' 300' GRAPHIC SCALE ®DENOTES IMPACTS IN SURFACE WATER ®DENOTES TEMPORARY IMPACTS IN SURFACE WATER Qy Q DORM CALDLE Moons / S- D ENGINEER FOR PROFILE OF LINE -L- SEE SHEET 43 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS FPERMIT DRAWING SHEET a OF 3t to m m N m J 00 z 0 ENLARGEMENT SHEET 50' 0' 50' 100, 150' LAT BASE DITCH GRAPHIC SCALE SEE DETAIL L ®DENOTES IMPACTS IN SURFACE WATER ®DgNQTkS TEMPORARY \ -- IMPACTjjZN SURFACE WATER SITE 11A Frrrrr WOODS SPECIAL J B w/MH FS 2G�� V RIP RAP \ .3 TONS 10SYGF. ` WOODS �r LAT BASE DITCH SEE DETAIL G BANK STABILIZATION IRNELL LAT BASE DITCH SEE DETAIL G WOW ah O� CLASS B RIP RAP -EST. 2 TONS EST. 7 SY GF lle�l 2GI FS --- _ F WOODS CLASS I RIP RAP EST. 10 TONS SITE 11 EST.14 SY GF RAP BANKONLY BASE DITCH SEE DETAIL HH CLASS I RIP RAP EST. 50 CY DDE EST. 8 TONS EST. 25 SY PSRM EST. 11 SY GF RIP RAP BANKS ONLY I BERM DITCH SEE DETAIL AA IOU F F PROJECT REFERENCE NO. 1 SHEET NO. R-0623 17 RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMIN Y PLANS DO NOT UM PO. 00NMUMON _T FOR PROFILE OF LINE -L- SEE SHEET 43 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS PERMIT DRAWING SHEET j�AOF q �r �m 48 CAPEL REAL ESTATE AND DEVELOPEMENT CORPORATION f R.....o..■..■ uu ..[.uouo■.. R: ■ ..moos... ■uuu..a 1..61.....E .........a auuuo. Euu.uuaoo . I a..Iolau ni.r-ter---a---i� v = �••--'-----i[u� ouc...c _ ... - .t .. ► . _ -u.r On ON ::iou.uw..oo...wouou..A.. .:o.0 uu[. [...a....noEuua .uuu... u[[[.uu[... ■[noun M [[[[.[.[. ■n.■■[o[ nuouo u[■■uuuuo[uu �uuou■ uuouu u• noun......■.... noun■ uwuuuN uouwo..uuu NEWS ■...O U PERMIT DRAWING mom no uuu SHEET 141OF on � uuu aa.. ■wwwu :::i:::is::::::::::::::::::::::::: ......:::::::: auauuu uuu[uN nuu.u. uuaouN o.uu.v ou•ooN uuuou ■ouuuN uuouo uuuo.[ uu.uo. uo■ ouN [u...u[l o[.uun u...uu. n..■■..n .......................00[n n..o.uu.uuun [.[[[ ■uu aw on.. nun.... DETAIL A FALSE SUMP f —mil =9002brr� ♦ 20:7 _ ♦0' u \ S=Ditch Slope fL Proposed Ditch FROM STA 193+15 ITT FROM STA. 196+65 RT FROM STA. 199+65 RT DETAIL B FALSE SUMP I Not to Scale) 11qh P� DORTiIY-CAIAIE / S=Ditch Slope 4 Proposed Ditch FROM STA 193+15 IT FROM STA. 196+65 LT FROM STA. 200+15 LT FROM STA. 204+15 LT CAPEL REAL ESTATE AID DEVELII)MOif CORPORATIOM ®DENOTES IMPACTS IN SURFACE WATER ®DENOTES TEMPORARY IMPACTS IN SURFACE WATER 100' 0' 100' 200' 300' GRAPHIC SCALE DETAIL C FALSE SUMP (Notto Scale) Median Ditch 9' I2' 2a GI S=Ditch Slope Cs Proposed Ditch FROM STA. 193+15 CL FROM STA. 196+65 CL FROM STA 200+15 CL K►'!1lRM a /J am yw W FLW fiwt R r R■ srtw WE? EST TONS CLASS 'Ir a TO TOMS EST FILTER FABRIC a 90 SY EST CON FIBER MATTING - 90 CY DDE = HO CY RrW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER DO NOT USE ■ I CMNIM MON FOR PROFILE OF LINE -L- SEE SHEETS 43 AND 44 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS PERMIT DRAWING SHEET" OF Q1 RIP RM AT REFERENCE NO. 1 SHEET NO. DETAIL A c DETAIL FALSE SUMP FALSE SUM? 1Haws .) (Not to Swle) Outside Ditch pal i Traff ic Flow w p� 20:1 z 2, � GI S=Ditch Slope ¢ Proposed Ditd+ S=Ditch Slope 4 Proposed D'ech FROM STA 193+15 RT FROM STA 193+75 Li FROM STA. 196+65 RT FROM STA. 196+65 LT FROM STA. 199+65 RT FROM STA. 200+15 LT FROM STA 204+15 LT LAPEL REAL ESTATE AND OEMOPEIEIIT CORPORATION ®DENOTES IMPACTS IN SURFACE WATER ®DENOTES TEMPORARY IMPACTS IN SURFACE WATER 100' 0' 100' 200' 300' GRAPHIC SCALE DETAIL C FALSE SUMP (Not to Scale) Mad- Ditch _ 9" _ 12' awn Gl—I W S=Ditch Slope 4 Proposed Ditch — FROM STA. 193+15 CL FROM STA. 196+65 CL �qh FROM STA.200+15 CL 2Q0 IWI SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO N07 CAN JIR LA FOR PROFILE OF LINE -L- SEE SHEETS 43 AND 44 RIP RAP AT ..Tzgum. _ ttu tt%pr" e i mm GMTOP W FLM Frs II P IV, tttttw nii t� EST TONS CLASS Ir a TO TONS EST FLTER FABRIC • 90 SY EST COIR FIBER MATTW - 90 CY SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS PERMIT DRAWING SHEET yf-OF j( SITE 12 PERMIT DRAWING SHEET q7 OF 1L L DETAIL FALSE SUMP I Not b Sd.l O DDt h 2. r t < Flow ,D� 20:1 GI S=Ditch Slone Proposed Ditch FROM STA.209+35 LT FROM STA.211+35 LT FROM STA.213+85 LT FROM STA. 217+85 LT I MET TYPICAL LWr 10 to MIdllip,. Ismi LL rm i mIIATLRAL m y �� �CirtL EST. COR FDER MATTMIG = ISO SY DDE = 690 CY DETAIL C FALSE SUMP (Notto Scaly) Median Ditch _ 9' I2' dwn e.lw7� zo• �{ GI S:Ditch Slone G Proposed Ditch FROM STA.211+35 CL FROM STA. 213+85 CL FROM STA.217+85 CL 50' CAPEL REAL ESTATE AND OEYEIAIM MT CORPORATION 100' 0' 100' 200' 300' GRAPHIC SCALE ®DENOTES IMPACTS IN SURFACE WATER �qaj DENOTES TEMPORARY Q IMPACTS IN SURFACE WATER CAM REAL ESTATE AND DEVELOPEIEMT CORPORATION RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER Do NOT Dfe ms CONBPRIIC170N FOR PROFILE OF LINE —L— SEE SHEET 44 1 SEE SHEETS 2—H & 2-1 FOR DRAINAGE DITCH DETAILS PERMIT DRAWING SHEET ,�tl? OF 1( Vg 2 G F- C m P L n a E L a DETAIL A 0 FALSE SUMP i I Haa swbl c S=Ditch Slope a 4� Proposed Ditch FROM STA. 209+35 LT FROM STA,211+35 LT FROM STA.213+85 LT FROM STA, 217+85 LT INLET TYPICAL 4WT n as afflimsm.R -- w �60se16 SWIMS 'M IS, EST. COIR FIBER MATTING = ISO SY DDE - 690 CY DETAIL C FALSE SUMP (Not to Scale) Median Ditch 9. 12' Chan m6") 20' GI S:Ditch Slope 4 Proposed Ditch FROM STA. 211+35 CL FROM STA.213+85 CL FROM STA.217+85 CL 50' NZY CAPEL REAL ESTATE AND DEVELOPEIEIT CORPORATION 100' 0' 100' 200' 300' GRAPHIC SCALE ®DENOTES IMPACTS IN SURFACE WATER �q� DENOTES TEMPORARY Q IMPACTS IN SURFACE WATER CAPEL REAL ESTATE AND DEVELOPOEHT CORPORATION RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER Do NOT Uma PO{ CON574VCTION FOR PROFILE OF LINE -L- SEE SHEET 44 1 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS PERMIT DRAWING SHEETA19 OF , Vg 2 PROJECT z z O fA L O 0 Y O E 0 L C W N w DETAIL FALSE SUMP I Not to Scale) Madinn Ditcti _ 9" I2' « cnan R.b�7 � W —.{ GI -t5— S=Ditch Slope C Proposed Ditch 100' 0' 100' 200' 300' GRAPHIC SCALE ® DENOTES FILL IN WETLAND MEDENOTES HAND CLEARING �qh LAPEL REAL ESTATE AND DEVELDPEMff CORPORATION �P DWAY DESIGN I HYDRAULICS ENGINEER ENGINEER PRELIM[IN4RY PLANS w zm Trs mill c0J1MUCTIlm FOR PROFILE OF LINE -L- SEE SHEETS 44 I AND 45 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS PERMIT DRAWING P- CV H LLI LLI N Lu LLI N O O CV CY) CV H N I J I LLI Z J FROM STA.221+85 CL FROM STA.230+65 CL NO. 1 SHEET NO. 0 i 0 DETAIL FALSE SUMP ( Not to Scala) M, dian Ditch 9" I2' 201 —+{ Gil f5— S=Ditch Slop. & Proposed Ditch 100' 0' 100' 200' 300' GRAPHIC SCALE ® DENOTES FILL IN WETLAND ® DENOTES HAND CLEARING �q5 OAPEL REAL ESTATE AND DEVELOPMENT CORPORATM �P RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER Do Nm IIS TOi1 commumou FOR PROFILE OF LINE —L— SEE SHEETS 44 I AND 45 SEE SHEETS 2—H & 2-1 FOR DRAINAGE DITCH DETAILS PERMIT DRAWING N F.- Lu LLI N Lu Lu N O O N eM N la— N J I Lu Z J V FROM STA.221+85 CL FROM STA.230+65 CL PROJECT REFERENCE NO. 1 SHEET NO. O CV H LLI W to W LLI V) O O CV M CV Ia- tA J I LU Z J gV 2 gjq5 CAPEL REAL ESTATE AND DEYELOPE/O1T CORPORATION WOODS LAPEL REAL ESTATE AID DEYELOPENENT CORPORATION 100' 0' 100' 200' 300' GRAPHIC SCALE ®DENOTES IMPACTS IN SURFACE WATER ®DENOTES TEMPORARY IMPACTS IN SURFACE WATER NME vm WOE HOOD DETAIL B FALSE SUMP j Not to Swle) Ouhideitch D Traffic How 2' GI .f S — etc. S=Ditch Slops 4i Proposed Ditch FROM STA.234+40 LT FROM STA.238+65 LT DETAIL C FALSE SUMP I Not to Scala) Medf�n Ditcl+ c�ned�---.r•— sa—�{ GI S=Ditch Sbpe 4 Proposed Ditch Ditch L 1 Ditch Groda L To 2.0% 20' 1 Over 4.0% To 0.0% 40' 30' 1 Over 6.0% 50' MOODS DWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRBLIMIITRY PLANS DO NOT UM CONS UCMON FOR PROFILE OF LINE -L- SEE SHEET 45 1 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS PERMIT DRAWING SHEET j3 OF 1 _ 5" MONOLITHIC CONC. ISLAND CV CV H W LLI N Lu LLI N O O CV gV 2 FROM STA.234+40 CL FROM STA.243+15 CL z z O N O N H Lu LLI V) LLI LLI N O O N M N H N I J I Lu Z J g915 / CAM REAL ESTATE AND DEVELOPEIEIIT CORPORATION MDWS LAPEL REAL ESTATE AMD OEVELOPEMEIff CORPORATION 100' 0' 100' 200' 300' GRAPHIC SCALE ®DENOTES IMPACTS IN SURFACE WATER ®DENOTES TEMPORARY IMPACTS IN SURFACE WATER mma wm YME FOOD DETAIL B FALSE SUMP ( Not to Smle) O �c Fl- 2' GI t S -Ditch Slope fL Proposed Ditch FROM STA. 234+40 LT FROM STA.238+65 IT DETAIL C FALSE SUMP (Not to S"le) Median Ditch 9' I2' Cn e.io.4 20' —.{ GI f5_ S=Ditch Slope (j Proposed Ditch Ditc L I Dikh Grade L 20' r 4.0% To 6.0% 40' 0 30' Over 6.0% 50' wows RNf SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER DO NOT UR Pot CONMUC'rWN FOR PROFILE OF LINE -L- SEE SHEET 45 1 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS PERMIT DRAWING SHEET 5-1 OF V _ 5" MONOLITHIC CONC. ISLAND N N F Lu Lu N Lu Lu N O O N H N I J I Lu Z J FROM STA.234+40 CL FROM STA.243+15 CL z 0 0 ®TIMES DITCH� DETAIL CC 1\ 1 _ N [SEE Lu \ Lu \ ■ �. Lu N Q GI Q LO N Q t— N J 251 LLJ Z F J 1 TO DRAIN rxl DETAIL C FALSE SUMP ( Not to Smle) Median Dif h _ 9" 2' e� Chan hbwl � 20, GI �-5— S=Dikh Slope 4 Proposed Ditch m PROJECT REFERENCE NO. SHEET NO. R-0623 22 FW SHEET NO. .OADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO NOT TDB P01 CONVMUCRON FROM STA.25D+00 CL\ \ 1 1 FROM STA. 252+85 CL \ FOR PROFILE OF LINE -L- SEE SHEETS 45 AND 46 5 FOR PROFILE OF LINE -Y8- SEE SHEET 52 n YVTTTW!iS55 Q \ SEE SHEETS 2-H & 2-1 iWMiYI! FOR DRAINAGE DITCH DETAILS S RMITFDRAWING fr171 BANK STABILIZATION /�/ STANDARD BASE DITCH t LAT BASE DI{cry LAT BASE DITCH SEE DETAIL HH 1 1 SEE DETAIL RT SEE DETAIL G EST. 15 CY DDE EST. 22 Y FIRM ` CLASS I RIP RAP TREES 'B RIP RAP TOE PROTECTION TOE PROECTION \\\\ \\ M •EST.2 TONS T. 2 TONS SEE DETAIL F SEE DETAIL F \ A EST. 22 SY GF ' EST. 7 SY GF ♦ \\ \ N IM -- -- -- ---- _ ♦♦ Lu-- p N �'4REEs W 22 - u^ w ''��� CUTB r `� `\ LLu u ' QQ TREES 2 ELBOWS ♦� \♦\ N Y7 2G is ENV � \ ♦♦♦ \ O SITE 15 � + Ln 2G1 FS r —L— GI ^ P-B, N 3/'S5'1P9'E N 0�.T ; 0 `\ \ `1 \\\ r EXISTING TOE PROTECTION JIJ�:—BACKFILL STING CHANNEL LL �\ SEE DETAIL V L7 \ 0 a \�� ® Ir 127fOYER 'W �0 158K0 Q GRADE TO DRAIN STANDARD BASE DITCH O EXISTING DITCH SEE DETAIL T E5T. 12 CY DDE zx O EST. 15 TONS CL I RIP RAP EST. 40 SV GF GRADE TO DRAIN �`\ �X TO EXISTING DITCH �X (� wNO WOOD CUfOVER PASTURE DENOTES \ ® SURFACE WATER)I,� TS IN EENSON MOM/ DENOTES TEMPORARY IMPACTS IN SURFACE WATER / wo• o• Zoo• zoo' 300• / GRAPHIC SCALE 5" MONOLITHIC CONC. ISLAND © a 0 0 v I 03 I 0 ,t� LLL ---]2 tis W "n T� / `CLASS B RIP RAP EST. S TONS EST. 14 SY GF RICKYPA TROY CANDOR RD. 1, 00 N I DD � y, 3D0 NC 2427 6,910 — — 7,031 TROY BYPASS 9,600 9,900 Y 400 iy 1,421 ADT 2014 1,600 ACT 2040 TROY CANDOR RD. 9 \E DETAIL C FALSE SUMP (Not to Scale) MM d,, OR h _ 9" I2' chart e.b»{—.ram zp'—.{ GI S=Ditch Slope ¢ Proposed Ditch FROM STA. 250+00 CL FROM STA.252+85 CL 5, RMYlr TO DRAIN UECT REFERENCE NO. SHEET NO. R-0623 22 IW( SHEET NO. DWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINA RY PLANS DO HOT D8 M DONMUCTI 1 m AND h FOR PRR OFILE OF LINE -YB- SEE SHEET 52 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS $@� PERMIT DRAWING SHEET S & OF q( \ BANK STABILIZATION // STANDARD BASE DITCH � Or� \\\ LAT BASE DI I LAT BASE DITCH SEE DETAIL HH \%\ \ SEE DETAIL R SEE DETAIL G EST.2 CY PSK \ � � �.�s EST. 22 Y PSRMLAT BASE DITCH , \ �' //\ tis ©%E DETAIL CC ` ` CLASS I RIP RAP ( TREES ,�'� 'S�BRIP RAEST. 11 TONS I`l T. 2 TONS TOE PROTECTION TOE PROTECTION ` M N EST. 22 SY GF ` - - , EST. 7 SY GF SEE DETAIL F SEE DETAIL F f ♦` ♦♦CN \ _ _ _ ��— �� __ c \—~Lu O W � ��� ��-- --- cW 22 — — �-c CUT ♦` �`. Lu �i N \ FS `\lSii'6GER TREES 2 ELBOWS ,tom `♦ ♦♦ VI O GI \ 2GI y1 2G o N - o 5 Ln R D D SITE 10- LO N 2GI FS GI P-IY N 3l'S5'129E N Q 2 ° Q J2GI �^ TREES 7 © I LLJ F ;L c _/ - ��� /i F ---- F — --- --- —�—� D --- c —_ _-- _ © LLl Z V F \ L /'i ':1•\ \� ///F 0--- C z J ; 22 BACKFILL EXISTING CHANNEL TOE PROTECTION f •tW� ` TOE PROTECTION ,,rtam� V� �♦ 1 \ Mtn SEE DETAIL © SEE DETAIL f `W • CUTOYLOI f ,r] EST. CLASONP S GIF (93 N /h N19 GRADE TO DRAIN YYs�2 STANDARD BASE DITCH O 70 EXISTING DITCH SEE DETAIL T s `W -EST. 12 CY DOE 2 Q O EST. 15 TONS Cl I RIP RAP FMY HARM E 22 \ EST. 40 SY Gf v L � N GRADD E TO DRAIN TO EXISTING DITCH \ m MOODS � WOOD \� X�\ W" \ CUTOYER OF Q j w GENM MOSS PASTURE\ ® DENOTES IMPACTS IN \ \ SURFACE WATER \ N r- ® DENOTES TEMPORARY IMPACTS IN SURFACE WATER E w a n / 100' � 0' 100' 200' 300' n o GRAPHIC SCALE 5" MONOLITHIC CONC. ISLAND _ TROY CANDOR RD. 1 1 00 r NC 2427 6,910 - 7-�031 TROY BYPASS 9,600 200 9,900 400 N N I � I 21 ADT 2014 1,600 ADT 2040 TROY CANDOR RD. ,.. uiv-�r---i --- rw— ------ ---memo I DETAIL AP DETAIL B FALSE SUMP FALSE SUMP 'O smNl ( Not to Scale) Outside Ditch Outside Ditch T-ffi�Flow Traif'c Flow ,�o.� 20:1 s.o 2• W GI etc. S_Diich Slo Proposed Dikh S=Ditch Slope Proposed Ditch FROM STA.261+15 RT FROM STA.261+15 LT DETAIL C FALSE SUMP ( Not to Smle) - Median Ditch _ 9" 2' Chan 0.Iw6 GI S=Ditch Slope IT, Proposed Ditch Ditch Gad* 2L0DBc 00% To2% veG6.0% r 30' 1 Cl— 6.0% L0 FROM STA.261+15 CL FROM STA.266+15 CL FROM STA.271+15 CL O M!(Y HAMIS BASE DITCH SEE DETAIL UU LAT BASE DITCH SEE DETAIL BB SEE DETAIL L CUTOVER C S B RIP RAP BERM DITCH EST 2 INS �t Lu ca �^ tam � � ra �o�iti ca �i.. JFS iaCUTOVER 41'.� _ i:VIM Ma �i�..�t#.�L�fi�►r•.� •T� .r is CLASS B Itl RAP ,► it isDITCH CLASS I RIP RAP LAT PROJECT REFERENCE NO. 1 SHEET NO. R-0623 23 R,W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINJ. RY PLANS DO Ndr Ima 110 commuenoN FOR PROFILE OF LINE -L- SEE SHEET 46 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS PERMIT DRAWING SHEET 51 OF 9/ LAT BASE DITCH SEE DETAIL L 'IT ] H W Lu 2 N Iu • Ln � (V©o r� N .• 5 a N I aLLI J TOE PROTECTION SEE DETAIL F0 BANK STABILIZATION CLASS I RIP RAP EST. 20 TONS EST. 39 SyGF RIP RAP BANKS ONLY STANDARD EQ DITCH SEE DETAIL KK EST.4 CY DDE O RMY HAMIS ®DENOTES TEMPORARY IMPACTS IN SURFACE WATER ® DENOTES FILL IN WETLAND ®DENOTES IMPACTS IN SURFACE WATER ®DENOTES TEMPORARY IMPACTS IN SURFACE WATER 100' 0' 100' 200' 300' GRAPHIC SCALE DETAIL A DETAIL B FALSE SUMP FALSE SUMP I tlal b Smbl c ? (Not to Sale) Outside Ditch Outride pp'tch Traffic Flow GI S-Ditch SI Proposed Ditch S=Ditch Slope 4 Proposed Ditch FROM STA.261+15 RT FROM STA. 261+15 L7 N N W W T CUTOVEIR N u.j_-___ W to ©© O ♦ ♦\ �`. ° 0 Ln N 0 H ♦ ♦ I J f ♦ W ♦ `♦ Z --- J TREES T i BASE DITCH SEE DETAIL WW EST. 20 CY DOE EST. 50 SY PSRM LAT WE DITCH SEE DETAIL G ©CLASS B RIP RAP EST. TONS EST. 7 SY GF O _ 2 ELBOWS �/� 311 �� C 0000 SPRING BO1 I I cc NG BOX LAT N' DITCH SEE DETAIL BB DETAIL C FALSE SUMP Median DBch (Not to Style) 9. 12' CF., bbhj ---. — 20' GI -.-5— S-Ditch Slope fL Proposed Ditch Ditch Grole I L Ditch Grade L 0.0% Io Z."20' Over 4.0% To 6.0% 40' r 30' Over 6.0% 50' •`♦ CLASS B RIP CLA55- P RAP="T.NS f. `♦ EST.2 TONS . TONSs7 SY GRAPBASE DRCHONSSEE DETAIL G GF FROM STA.261+15 CL FROM STA. 266+15 CL FROM STA-271+15 CL LAT N' DITCH SEE DETAIL UU Q10-1.9ds V10=0.8fps SITE 17 O Mmy NUM LAT BASE DITCH SEE DETAIL L 1 S B RIP RAP T.2 TONS 7 SY GF1 Ts-%, / AI Q10-1 V10=1 -Jq5 ooe- BERM DITCH SEE DETAIL P TREES' CUTOVER 4,.11 CUTOVER SITE 18 2 F _ _ _ F --- F------- F — F BRIPRAP\-C—EST.2 TONS VI 2.Ofps EST. 7 SY GF CLASS I RIP RAP SLATEE BASE EST. 33 TONS SEE DETAILL G G EST. 62 SY GF Yis RIP RAP BANKS ONLY Q0 14W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINA. RY PLANS DO NM UN PO COMMUCIION SEE SHEETS 2—H & 2-1 FOR DRAINAGE DITCH DETAILS PERMIT DRAWING SHEET �0 OF 9/ LAT BASE DITCH SEE DETAIL L N W W N W W 4 0 In Cb0© + I*-. G N •" s dd Q N J { Lu Z _ Q J TOE PROTECTION SEE DETAIL Fo �� BANK STABILIZATION E CLASS I RIP RAP EST. 20 TONS EST. 39 SY GF RIP RAPBANKSONLY STANDARD EQi DITCH SEE DETAIL KK EST.4 CY DDE O RMY HAM ®DENOTES TEMPORARY IMPACTS IN SURFACE WATER DENOTES FILL IN WETLAND ®DENOTES IMPACTS IN SURFACE WATER ®DENOTES TEMPORARY IMPACTS IN SURFACE WATER IDO' 0' 100, 200' 3DO' GRAPHIC SCALE p• PROJECT REFERENCE NO. SHEET NO. R-0623 23 ro PAN SHEET NO. BASE DITCH ENLARGEMENT S ROADWAY DESIGN HLICS SEE DETAIL WW 50' �' 50' 100, 150' P RAP ENGINEER EENGINEERR NGINE EST. 6 TONS EST.20 CY DDE EST. 9 SY GF EST. 50 SY PSRM GRAPHIC SCALE LAT 'V' DITCH RIP RAP BANKS OI PRELIMIN Y PLANS SEE DETAIL UU DO I= � CONMUCTMIN LAT 'V' DITCH LAT BASE DITCH SEE DETAIL BB \ ` : 5 SEE DETAIL L FOR PROFILE OF LINE -L- SEE SHEET 46 ADITCH DENOTES TEMPORARY 5 EDETAILG ® IMPACTS INS RCE WATER 9 �' � SEE SHEETS 2-H 8 2-I ®DENOTES FILL IN FOR DRAINAGE DITCH DETAILS F WETLAND �' �' C '5S B RIP RAP DENOTES IMPACTS IN '; �I E T. 2 TONS PERMIT DRAWING IP RAP ® SURFACE WATER // . 7 SY GF SHEET (a0 OF q/ TONS SY GF ® DENOTES TEMPORARY f i IMPACTS IN SURFACE WATER �' � J ' TS ' R ' TS i 15" w/ 2 ELBC OWS _ ---- W \\\\ ------------- \\ ----- 0 2GI BANK; STILIZATION E Fs • SITE 16 _ Q SPRING BOXSP G O-� ;� Q10=1.9cfs Q10=1.3cfs 2GI VI = 0.8fps V10=1.4fps 15" RCP —III S ING BOX * * N 3/° 55' 12.9" E FS ** * F P' ;2GI TREES oVe , _ c" * * 2GI s i� E Fg `cam * * * * I, I' * 15" w/ w 2GI * * 2 ELBOWS \ SPRING X —\ F _ SITE 17 * or L N , , R R o CLASS B RIP RAP E CLASS • IP RAP "b10i5.Ocfs *� Q1 3.9cfs EST. 2 TONS CLASS B RIP RAP / EST. 2 TONS ST. 2 TONS / Vlq'=2.Ofps VI —2.Ofps EST. 7 SY GF c E 7 GF 7 SY GF 1 CLASS B RIP RAP CLASS I RIP RAP LAT BASE DITCH BASE DITCH EST. 8 TONS EST. 33 TONS SEE DETAIL G - F SEE DETAIL G ;' EST. 28 SY GF EST. 62 SY GF oP RIP RAP BANKS ONLY i O N ch 1 N W I W N W W N DETAIL A F F I LSE SUMP 0 lnidldec: Flow Zp 7rofhc FI 1 20;1 S=Ditch Slope 4 Proposed Ditch FROM STA. 275+15 RT FROM STA.278+65 RT FROM STA.282+10 RT DETAIL B FALSE SUMP (Not to Scale) Outside Ditdi Traffic 2' GI S— elc. FROM STA.275+15 LT FROM STA.278+65 LT FROM STA.282+65 LT ® DENOTES FILL IN WETLAND ® DENOTES HAND CLEARING IMPACTS IN ®DENOTES SURFACE WATER ®DENOTES TEMPORARY IMPACTS IN SURFACE WATER DETAIL C FALSE SUMP (Not to Smle) Mediae Dad, 9' I2' Cna+GI - S—Ditch Slope G Proposed Dad+ FROM STA 275+15 CL FROM STA- 278+65 CL 100' 0' 100, 200' 300' GRAPHIC SCALE O RM HARM RN/ SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER DO NOT 11Q DO; CONMUCL70N FOR PROFILE OF LINE —L— SEE SHEETS 46 ' AND 47 SEE SHEETS 2—H & 2-1 FOR DRAINAGE DITCH DETAILS PERMIT DRAWING SHEET(3 OF _[ FALSE IL AiP % LSE Swl�l c' Outside Duch 2.0 Op 20:7 S=Ditch Slone Proposed Ditch FROM STA. 275+15 RT FROM STA.278+65 RT FROM STA.282+10 RT M N W Lu N W W N O Lf) L- 04 DETAIL FALSE SUMP 1 (Not to Swe) Outside Dish Trpffrc Flo 2' .tc tc: S=Ditch Slap. (E Proposed Ditch FROM STA.275+15 LT FROM STA. 278+65 LT FROM STA.282+65 LT DENOTES FILL IN ® WETLAND ® DENOTES HAND CLEARING ®DENOTES IMPACTS IN SURFACE WATER ®DENOTES TEMPORARY IMPACTS IN SURFACE WATER DETAIL C FALSE SUMP ( Not to Sml.( M.dien Ditch _ 9" +I 2' W —_1 GI S=Ditch SIo C Proposed Ditch FROM STA. 275+15 CL FROM STA.278+65 CL IGO' 0' 100' 200' 30,0' GRAPHIC SCALE O RICKY MARF45 PROJECT REFERENCE NO. 1 SHEET NO. R4623 24 PAY SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELININA RY PLANS DO NM DO CONMUCIWN FOR PROFILE OF LINE -L- SEE SHEETS 46 AND 47 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS PERMIT DRAWING SHEET 0 OF qL to N j W y PROJECT REFERENCE NO. 1 SHEET NO. z 0 O El L_J DETAIL A DETAIL B FALSE SUMP • FALSE SUMP I �+•� w•) c ( Not to Scale) pvttW%_p OTarOhffic id F owh pw 0 2' cl GI S-Ditch Slop* 4 Proposed DRch S-Ditch Slope lj Proposed Ditch FROM STA. 285+35 LT FROM STA.289+35 LT FROM STA 293+85 RT ' FROM STA. 293+85 LT FJP i 19B SITE 19C __ F — @RCBC SITE 19C DETAIL C FALSE SUMP (Not to Scale) Median D'nch _ 9' I2' then 26' -•( GI S=Ditch Slope 4 Proposed Ditch FROM STA.285+35 CL FROM STA.293+05 CL �Q III SI/TIER" Qe J MOODS STANDARD BASE DITCH 2 SEE DETAIL MIA # EST. 170 CY DOE ■0005 / EST. 76 SY PSRM BERM DITCH SEE DETAIL AA LAT RAP DITCH BANK LAT BASE DITCH RIP 'RIP RAP SEE DETAIL LL EST. 28 TONS LAT BASE DITCH PDMD EST. 60 SY GF SEE DETAIL CC rDE-7 ��FS F'—'C 2GI-A +70 +10 C1A55 B RIP R� EST.2 TONS EST. 7 SY GF Oe ENGINEER IPRELIMIN4RY PLANS DO NOT USE POS CON MUl7r'20N FOR PROFILE OF LINE -L- SEE SHEET 47 SEE SHEETS 2-H & 2-I FOR DRAINAGE DITCH DETAILS PERMIT DRAWING SHEET &_,%-OF BASE DR CLASS B RIP RAP DETAIL R? �EST.7 SY 2 TONS EST.S CN N Lu Lu _ W Lu FS 2GI N FS 2GI •sue=�__t��)t� ���� w • c Q` / - \ �LAT RIP RAP ME EMBANKMENT •` �, •• CLASS RI �� EST. 15 TON R0005 •' \ BASE DRCH SEE DETAIL R CLA55 B RIP RAP EST.2 TONS ESf.7 SY GP SEE DETAIL EST. 30 SY GF © \ LAT BASE DITCH SEE DETAIL CC SEE CLASS B RIP RAP EST.2 TONS LXT BASE DITCH© WOODS EST.7 SY GP SEE SEE DETAIL NN \ \ NARY SNTIERNAN \ O RTCKY IIARRIS K.EppT��pTYPICAL t!f A III &AW ePI0 omw u7* WWOI RSA r W "'F' EST.001h !M Hy 75 SY DENOTES HAND CLEARING !I DE S FILL IN WE D DENOTES IMP IN SURFACE WATER ®DENOTES TEMPORARY\ IMPACTS IN SURFACE WATNI 100, 0' 100' 200' 300' GRAPHIC SCALE 0 0 to 01. N I W 2 N 5" MONOLITHIC CONC. ISLAND DET DETAIL A FALSE S B FALSE SUMP � % FALSE SUMP I n'or w swi.l c No to S-I.) Out Fah �Qutside Ditch =. - 2' TrofEic Flow j ,�o.� 20:) GI .k .r5� etc. S=Duch Sb Proposed DBd, S-Ditch Slope 4 Proposed Ditch FROM STA. 285+35 LT FROM STA.293+85 RT FROM STA.289+35 LT FROM STA.293+85 LT 1 1 N W� N MY I AM *LET TpTYPI[CAL UFT TO am MYiamum e I L9kvmw NATURAL OO FlA /� EST. C01ME4ARNRY 75 SY DETAIL C FALSE SUMP (Nor to Swle) Median Ditch 1 2' Chvrt MI-4—.T — 20' GI f5_ S=Ditch Slope CL Proposed Ditch FROM STA.285+35 CL FROM STA.293+85 CL RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER e \ MA" SMITiERMAN DENOTES HAND OUTLET �p TYPICAL CLEARING R!T TO IE 3Off QWF=r p DEW S IF LLL IN _4lm NATURAL G1Nllp ® DENOTES IMP IN SURFACE WATER DENOTES TEMPORARY\ OAF T�Rr ® IMPACTS IN SURFACE WA7 V Rw Fri Ra r r� • 0 v 100' 0' 100' 200' 300' r�tidl � EST. TONS CLASS 'Y990 TONS EST. FALTER FABRIC = 130 SY GRAPHIC SCALE EST. COIR FIBER MATTING = MO SY - DOE = 240 CY PRELIMIN4RY PLANS DO NOT UM "I COMRUCT10N 5" MONOLITHIC CONC. ISLAND 2 0 PROJECT REFERENCE NO. 1 SHEET NO. 50' 0' 50' 100' 150' R-0623 25 CLASS B RIP RAP EST. 8 TONS }} `c DENOTES HAND BI SEE RW SHEET NO. DESIGNHYDRAULICS ROAENGIN CLEARING ER ENGINEER EST.21 SY GF 1 GRAPHIC SCALE F DE IN N WETLAND LAT BASE DITCH ® DENOTES IMPACTS IN ENLARGEMENT SHEET PRELIMIN Y PLANS SEE DETAIL R SURFACE WATER ]%1 NOT V>e CONIT14UC390N RIP RAP AT EIP DENOTES TEMPORARY IMPACTS IN SURFACE WATER *�\ / R i EMBANKMENT >`� _ FOR PROFILE OF LINE —L— SEE SHEET 47 SEE DETAIL EE SITE 19B _—�_ SEE SHEETS 2—H & 2—I \ C --------��� --------G- C _— FOR DRAINAGE DITCH DETAILS — --_--� S— C ____—_ PERMIT DRAWING 2� SHEET k7 OF g/ SITE 19C - ,,— --' Fs �- --_-----� 36„ 36„ F FS 2GI—A , 2GI—A —"— BANK STABILIZATION i S 10 M 8' X 21' PSRM PAD —L— FS 2GI F------- C------- � --____ F WOODS RIP RAP AT " CLASS I RI P LAT BAD EMBANKMENT EST.15 TONS SEE DE' ul SEE DETAIL EST. 30 SY GF LAT BASE DITCH SEE DETAIL NN i SITE 19C 11' x 7' 2 RCBC t00 END SBG 283t95[ SITE 19 PERMIT DRAWING SHEET OF __[_ v _ 5" MONOLITHIC CONC. ISLAND URm STAG OF AIENCA GRADE EXISTING DITCH TO DRAIN TO PROPOSED DITCH STANDARD BASE DITCH MOODS SEE DETAIL QQ Esir.218 CY ODE IF Eqr.86 SY PSRM CLASS B RIP RAW? �`4'�a•n`v. _`�✓_�ar. EST.2 TONS EST. 7 SY GF g1.05'LT _ � PUE C(. T • C _ ---rRADE CMINME / IT I'DITCH SEE DETAIL E W 2GI 2GI = t C \ MOODS SPECIAL CUT DITCH SEE DETAIL PP DAMMY SEDBWY® uT N' DITCH SEE DETAIL L / .EFFERY ® V GLEN P.D. 731 100 d n 631 1 INC 24,27 12,100 -L- 12,641 TROY BYPASS 17,300 18,200 'DO �10 1DO ca 210 3DO ADT 2014 ADT 2040 HOLLY HILLS DR. PROJECT REFERENCE NO. i SHEET NO. R4623 27 RD S \ 59 ER SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER / FAIRY MOR511111" IMTRIM MO. TOM OF TROY I I `" R0005 y roods pREHvIN o snPLANS Do `aBReDs -- -SYEPS 1 ws • I m AEIICE ♦ - �- - e -� BEES x+' — QP \ `\ FOR PROFILE OF LINE —L— SEE SHEET 48 `" ^'fj '• Q� GRASS \ \ FOR PROFILE OF LINE —Y10— SEE SHEET 53 FOR PROFILE OF LINE —Y10A— SEE SHEET 5 UE `\� PERMIT DRAWING SHEET OF � PUFIIfCH Ac \\ \ A\ p IL V J 2GI ROODS FS 2GI C E bp BERM L AA yp \ \ SEE DETAIL M ITCH J DANIY SEDOMM Wm NO ASSCIAT / PP►M FOLKD m \ `/ ALDEMA LEE \\ DENOTES FILL IN \ WETLAND 100, 0' 100, 200' 300, GRAPHIC SCALE SEE SHEETS 2—H & 2-1 FOR DRAINAGE DITCH DET,A.1LS DETAIL A 3 FALSE JUMP �� p (Naa Sael.l „o -OT-fT Flo�w� D.� 20:1 -• z0 S-Ditch Slope 1; Proposed Ditch FROM STA.313+65 RT FROM STA 315+60 RT FROM STA.320+00 RT DETAIL FALSE SUMP I Not to Scale) Mndien Ditch 9" 2' than a.!o..l---.r•— aa-� GI —5— S=Ditch Slope 4 Proposed Ditch FROM STA.313+65 CL ,�1 TO DRAIN _� SITE 20 2GI-A DI \IV BERM DITCH L10�H � I p � SEE DETAIL P DITCH ER SEE DETAIN Q , n CLASS B RIP RAP ' EST.2 TONS EST. 7 SY GP / ,y 6.e9 RA.EJORA KALE It \ �E i 1581LD SK DR TB cc? asT � I DAIMY SEDBERRY ISFD I 4' BRICK ter.= ® 68KB • .: N z 0 Ar7T TO SCALE TYPE B-77 TYPE B-77 k t TYPE B-77 MOODS W LLB PUE PUE N TYPE B-77 I TYP—� t T �_ 1 TYPE B-77_ _ 59 TOM OF TROY Lu C O 2GI FS In M M 62'Or 2�' 261 NAc eve esr TYPE B-77 F DETAIL TAIL B FALSE SUMP Np ALSEo SUMP 1 r+a b sra1N ( Not t Scale) 0 ide Ditch 2.0 c Traffic Flow \�.\ 20:7 u ' —S— S-Dith SI 41 Proposed Ditch S=Dirt lope fL F FROM STA. 333+65 RT FROM STA 334+85 LT FROM STA 345+85 L7 FROM STA. 343+35 RT SITE 21 I �,o ORARY CAUSEWAYS R PROPOSED BENTS MD 0wm w� 21 LA7 BASE: IT F SEE DET IT LAT BASE DITCH CLASS I RI P SEE DETAIL TT O , $- \` 5fj EST. 20 TO ' EST. 39 SY DAIMY S£DEERRY i j" �� « 7 A3 TOIL Q EST.7 SY GF 60 CART. EIIGEIE MANESS Er CLASS II RIP RAP AT EMBANKMEN! SEE DETAIL SS I TREES PERMANENT ROCK CHECK DAM SEE DETAIL WW LA TEMPORARY CAUSEWAYS FOR EXISTING AND PROM BENTS CLASS II RJP RAP AT CLASS I RIP RAP EMBANKMENT LEST.3 TONS SEE DETAIL SS EST. 7 SY GF I BANK STABILI GRASS 7� III Y � ♦ PF� iRF - Amp- T 16 Ditch 61 !RUIN YORRIS DETAIL C FALSE SUMP ( Not to Scale) � M..1inn Ditch - 9' I2' than Mlw4 —�.•— 20'—=I GI S=Ditch Slope 4 Proposed Ditch FROM STA. 337+75 CL FROM STA. 345+85 CL STANDARD BASE DITCH LAT GRASS SWALE CLASS B RIP RAP [� �own� 1=---�� 2 ELBOWS PASTURE ,T BASE DFTCH J SEE DETAIL J R000s WARY ALLELE rILLIS TRUSTEE CLASS B RIP RAP EST TONS EST. 10 SY GF cr Z PAY SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER DO NOT USB POs CONe7 umoN FOR PROFILE OF LINE —L— SEE SHEET 49 SEE SHEETS 2—H & 2-1 FOR DRAINAGE DITCH DETAILS PERMIT DRAWING SHEET VrOF y H aF j Lu Lu 1 W uj • o ELBOW u .I 2GI HOODS F5 (Al • O O M ------r - -- ----- --_—■-- —ate— �— =___= H RD ewe DST N tAATURI J T _ 1 Z -- — J D `I.g ®DENOTES TEMPORARY IMPACTS IN SURFACE WATER 100' 0' 100' 200' 300' GRAPHIC SCALE MOODS z O N AM TO SCALE TYPE 8 77 00 N H W W (All W W N O in th M CV) FQ- N I J I W Z J V ,TYPE B-77 `l EST. 39 SY DAMN SEDBERRY 59 TWN OF TROY DETAIL A FALSE SUMP'FALSE TAI SUMP ( Not to Scale) Outside Ditch Outside Ditch Traffic Flow Troil�Fc I w �p1 Tp:l z.o 2, w GI �-S — etc. IS -Ditch SlopeE' Proposed Ditch S=Ditch lope f Proposed Ditch FROM STA. 333+65 RT FROM STA. 345+85 LT FROM STA. 334+85 LT FROM STA.343+35 RT 61 Ef�II1N MORRIS CLASS R RIP RAP AT EMBANKMENT SEE DETAIL SS TREES S PEPMAMEA ROCK . 't, CHECK DAM 7E LOIO' cim / IIr r DETAIL C FALSE SUMP Median Ditch (Not to Scale) _ 9" II2' than ul-j tea«- zo"—.I GI S=Ditch Slope rj Proposed Ditch DitchGrodo L Ditch Grade L 0.0% To 2.0% 20' rr 40% 40' Q— o 4.M 1 30' 1 Over 6.0% 50, \ MARY A IEME rLI.IS TRUSTEE FROM STA. 337+75 CL FROM STA. 345+85 CL STANDARD BASE DITCH PROJECT REFERENCE NO. SHEET NO. R-0623 29 RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIM N Y PLANS DO NOT USE M. OONR7 UMON FOR PROFILE OF LINE -L- SEE SHEET 49 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS PERMIT DRAWING SHEET 7j� OF Sj MOODS ®DENOTES TEMPORARY IMPACTS IN SURFACE WATER 100, 0' 100, 200' 300' GRAPHIC SCALE V I 338 00 339 00 340 + 00 PERMIT DRAWING 341 001 SHEET 7i OF ■■eSiaiJL�■■■■■■■■■■■ ■■\„►%ilk■■■■■■■■■■■■■■■I■■■■■■■■■■■■■■■■■e■■■■■■I■■e■■■■■■■■■■I►.,.,I■■I■■■■■■■■■■■■■■■■■ ■■■■Ili■■■■■■■■■■■■■■■ ■■\���i!I�i!i!!•i!i!i!ii!�!iiiii!ii!i!i!!•i!i!i■�!�!!�Y!!!!i!!•i!i!!•■I!'se■■I■■■■■■■■■■■■e■■■■ ■■■■■C�■■■.■■.■■■■■■ ■■■►1►ail■■■■■■■■■■I■■■■■I■e■■■1■■■■■■■■■■■I■■■■■■■■I■■I■■FTQ■■e■�►�%;l■■■I■■■e■■■■■■■■■■■■■ .■■■■■ee■■■■■■■■■■■■ ■■■►cre■■■■I:w■■■■■■■■I■■■■■■■■e■■■■e■.I■■■■■■■■Im■tc�nrrr,nwn..,��;�■■■.I■■■■■■e■■■■■■■■■■ e■■■■■■■■■■■e..■■■■■ ■■■■e-.��leeee■aw■■I■■■■■I■■■.■I■■■■■■■■■■■I■■■■■■■■I■I■II■■I.'eeW■ie■..,,;,■e■■I■■■■■■■■■■■■■■■■■ .■■■■■■■■■■c■e■■■■■■ ■■■■►:�.•.����eeue■e►�:�■,■■■■■I■.■■■u■■■■■■■■■■I■■■■■■■■I■■u■■■■■■■In:�n■■■■I■■■■■■■■■■■■■■■■. e■■■■■■■■■■■■■e■■■■■ ■■■■r�■��►z�►�■■■■■■■■�■■■■■I■■■■■u■■�e■■■■■■I.■■■■■■■I■■u■■■■■■■���;u■■■■le■■■■e■■■■■■■■■■■ '■■■■■■■■e■■■■■■■isa■ ■■■■r„�.-�c�.�e■■■n■■ie■■■�I■■e■■I�::�■:e■■e■I■■■■■■■■I■■I■■■■■■■■i►.��■I■■■■I■■■■■■■e■■■■■■■■■ ■■■■■■■■■■■■■■■■%Yi/■ iJY\■►�b!Y!��#LiV■�IWYAIw�iiiaiYY�1e■H■■■■■e\■■■I■■■■■■■■■■I■.■■■■■/�I■L■.■I■■■■■■■■■■■■■■■■■ ■■■■�f:1rTR�7■i1Z�a.■■ ■■■■OG;t��/�►`�YBei%%l71':f■■■■ICi!:�_:!i.■■■■elf%rin.7rr■1'1rl■■I■■■■■■■'1:I%■I■■■■I■■■■■■■■■■■■■■■■■ ■■■■��-i�•�y■ei■■e■■■■■■■■■■r:rw��■■e■■y■,■'I■■■7■■we■■■n■■■■e■■rye■ee�nr�■■■I■■n■■■■■Ii �r��■■■■e■I■■■■■■■■■■■■■■■■■ ■■..e■■■■■e■■e■■■■e■ ■■■.■■1i ���1i.■■���.ltll���n�l■r��■■■■■u■e■■e■■Meru■eeiYr■■■■■u.■■■■���I■■.I■.■.■■■■■■e■e■■■■■■■e ■■■■e■■■■■■■■■.■■■e■ ■■■■■■���-►e.�■■■■I■ei.7.nE.l■■■■■I■■■■■■■■■■■I■■■■■■■■I■■I■e■■■e►-�►-;e■■I■■■■I■■■■■I■■■■lee■■■■■■ ■■■■■■■■■■■■■■■■■■e■ ■■■■■■H��►i!.e■■i'SrliirlY.l■e■■■■e■e■■■■e■■I■■■■■■■■I■■I■■■■■I�,11��:■II'.1�J%■I■■■■rWL�■Ji!�■■■■■■ ■■■■■■■e■■■■■■■■■■■. ■■■■■■����:�►:�:�■■.■.�■■■■■I■■■■■I■■■■■■■■■■■I■■■■■■■■I■■I■■■■■/�:I4IYL`■IL'�r�C�■i►\■r1■■■■■■■■■■■e■ ■■■■■■■■■■■■■■■■■■■■ ■■■■■■n\��e��►:!■■■■■I■■■■■I■■e■■Il■■■■■■■■■■I■■■■■■■■I■■I■■■e1!I,I■■■■I■■■■I■■■\1�iCG■■iilS'lie e■■■■■■■■■■■■■■■■.■■.■■■■■�■is:��i %:'.���..■■.■.I■■■■■1■■.■■■■■■■■I■■■■■■■■ I■■I■■■I_I►�I s%■■■■I■■■■ I■.■Yi■■■■■■■■e■■. .■■..■..■■■e■■■■..■.■■■.■■n■►�.o:��� ����rlip■.■.I.■■■.u■.■■■.■■■■�■■■■■■■.I.■.■eec�.■■.■I.._.elsee.■■.■■■■■■■.■. .■■..^���e■■■■■■■■■■■ ■■■.■■��er;���:�_�►_w����■■■■I■■■■■I■■e■■■■■■■■I■■■■■■■.I■■I■e_���■n�■■■.■Is■e■I■■■■■■■■.■■.■..■■ ■■s■� r�.�,�i■■■■■■■.■■■ ■■■■■■n■eieeuec�■■�e■■■■I■■■■■n■■■■■.■■■■I■■■■■■■■I■■fr.��N■�;e■■s■I■I■■■■I■.■■■■■■■■■■■■■■■ ■■■■eee■■■■■■e■■e■e■ ■■■■■■��■■►�e■■e>■esla■■■■I■e■■■I■■■■■■■■■■■I■■■■■■■■I■■�■r■er-�s=■le■■le■e■I■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■11■■■■■■■ �1►�1■■�i�■■■■■■11■■■■■■■■■■■■■■■■■■■■■■■II■■■■■■■��%I■■■'i■PS�ii■■■i■■■■■■■iPl�i■i■■■IZ ■■■■■■■■■■■■■■■■11■■■■■■■1's.` �� �.►'��■��■■■■■■11■■■■■■■■■■■■■■■■■■■■■■■11■■■■■■■[ii■■■ss■■11■■■■■■■■■ee■■■Glc�s'li■ ���������� ������■ ■����e���;7�ri7A�11�1������■ ■�����iiiiiiiiiiiiiiiiii■ �iiiiiAG•9'Sii■■■�■■■■ ■■■■i�J�■■■■ ■■■■■■■■■■ EMINWO aramil MMMME 3.Sy+VU I J41+UU � I W 450 440 430 420 410 400 +390 380 370 360 W.P.'1R is FILL FACE END BENT '1 STA .337+99.43 -L- G.P. EL. 416.75 BEGIN FRONT SLOPE STA.337+85.37 -L- G.P. EL. 416.81 +I INTEGRAL FILL kl:iU L"J --------------------------1F�_- ----------{{{ --- HP 14x73 STEEL PILES (TYP.) 41^ -5.43357 EXCAVATE TO P.I. STA. = 334+20.00 -L- EL. 380.90 EL. = 418.36' V.C. = 680' GRADE DATA � SURVEY -L- END BENT No, 1 W.P. '1R STA . 337+99.43 -L- BEGIN FRONT SLOPE STA.337+85.37 -L- GL -L- TC SR 1324 SPAN A SPAN B SPAN C W.P.'4R is FILL FACE HYDRAULIC DESIGN DATA END BENT 12 STA .341+14.43 -L- DESIGN DISCHARGE 14000 CFS. G.P. EL. 415.42 FREQUENCY 50 YR. DESIGN HIGH WATER EL. 391.3 25'-0"MIN. BERM 1'-0"MIN. EARTH DRAINAGE AREA 148.6 SO. MI. FOR GREENWAY BEGIN FRONT SLOPE BERM (TYP.) STA.341+28.26 -L- G.P. EL. 415.36 BASE DISCHARGE (0100) 16000 CFS. BASE EXISTING BASE HIGH WATER EL. 392.64 DISCHARGE (0100) SUBSTRUCTURE (TYP.) INTEGRAL Z WS EL. = 392.64 1 L H J CLASS II APPROX.NATURAL FIX FIX FIX FIX RIP RAP �� GROUND LINE OVERTOPPING FLOOD DATA DESIGN H/W (050) - FILL io 2'-0"THICK ---- ----- OVERTOPPING DISCHARGE 73000 CFS. INS EL. 391.3 51 - ----------------------------- w (TYP.) J; +I FREQUENCY 500+ YR. J In OVERTOPPING EL. 415.21 ICI III ICI = t 3 III Q EXIST. SUBSTR. iii ili i;i / w —— ---------- (TYP.) z% SLOPE ; ; ; ; ; 2% PERMIT DRAWING 77WS SHEET7gOF a� SLOPE 0_SLOPE 11/Z:1 'oNORMAL TO CAP w (TYP.) BRIDGE OPENING AT D/S EXCAVATE TO FACE OF BRIDGE EL. 381.00 EL. = 370.8 BENT No. 1 (4-2-12) BENT No. 2 END BENT No. 2 TEMPORARY CAUSEWAY SECTION ALONG GRADE LINE -EBL- NOTES: SECTIONS (a BENTS AND END BENTS ARE 0 RIGHT ANGLES BENTS AND END BENTS ARE PARALLEL. 315'-0"(FILL FACE TO FILL FACE) 110'-0" 120'-0" 85'-0" �8.-4��6" 72'-6" BRIDGE��.\ 0 E BRIDGE IDENTIFICATION—, ' 25 STA. 339+48.56 -L- BEGIN APPROACH SLAB \ \ n ;I GRADE LINE STA.337+75.32 -L- ii `,EBL- i FILL FACE N !; W.P.'2R T_j Uy�� STA. 339+09.43 -L- ` STA. 339+56.93 -L- -� �- BENT AND 9ERM BENT CONTROL Np LINE C) BENT I 3 RIP 3 ILENLL ` 1" q05• 1 RIPSRAPI TEMPORARY CAUSEWAY TOE OF SLOPE ( BENT AND BENT CONTROL LINE (a BENT 2 •NNNNNNNNNNNN4c�'4NQ /Id/////d/////1t01► //U///////1//L���►1�,1 E ) A.340+29.43 -L- EXIST. STRUCTURE CLASS II rY RIP RAP — r TOE F SLLOPEF P EDGE OF EDGE OF WATER WATER PLAN ALONG -EBL- W.P. '4R STA.341+14.43 -L- BEGIN FRONT SLOPE STA.341+28.26 -L- o END APPROACH SLAB STA. 341+38.54 -L- N TO SR 1381 BRIDGE CONTROL LINE 70°00'00" (TYP.) FILL FACE I HEREBY CERTIFY THESE PLANS ARE THE AS -BUILT PLANS PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION PROJECT N0. R-0623 MONTGOMERY COUNTY STATION: 339+48.56 -L- PILES NOT SHOWN IN PLAN VIEW STR. '4 z z 0 w 0 ACIr To SCALE TYPE V77 00 CN H Lu LJJ N LJJ Lu N O Ln M C'7 M Q N I J I Lu Z J V TYPE 8-77 DETAIL A D(AIL FALSE SUMP ALSE SUMP 1 rtw a s�lsl (Not to Scale) Oxhide Ditch s� 12itsb Traffic Flow _ GI ..-S— etc. S-Ditch St Proposed Ditch S=Ditc lope 4 Proposed Ditch FROM STA. 3+65 RT FROM STA. 334+85 LT FROM STA. 345+85 LT FROM STA. 343+35 RT OR" MOANS l EIP DETAIL C FALSE SUMP Median Ditch ( Not to Scale) 9' 2' awne.t.,4 - 20, GI S� i S=Ditch Slope CL Proposed Ditch DitchGrade L Ditch Grade L 0.0% To 2k 20' r 4.0% 0 1.0% 40' FROM STA.337+75 CL FROM STA. 345+85 CL PROJECT REFERENCE NO. SHEET NO, R4623 29 RAY SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER Cr FPRELIMINJ RY PLANS Q6 ti DO NOT Un F0 commuC[ION FOR PROFILE OF LINE -L- SEE SHEET 49 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS PERMIT DRAWING SHEET 80 OF -V 100' 0' 100, 200' 300' GRAPHIC SCALE O M H W Lu Ln Lu Lu N O O d' C`) H N I J I Lu _Z J 337+00 338+00 339+00 340+00 541+Uu 4Z+UU I I I I I I 450 440 430 420 410 400 i-390 380 370 360 SPAN A SPAN B SPAN C W.P.-1L (a FILL FACE W.P.'4L (ia FILL FACE HYDRAULIC .DESIGN DATA END BENT '1 END BENT -2 STA. 337+82.69 -L- STA.340+97.69 -L- DESIGN DISCHARGE 14000 CFS. G.P. EL. 416.82 G.P. EL. 415.49 FREQUENCY 50 YR. DESIGN HIGH WATER EL. 391.3 BEGIN FRONT SLOPE 1'-011MIN. EARTH BEGIN FRONT SLOPE DRAINAGE AREA 148.6 SO. MI. STA. 337+68.77 -L- BERM (TYP.) STA.341+11.38 L- G.P. EL. 416.88 25'-0"MIN. BERM BASE DISCHARGE (0100) 16000 CFS. FOR GREENWAY G.P. EL. 415.43 BASE HIGH WATER EL. 392.64 INTEGRAL DISCHARGE (0100) INTEGRAL WS EL.= 392.64 FIX FIX FIX FIX �� GROUND LINEL - A pp OVERTOPPING OVERTOPPING FLOOD DATA DESIGN H/W (050) CLASS II RIP RAP - FILL L x, 2'-0"THICK (TYP.) FILL OVERTOPPING DISCHARGE 73000 CFS. x WS EL. = 391.3 ^� R• _____________ +' _ �y ________----- OVERTOPPING EL. 415.21 o a -- -- +I _ +I M HP 14x73 M EL. = 370.8 Q In STEEL PILES +� - J (4-2-12)-------- ---- ------- Z � (TYPJ M 2% SLOPE W �"------- +, ° w PERMIT DRAWING w -5,43 w � 35% � -- -0.4236% _ SHEET OF RI ----------]L�" ----------- 0 EXCAVATE TO +, P.I. STA. = 334+20.00 -L- EL. 383.00 ~EL. = 418.36'SLOPE 11/Z: 1 V.C.= 680' TEMPORARY CAUSEWAY w (TYP.) TO CAP GRADE DATA C SURVEY -L- END BENT No. 1 BENT No. 1 BENT No, 2 END BENT No. 2 SECTION ALONG GRADE LINE -WBL- SECTIONS 0 BENTS AND END BENTS ARE 0 RIGHT ANGLES \\ M P gERM MZN• �gp\NP� TEMPORARY CAUSEWAY l' FiP P l�gvg\ l CLASS II RIP RAP EDGE OF �� EDGE OF WATER -WATER —�` \ � t/I TOE OF — TOE OF SLOPE SLOPE _ y CLASS II \ O \RIP RAP BEBENT AND cl,BENT CONTROL \ BENT AND I BENT LINE 0 BENT 2 ` \ \ LINE i BRIDGE FILL FACE W.P. # 3L GRADE LINE 1 STA.340+12.69 -L- TO SR 1324 \`\,\\ -WBL- \i 1 \ .19 -L- \ W.P. '2L �54 STA.338+92.69 -L- 70 ° 00'00" 70°00'00" BEGIN APPROACH SLAB _ (TYP.) BRIDGE IDENTIFICATION STA. 337+58.58 -L- -L 1! STA. 339+48.56 -L- ---------------------- ----------------- ----------------------------- - ------------- BEGIN FRONT SLOPE/j ii 47'-6" 64'-13/6" STA. 337+68.89 -L- W.P. '1L ,I i i 8'-4Y6" i STA. 337+82.69 -L- i1—_ _ _—______________J_________ t! 1_ _____ ___1___------ _ _ 110'-0" 120'-0" \ 315'-0"(FILL FACE TO FILL FACE) PLAN ALONG -WBL- PILES NOT SHOWN IN PLAN VIEW 05-14-13 NOTES: BENTS AND END BENTS ARE PARALLEL. IHEREBY CERTIFY THESE PLANS ARE THE AS -BUILT PLANS \\'• FILL FACE \ \ \ \ W.P. '4L STA. 340+97.69 -L- BEGIN FRONT SLOPE ` \\ STA. 341+11.38 -L- END APPROACH SLAB STA. 341+21.60 -L- PRELIMINARY E]LIMINARY PLANS DO NOT USE FOR CONSTRUCTION BRIDGE CONTROL o LINE N PROJECT N0. R-0623 MONTGOMERY COUNTY TO SR 1381 ----------al % STATION: 339+48,56 -L- EXIST. STRUCTURE STR. #3 z O N AVr TO SCALE TYPE B-77 O N H W W N W W to O LA CV) M Fa- N J W Z J V I� TYPE 8-77 % 1 TYPE B-77 RELA .L.TYPE B-77 71 TYPE B-77 DETAIL AA AIL B_ FALSE SUMP ALSESUMP Outside Ditch I— smW ( Not to Scale) • Trc(fic Flow Pitch`O.1 20:7 z.o 2' f S � etc. S-Dikh Slop,Proposed Ditch S=Ditc lope f5 Proposed Ditch FROM STA.333+65 RT FROM STA. 334+85 LT FROM STA 345+85 LT FROM STA 343+35 RT 61 sm mom DETAIL C FALSE SUMP (Not to Smle) Median Ditch _ i, 9' 2' Chen hlaj]R' GI —5— t S=Ditch Slope fL Proposed Ditch Disc TI e L Grade— Ditch L To .0% 20' 1 Lt., 4.0 0 6.0 40' �rY.tM to an o 'ADM 1 50' FROM STA. 337+75 CL FROM STA.345+85 CL PROJECT REFERENCE NO. 1 SHEET NO. R-0623 29 PrW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER FP-RELIMWI RY PLANS Q� W NOT U3Z PO CONMUCnON ti FOR PROFILE OF LINE —L— SEE SHEET 49 SEE SHEETS 2—H & 2-1 FOR DRAINAGE DITCH DETAILS PERMIT DRAWING SHEET %;,OF ` rw�r Iir.carG _Ryy rrvnree. 100' 0' 100' 200' 300' \ GRAPHIC SCALE O M H Lu Lu N W W N O O N d' M H to J W Z J gV 2 N W H o U H O DETAIL A DETAIL B FALSE SUMP FALSE SUMP ( Not to Scale) Ouhide Ditch Ouhide Ditch Tmffi�Flow GI .�. S— etc. S=Ditch Slo k Pry DMh S=Ditch Slope CL Proposed Ditch FROM STA. 35D+75 5 LT FROM STA. 347+LT FROM STA. 347+85 RT FROM STA. 35+5 LT FROM STA. 358+15 LT FROM STA. 359+35 LT � �"-- -•D Posr MTL i UE�� PUE - PUE - PUE PUE WRY ALLBE WILIS TRUSTEE WOODS DETAIL C FALSE SUMP ( Not to Scale) Media�Ditdi 9" I2' then s.I—yam 2a ---.{ GI --'s — S=Ditch Slope E Proposed Ditch I E VEO E]M I'PAP Ar C FROM STA. 347+85 CL FROM STA. 351+35 CL FROM STA.354+35 CL FROM STA. 358+15 CL V" mom SITE 22 CLASS B RIP RAP EST.2 TONS EST.7 SY GF PASTURE C — C --- C 6 ---� C ---� _ITL__e________ _ \ -Do" FJP PUE PUE �_ PUE PU ®DENOTES TEMPORARY IMPACTS IN SURFACE WATER ®DENOTES IMPACTS IN SURFACE WATER (POND) 100, 0' 100' 200' 300' F MOODS S ROODS 1 1 ; PROJECT REFERENCE NO. SHEET NO. R4623 30 PAY SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELDICIN Y PLANS DO ?Mr VS CONMUCTWN FOR PROFILE OF LINE -L- SEE SHEETS 49 AND 50 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS PERMIT DRAWING SHEET 13 OF q( SMALL TREES I BERM DITCH Z DETAIL M ISEE 7 ELBOW �J 2G 2GI I S FS r 24" PAR R �RAk�X—X— %ND RETAIN - O —�� F —'---.. - F F— w F N m mI PUE PUE- PUE j PUE --� PUE OR" IIORroS CLASS B RIP RAP EST, 5 TONS EST, 17 SY GF GRAPHIC SCALE NO. gu 2t DETAIL A DETAIL FALSEI SUMP Hero >UFALSE SUMP Outside Ditch (Notto Sooale) Ouhide Difsh 2 TmM=Flow iraR c Flow `a.� �0:7 2' _ etc. S=Ditch Slo Proposed. DBd, S=Ditch Slope (j Proposed Ditch FROM STA.347+85 LT FROM STA 347+85 RT FROM STA 350+75 LT FROM STA. 352+35 LT FROM STA 358+15 LT FROM STA 359+35 LT ®DENOTES TEMPORARY IMPACTS IN SURFACE WATER ®DENOTES IMPACTS IN SURFACE WATER (POND) 100' 0' 100' 200' 300' GRAPHIC SCALE DETAIL C FALSE SUMP ( Not to Scale) Medinn Di1dh - 9" 2' so' GI 5� S=Ditch Slope C Proposed Ditch I I R-0623 3C i RM' SHEET NO. ROADWAY DESIGN HYDRAULIC ENGINEER ENGINEER PRELIMIN4RY PLAN: CONMUCTWIR SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS PROJECT REFERENCE NO. 1 SHEET NO. DETAIL FALSE SUMP a s-w Omtside DijSh 20:1 2.0 Tdl c Flo —`off W S=Ditch Slope (i Proposed Ditch FROM STA.362+10 LT DETAIL C FALSE SUMP I Not to Smle) Median Ditch _ 9' I2' Chan 4lavj ---.ram 2aGI --'s — S=Ditch Slope CE Proposed Ditch ROSE BO luN FROM STA.362+10 CL FROM STA.365+DO CL EARLE POOLE ENGINEER 1 ENGINEER PRELIMINIRY PLANS no xar vs COxf'IA1JC190N FOR PROFILE OF LINE -L- SEE SHEET 50 1 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS PERMIT DRAWING SHEET 6-OF U I I ®DENOTES IMPACTS IN SURFACE WATER (POND) 100' 0' 100' 200' 300' II GRAPHIC SCALE DETAIL A FALSE SUMP i I_ smM t c Dith o 20:1 GI S=Ditch Slope Proposed Ditch FROM Sl 362+10 LT DETAIL C FALSE (Not to Swle) Median Dit h 9" I2' Chan Mlw)—ti+— 20' GI S=Ditch Slooe 6 Proposed Ditch 0.0% To 2.0% 1 20 ver O4.0% To 6.076 40' 30' Over 6.r 50' o FROM STA.362+10 CL FROM STA_ 365+00 CL PAM BOY" EAME POM RW $MEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER DO HOT U0 tr04 0WXMIICfl0N FOR PROFILE OF LINE —L— SEE SHEET 50 SEE SHEETS 2—H & 2-1 FOR DRAINAGE DITCH DETAILS PERMIT DRAWING SHEET I& OF I I I ®DENOTES IMPACTS IN SURFACE WATER )POND) 0' 100' 200' 300' IN GRAPHIC SCALE SEE DETAIL G ® DENOTES FILL ID WETLAND ® DENOTES HAND \ CLEARING \ ®DENOTES IMPACTS IN SURFACE WATER ®DENOTES TEMPORARY IMPACTS IN SURFACE WATER \ 100' 0' 100' 200' 300, GRAPHIC SCALE DETAIL A 61 FALSE SUMP R I nab smi.l ink Outside DiWh 2.0 cal \ 20:1 \O' S=Ditch Slo 4j Proposed Ditch FROM STA. -Y7- 18+85 LT REFERENCE NO. SHEET NO. t4623 34 R,W SHEET NO. Y DESIGN HYDRAULICS INEER ENGINEER ]ELIMINA. RY PLANS 10 ?M OQ CONIMUC170N LE OF LINE -Y7- SEE SHEET 52 .E OF LINE -Y7A- SEE SHEET 55 SEE SHEETS 2-H & 2-1 t DRAINAGE DITCH DETAILS 'ERMIT DRAWING SHEET Q)! OF g[ DETAIL 8 FALSE SUMP Outside Ditch ( Not to Sc01e) 7n>�c Fbw 2' GI f 5 — etc. S-Ditch SIoPe fE Proposed Ditch FROM VA. -Y7- 18+85 ITT SEE DETAIL G ® DENOTES FILLLL ID WETLAND ® DENOTES HAND \ CLEARING ®DENOTES IMPACTS IN \ SURFACE WATER ®DENOTES TEMPORARY IMPACTS IN SURFACE WATER \ 100' 0' 100' 200' 300' 5 — 9i8g CRAPFMC SCALE DETAIL A FALSE SUMP n (N. � 20:1 IS -Ditch Slope rE Proposed Ditch FROM STA. -Y7- 18+85 LT REFERENCE NO. I SHEET NO. 34 NO. HYDRAULICS ENGINEER Y PLANS coNerRooriox E -Y7- SEE SHEET 52 -Y7A- SEE SHEET 55 i 2-H & 2-1 iE DITCH DETAILS DRAWING 51OF_J( DEIL 8 FALSE (Not to Scale) OutsiG Ditch M is Flow Y GI S — m. S=Ditch Slope 4 Proposed Ditch FROM S7rA.-Y7-18+65 RT PERMIT DRAWING SHEETS OF 17/ Rounded totals are based on sum of actual impacts. 172 feet Stream Bank Stablization Sites 1-15 = NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS MONTGOMERY COUNTY WBS - 34352.1.1 (R-0623) ATN Revised 3/31105 - SHEET 12 6 2013 WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size /Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Han Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 L2 26+14 to 28+48 Roadway Fill 0.13 0.02 0.01 <0.01 136 16 Bank Stabilization <0.01 11 2 L 30+39 to 30+81 Rt 15" <0.01 <0.01 <0.01 <0.01 39 34 3 L 53+20 to 55+42 2@8'x6' RCBC 0.01 0.01 0.03 <0.01 294 24 4 L 70+83 to 73+70 60" RCP IV 0.02 0.06 0.01 <0.01 271 73 5 L 75+30 to 84+50 2@10'x7' RCBC 0.05 <0.01 295 17 Bank Stabilization 0.01 62 5A Roadway Fill 0.04 5B Roadway Fill 0.01 0.02 500 5C Pond 0.02 0.02 0.34 6 L 120+95 to 121+90 Lt Roadway Fill 0.08 7 L 122+87 to 123+78 Bank Stabilization <0.01 43 7A L 124+42 Lt Bank Stabilization <0.01 16 7B L 124+91 to 128+04 Roadway Fill 0.16 0.02 <0.01 355 72 8 L 131+38 to 132+10 Lt Roadway Fill <0.01 <0.01 <0.01 10 9 L 137+97 to 138+55 Roadway Fill 0.03 10 L 150+48 to Y6 11+00 Rt Roadway Fill 0.14 <0.01 0.13 11 L 187+35 to 188+66 96" RCP IV 0.03 0.01 322 83 Bank Stabilization <0.01 15 11A L 187+80 to 187+98 Roadway Fill 0.01 0.02 91 41 12 L 203+49 to 206+55 2@12'x8' RCBC 0.10 0.01 499 38 13 L 228+85 to 229+98 Roadway Fill 0.05 0.04 14 L 241+68 to 242+88 54" RCP IV 0.02 0.01 229 60 Bank Stabilization <0.01 12 15 L 250+61 to 251+71 66" RCP -IV 0.02 <0.01 370 31 Bank Stabilization <0.01 13 TOTALS: 0.68 0.03 0.26 0.68 0.07 3573 499 PERMIT DRAWING SHEETS OF 9/ WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 16 L 262+36 to 264+32 30" RCP-II1 0.14 0.01 17 L 264+70 265+86 54" RCP-111 0.10 0.01 0.03 0.01 <0.01 280 57 to Bank Stabilization <0.01 21 18 L269+62 272+04 42" RCP-111 0.11 <0.01 0.02 0.01 <0.01 297 44 to Bank Stabilization <0.01 22 19 L 282+75 to 283+36 Roadway Fill 0.04 19A L 282+68 to 283+49 Roadway Fill 0.01 0.02 19B L 283+33 to 283+47 2@1 VxT RCBC <0.01 17 19C L 283+47 284+20 2@1 VxT RCBC 0.05 340 to Bank Stabilization <0.01 9 20 L 316+99 to 317+88 Roadway Fill 0.05 21 L Bank Stabilization 0.01 75 338+46 to 340+55 Causeways 0.08 112 22 L 350+09 to 352+49 Lt Pond 0.55 23 L 362+75 to 364+14 Rt Pond 0.48 24 Y7 15+26 to 15+49 Lt Roadway Fill <0.01 <0.01 24A Y7 15+63 16+31 48" RCP 0.04 0.02 0.01 <0.01 240 18 to Bank Stabilization <0.01 10 SHEET TOTALS (SITES 16-24A): 0.49 1 1 0.02 1 1 0.11 1 1.12 0.09 1294 248 SHEET TOTALS (SITES 1-15): 0.68 0.03 0.26 0.68 0.07 3573 499 TOTALS: 1.17 0.05 0.38 1.80 0.17 4867 747 Rounded totals are based upon sum of actual impacts. Stream Bank Stablization Sites 16-24A = 137 feet An additional 0.03 acres of temporary wetland impacts in Hand Clearing areas is due to placement of Erosion Control measures. } E L w z i c ® i f THIS PROJECT IS WITHIN THE MUNICIPAL BOUNDARY OF TROY -Ll- STA.17 + 00.00 GRAPHIC SCALES 50 25 0 50 100 PLANS 50 25 0 50 100 PROFILE (HORIZONTAL) 10 5 0 10 20 \ PROFILE (VERTICAL) STATE OF NORTH CAROLINA DIVISION OF HIGHWAYS UTILITY ENVIRONMENTAL PLANS MONTGOMERY COUNTY T.I.P. NO. SHEET NO. R-0623 UEP-1 UTILITY SHEET: 1-OF-5 TYPE OF WORK: WATER AND SANITARY SEWER UTILITY CONSTRUCTION INDEX OF SHEETS SHEET NO. DESCRIPTION UEP-1 TITLE SHEET UEP-2 UTILITY IMPACT SITES Ul, U2 UEP-3 UTILITY IMPACT SITE U3 UEP-4 UTILITY IMPACT SITE U4 UEP-5 IMPACT SUMMARY SHEET SEAL -Y9- PAGE ST /� Nn (SR 1332) PLAN DATE: 10 16-2013 PREPARED IN THE OFFICE OF. DIVISION OF HIGHWAYS UTILITIES UNIT UTILITIES ENGINEERING m e 7 P 1591 MAIL SERPICES CENTER RAI.EIGl1 NC 27699-1591 OF TFAX (919)91925551 Roger Worthington, P.E. UTILITIES SEC77ON ENGINEER Ron Wilkins, P.E. UTILITIES SQUAD LEADER PROJECT ENGINEER Eric Haugaard UTILITIES PROJECT DESIGNER HC = UTILITY IMPACTS HATCHED AREAS SHOW: "HAND —CLEARING IN WETLANDS" FROM UTILITY INSTALLATION E = UTILITY IMPACTS HATCHED AREAS SHOW: "TEMPORARY EXCAVATION IN WETLANDS" FROM UTILITY INSTALLATION P = PROJECT IMPACTS (NON —UTILITY) SITE—Ul vm NCDOT PROJECT R-0623 UTILITY ENVIRONMENTAL PERMIT DRAWING UTILITY IMPACT SITE-U1 AND SITE-U2 SITE—U2 ,may_ "TEMPORARY EXCAVATION IN WETLANDS 185 SQFT (< 0.01 AC) "HAND -CLEARING IN WETLANDS" 375 SQFT (< 0.01 AC) N O 0/1 ro LIM .1. - LIM LI. IIO' G/N ro„ GRAU 350 OH PO# EXIST ON POW fq�,EX VATION IN-WETCAI 156 OFT (0.04 AC) "HAND-CLEA NG IN WETLANDS" 1160 SQFT (0.03 AC) OE5IGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: REVISED: NORTH CAROLINA DEPARTMENT OF TRANSPORTATION UTILITIES ENGINEERING SEC. PHONE: (919)707-6690 UTILITY NSTRUCTIOI FAX:(919)250-4151 PLA S ONLY UTILITY CONSTRU¢TION y UTILITY SHEET 2 F 5 PLAN DATE: 10-16-2013 PLAN SCALE: 1"=50' (FULL-SIZE S E 1"=100' (HALF-SIZE HE ) REM. EXIST OM POW It r� REM. NCDOT PROJECT R-0623 UTILITY ENVIRONMENTAL PERMIT DRAWING UTILITY IMPACT SITE-U3 UTILITY IMPACT SITE-U3 "TEMPORARY EXCAVATION IN WETLANDS 390 SQFT (< 0.01 AC) DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: REVISED: UTILITIES ENGINEERING SEC. PHONE :(9191707-6690 UTILITY CONSTRUCT IOl FAX:(919)250-4151 I PLANS ONLY UTILITY CONSTRUCTION UTILITY SHEET 3 OF 5 PLAN DATE. 10 16-2013 PLAN SCALE: 1"=50' (FULL-SIZE SHEET) 1"=100' (HALF-SIZE SHEET) HC = UTILITY IMPACTS HATCHED AREAS SHOW: "HAND -CLEARING IN WETLANDS" FROM UTILITY INSTALLATION E = UTILITY IMPACTS NCDOT PROJECT UTILITY ENVIRONMENTAL UTILITY IMPACT R-0623 PERMIT D SITE-U4 \ UTILITY IMPACT SITE-U4 "HAND CLEARING IN WETLANDS" 855 SQFT (0.02 AC) Epy} av p4p , EYgy iS �1 z RAWI N G DRAWN BY: CHECKED BY: APPROVED 8Y: REVISED: DEPARTMENT OF TRANSPORTATION UTILITIES ENGINEERING SEC. PHONE: (919)707-6690 UTILITY CONSTRUCTIO FAX:(919 )250-4151 1 PLANS ONLY UTILITY CONSTRUCTION UTILITY SHEET 4 OF 5 PLAN DATE. 10 16-2013 PLAN SCALE: 1"=50' (FULL-SIZE SHEET) 1"=100' (HALF-SIZE SHEET) HC = UTILITY IMPACTS HATCHED AREAS SHOW: "HAND -CLEARING IN WETLANDS" FROM UTILITY INSTALLATION E =UTILITY IMPACTS HATCHED AREAS SHOW: "TEMPORARY EXCAVATION IN WETLANDS" FROM UTILITY INSTALLATION P=PROJECT IMPACTS (NON -UTILITY) UTILITY WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Temp. Hand Existing Existing Permanent Temp. Excavation Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site -L- Station Structure Fill In Fill In in in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) U1 Sta 28+OOL overhead power line - clear 15' < 0.01 each side of line (375 SQFT) U1 Sta 28+OOL open -trench excavation for < 0.01 installation of water line (185 SQFT) U2 Sta 29+25L overhead power line - clear 15' 0.03 each side of line (1160 SQFT) U2 Sta 29+25L open -trench excavation for 0.04 installation of water line (1515 SQFT U3 Sta 55+OOL open -trench excavation for < 0.01 installation of water line (390 SQFT) U4 Sta 153+50L overhead power line - clear 15' 0.02 each side of line (855 SQFT TOTALS: 0.05 0.05 (2090 SQFT) (2390 SQFT * total calculated summing square footage at each site and then rounding to the nearest one -hundredth acre UTILITY SHEET 5 of 5 Revised 3131/05 VICINITY MAP -Ll- STA. 17 + 00.00 GRAPHIC SCALES 50 25 0 50 100 PLANS 50 25 0 50 100 PROFILE (HORIZONTAL) 10 5 0 10 20 PROFILE (VERTICAL) 611 "I AllrI,1 (0I loll IN'1 1-11 .1I' 1 I 10 W) I I -I 11-II �". A UTILITY ENVIRONMENTAL PLANS MONTGOMER Y COUNTY T.I.P. NO. SHEET NO. R-0623 UEP-1 UTILITY SHEET: I-OF-S TYPE OF WORK: WATER AND SANITARY SEWER UTILITY CONSTRUCTION INDEX OF SHEETS SHEET NO. DESCRIPTION UEP-1 TITLE SHEET UEP-2 UTILITY IMPACT SITES Ul, U2 UEP-3 UTILITY IMPACT SITE U3 UEP-4 UTILITY IMPACT SITE U4 UEP-5 IMPACT SUMMARY SHEET SEAL PLAN DATE: 10-16-2013 PREPARED IN THE OFFICE OF DIVISION OF HIGHWAYS y UTILITIES UNIT o = UTILITIES ENGINEERING 4 �~ y Q 1597 MAIL SERVKES CENTER RALEIGH NC 276994591 PHONE 690 OF Tfl0`aS�O FAX(919)250-4l51 Roger Worthington, P.E. UTILITIES SECTION ENGINEER Ron Wilkins, P.E. UTILITIES SQUAD LEADER PROJECT ENGINEER Eric Haugaard UTILITIES PROJECT DESIGNER PROJECT REFERENCE NO. SHEET NO. v R-66?3 UF_P-z N C D OT PROJECT R-0 62 3 DESIGNED BY: - DRAWN BY: HC = UTILITY IMPACTS CHECKED BY: UTILITY ENVIRONMENTAL PERMIT DRAWING APPROEE°EJY: REVISED: N042T61 CAROLINA UTILITY IMPACT SITE-Ul AND SITE-U2 DEPARPAENT OF TRANSPORTATION UTILITIES EN6I NECR ING SEJUTILIPLY[INSTRUCTION PHONE:(919)707-669TY FAX:(919)250-41', A S ONLY HATCHED AREAS : "HAND —CLEARING S NO WETLANDS" UTILITY CONSTRU TION FROM UTILITY INSTALLATION .�'A►' W UTILITY SHEET 2 kOF 5 E=UTILITY IMPACTS PLAN DATE: 10-16-2013 PLAN SCALE: HATCHED AREAS SHOW: 1 "=50, (FULL—SIZE SHEET) FROMOUTLITYXINSTALLATION WETLANDS" 1 "=100' (HALF—SIZE HEET) P=PROJECT IMPACTS (NON —UTILITY) SITE—U1 SITE—U2 0 - wop o/w paw L.rvEo %: ThrvEa -w - _ ow ow ------------------------------- pAOF o,w paw L�wEs pAop o/x pow �prvEs .. pAop arH pow �:rvE pAop orx pow ��wEs � paw p�rvss pnap o/N paw s�rvss p p/n2 _ pAop o,w � } 21 F F F� Y F 1' - -----� --- CA' 1Ex45T OH �_ EXI57 0 N POW O GRAD 350 TL-3 _ T T T r r REM. REM. — — REM. Ex— OH Pow LINEs------------ LINE _ R M. —EXIST OH POW Exlsr oN vox axes EXIST ------ , ________- o F REM. -___-L _ __ __ cnr-i N 37 4l' 59.5" ----- 1 UTILITY I�1PAOT_ -SITE-U2 --- ----- _ - ------------- -- TV IN► �P [TA �,o� �SITL=Ufi "TE EX NATION IN WETLADS TSl T---- �y T�-T1 1516 FT (0.04 AC) "TEMPORARY EXCAVATION IN WETLANDS "HAND-CLEA NG IN WETLANDS" I =� 185 SOFT (< 0.01 AC) 1160 SOFT (0.03 AC) �� HAND -CLEARING IN WETLANDS"REM. 375 SOFT (< 0.01 AC) -- _— - -- \ 1 � i REM. w z N m o m � � ' I � i 0 O Od N I � � i U E �tl �. PROJECT REFERENCE N0. SHEET NO. P-0623 UEP-3 NCDOT PROJECT R-0623 DESIGNED BY:. DRAWN BY: CHECKED BY: APPROVED BY: UTILITY ENVIRONMENTAL PERMIT DRAWING REVISED: UTILITY IMPACT SITE-U3 NORTH GARDLINA DEPARTMENT OF TRANSPORTATION UTILITIES ENGINEERING SEC. PHONE: (919)707-6690 UTILITY CONSTRUCTION FAX:(919)250-4151 PLANS ONLY UTILITY CONSTRUCTION UTILITY SHEET 3 OF 5 - - - - - PLAN DATE: 10-16-2013 PLAN SCALE: 1"=50' (FULL-SIZE SHEET) 1"=100' (HALF-SIZE SHEET) ------- ---- HC = UTILITY IMPACTS UTILITY IMPACT SITE-U3 HATCHED AREAS SHOW: "HAND -CLEARING IN WETLANDS" "TEMPORARY EXCAVATION IN WETLANDS FROM UTILITY INSTALLATION 390 SQFT ( G 0.01 AC) E=UTILITY IMPACTS I� � Cfl I � N HATCHED AREAS SHOW: m "TEMPORARY EXCAVATION IN WETLANDS" FROM UTILITY INSTALLATION P= PROJECT IMPACTS (NON -UTILITY) �9 In "" %. ' �Y EXIST ON POW LINE EXIST OH POW UNE EXIST OH KW LINE �z ws 12 wL EXIST OH PLµe.E��_ -- C EXIST OH POW LINE EXIST OH z iz w� i ri w CAT-1 T I I I T I GRAU TL- m s � a ee — [ LC, z S L t REM N m CAT-1 GRAU TLC i W J m O ea 0 z 0 e F93 3' F83 s Fss y e" F33 e F33 9 Fs3 6 e s e' F$3 � o q v �n Fss W I rn � N y UE O i i N LflIL PROJECT REFERENCE NO. SHEET ND. a R-0623 IJEP-4 \ NCDOT PROJECT R-0623 DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED UTILITY ENVIRONMENTAL PERMIT DRAWING REVISED: UTILITY IMPACT SITE-U4 NORTH CAROLINA DEPARTMENT OF TRANSPORTATION UTILITIES ENGINEERING SEC. PHONE:(9i9 R 07-6690 UT]LI TY CONSTRUCTION FAX:(:191250-4151 PLANS ONLY UTILITY CONSTRUCTION - UTILITY SHEET 4 OF 5 PLAN DATE: 10-16-2013 PLAN SCALE: 1"=50' (FULL-SIZE SHEET) 1"=100(HALF-SIZE SHEET) P HC = UTILITY IMPACTS HATCHED AREAS SHOW: "HAND -CLEARING IN WETLANDS" UTILITY IMPACT SITE-U4 FROM UTILITY INSTALLATION E = UTILITY IMPACTS "HAND CLEARING IN WETLANDS" 855 SQFT (0.02 AC) / HATCHED AREAS SHOW: "TEMPORARY EXCAVATION IN WETLANDS" /. • . * * _ * _ * * FROM UTILITY INSTALLATION P= PROJECT IMPACTS (NON -UTILITY) * r � * . p o,l .ow —'s aw LrNEs LINE S fxiST 11 e S r� W �X !! G s a w z �s a ci cNn LINE �t 6' 13 On z � 0 6 M� s� N �E o� UTILITY WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Temp. Hand Existing Existing Permanent Temp. Excavation Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site -L- Station Structure Fill In Fill In in in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) U 1 Sta 28+OOL overhead power line - clear 15' < 0.01 each side of line (375 SQFT) U1 Sta 28+OOL open -trench excavation for < 0.01 installation of water line (185 SQFT) U2 Sta 29+25L overhead power line - clear 15' 0.03 each side of line (1160 SQFT) U2 Sta 29+25L open -trench excavation for 0.04 installation of water line (1515 SQFT) U3 Sta 55+OOL open -trench excavation for < 0.01 installation of water line (390 SQFT) U4 Sta 153+50L overhead power line - clear 15' 0.02 each side of line (855 SQFT) TOTALS: 0.05 0.05 (2090 SQFT) (2390 SQFT) * total calculated summing square footage at each site and then rounding to the nearest one -hundredth acre ATN Revised 3/31/05 See Sheet 1-A For Index of Sheets conorem°e mouma;o 316 Okeewemee TA 1317 4 220 - 310 °02 109 323 1363 A 1369 EID PROJECT �9° � 2 _ 13 34 �1171 1332 I C220 I 135 ' 6 O 34 �i39 38i Lammon s oad BEGN PROJECT 1554 1519 220 1500 220 27 0059 A Cap se °-6011 9 113s113 154 109 { Wader°""�'° ,s,0 vill= sin Onvll 31 ° ; �"o 11 220 A VICINITY MAP THIS PROJECT IS WITHIN THE MUNICIPAL BOUNDARY OF TROT —L2— STA. 28 + 91.05 L.B. _ —L— STA. 28 + 83.70 L.A. -YS- 1,711 E( BUSINESS CENTER -Y12- DRIVE (PRIVATE) oar " y INC 2427) 9ti -Y1- DAIRY ✓� G 2 4 ti/ W4; I yy�Q BEGIN RCBC 0 � R4 0 -L- POT 53+84.72 Z a BEGIN RCBC —L— STA. 122 + 63.60 (RT)� BEGIN BRIDGE -L- STA. 125 +18.11 END BRIDGE —LI— STA. 28 + 91.37 L.B. _ —L— STA. 28 + 83.70 L.A. —L2— STA.18 + 49.86 = —LI— STA. 18+49.86 BEGIN TIP PROJECT R-0623 -LI- STA.17 + 00.00 —LI— STA.15 + 50.00 BEGIN CONSTRUCTION * TRAFFIC SIGNAL GRAPHIC SCALES 50 25 0 50 100 PLANS 50 25 0 50 100 PROFILE (HORIZONTAL) 10 5 0 10 20 PROFILE (VERTICAL) DESIGN DATA ADT 2014 = 6610 - 12,641 ADT 2040 = 9300 - 18,200 K = 10 % D = 55 % T 17 % V 60 MPH * TTST =12% DUAL 5% FUNCTIONAL CLASSIFICATION RURAL ARTERIAL REGIONAL TIER PROJECT STATE OF NORTH CAROLINA DIVISION OF HIGHWAYS MONTGOMERY COUNTY (DOGWOOD AVE) V� LOCATION: NC 24127 TROY BYPASS FROM WEST OF SR 1138 (DAIRY ROAD) TO JUST EAST OF LITTLE RIVER TYPE OF WORK: GRADING, DRAINAGE, PAVING, STRUCTURES SIGNALS AND SIGNING -L- STA.125+01.86 (LT) END BRIDGE -�oo Ali OS\ 406 A.15A T� O �Jy`C,yyB -Y7- CAPELSIE RD RELOCATION (SR 1519) NOTE: THIS PROJECT IS A PARTIAL CONTROLLED ACCESS PROJECT WITH ACCESS BEING LIMITED TO POINTS AS SHOWN ON THE PLANS CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III r PROJECT LENGTH LENGTH ROADWAY TIP PROJECT R-0623 = 6.523 MILES LENGTH STRUCTURES TIP PROJECT R-0623 = 0.126 MILES TOTAL LENGTH OF TIP PROJECT R-0623 = 6.649 MILES Prepared In the Office of. DIVISION OF HIGHWAYS 1000 Birth Ridge Dr., Raleigh NC, 27610 2012 STANDARD SPECIFICATIONS G. E. BREW, P.E. RIGHT OF WAY DATE. JANUARY 30, 2013 PROJECT ENGINEER I.T. YOUNIS LETTING DATE: NOVEMBER 18, 2014 PROJECT DESIGN ENGINEER STATE STATB PR.— RRFRR.-. N0. N.C. R-0623 1 STATE PR0.1.N0. P. A.PRQI.N. RSSCRIPTION 34352.1.1 STP-24 6 PE 34352.3.U1 ILW & UTIL -Y9- PAGE ST N (SR 1332) C / � -Y10- GLEN RD (SR 1324) -L- STA.337+65.28 BEGIN BRIDGI a� �4 v� (SR 1586) -L- STA.337+91.84 END TIP PR -L- STA. 368 + HYDRAULICS ENGINEER P.E. SIGNATURE: ROADWAY DESIGN ENGINEER SIGNATURE: P.E. v CO� kalrfl% PRELIMINARY PLANS W NOT USE FOR CONSTRUCTION DIVISION OF HIGHWAYS �F NORTH n OF T"I �- STATE OF NORTH CAROLINA Note: Not to Scale STATE OF NORTH CAROLINA PROJECT REFERENCE NO. SHEET R-�23 �-/ *S. U.E. = Subsurface Utility Engineering DIVISION OF HIGHWAYS CONVENTIONAL PLAN SHEET SYMBOLS BOUNDARIES AND PROPERTY WATER: State Line — - Water Manhole County Line RAILROADS: Water Meter o Township Line Standard Gauge CSX TRANSPORTATIOIV Water Valve Orchard f� f3 Q Q City Line RR Signal Milepost MILEPOST 35 Vineyard^eya a Water Hydrant Reservation Line Switch SWITCH Recorded U/G Water Line Property Line RR Abandoned — — — — EXISTING STRUCTURES.• Designated U/G Water Line (S.U.E.*) - - - -•- - - - Existing Iron Pin E.P RR Dismantled - - - - - - - - Above Ground Water Line A/C Ovate MAJOR: Property Corner RIGHT OF WAY.- Bridge, Tunnel or Box Culvert coNc Property Monument El Baseline Control Point ♦ Bridge Wing Wall, Head Wall and End Wall - l r J C-C WW l TV: Parcel/Sequence Number i23 Existing Right of Way Marker MINOR: TV Satellite Dish CC Existing Fence Line —x x x— Existing Right of Way Line - Head and End Wall coNC Hw TV Pedestal Proposed Woven Wire Fence Proposed Right of Way Line Pipe Culvert TV Tower 8 Proposed Chain Link Fence Proposed Right of Way Line with (D A_ Footbridge }----------< U/G TV Cable Hand Hole "H a Proposed Barbed Wire Fence v Iron Pin and Cap Marker Drainage Box: Catch Basin, DI or JB ElCe Recorded U/G TV Cable Proposed Ri ht of Wa Line with g Existing Wetland Boundary - - - -"`R- - - - Concrete orGranite R/W Marker Paved Ditch Gutter ____ — Designated U/G TV Cable (S.U.E.*) - - - - - - - - Proposed Wetland Boundary "`R Proposed Control of Access Line with Storm Sewer Manhole OO Recorded U/G Fiber Optic Cable T° Fo Existing Endangered Animal Boundary E<a Concrete C/A Marker Storm Sewer Designated U/G Fiber Optic Cable (S.U.E.*r - - - -T° Fo- - - Existing Endangered Plant Boundary EPB Existing Control of Access Known Soil Contamination: Area or Site Proposed Control of Access UTILITIES.- GAS: Potential Soil Contamination: Area or Site Existing Easement Line _E g Gas Valve 0 BUILDINGS AND OTHER CULTURE: Proposed Proposed Temporary Construction Easement - E POWER: Power Pole j Gas Meter Gas PumpVent or U/G Tank Ca p O Proposed Temporary Drainage Easement TDE Proposed Power Pole l V Recorded U/G Gas Line 0 5 Proposed Permanent Drainage Easement PDE Existing Joint Use Pole Designated LJ/G Gas Line S.U.E.* g ( ) - -�- - Sign Well o w Proposed Permanent Drainage /Utility Easement DUE Above Ground Gas Line Aic cas Proposed Joint Use Pole Small Mine ,x, Proposed Permanent Utility Easement PUE Power Manhole Foundation � Proposed Temporary Utility Easement TUE Power Line Tower ® SANITARY SEWER: Area Outline 0 Proposed Aerial Utility Easement AUE Power Transformer Sanitary Sewer Manhole ry ®O Cemetery 0 Proposed Permanent Easement with U/G Power Cable Hand Hole Sanitary Sewer Cleanout 0+ Building � Iron Pin and Cap Marker U/G Sanitary Sewer Line s: School ROADS AND RELATED FEATURES. H-F Pole rame oe �� P Above Ground Sanitary Sewer A/G Sanitary Sewer Church ExistingEdge of Pavement — g — — — — Recorded U/G Power Line Designated U/G Power Line Recorded SS Forced Main Line Fps Existing Curb _____ (S.U.E.*) Dam Designated SS Forced Main Line (S.U.E.*) — - Proposed Slope Stakes Cut - - - C - - - TELEPHONE: HYDROLOGY.- Proposed Slope Stakes Fill - - - F - - - MISCELLANEOUS: Stream or Body of Water Proposed Curb Ramp CR Existing Telephone Pole Utility Pole • H dro, Pool or Reservoir I ------I Y Existing Metal Guardrail Proposed Telephone Pole � Utility Pole with Base El Jurisdictional Stream — �s _ Proposed Guardrail T T T Telephone Manhole O Utility Located Object p Buffer Zone 1 ez I n Existing Cable Guiderail n n Telephone Booth ❑O Utility Traffic Signal Box ❑s Buffer Zone 2 Bz z Proposed Cable Guiderail n n n n Telephone Pedestal O Utility Unknown U/G Line teT� Flow Arrow � Equality Symbol Telephone Cell Tower � U/G Tank; Water, Gas, Oil Disappearing Stream ;— — Pavement Removal ® U/G Telephone Cable Hand Hole HH Underground Storage Tank, Approx. Loc. BST Spring per- �_.-^ l�EGETATION. Recorded U/G Telephone Cable Wetland Designated U/G Telephone Cable (S.U.E.*) - - - - -T- - - - A/G Tank; Water, Gas, Oil �c Single Tree � Geoenvironmental Boring Proposed Lateral, Tail, Head Ditch �T Single Shrub © Recorded U/G Telephone Conduit T= False Sump Designated U/G Telephone Conduit (S.U.E.*)- - - - -TE- - - - U/G Test Hole (S.U.E.*) m Hed a g Abandoned According to Utility Records AATUR Woods Line t Recorded U/G Fiber Optics Cable T Fa Designated U/G Fiber Optics Cable (S.U.E.*) -- - -TFo---. End of Information E.O.I. CL -L2- CL -Ll- -0" VARIES VARIES VARIES VARIES 12'-0" 10'-0" 2' TO 12' O' TO 8.1' O' TO 8.1' 2' TO 12' 13'-0" W/GR ! 1 6,_0„ 6'_0„ =A Z m C3 GRADE 2'_0" 2 _p W C3 o NT C3 0" O 4'7008 POINT FDPS FDPS W N z y 0`02 0.04 Q 04 0.02 6:1 6 1 J1 D3 16 T T J1 D3 16„ U 16„ D3 AGRADE TO THIS LINE GRADE TO THIS LINE GRADE TO THIS LINE TYPICAL SECTION NO. 2 -Ll- STA. 18+49.86 TO 22+00.00 & -L2- STA. 18+49.86 TO 21+99.31 TRANSITION FROM T.S. 1 TO T.S. 2 CL -L2- CL -Ll- IARIES -0" 18'-0" 10'-0" 12'-0" VARIES VARIES VARIES VARIES 12'-0" 10'-0" X-SECT. 2' TO 12' 8.1' TO 23'-0" 8.1' TO 23'-0" 2' TO 12' 13'-0" W/GR t 6 -0 6'-0" t z O n m 4'-0" C3 GRADE 2 _p 2 _p" C3 GRADE C3 4 -p O FDPS POINT FDPS FDPS POINT FDPS N i Z.� 0.08 0.02 0.04 6:1 - 0 02 . 0.08 6:1 0Q 6:1 6„ 6" 6„ D3 T T D3 D3 T A 16" 11 16'" J1 T GRADE TO THIS LINE TYPICAL SECTION NO. 3 GRADE TO THIS LINE GRADE TO THIS LINE -Ll- STA. 22+00.00 TO 28+91.37 L.B. & -L2- STA. 21+99.31 TO 28+91.05 L.B. CL -L- -L- EBL STA. 125+01.86 (END BRIDGE) TO 337+65.28 (BEGIN BRIDGE) -L- WBL STA. 125+18.11 (END BRIDGE) TO 337+91.84 (BEGIN BRIDGE) -L- EBL STA. 340+80.28 (END BRIDGE) TO 350+25.00 -L- WBL STA. 341 + 06.84 (END BRIDGE)TO 350+25.00 PROJECT REFERENCE NO. SHEET NO. R-0623 2-A ROADWAY DESIGN PAVEMENT DESIGN ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION ES ;ECT. PAVEMENT SCHEDULE C1 3.0" S9.5B C2 VAR S9.513 C3 3.0" S9.5C 6; 1 C4 VAR S9.5C Dl 2.5" 119.0E ORIGINAL GROUND p2 VAR. 119.08 VARIABLE D3 3.0" 119.00 SLOPES ORIGINAL D4 VAR. 119.00 GROUND E1 4.0" B25.OB E2 5.5" 625.013 E3 VAR. 325.013 JO 6" ABC Jl 10" ABC 'S ECT. OT EARTH MATERIAL OEXISTING PAVEMENT lWl I WEDGING VARIABLE -SLOPES DRIGINAL GROUND x Z p GRADE 6'-0" m a OINT 4'-0" 2'-0" FDPS Q C3 C3 Q FDPS 6" J A3 16„ U 16" D3 AT T AD3 16" U 16"/ ORIGINAL r( :GROUND GRADE TO THIS LINE GRADE TO THIS LINE GRADE TO THIS LINE RIABLE TYPICAL SECTION NO. 6 OPES ORIGINAL -L- STA. 359+00.00 TO 364+25.70, TRANSITOIN FROM T.S. 5 TO T.S. 6 GROUND -L- STA. 364+25.70 TO 368+00.00 10' 3' 2'-4" OFFSET BLOCK PAVED SHOULDER POST C3 Rl 2.1 MATTING FOR EROSION CONTROL A D3 T SHOULDER BERM GUTTER (STANDARD 846.01) DETAIL SHOWING SHOULDER BERM GUTTER USE WITH TYPICAL SECTION NO. 4 (SEE PLANS FOR LOCATIONS) � -Yl- (SR 1138) GRADE TO THIS LINE —I iL—GRADE TO THIS LINE TYPICAL SECTION NO. 7 -Yl- STA. 14 + 00.00 TO 14 + 50.00 TRANSITION FROM EXISTING TO T.S.7 -Yl- STA. 14+96.21 TO 15+60.52 GRADE TO THIS I: - GROUND PROJECT REFERENCE NO. SHEET NO. R-0623 2-B ROADWAY DESIGN PAVEMENT DESIGN ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION PAVEMENT SCHEDULE C1 3.0" S9.513 C2 VAR S9.513 C3 3.0" S9.5C C4 VAR S9.5C Dl 2.5" 119.0E D2 VAR. 119.08 D3 3.0" 119.0C D4 VAR. 119.00 El 4.0" B25.OB E2 5.5" 625.013 E3 VAR. 325.013 Jl 10" ABC TO EARTH MATERIAL �O EXISTING PAVEMENT IW1 WEDGING 43' _ 1 OFFSET BLOCK i POST Cl Rl 21 MATTING FOR EROSION CONTROL 6" T El Dl E3 SHOULDER BERM GUTTER (STANDARD 846.01) DETAIL SHOWING SHOULDER BERM GUTTER USE WITH TYPICAL SECTION NO. 16 -Y7- STA. 14+25 TO 18+25 LEFT -Y7- STA. 14+25 TO 16+30 RIGHT CE -Y6- (SR 1005) 4 -Y6- (SR 1005) Ct -Y6- (SR 1005) =Y7- (SR 1519l CE -Y8- (SR 1554) TYPICAL SECTION NO. 13 -Y6- STA. 11 + 00.00 TO 12 + 00.00 TRANSITION FROM EXISTING TO T.S.13 -Y6- STA. 12 + 00.00 TO 13 + 25.00 TYPICAL SECTION NO. 14 -Y6- STA. 13+25.00 TO 14+26.94 TYPICAL SECTION NO. 15 -Y6- STA. 16 + 88.33 TO 18 + 90.00 -Y6- STA. 18 + 90.00 TO 19 + 50.00 TRANSITION FROM T.S.15 TO EXISTING TYPICAL SECTION NO. 16 -Y7- STA. 10+59.32 TO 24+50.00 -Y7- STA. 24 + 50.00 TO 25 + 00.00 TRANSITION FROM T.S.16 TO EXISTING * -YIOA- STA. 10+58.04 TO 11+22 TYPICAL SECTION NO. 17 -Y8- STA. 11 + 60.00 TO 12 + 10.00 TRANSITION FROM EXISTING TO T.S.17 -Y8- STA. 12 + 10.00 TO 12 + 96.91 PROJECT REFERENCE NO. SHEET NO. R-0623 2-D ROADWAY DESIGN PAVEMENT DESIGN ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION PAVEMENT SCHEDULE Cl 3.0" S9.56 C2 VAR S9.513 C3 3.0" S9.5C C4 VAR S9.5C Dl 2.5" 119.013 D2 VAR. 119.08 D3 3.0" 119.0C D4 VAR. 119.00 El 4.0" B25.013 E2 5.5" 625.013 E3 VAR. 1325.013 Jl 10" ABC TO EARTH MATERIAL �O EXISTING PAVEMENT IW1 WEDGING A 4' Z J U',o ?, ~ L5' A DETAIL SHOWING VALLEY GUTTER USE WITH TYPICAL SECTIONS 22 & 23 -Y10- STA. 22+14.41 TO 23+38.00 RIGHT CL -Y8- (SR 1554) CL -Y9- (SR 1332) CL -Y9- (SR 1332) � -Y10- (SR 1324) -Y10- (SR 1586) TYPICAL SECTION NO. 18 -Y8- STA. 15 + 85.57 TO 17 + 00.00 -Y8- STA. 17 + 00.00 TO 17 + 50.00 TRANSITION FROM T.S.18 TO EXISTING TYPICAL SECTION NO. 19 -Y9- STA. 11 + 50.00 TO 12 + 00.00 TRANSITION FROM EXISTING TO T.S.19 -Y9- STA. 12 + 00.00 TO 14 + 46.82 TYPICAL SECTION NO. 20 -Y9- STA. 16 + 08.63 TO 22 + 63.64 TYPICAL SECTION NO. 21 -Y10- STA. 14 + 00.00 TO 14 + 50.00 TRANSITION FROM EXISTING TO T.S.21 TYPICAL SECTION NO. 22 -Y10- STA. 14+50.00 TO 16+10.86 -Y10- STA. 18+70.40 TO 23+00.00 PROJECT REFERENCE NO. SHEET NO. R-0623 2-E ROADWAY DESIGN PAVEMENT DESIGN ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION PAVEMENT SCHEDULE C1 3.0" S9.56 C2 VAR S9.5B C3 3.0" S9.5C C4 VAR S9.5C Dl 2.5" 119.013 D2 VAR. 119.08 D3 3.0" 119.0C D4 VAR. 119.00 El 4.0" B25.OB E2 5.5" B25.OB E3 VAR. 325.013 Jl 10" ABC R2 VALLEY GUTTER OT EARTH MATERIAL OI EXISTING PAVEMENT lWl WEDGING 17� Z J S U 2�M U EXIST. qX 2' P.S. A DETAIL SHOWING GUARDRAIL PLACEMENT USE WITH TYPICAL SECTION 24 -Yll- STA. 23+00.00 TO 25+00.00 RIGHT C;RAnF -Y10- (SR 1586) CL -Yll- (NC 2427) I nIJ LIIVC I- LIIVC -Y12- (NC 2427) CL -Y12- (NC 2427) CL -Y13- (NC 2427) TYPICAL SECTION NO. 23 -Y10- STA. 23 + 00.00 TO 23 + 50.00 TRANSITION FROM T.S.23 TO EXISTING TYPICAL SECTION NO. 24 -Yll- STA. 13+50.00 TO 22+00.00 TYPICAL SECTION NO. 25 -Y12- STA. 15+00.00 TO 16+25.00 TYPICAL SECTION NO. 26 -Y12- STA. 16 + 25.00 TO 17 + 52.76 TYPICAL SECTION NO. 27 -Y13- STA. 10 + 50.00 TO 13 + 10.64 PROJECT REFERENCE NO. SHEET NO. R-0623 2-F ROADWAY DESIGN PAVEMENT DESIGN ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION PAVEMENT SCHEDULE C1 3.0" S9.56 C2 VAR S9.5B C3 3.0" S9.5C C4 VAR S9.5C Dl 2.5" 119.0E D2 VAR. 119.08 D3 3.0" 119.00 D4 VAR. 119.00 El 4.0" B25.013 E2 5.5" B25.OB E3 VAR. 325.013 Jl 10" ABC R2 VALLEY GUTTER OT EARTH MATERIAL OEXISTING PAVEMENT lWl WEDGING GE -Y13- (NC 24/27) PROJECT REFERENCE NO. SHEET NO. R-0623 2-G ROADWAY DESIGN I PAVEMENT DESIGN ENGINEER ENGINEER q -Y13- (NC 24✓27) (� -Y7A- (i -DRVI- TYPICAL SECTION NO. 28 -Y13- STA. 13 + 10.64 TO 13 + 50.00 TRANSITION FROM T.S.27 TO T.S.28 -Y13- STA. 13+50.00 TO 18+43.67 TYPICAL SECTION NO. 29 -Y13- STA. 21+67.32 TO 23+00.00 TYPICAL SECTION NO. 30 TRANSITION FROM EXISTING TO T.S.30 -Y7A- STA. 10+30.00 TO 12+11.50 TYPICAL SECTION NO. 31 -DRVI- STA. 10+12.00 TO 13+24.36 PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION PAVEMENT SCHEDULE 0 3.0" S9.513 C2 VAR S9.5B C3 3.0" S9.5C C4 VAR S9.5C Dl 2.5" 119.013 D2 VAR. 119.0E D3 3.0" 119.0C D4 VAR. 119.00 El 4.0" B25.OB E2 5.5" B25.OB E3 VAR. 1325.013 JO 6" ABC Jl 10" ABC TO EARTH MATERIAL @/ EXISTING PAVEMENT nw WEDGING PROJECT REFERENCE NO. I SHEET NO. DETAIL D LATERAL 'V' DITCH II Not to Sccale)) d— G Ground ;) �\ lift. Slope D Min. D=1 Ft. b=5 Ft. FROM -Ll- STA. 23+00 TO -Ll- STA. 25+00 RT FROM -Y3- STA. 11+15+/- TO STA. 11+75+/- RT DETAIL I LATERAL 'V' DITCH (Not to Scale) Fill Ground D lifl. Slope d Min. D = 1 Ft. Max. d = 1 Ft. b=5 Ft. of Liner= PSRM FROM -L- STA. 34+20 TO STA. 38+10+/- RT DETAIL O BERM 'V' DITCH ( N.1 to Sw.le—){ter—�'I Naturol roan N Min. D=1 Ft. b=5 Ft. FROM —L— STA. 50+20 TO STA. 53+40 LT LAIERAL BASL UIILH ( Nof to Scale) 6 Notu�ol sill ope d B Min. D=1.5 Ft. Max. d=1.5 Ff. B=2 Ff. b = 5 Ft. Type of Liner= PSRM FROM -L- STA. 66+75 TO STA. 68+10+/- RT FROM -L- STA. 68+45 TO STA. 70+40+/- RT DIMINAGE DITCH DETAILS DETAIL E LATERAL 'V' DITCH I Not to Scale) N " I t_ Ground D 1"iR. Fill Id Slope Min. D=1 Ft. Mo.. d = 1 Ff. b=5 Ft. of Liner= PSRM FROM -Ll- STA. 25+00 TO STA. 26+90+/- RT FROM -L- STA. 105+70 TO STA. 105+90 RT. FROM -L- STA. 303+00 TO STA. 304+50 RT FROM -L- STA. 307+00 TO STA. 310+35 LT FROM -L- STA.90+50 TO STA. 92+00 LT. FROM -L- STA.90+50 TO STA. 92+90 RT. FROM -L- STA. 229+50 TO STA. 230+50 LT FROM -L- STA. 200+00 TO STA. 200+65 RT FROM -L- STA. 34+20 TO STA. 38+10+/- RT FROM -L- STA. 307+00 TO STA. 310+35 LT FROM -L- 171+70 TO 172+65 LT DETAIL J LATERAL BASE DITCH I Nat to Scale) b Naturol Fll Groun d D� Siope B Min. D = 1 Ft. Max. d=1 Ft. B=2 Ft. b=5 Ft. of Liner= PSRM FROM -L- STA. 34+25 TO STA. 38+00 LT FROM -L- STA. 66+00 TO STA. 66+75 RT FROM -L- STA. 72+44+/- TO STA. 74+50 LT FROM -L- STA. 34+25 TO STA. 38+00 LT FROM -L- STA. 43+00 TO STA. 48+85+/- LT FROM -L- STA. 84+25 TO STA. 85+50 RT FROM -L- STA. 341+10+/- TO STA. 342+50 RT DETAIL P BERM DITCH z G( Nof to Scale) F 5.0' 1 6 4 10.01V.C.?1 D Min. D=1 Ft. FROM -L- STA. 57+70 TO STA. 63+00+/- RT FROM -L- STA. 166+50 TO STA. 168+00 LT FROM -L- STA. 192+00 TO STA. 195+70 LT FROM -L- STA. 200+00 TO STA. 201+20 LT FROM -L- STA. 267+00 TO STA. 269+00 LT FROM -L- STA. 232+50 TO STA. 234+25 LT FROM -L- STA. 151+00 TO STA. 152+00 RT FROM -L- STA. 319+85 TO STA. 322+00 RT FROM -L- STA. 325+00 TO STA. 326+50 RT DETAIL F TOE PROTECTION (Not to Scale) unR\ale Natural d Grod\`'\o d=1 Ft. b=2 Ft. Geotextile FROM -L- STA. 49+20 TO STA. 50+00 RT FROM -L- STA. 67+00 TO STA. 68+70 LT FROM -L- STA. 85+50 TO STA. 86+50 RT FROM -L- STA. 121+40 TO STA. 122+20+/- RT FROM -L- STA. 250+00 TO STA. 252+50 RT FROM -L- STA. 252+50 TO STA. 253+50 LT FROM -L- STA. 254+50 TO STA.255+20 RT FROM -L- STA. 254+90 TO STA. 255+25 LT FROM -L- STA. 270+00+/- TO STA. 271+00+/-RT FROM -Y7- STA. 15+50 TO STA. 17+50 LT FROM -DETI- STA. 15+60 TO STA. 20+50 LT DETAIL K SPECIAL CUT DITCH (Notts SwleI Front oc Ditch Natural � A'� sec Slops ground ay D F\o Min, D=1 Ft. FROM -Yl- STA. 17+85+/- TO STA. 19+50 LT FROM —Yl— STA. 18+55+/— TO STA. 19+50 RT FROM —Y3— STA. 11+75 TO STA. 12+25+/— RT DETAIL Q CUT DITCH LINER (Not to Sw1.) Front oc Ditch Ground ?'/ A �ac Slope D F d Min. D=1 Ft. Type of Liner= PSRM Max d=1 Ft. FROM -L- STA. 65+00 TO STA. 65+50 LT FROM -L- STA. 317+70 RT TO STA.-YI G- 21+50 RT FROM -DET4- STA. 11+00 LT TO -L- STA. 327+50 -L- LT DETAIL V LATERAL BASE DITCH (Notto Scale) b Natural Fill Grod un D 1"RI. Slope B Min. D=1 Ft. Max. d=1 Ft. B=3 Ft. b=5 H. Type of Liner= PSRM FROM -L- STA.72+00 TO STA. 73+23+/- RT DETAIL G LATERAL BASE DITCH (Nof to Sm1e) b Natural Z Fill Groun �TD 19Ft.Slope dMin. D=1 Ft. Max. d=1 Ft. B=2 Ff. b=5 Ft. Type of Liner= PSRM FROM -L- STA. 188+35 TO STA. 189+70 LT FROM -L- STA. 186+00 TO STA. 188+00 RT FROM -L- STA. 103+00 TO STA. 105+70 RT. FROM -L- STA. 92+00 TO STA. 95+00 LT. FROM -L- STA. 251+25+/- TO STA. 252+60 LT FROM -L- STA. 204+45 TO STA. 204+90 LT FROM -L- STA. 328+50 TO STA. 331+00 LT FROM -L- STA.120+50 TO STA.121+00 LT. FROM -L- STA.261+25 TO STA. 262+00+/- LT FROM -L- STA. 261+50 TO 263+85+/- RT FROM -L- STA. 264+80+/- TO 266+00 RT FROM -L- STA. 52+50 TO STA. 53+20+/- RT FROM -L- STA. 53+45 TO STA. 54+50 RT FROM -Y7- STA. 13+80 TO STA. 15+65 RT FROM -Y7- STA. 16+30 TO STA. 18+00 RT DETAIL L LATERAL BASE DITCH Not to Scole) b Naturol Ground1.) �,� 1"Ft. Fill D Slope I e Min. D=1 Ft. l«.! B=2 Ft. b=5 Ft. FROM -L- STA. 39+60+/- TO STA. 45+50 RT FROM -L- STA. 48+50+/- TO STA. 49+00 RT FROM -L- STA. 122+20 TO STA. 123+65 RT FROM -L- STA. 152+00 TO STA. 152+36+/- LT FROM -L- STA. 187+50 TO 188+35 LT FROM -L- STA. 231+50 TO STA. 234+00 RT FROM -L- STA. 265+35+/- TO STA. 266+65 LT FROM -L- STA. 269+00+/- TO 271+80+/- LT FROM -L- STA. 351+00 TO STA. 352+20 LT FROM -Y7- STA. 18+00 TO STA. 18+70 RT LATERAL BASE DITCH ( Not m style) b Naofurol f— Fill u D 1"Rf. Sl d ope g Min. D=1.5 Ft. Max. d=1.5 Ft. B=2 Ff. b=5 Ft. of Liner= PSRM -I- STA 71 +' FROM -L- STA. 283+00+/- TO STA. 283+44 LT FROM -L- STA. 287+70+/- TO STA. 291+00 RT FROM -L- STA. 292+50 TO STA. 293+50 LT FROM -L- STA. 171+00 TO STA. 173+40 RT FROM -L- STA. 205+65 TO STA. 209+00 LT FROM -L- STA. 249+50 TO STA. 251+25+/- LT DETAIL W BERM DITCH (Note. Sc,[,) t7 z O0 9 F 5.0' 10' 1 o.0'V.c. D s d Geotextile Mi, D=1 Ff. Type of Liner= PSRM Max. d=1 Ft. DETAIL X BERM DITCH z O a I Not to Scale) 1, Min. D=1 Ft. DETAIL H STANDARD BASE DITCH (Notto Scale) N f r I N t I Ground :) D ,5.1 Ground d B Min. D=1.0 Ft. Max. d=1.0 Ft. 'When B is < 6.0' B=4 Ft. Type of Liner= PSRM STA. -L- 30+50+/- RT DETAIL M LATERAL BASE DITCH ( Not to Scale) b Natural .-- Ground 3 y D g'� 1iFt. Fill Slope I e Min. D = 1 Ft. L=.J B=2 It. b=5 Ft. FROM -L- STA. 47+00 TO STA. 47+75 RT FROM -L- STA. 74+50 STA. TO STA. 77+00+/- LT FROM -L- STA. 74+50 TO STA. 77+00+/- LT DETAIL S STANDARD BASE DITCH (Not to Smle) N tural Ground 3.) D� Ground d B Min. D=1 Ff. Max. d=1 Ft. 'When B is < 6.0' B=2 FL -L- STA. 66+85+/- RT FROM -L- STA. +/- 343+10 TO STA. +/- 344+20 - LT LATERAL BASE DITCH ( Not fo Scale) b Not.. I Fill D liH. Slope d g Min. D=1.5 Ft. Max. d=1.5 Ft. B=5 Ft. b=5 Ft. of Liner= PSRM WW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION DETAIL N STANDARD BASE DITCH ( Nof to Swlel Natural Naturol Ground �:� Ground d D B Min. D=2 Ft. Max. d=2 Ft, 'When a is < 6.0' B=3 Ft. IType of Liner= PSRM -L- STA. 49+20 RI STANDARD BASE DITCH (Not fo Scale) Natural Natural GrounrI Groun d Geotextile g Min. D=2 Ft. Max. d = 2 Ft. B=3 Ft. -L- STA. 73+22 +/- RT -L- STA. 251+50+/- RT LATERAL BASE DITCH ( Not fo Scale) b 4.1—1 r Fill u D I-. Slope D =2 Ft. d g Min. Max. d = 2 Ft. B=3 Ft. b=5 Ft. of Liner= PSRM FROM -L- STA. 85+50 TO STA. 88+00 LT FROM -L- STA. 76+85+/- TO STA. 78+60 RT FROM -L- STA. 78+60 TO STA. 84+25 RT FROM -L- STA. 84+30 TO STA. 85+50 LT PROJECT REFERENCE NO. I SHEET NO. DETAIL AA BERM DITCH I Nof to Scale) Z 5.0' 1 6 1 5.0• to.o•v.C. D d PSRM Min. D=1 Ft. Type of Liner= PSRM Max. d=1 Ft. FROM -L- STA.95+00 TO STA. 95+50 LT FROM -L- STA. 150+00 TO STA. 151+00 RT FROM -L- STA. 287+75 TO STA. 290+00 LT FROM -L- STA. 322+00 TO STA. 326+00 RT FROM -L- STA. 322+50 TO STA. 325+00 LT FROM -L- STA. 326+50 TO STA. 329+00 LT FROM -L- STA. 357+50 TO STA. 362+50 LT FROM -L- STA. 315+50 TO STA. 318+25+/- RT FROM -L- STA. 195+70 TO STA. 200+00 LT FROM -L- STA. 165+00 TO STA. 166+50 LT FROM -L- STA. 189+70 TO STA. 192+00 LT DETAIL GG SPECIAL CUT DITCH ( Nof to Smle) Front Ditch Natural A'N lac Slope Gravnd ?-y D F\O Min. D=1 FI. FROM -L- STA. 150+50 TO STA. 153+00 RT FROM -Y11- STA. 20+00 TO STA. 21+00 RT DETAIL MM STANDARD BASE DITCH I Nofro Scalel N.-I Ground D �) Gravnd d B Min. D=1 Ft. Max. d=1.5 Ft. 'When B is < 6.0' B=3 Ft. ofLiner- PSRM FROM -L- STA.291+00 TO STA. 291+37+/- LT DETAIL SS RIP RAP AT EMBANKMENT I Nof fo 5cale) 10'm' Ditch y" 2.0' Grade 47 / GEOTEXTILE of Liner = CLASS II RIP RAP -L- STA. 339+50+/- RT EST. 22 TONS CL II RIP RAP EST. 45 SY GF -L- STA. 339+63+/- LT EST. 32 TONS CL II RIP RAP EST. 62 SY GF -L- STA. 341 +10+/- RT EST. 14 TONS CL II RIP RAP EST. 30 SY GF DRAINAGE DITCH DETAILS DETAIL BB LATERAL 'V' DITCH IN., to Sc.I.) 6) Natural I Fill Ground 1.7 D -N 1"Rf. Slope Min. D = 1 Ft. b=5 Ft. FROM -L- STA. 92+90 TO STA. 94+00 RT FROM -L- STA. 262+00+/- TO STA. 263+50 LT FROM -L- STA. 263+50 TO STA. 264+50 LT FROM -L- STA. 319+50 TO STA. 321+50 LT FROM -L- STA. 300+50 TO STA. 305+00 LT FROM -YI2- STA. 16+00 TO STA. 17+50 RT DETAIL HH STANDARD BASE DITCH (Not to Scale) N Nral Nafurol Ground :7 �.d d 'When B is < 6.0' B=2 Ft. FROM -L- STA. 171+50 TO STA. 171+70 LT FROM -L- STA. 187+80 +/- TO STA. 188+00+/- RT -L- STA. 255+30+/- LT -L- STA. 297+40+/- RT FROM -Y6- STA. 13+84 TO STA. 14+38 RT DETAIL NN LATERAL BASE DITCH I Not fo Scalel b Natural Fill roun D 1ifj, Slope d g Min. D=2 Ft. Max. d=2 Ft. B=3 Ft. b=5 Ft. Type of Liner= PSRM DETAIL TT LATERAL BASE DITCH (Not fo Scale) b Natural �- Fill Groun D 1"Rt. Slope d g Min. D = 2 Ft. Max. d=2 Ft. B=4 Ff. b=5 Ft. of Liner= PSRM FROM -L- STA. 334+00 TO STA. 335+15+/- RT FROM -L- STA. 335+65+/- TO STA. 339+50+/- RT DETAIL CC LATERAL BASE DITCH ( Nof fo Scale) b Natural Ground 1.7 D ry.� t"iFt. Fill Slope I a I Min. D=1.5 Ft. I«J 6=2 Ft. b=5 Ft. E Is II /cAY]!'SQF1 [oIf.'1 /cAYYI SD7 %I FROM -L- STA. 241+80+/- TO STA. 246+65+/- LT FROM -L- STA. 291+00 TO STA. 292+50 RT FROM -L- STA. 291+25 TO STA. 293+50 LT FROM -L- STA. 241+80+/- TO STA. 246+65+/- LT DETAIL II STANDARD BASE DITCH ( Nof to Scale) Natural Natural Groun ?_ D 1.� Groun Min. D=2 Ft. B=2 Ft. -L- STA. 167+50 RT DETAIL 00 STANDARD BASE DITCH (Notto Scale) Natural Natural Groun I1 roun Min. D=1 Ft. B=2 Ft. -L- STA. 303+00+/- LT -L- STA. 303+00+/- RT DETAIL UU LATERAL 'V' DITCH I Not to Scale) .l Fill Gravnd D 1"iFI. Slope d Min. D=1.5 Ft. Max. d=1.5 Ft. b=5 Ft. of Liner= PSRM FROM -L- STA. 102+50 TO STA. 105+20 LT. FROM -L- STA. 264+50 TO STA. 265+30+/- LT FROM -Y11- STA. 21+35+/- TO STA. 23+70+/- RT DETAIL DID LATERAL BASE DITCH I Not fo Scalel b Natural Ground 7.y D ry.� 17R. Fill Slope I a I Min. D=1.5 Ft. I«J B-3 Fi. b=5 Ft. FROM -L- STA. 124+50 TO STA. 125+80 LT DETAIL A LATERAL 'V' DITCH ( Not fo Sc.I.)) 1� Nafurol j- Fill Ground Slope Min. D=1.5 H. b=5 Ft. FROM -L- STA. 203+90 TO STA. 205+65 RT FROM -L- STA. 228+00 TO STA. 230+50 RT FROM -L- STA. 307+00 TO STA. 308+50 RT FROM -L- STA. 203+90 TO STA. 205+65 RT DETAIL PP SPECIAL CUT DITCH )Notb Scale) Front 0 Ditch N r I Slope Ground ?7 Q\a D Min. D=1.5 Fl. FROM -L- STA. 308+50 TO STA. 310+00 RT DETAIL W SPECIAL CUT BASE DITCH (Notfo Scale) Natural � oc Front Ground 1.7 A' a Ditch D F\ Slope Min. D = 1 Ft. B=2 Ft. FROM -L- STA. 45+50 TO STA. 46+40+/- RT DETAIL EE RIP RAP AT EMBANKMENT (Not to Scale) 10,min. Ditch 1.5' Grade GEOTEXTILE Type of Liner= z TONS, CL G.-, -L- STA. 122+90 LT -L- STA. 123+65 RT -L- STA. 124+50 LT -L- STA. 206+10+/- LT -L- STA. 283+40 LT -L- STA. 283+90 RT -L- STA. 203+95+/- RT -L- STA. 204+90+/-LT DETAIL KK STANDARD BASE DITCH (Nett. Scale) Nafurol Nafurol Groun :7 ,y.1 Ground d D Georedile g Min. D = 1 Ft. Max. d = 2 Ff. B=2 Ft. -L- STA. 270+00+/- RT DETAIL QQ STANDARD BASE DITCH I Nof to Scale) N t raI Neural Ground ?y D ry.1 Ground d B Min. D=1.5 Ft. Max. d=7.5 Ff. 'When B is < 6.0' B=2 Ft. ofLiner- PSRM -Y11- STA. 35+05+/- CL -L- STA. 351+00+/- LT DETAIL WW STANDARD BASE DITCH (Not to 5m1e) Grounds Ground d D B Mn.D- Ft. Max. d= Ft. 'When B is < 6.0' B= Ft. Type of Liner= PSRM FROM -L- STA. 261+40+/- TO STA. 261+97+/6- LT WW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION LATERAL BASE DITCH (Notts Scale) b Nafurol Fill Gravn D 1"iFt. Slope d g Min. D=1.5 Ft. Max. d=1.5 Ft. B=3 Ft. b=5 Ft. Type of Liner= PSRM FROM -L- STA. 125+80 TO STA. 127+00 LT FROM -L- STA. 125+00 TO STA. 127+85 RT DETAIL LL LATERAL BASE DITCH ( Not to Scale)) b Natural ♦--- Ground '27 D ,�1 1"ht. Fill Slope I . I Min. D = 2 Ft. I.".J B=3 Ft. b=5 Ft. FROM -L- STA. 290+00 TO STA. 291+25 LT LATERAL GRASS SWALE (Not fo Scala) h Natural Fill Gravn D i"ht. Slope d g Min. D=1 Ft. Max. d = 1 Ft. B=6 Ft. b=5 Ft. Type of Liner= PSRM FROM -LI- STA. 25+00+/- TO STA. 26+90 RT FROM -Ll- STA. 26+90+/- TO STA. 29+00 RT FROM -L- STA. 339+63+/- TO STA. 343+00 LT DETAIL XX STANDARD BASE DITCH (Not fo Scale) NafrI Ntrl Ground :) g.\ Ground d D B Min. D=1 Ft. Max. d=1 Ft. 'When B m < 6.0' B=4 Ft. of Liner= PSRM -L- STA. 152+50 LT EST. DDE = 54 CY EST. PSRM = 84 SY FROM -Y6- STA. 13+84+/- TO STA. 14+38+/- RT DITCH SLOPE FROM END OF PIPE: 40' AT 4.0%+/-, 12' AT 2% +/- EST. DDE = 43 CY EST. PSRM = 68 SY DETAIL V~ TRAPEZOIDAL GRASSED SWALE WrROCK CHECK DAM (Not to Scale) WATER QUALITY 6" OF FREEBOARD ROCK CHECK NATURAL GROUND LINE FLOW— �SWALE 10-YR. STORM ELEVATION BASCLASS B RIP -RAP 1' PROFILE 6" OF CLASS B RIP -RAP FREEBOARD 10-YR STORM EVENT NATURAL GROUND �0. TYPICAL SECTION NOTES: 1) DO NOT USE INSIDE CLEAR RECOVERY AREA. 2 NOT PRACTICAL TO USE ON SLOPES 5%. 3 FOR PERMANENT STRUCTURES IN GRASS SWALE. 4 CHECK DAMS SHOULD BE SPACED SUCH THAT THE BASE OF THE UPSTREAM CHECK IS AT THE SAME ELEVATION AS THE TOP OF THE DOWNSTREAM CHECK. FROM STA. -Ll- 25+00 TO STA. -L1- 29+00 RT FROM STA. -L- 339+50 TO STA. -L- 340+50 LT DRAINAGE DITCH DETAILS DETAIL YY DAM BREACH DETAIL EXISTING _ INa%ele= �r-AM E Exra<rn xtnung E%,t Demme em TIE TO E%ISTING GEOTEXTILE 'When B m < 6.0' OUTFALL Min. D=1.0 Ff. B=2.0 Ft. Type of Liner= CL. I Rip -Rap b=5.0 Ft. FROM STA.-L- 362+44 TO STA 362+94 RT. DETAIL ZZ SPECIAL CUT DITCH Naro S.10 Df1, Ditch 3',gl Slope G.ound 7�J D P° Min. D=1.0 Ft. FROM -DRVI- STA. 10+25 TO STA. 12+75 Rt FROM -DETI- STA. 10+12 TO STA. 13+50 Rt DETAIL AAA STANDARD 'V' DITCH I Na fo Smle) Ground ?.� Ground D d Min. D= 1.0 FI. Type of Liner= PSRM Max. d= 1.0 Ft. FROM -DRV1- STA. 12+75 TO STA. 13+32 RT DETAIL FF1 TOE PROTECTION (Not to Bmle) 00. ♦ CEP GRourlo NnruluL M1` FJ' I d d=1.0 Ft. b=2.0 H. b=2.0 Ft. SLOPE Type of Liner= PSRM FROM -DET2- STA.11+50 TO STA. 12+25 RT DETAIL SPECIAL CUT DITCH SPEC! Not to Scale) Fra 00. DB<h 3A 'Ch'0. Slova Ground ?-I D FS Min. D=1.0 Ft. FROM -DETI- STA. 10+12 TO STA. 13+50 Rt PROJECT REFERENCE NO. R-0623 WW SHEET NO. '.OADWAY DESIGN ENGINEER SHEET NO. 9-1 ENGINEER 0 I] 0 p DETOUR DESIGN SPEED = 45 MPH RE TQ UR 5 O. 2' , 12'-0" q -L- WESTBOUND 12'-0" 1 U C3 VARIES 12'-0" TEMPORARY HOUR GLASS DESIGN —D ET5A— STA. 10 + 00.00 TO 14 + 49.66 —DET5B— STA. 10 + 00.00 TO 14 + 49.66 -L- EASTBOUND 12'-0" 1 )JECT REFERENCE NO. SHEET P R-0523 2- W SHEET NO. DWAY DESIGN HYDRAULICS ENGINEER ENGINEER INCOMPLETE PLANS DO NOT USE FOR R/W ACOUISITION PRELIMINARY PLAN DO NOT USE MR CONSTRUCTION DET5A- Pt Sto 13+3757 17J A = 10'44'05P(LT) D = 4 46' 28.7' L = 224.83' T = 112.74' R = 1200.00' -DET5B- P1 Sto a+12.74 P1 Sto 13+3757 A = 10'44'05PfLTt A = 10'44'05P(RT) D = 4' 46' 28.7' D = 4 46' 28.7' L = 224.83' L = 224.83' T = 112.74' T = 112.74' R = 1.200A0' R = 1200DO' AA PROJECT REFERENCE NO. SHEET NO. R-0623 ' -Y13- // RNJ SHEET NO. Pl Sto 15+4/58 ROADWAY DESIGN HYDRAULICS A = 34'26'54-rQTI ENGINEER ENGINEER = 9006'llA' L �l R = 1.500.00' PIS Sto 79+1274 Pl Sto 88+07.62 / �l 9s = 4' 35' 01Z 0 = 57'Or 47.7' fRTt Ls = 240.00' D = 3' 49' 11D' LT = /6005' L = I814-CW' / -Y12-POT Sto.18+3762= �l ST = 80A5' T = 8/494' / -Y13-POC S1o.16+11D5 R = 1500.00' �/ SEE SHEETS 9 & 10 FOR PLANS -LTPS-PRC Sto.90+48.00= �DETOUR 6 L, A -Y13-POC Sto.18+57.06 °' �I DETOUR DESIGN SPEED = 25 MPH Z -Yl3TPS-PT Sto.10+0000= �� -LTPS-PC Sfo.89+02J0 -LTPS-PC Sto.87+4/93= � -L-POC Sta.87+419 13 \ CO —_ DI O me 2GI pow woo -Yl3TPS-PC Sto.10+24.50 / 00 -LTPS- PI Sto 89+2394 ��I -Yl3TPS-PT Sta.11+08.61= �I i i A = 77' 56' 235' fLTt �' u -Y13-POT Sto. 20+79B2 I D = 25' 27' 53Z �i -Y13TP5- L = 306.07' Pl Sto 10+6922 T = 182.0t' / A = 48 Ir 35.r 1RTt = R 22500 D = 57' l7' 44.8' I L = 840 Y, T = 44.72' R = 100.00' I -DRVI-POT Sto.10+00.00= -Y13-P0T Sto.22+6224 -LTPS- _ -L- TEMPORARY PAINT STRIPE -Yl3TPS- _ -Y13- TEMPORARY PAINT STRIPE I "i DETAIL FALSE SUMP No��o Scole) OTutside�Ditch GI S=Ditch Slope Proposed Ditch FROM -L2- STA. 20+90 LT BEGIN C/A BEGIN FENCE DETAIL C FALSE SUMP ( Not to Scole) Median Ditch - 9 .� 2 �. S- Chan M-) - , - 20' GI S=Ditch Slope E Proposed Ditch FROM -Ll- STA. 24+90 CL O KATIE DEATON DB 249 PG 296 BEGIN TIP PROJECT R-0623 -Ll- POT Sta. 17 + 00.00 -L2- P/ Sto 22+2396 P1 Sto 27+4058 A = 2rlr259'tLTt A = 8'38'14.4'(RT) D = 2r 5r 53Z D = 2' Sr 53Z L = 739.69' L _ 35 W T = 374J2' R _ 2A00W BEGIN CONSTRUCTION -DR4A- STA10+04D0 END C/A FENCE — +04.4I -L2-POC Sto. 25+36,61 PROPOSED TEMPORARY WIDENING GRADE TO DRAIN TO FOR MAINTENANCE OF TRAFFIC �z EXISTING DITCH SEE TMP C C C C � C ;40407 _ N' 24127 R.. -_�FSS�1 -s- 4P-.S. +50-L1-- 1 -,ss---------- — ----- - GRADE TO DRAIN TO R EXISTING DITCH C C si�so�EIP C +00-L1 + -u- +40 -Ll- B£NCE H f 90, END C/A FENCE CHORD 60.07 -Ll- +55 -1 -LI -T S Sto. 18+60D7 / \ BEGIN FENCE POIN -BL- 135 POT 501+2g•91 = (R-252-B) -BL- 135 PING 501+29"91 -Ll- P/5 Sto 20+21.64 PI Sto 21+6229 Ply Sto 23+4291 es = 3' 46' S8D' & = 4' 59' 155' QTt es = 3' 46' 58D' Ls = 242.30' D = 3' 07' 20e Ls = 24230' LT = 16157' L = 15974' LT = 1615' ST = 80.80' T = 79.90 ST = 80e80' R = 1,835D0' e = SEE PLANS 5" MONOLITHIC CONC. ISLAND LAT 'V' DITCH SEE DETAIL D NOTE: -Ll- PROPOSED RM/ HAS PROJECT REFERENCE NO. SHEET NO. R-0623 4 BEEN SET TO ACCOMODATE FUTURE FOUR LANE DIVIDED SECTION PW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION FOR PROFILE OF LINE -1-2- SEE SHEET 36 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS BEG C/A FENCE- +83.70 / m ,OODS CAT- � J „ RCP-1I oao2 _ yL- N O OVE N 147 W O 2 .21' m f / F oa0t T LAT BA E DITCH ' +26 -LT- 0 NI SEE TAIL RR y n TO, r r� I Prn ERMANENT OCK CLASS B RIP RAP EST.2 TONS CHECK qAMS SEE DETAIL (JT EST. 7 SY GE t +04.41 -Ll- 90' - .1-ST Sto. 25+04.41 O GUS SCHAD DO 534 PG 545 d 7 r a 0 5" MONOLITHIC CONC. ISLAND -L - P/s Sto 31+8635 P1 Sto 34+30.77 PIS Sto 36+75.03 7 es = r or 52.8` A = 4' 13' 293` (RT) es = r Or 52.8` \ Ls = 180.00' D = r 08' 453` Ls = 180.00' LT = 120.00' L = 368.68' LT = 120.00' ST = 60DO' T = 184.43' ST = 60.00' e = SEE PLANS / \ FROM STA. 28+88 CL FROM STA.34+10 CL 5 q� FROM STA. 35+85 CL \ MARION HINSON /3 OB 76�O LARRY THOMPSON 170 P DB 170 PG 659 DB 181 PG 103 DB 214 PC 561 0 -L2- KATIE DEATON Pl $t0 27+40.58 \ w000s OB 249 PC 296 = 8' 38' 14.4' (RT ) D = 2` 5/' 53Z L = 301.50' LAT BASE DITCH 2 T c 15ID4' SEE DETAIL J �9 -L2-PT Sto. 28+9/A5 LB.- R = 2�., BEG Cl s2 3s. -L-POT Sto.28+8370 LA FENCE (OFFSET 35' R/GW) END C/A TOE PROTECTION +46.34 FENCE SEE DETAIL F +83.70 -L- + 5034 +20 15 ISBD -15.03 150' z IR LIP 10 �.} ' , : . ' ` . ✓ w •47 z 154.53 I I .XFIE Lu Lu R DRD L LIJp H — �— — —� — -F_NNETH MORRIS W / 0506 N L _ f - c J t f/ 000s SBD tis o t ' ' , , ) m a GRA 350 TL-3 / > TYP N Lu LLJl . • ' N �� 0 93.76 O O "1 0 4' P$. N ' CflNC • -LZ- O N 4-8' X 21' PSRM PAD N EIP To cL v 0505 M u1 TREES II R - - cm - - O 0 -- - -- .. L .- R34' - - -- _ _ EMOVE EIP EIP exisT + �� p FS GI -A 050] - - "RCP S RE ES - F -_ 'S-_- .�. JB w51a Li co- AT-1 a- -- ---- 2 0l AX N NC 24/21 BST REMOV Q r �1 ---- O51] �► _ __ _ _ - _ _ - - -- ---- -- -- - - — �— i-rss F T .. - EIP . Fss II 2GI ----_ T--------- - _ N - S EZILT xL R w050 4 P - +9150 Z s _ - - - 2G soa s cR ! 'A55 B +3/.50 : i BEG C/A REMOVE END SBG ¢I RIP IRP PAD END C/A FENCE a _ WO�f BASE DITCH S� f - T TONS FENCE / +15.03 a I 3' CONC ww �' +66.34 O F - 125' LLJ 1 / osnyyy C ST. SY GFTREES I 2TONCRw SEE DETAIL RR ,r> F 125' yT` CA.- MTL z 2'CONr WW � 0501 \ • RING X�`�C3�� _ ANOP F F Q F F � 0516 6 W ISFD 1517 F "' F \ W 9 AB D DE SFD woous z ` / A Z 122. 1, PROPANE TAN a -L SIO. + . _ 'a a509 _ . S B RIP RAP - _ a R C T EST. 2 TONS g�p Z n LAT 'V' DITCH e n U 05 0 EST. 7 SY F 125' x 1�iH w SEE DETAIL I+83.70 u 130, - - CLASS B RIP RAP CLASS B RIP RAP ❑ I m tO M7 p0 21g U PERMANENT ROCK ES T.5 TONS EST.2 TONS S S Yy mF /O 338 D 79 S EST. 14 SY GF EST,7 SY i- ,r� z ICED F.. I/� 1 45 -L7- CHECK DAMS I `W +46 X 9 5 O - a PG 1 SLOE 432 �SEEASE DITCHD-11 RR J 130 SEE DETAIL WWW / �. K END CIA +06 OSCAROLEMONDS DOBA HTPC21 a RE DECK BA DIT ? BEG C/A I DB 147 PG 219 PC A3SLIIDE �32 -LI-POT Sto. 28+9/•37 LJ3.- 187 -L-SC Sto. 32+4634 FENCE OB 338 PC 331 tiF -L-POT $to.28+8370 LA EST E5 COY D i 75 PC A SLIDE 432 N 7.43'22'E (OFFSET 35' LEFT) .11 �oN� CLASS I RIP RAP S 37°43'21' w S 37.43'21' w S 37.43'21• w - EST. 33 TONS EIP 100.00' 100.00' '04* E m / EST. 62 SY GF .�, z I I'94'04' E -L-T$ to. 30 6634 "RIP RAP BANKS ONLY O AXLE OSCAR 19t DB P P p7 C' 219 JOE HURLEY 6 OB 338 P6331 DB I48 PC 595 O ® s PLAT SLIDE 31 Y A DB112 E UPC 65 THOMAS LEMONS oo a% Ni p DB 707 PC 762 yo y gib . 5 = BARRY LAMONDS o OB 227 PC 190 \ { ° o PLAT SLIDE 314 A BARRY IAMOND\ �m DB 22T PC 190 N )p7 PLAT SLIDE 314 A 2p 6y SS, F 72p. /i g9T g S9•f 7 / 7 1 PROJECT REFERENCE NO. SHEET NO. R-0623 5 KW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS 0o NOT l"SE FOR CONSTRUCTION FOR PROFILE OF LINE -L- SEE SHEET 36 FOR PROFILE OF LINE -LI- SEE SHEET 36 FOR PROFILE OF LINE -L2- SEE SHEET 37 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS PROJECT REFERENCE NO. SHEET NO. bo.owl V III � I BM*15 ELEV = 552.87' R-0623 6 III -Yl- -L- N 578280 E 1722662 RAN SHEET NO. 41 Pis Sto 36+75A/ PIS Sto 36+75A3 BL STATION 529+12 38 LEFT RR SPIKE IN BASE OF POWER POLE ROADWAY DESIGN HYDRAULICS m I e5 = I*OY 52e e5 = POP 52e ENGINEER ENGINEER EOII I IIIII Ls = 180A0' Ls = 180.W SEE SHEETS 2-H & 2 1 �I I LT = 120A0' LT = 120A0' FOR DRAINAGE DITCH DETAILS \ 1111 ! I o ^ ST = 60A0' ST = 60A0' Illy III N� CENTRAL TELEPHONE COMPANY lull PRELIMINARY PLANS OB 245 PG 799 I DO NOT USE FOR CONSTRUCTION v RE IN w I FOR PROFILE OF LINE -L- SEE SHEET 37 a TOWN OF TROY FOR PROFILE OF LINE -Yl- SEE SHEET 50 / n OB 369 PG 501 PLAT SLIDE C-165A ASEPTIA. INC. DB 690 PG 569 FOR PROFILE OF LINE -Y5- SEE SHEET 51 11111 : �' m BEGIN CONSTRUCTION -Y5-POT Sto. /0+00.00 04.18 -ri- X III A u m -Yl- STA/4+00 w o UA1EBUILDERS 50 f N DB496P G 830 END C/A -YI-PC SiO. 14+04 = R-2527B LB-BL-137 POT 527+09.56 6 -.PLAT SLIDE D-07C END FENCE 04.75 -Yl- R0623 LA-BL-137 POT 5+00.00 = - Tj LN 13 +25 -Yl- 50' RT jl I II z9.as BEG C/A -BL- 136 PING 519+45.02 ` BEGIN CONSTRUCTION 22 LARRY THOMPSON I, BEG FENCE (R-2527B) -BL- 136 PING 519+g5.02 = �� 3p•RCP RETAIN OB 181 PG 103 I I -BYI- 136 PINC II+47.98 = �� 50' I R-25278) -BY8- 136 POT II+17.98 = IR-2527B) D -BY9- 136 POT 5+00.00 -YI-POC Sto.17+13 8= -L-POC StO.39+2 63550' T + - _ 33.96'LT \ T� ) _ \ LAT BASE DITCH WOODS \ �30< SEE DETAIL J / III - / MCP CONC +32 -L- +60 -L- 1 9.44 I IIN �E III 37.99' AG / / Lf) / I I I F CLASS B RIP RAP / I- PlIF CliOR C3 - /50 EST. 2 TONS EST .7 SY GF LAT BASE DITCH SEE DETAIL J GR I 72' CONC CURB �- II _ - Lu I n 0 +65 +75 LOWER I /�DY 4 0 w -SAC 1 -YS- STAll+50 I � FES A. CONE -- / RETAIN e RETAIN +G e FE N I s RAP ` 1� 30.62' +so -Ys BEG C/A 8ST RETAIN _ 29.38, I BEG�F NC NATUR) 17tL£ Oboi 1l - - - EOI T- - .. - TREESJ (AATU p w m 2 w I w IA uRl 0�I YP � IAAT RI Ir oi -- ---_ NC 241Z O 4� o - - v� 0' l W (AATUR) _ TEMP. y4S7 of A - - - - - M 350 TL-3 PS REMOVED - -N -- M NO 24/27 BST _DI --- _-�- �- TOWN OF TROY 44 ss 0 EIP TEMP.GUARDRA/L < _ N p IT, / \ / R3�0' EIP - S 89 �� M e m W R N \ \ R I00' J 4'PS- 1 I\ \ 1 / C a �, 4'PS. EIP 4P.5. �yb� I) I ro Nl LAT BASE DITCH WOODS 9 12 I-t- / n 1 SEE DETAIL L r� LAT BASE DITCH Lu 14 ti /� / SE6U 4 C 2Gh SEE DETAIL L Z $ BONDS / q+ 0 L T 0 J /Sd i aT6F END SECTIPN � /C +00 C„ _ / � � 0604 FIN -95.03 -L- TEPS +0 I 0605 F BOI,1,S R 0/ R lzs• 32 TREES a RAE . / .� W-AL TON _ END C/A/ -- 4 SON FENCE PDE- LAT'V'DITCH "' b R2527-9 (GP EN 11 t2s + SEE DETAIL I a / �cl CONC 2 PG 286 -BYI- PINC I N 86.36 = BEG C/q �i£'3 0 C S B RIP RAP -L-ST StO. 3 + ° Ano (R-2527B) -BY9- INC 6+38.38 FENCE p EST.2 TON SPECIAL CUT DITCH f 4 / K 1 1 + /9 L+92 _ ISBD { EST' 7 +4G 15'. SEE DETAIL K / s6' 'L�p'7• AUM DEVELOPMENT AND UTILITIES. INC 1 9 p RET WAL OB 510 PO 706 ON CJ - p AIL BASE DIT OB 147 PG 219 `0/t �; / / + 46 ' LT b 2 SEE DETAIL OB 338 PG 33, - r 0 oy -T o a ESL 14 CY DI PC A SLOE 4M +67 - Lf //a6 /�/� 73.50' LT LAT BASE DITCH y EST. 33 SY P51 EIP ti / cC / �pT ' �B9• 67.44 -Yl- l8SEE DETAIL M = 37.4 '20' a 60,80' LT HOWARD C 585 d i ® + 99•7 ( o / D a 6aq , OB 300 PG 585 �9ss. DOUGLAS BYRD OOpS�BC uR l �� / t � /Se0 I h SEESPECDET IL K IAL CUT DITCH 'O00z3S'b e3o s� DB 153 PG 576 PL3 $L o� GRA E TO DRAIN \ h ab' LT 4 T. ��yP o� ` ae9� KHAMUNG THONGKHAM EN FE/ £ l "^�\ s, 2a esi DB 572 PG E893 -5 \ r� � o/ - t` PLAT SLIDE E-56C o 0 11 / dog bn'. s ENDCONSTRUCTIONL3e. F i60. 4 N °O \ / DETAIL A \ // yyyPPP FALSE SUMP � INotro Scolel C� Outside Ditch _ Iz 0•� ~Tra�lc FI- 20:7 'I RACHEL WHITE & CINDY WHITLEY .�S- G� OB 565 PG 14 S=Ditch Sloe ¢ Proposed Ditch \ / FROM STA. 47+92 RT 5" MONOLITHIC CONC. ISLAND fA BERfy1 DITCH NC SEE D IL O I y +74.67 - 5- Lu R Lu N �✓ ? N �5 2(10 LJ,J m - z *w- - Lu Q LO AXLE X\ INO AS 0 4' PS. J S IT RAILFLu /48- c+ 7 L 0610 C/L1lSS I RIP P / --A EST. 20 TONS EST. 39 SY GF T +3 2 o END C/A U +40 FENCE II E 155 Q Y5 PO sta. 13+2893- -L PO Sto.49+44.40 �I I l I WILLIAM MORTON DB 248 PG 566 I PLAT SLIDE A•549 INLET TYPICAL NOT L0'E"' 'LEFT TO RWxI OOLNO OO.SIREWI SILL BOURREt RSRFO M NATURAL rr W, FOUR / GROUND CM BER WItNO ill EX CxRNEL W /LS/�LET N I• ELASS r - / -I I. STREW 801 v TITER 'We' LET x r ITE8 R LOW FLO e EST.TONS CLASS '1'= 40 TONS EST. FILTER FABRIC = 50 SY EST. COI FIBER MATTING = 90 SY DOE = 300 CY OUTLET TYPICAL 11 11 SCLLE .LEI' TO R T LODoNG DOW%STREALO %I Ba LK TIE [an raa wTTw `NATURAL GROUND CLASS •RRRa Rfr N r R/ FLIER F1BI1R h-{ LET x r qT x r BEr LC- FLOW /lLOa s1K. BED e• a BT4c EST.TONS CLASS '1'= 50 TONS EST. FILTER FABRIC 65 SY EST. COIR FIBER MATTING = 60 SY DOE = RO CY UWHARRIE BUILDERS OB 496 PG 830 PLAT SLIDE D•13TC -D L- DUU r'IINU IL-11.VI -TI- POT 6+70.119 ELEV=531.73 REBAR & CAP SET BERM DITCH SEE DETAIL O BST SEE ROCK PLATE 1.5:1 FILL SLOPES L~ SEE DETAIL ON SHEET 2-7 UJI BDO mos Z - oT N - EXI 15" WELBOW �R1P AP W T 2GI FS LV o7oa 20d GRASS N OMER4'Y.S- - 12 O rL I (AATUR) _-T_-- .-- V I 6f3 0]03 S tt Q ATED N BE N rL J 465 GRAD TL-3 Po� FS �GI o7oz Z-� SS J Q / BEG CIA 0 5$ B IP RAP 0FFENCE +60 +84.00-L- EST. ONS 125' RT EST. 10 SY GF Z U ° 746' RT i - 5 K STEPS IF =000 CONC ISBD + 17V RT 180'R% WILLIAM MORTON OB 248 PG 566 PLAT SLIDE A-549 4' HIGH \ y. 0,>: PIS Sto 61+38.75 P/ Sto 63+0971 Pis Sto 64+8059 S 35.39'20' E m- 25. F Bs = 3' 26' /5.9e & = 5e /2' 34.0- (RT) 6s = -726' 15.9' / S 01'47'06' Ls = 240.00' LT = D = 2' 5/' S32 T /90.98' Ls = 240A0r ST • '" 80.03' ST = 80A3' = = 80.03' R = 2DW.00' / JC�Q� S 71'58:5T' S 14I40'29' W �O o0 oy • o, O � yI TREES . F \ 1- ga '� EXISTING BOX HH '�RI/TJCULVERT AND HEADWALLS -WOODSREMOVE ti -BL- 501 PINC 20+41.93 = 10.27'4' S 8E LOCHWOOD FARMS.LLC OB 657 PG 883 -BY2- 501 POT 5+00.00 o.z7• n n 0 m "s, s \ s e� oam o NA 24 9.56' W 45.03' THOMAS J. FIELDS _ DB 426 PO 269 , THOMAS H.LEMONS _iC S 22.43.3-Is OB 512 PG 874 21.08' IABANDI y BEG C/A I FENCE A I FENCE� ISFBUS + +30 / +15 +55 j EN NCIA Tz' WD & CHL\ FEN £ 501L s GB I FE CE 1 rlt- tir H ISRKBUS TREE �+ ONC CONC �Q _ FSS I SO NC PARKING '. uFr I '. + N GR cupB srDPs BEG E +tB 22 9os FENCE atta0aaa�TA. POINT 95' N n• 4' +IB 5, \ Bsr S r BST IPING CONC b AJ \ RE3'�� 0719 FS SS AL IS- RCP Tx p7 ' T i WM IFS o715 <v NO ASSOCIIA_D D RCBC 070 -L- PDT 54+ END RCBC T-1 on6 f BASE DITCH - �oi`o' FS 2GI 071z 'AD 3GI-AO SEE DETAIL G og• SBG END C/A �_ a \ 7- �� FENCE _ CLASS B RIP RAP -� f� DO i EST.2 TONS 070 o71t EST.7 SY GF R o717 C BEG C/A S or FENCE I25 - �,T LAT BASE DITCH fl M / BERM DITCH SEE DETAIL P + SEE DETAIL G 'yBTJEL $ �� � e4 BK RET WALL / I 9LA�S B RIP RAP 125' 1 E51Ly 2�TON 5 ISBD _ EFvST 7 SY GF BK RET WALL \ J. C. BURNS C140' N%AFL TER FABRIC \ / DB � PC 496 SILL BOULDER r PLAT SLIDE A-549 soyy� FALSE SUMP ( Not to Scale) Median Ditch _ ae Chart Below) � 20' -.•I GI _ S - I S=Ditch Slope 4 Proposed Ditch Ditch Grade I L Ditch Grade L <� 0.0% To 2.0% 20' Over 4.07 To 6.0% 40' 30' 1 Over 6.0% 50' o m FROM STA. 52+15 CL FROM STA. 57+85 CL Im DETAIL FALSE MP Outside Ditch DETAIL B FALSE SUMP � � I Narro xclel n SU ( Not to Scale) Outside Dii<h Traffic Flow 7 Tra i`i� F o�,KO.\ 20:1 2.0• � 2, �I GI _S_ f S _ etc. S=Ditch Slope I S=Ditch Slope fL Proposed Ditch FROM STA. 52+15 RT FROM STA. 52+15 LT FROM STA.57+85 LT FROM STA.54+87 RT NC 2427 11,369 TROY BYPASS -L- 11,379 16,300 16,400 100 2 0 200 e I 200 300 ADT 2014 ADT 2040 gLEXANDER DR. JO ELLENSHOLDER OB 349 PG 263 PLAT SLIDE A-568 tiG S a�io o° / a2 30 +oho qD�- F£ £ND / ANTHONY HAMILTON \ PLAT SLIDE A-568 \ OB 584 PG 23 \ \ END CONSTRUCTION \ 2 -r2- STA15+50 \ OT Sto. 16+17.40 +50 -Y2- 5 EX. SB 9 GQP / y -BY2- 588 POT 12+37.79 40LT. PROJECT REFERENCE NO. SHEET NO. R-0623 7 RM/ SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER PRELIMINARY PLANS DO NOT UI F FOR CONSTRUCTION FOR PROFILE OF LINE -Y2- SEE SHEET 51 FOR PROFILE OF LINE -L- SEE SHEETS 37 AND 38 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS z -Y2-PC Sto. /0 h 45' R.33YJ��/ i9.08-Y2- 30' RT. _ GR EGCl GR FItNCE \ i TR S \ 00 DE TO 5 W 2 N NO ASSOG AAT PIPING FOUND - - W ®� -- ES 4, PIPING W O to O T TO N 0 TROY - - TF \ �sa LL� O YA}2 p �i F60.42 O/ J R 's W Z e y. \/ NC N•. BEG FENCE p 81 ELLEN HOLDER 351P0 27, 80 BECKY WALLACE PLAT SLIDE B-275 OB 706 PG 124 \ -L - Pls Sto 64+8059 6s = 3e 26' 15.9' Ls = 240A0' LT = 160.03' ST = 80A3' DETAIL A N g DETAIL FALSE SUMP I Nof fo stole) o FALSE SUMP c- ( Not to Scale) Outside Ditch Outside Ditch �z7Propos.d o Traffic Flow 70 `TR c I,ow 20:7 .2 2' GI GI S=Ditch Sloe Ditch S=Ditch Slope t} Proposed Ditch FROM STA. 65+65 RT FROM STA.65+65 LT 27 THOMAS H.LEMONS DS 512 PC 874 HTR WE DECK I I DECK T WD WD DECK (wD1DECK DECK A J - _ cR 1 11 I wREEs� W SPECIAL CUT DITC SEE DETAIL.' W _ . .. . _ TOE PROTECTIOP 's I (2) WM's (S) WM' N 0 DD 0804 PIP1NG `FCOIU _L_ SBG NO ASSOCIATED W TED '�� � O w __ W _ R O O N NO 24/ BST 0 - -rss - - - - y - - WD 55qqH GRAU 350 TLC / 00 L{gl @03 WOODS P J E%ANDE 4 PS. DB I PO 335,t W ® y �o oe2 S END C/A oo>• 2 FENCE Z +05 oa11 U '^ I„� ,o,• CLASS B RIP RAP +68.00 TONS 501C 123.28' RT.T. EST. ST.7 7 SY GF TN BASE DITCH STD. BASE DITCH / / SEE DETAIL J SEE DETAIL S +4 . SF 145' LAT BASE DITCH SEE DETAIL U +57 O \ -L-ST Sta. 66+4057 160' J11 ASHLEY WILLIAMSON 160' OB 699 PG 224 PIS Sfo 64 64+8055 6s = 3' 26' 15.9' "es 9, Ls = 240A0' os9 LT = 160A3' F ST = 80.03' m JO ELLEN HOLDER ~,1, DB 351 PC 271 a a ""I w( vuc SEE DETAIL DETAIL C FALSE SUMP ( Not fo Scale) Median Ditch _ I I' 9 •I1 2 f See Chan M—) —.ram zo —.I GI S _ etc. S- Ditch Slope C1. Proposed Ditch FROM STA. 65+65 CL FROM STA.72+68 CL FROM STA, 75+14 CL �F N O I ylDy t I f L'ibbU yp BY3 STATION 8+23 S 62' 00' 09.8" E Dist 23.17' �NNETH LCALUCUTT RR SPIKE IN BASE OE POWER POLE (CP&L # DB 221 PG 372 \ aF -DR8A- D = 57e 17' 44.8e L = 77.00' T = 4052' R = 100.00' O MCRAE INDUSTRIES INC. DB 238 PC 859 OB 264 PO 670 PC C SLIDE 51A 3/ BENNY HAMPTON DB 516 PC 28 PROJECT REFERENCE NO. SHEET NO. R-0623 8 RM/ SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION FOR PROFILE OF LINE -L- SEE SHEET 38 FOR PROFILE OF LINE -Y3- SEE SHEET 51 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS H W W 2 N W W N 0 0 NO J W _Z J ■■ INLET TYPICAL NOT TO sCKE I LEFT TO RRI LOPING DOINSIREAse NATURAL — GROUND WO.O COA III RsTTFID \ w stiNr O IT WE �, WLa STTENR KO ass T® RAF W/ FLIER rWK LOW FLOW K~Not KT N r C01p EL O' EST TONS CLASS '1'= 50 TONS EST FILTER FABRIC = 100 SY EST, COIR FIBER MATTING = DO SY EST DOE = 1050 CY OUTLET TYPICAL NOT TO KsLE LEFT TO ROFT LODIMG OOMSTREARI � NGRATOUURAL ND AL BORKRS,KLKO LEE TRYRr 4LWROI I- 20 CM FIBER WTTF6 TLASS TRP RAP 9/ FLIER FAI 1SS T RP RAP LSRi N r ` 1-10 W/ RRC �� RET R r FLIER IA LOW aQ BELa sTEw ao uT w r ONNE EST TONS CLASS '1'= 75 TONS EST FILTER FABRIC = 100 SY EST, COIR FIBER MATTING = 50 SY DOE = 130 CY -L- PIS Sto 79+12.74 P1 Sto 88+07.62 6s = 4 35' 0/2' A = 57'OY 47,7' (RT) Ls = 240DU D = T 49' 11D' LT = 160,05' L = 1,493D4' ST = 80.05' T = 81494' R = 1,500D0' DETAIL C FALSE SUMP DETAIL Norm sc4101 AL �F DETAIL B FALSE SUMP Median Ditch - iNmm sFelel FALSE SUMP 9" 2, MICHEAL NORRIS (Not to Scale) '{ I— DB 672 PG 554 Outside Ditch - I20-� Outside Ditch Traffic Flow �D R „cn.n R.lowl --,� zo'--I GI Tros��0.1 20:1 l f 5 eic. S=Ditch Slope 4 Proposed Ditch TREES 01 GI Ditch Grade L Ditch Grade L f .to �-S- etc. 0.0% To 2.0% 20' Over 4.0% To 6.0% 40' S=Ditch Sloe Proposed Ditch P S=Ditch Slope 4 Proposed Ditch 30' Over 6.0% 50' FROM STA. B1+33 LT FROM STA. 86+34 FIT FROM STA. 81+33 CL FROM STA. 84+13 CL \ \. FROM STA. 84+13 IT FROM STA. 86+34 CL / CULTIVATED FIEL D -BL- 5 PINC 34+70.99 34 BEG C/A +5as0a- / 3l-T2- 50 POT 13+38.04 KENT NEWPORT FENCE 54'LT +70.50 -L-II BEDS PG -EL EV=512 28 y REBAR & CAP SET �1; �' '✓ASP DB &I PG 377 OB 612 PG 278 146,10' LT I + 0.L- 516 28N LAT 'AS DITCH -\ -BL- SEE DE7A L EE rn, 504 PINS 38+53.08 = + 0.L- 105' LT J� W 105'LT RETAIN EXISTING DITCH -L- POT 76+g3.08 50 -BY5- 504 POT 5+00.00 BEGIN RCBC EAT BASE DIT C 178' DRAINED POND`. SEE DETAIL //(/ ,_ �/ /1 _ +92.68 105' ctT ft`P RPP BASE DIT( EE DETAIL 30 MCRAE INDUSTRIES INC. OB 238 PG 859 DB 264 PG 670 PC C SLIDE 51A im F 15BKD SEE SHEETS 2-H & 2-I FOR DRAINAGE DITCH DETAILS SEE SHEET 2-I FOR PREFORMED SCOUR HOLE DETAIL -BY5- 586 PING 11+93.18 A'" - ,CV,rR 056- �BK WA K 4 rra�yy o 'C GRASS �y G/ NO PNGo�00MER00 BRgN LASSITER DB 528 PG 685 PC D SLOE EBID 6k PIPNTER \ \ GR 9 GRASS oTR0,1-.. MTV 50 TOWN � NG Ps' PIPM� _—+0�6 BERM DI SEE DETAIL .- 15"vJG ... OW � a9ta 0 9t5 / FS �X 72"CHL & 35BW � I 4,P � + "S' BERM DIT( SEE DETAIL ''BASS 0915 zG/ FS m � IL SEE j5� � I DRAIN PON¢DND jz - o9oR < REMOVE DAM -L-SC Sta.79+92.68 �= ' 0912 TOE PROTECTION -- F— __T— SEE DETAIL F \ RIP RN? � 2 GN 09i) O 7 �\ 0916 \ �F 135' ITT I E E ..._ } y�.• �s • y P 15" y T 140' C.:5 CLASS �r'RIP RAP E C �C F \ es} EST. 3 TONS / 35LAT BASE ' + 20' RT. / rn, EST. 10 SY GF � E SEE DETAILDZCH WEUU GP MG ��N�i�l � W LAT BASE DITCH 173' RIPS RASH` _ SEE DETAIL J • � RETAIN - 25' 166'RT RETAI 'L% � 71 POWER OUTLETS -,/1, _��j --\ / I ` (DO _LA$S� RIP RAP110, CLASS I RIP RAP \ \ CLASS 111 RAP EST. 3 TONS \ EST. 3 TONS EST, 7 SY GF EST. .7 SY GF / I E-gDkGR � NE,P PROP P �ANKW� P C/FS RI 91JST4. _7 gT i � GR 1 � esr 1 \ EST. 2 TORS o �/ I _ � ES�SY�GF 1111\ —E 1• �\--��-��1- rV/ t3+�2 40' LT 40' LT �- -BL- 505 PINC 43+51.24 CSDRVI-PT 12+2793 QEND CONSTRUCTION -DRVI-PC 11+7232 PATSY D.MANESS FAMILY LLC 12 -DMI-POT 5/a. 12+863 DB 582 PG 387 GR -DRVI- PC C SLIDE 51A +60 -DRV' 40' LT. P/ Sto 12+0796 A = 9Y 02' 326" QT) D = 163' 42' 08D' -`c ;o?0"ER ouT E L = 55.6P ' - o T = 35.64' R - 35D0 CONC C 0 SHRUBS / PROJECT REFERENCE NO. SHEET NO. R-0623 9 RM/ SHEET NO. :OADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION FOR PROFILE OF LINE -L- SEE SHEETS 38 AND 39 FOR PROFILE OF LINE -Y12- SEE SHEET 54 mnm WOODS mN 37 INN C. KING, JR. $ It-)EDRICK H. TAYLOR DB 299 PG 622 DB 299 06. 60 5" MONOLITHIC CONC. ISLAND ADT 2014 6,348 ADT 2040 8,500 M r I 5,559 790 7,aoo , �So NC 2427 11,379 -L- �J -L- 6,610 TROY BYPASS 16,400 9,300 TCH LINE Y13- MA SEE SHEET 32 STA 18+�� EE p 180' b OR SF, 3 H622 ABA D IPG 601 �P c5 I +125 L- Z O m S uN\i -b Ps pPO x Lu e M C3 N Q-\ CP Q cp 0 QW �Ln Q Q. W W W C I I I I aepND �� 6/ Ott'_ CLASS B RIP RAP CAT 1 EST.2 TONS EST.7 SY FF 1 S0 ECIAL CUT TC EE DETAIL ?? I -YLZ- \ VI— �� v +2593�� 506 PINC tY3- w+� \ 15' 36 BS% ape Pie LONG VENTURES DB 562 PG 640 ' �4,A , C\y MTL BU� 'V' DITCH DETAIL E N 580076 E 172C,540 6l. STATI IN SI+06 129 LEFT RR SPIKE IN EASE -OF 12" Ptq z�� will „ LAT BASE DITCH ELBOWS SEE DETAIL E _ — __ j— — - CLASS B RIP RAP +2698 EST. 2 TONS EST. 7 SY FF -BL- 507 PINC 48+78.02 22+29.83 A— PT 10+5458 —DRVi—POT 10+00.00= Y/Z- AnT 994"09 CLASS B RIP RAP EST. 8 TONS EST. 21 SY FF —DRV1— Pl Sto 10+41J1 AOOD, A = 4654' 052z tRTt D = 163'42'08D' 3— PT 22+9625 L = 28.65' T = 15.18' R = 35.00' X B SAP -Y13- P/ Sto 15+41.58 A = 34' 26' 54-r (LT) D = 3' 49' 11D' L = 9006' T = 465.02' R = 1,500DO' -L- Pi Ste 88+07.62 Pis Sto 95+6577 A = 5r Or 47.r (RT) es = 4' 35' OL2' D = 3' 49' 111 Ls = 24OD0' L = /,493D4' LT = 160.05' T = 81494' ST = 80D5' R = 1,500D0' BASE DITCH JOHN C. KING, JR. DETAIL G FREDERICK H. TAYLOR DB 2" PG 622 DB 299 PO 66 -6L- 509 PINC 54+60.8 I BERM DITCH DET AIL TAIL AA PROJECT REFERENCE NO. SHEET NO. R-0623 10 RN+ SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION FOR PROFILE OF LINE -L- SEE SHEET 39 FOR PROFILE OF LINE -Y13- SEE SHEET 55 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS 50 150' GRAU 350W06D5 -BL- 510 PINC 57+86.24 +2s r �� \ r► \ C p 4 F'S ,o,a2Gl FS TW 2GI p � 11t R qZ. uj 15' 4 PS O 5„ 84'P,S, ELBOWS P► 0 D07 F //Q' CLASS B RIP RAP F \ p _, EST.2 TONS EST.7 SY FF END SBG -L- + C FS 4 P.S. (� \ 2GI + .72 135' CHORD IT ,011 ' R c c — c — c_ +2 .72 C W -L -CS Sto. 94+8572 140" .... .-. _ ..� ..,� �.. _Z J BASE DITCH DETAIL BB 211111111111111 37 JOHN C. KING. JR. FREDERICK H. TAYLOR DB 2" PG 622 DB2"PG618 —Y13— P1 Sto 21+7957 P1 Sto 22+65.44 A = 29' 2r 52.r(RT) A = 39' Ir 599' tLTt D = 28' 38' 52.4" D = 57' 17' 44.8' L = 102.85' L = 66.42' DETAIL A =" DETAIL B T = 5259' T = 35.6r FALSE SUMP FALSE SUMP c R = 20000' R = 10000' I �oN.-5�al,l (Not to Scale) OuUide Ditch Outside Ditch �Z D,� Traffic GI tS- " -S- etc. S-Ditch Slope Proposed Ditch S=Ditch Slope (} Proposed Ditch FROM STA. 99+75 RT FROM STA.99+95 LT 5" MONOLITHIC CONC. ISLAND i ' O (O Q: Q -BL- 511 PINC 60+8 c n„ W N — � W 2GI nD IS �I r Q r C) 2 t� Q1103 c!i N 4" PS. I Z c — c J U CLASS B RIP RAP EST.2 To EST. 7 SY FF LAT 'V' DI SEE DETAIL -L - PI Sto 121+77.84 A = /4' 09' /6.6 (LT) D = (7 29' 15.4 L = 2.90277" T = 1.4588Y R = 11.750.W e = N.C. -BL- 512 PING 63+99.67 2111111110111111 O JORN C. KNG. JR. FREDERICK H. TAYLOR DB 2" PG 622 DB 2" PG 66 -BL- 513 PINC 68+28.67 WOODS -L-PC Sto.107+19.03 C C � � c — I\ \F C C 2GI FS BM"18 ELEVATION = 524.17' m N 579386 E 1728461 BL STATION 71+08 164 LEFT RR SPIKE IN BASE OF 12" WHITE OAK AL J.00LN 08 65 PG 825 p- -BL- 514 PINC 71+81.17 L� 0� PROJECT REFERENCE NO. SHEET NO. R-0623 11 R,W SHEET NO. IOADWAY DESIGN ENGINEER HYDRAULICS ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION FOR PROFILE OF LINE -L- SEE SHEETS 39 AND 40 FOR PROFILE OF LINE-DR11A- SEE SHEET 56 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS A BENCE +/7 R CN _ — =- W — C c — — — W — _ WOODS tN -DRIIA- POT I0+OO.00 -L -POC 110+3235 - L1.1 W to 2GI FS Q nm L0 N i 2GI FS \ nos 1105 ­CAT-1 15" v _=n2 1 2 ELBOWS C\ F \ ms \ \ 110 nos N 4'P.S. LLJ `_ F \ \ FS J trod C 2GI I Z 2GI m 38 c— \ AL J. LINCOLN OB 65 PG 825 iJ \ c I C \ BEG , FENCE / LAT LAT BASE DITCH) CLASS B RIP RAP J SEE DETAIL G EST. ONS CLASS B RIP RAP EST. 28 TSY FF EST.2 TONS LAT 'VDITCH EST. 7 SY FF SEE DETAIL E DETAIL A =" DETAIL B FALSE SUMP �i - FALSE SUMP rvo„o sml,l `r? (Notto Scale) a?o Outside Ditch Outside Ditch �2 0,- Traffic Flow 707 c1 GI s— .-S— etc. S=Ditch Sloe Proposed Ditch S=Ditch Slope fL Proposed Ditch FROM STA.102+63 RT FROM STA.102+15 LT FROM STA.111+70 RT FROM STA 111+70 LT 37 JOHN C. KING. JR. FREDERICK H. TAYLOR DB 2" PG 622 DB 299 PG 66 DETAIL C FALSE SUMP Not too Scale) Median Ditch 9 + 2 I .. ehan aelowl 20" GI —S— S-Ditch era. Slope 4 Proposed Ditch FROM STA.102+63 CL FROM STA. 106+06 CL FROM STA. 111+70 CL FE r- ` FENCE A C +00-DR11A- E C°�LJF 55' RT. SPECIAL CUT DITCH SEE DETAIL ?? +-DR11A- 42/' �RT� / I +3 3 1 0' -ORIIA- POT 14+301 it END CONSTRUCTION I I I II I ?C 12 Zhy'S Ae +1�88 87.2-'C � +d0 -I- C C " Z J n Rll - PT 13+7498 O Z \ \ SPECIAL SEEDETAIL CUT CARLIE BATTEN OB 297 PG 24 -DRIIA- P1 Sto //+81.41 P1 Sto 13+1857 A = 79 2Y 17-q tLTI A = 56' 53' 29.4 (RT) D = 45' 50' I1.8' D = 45' 50' 11.8' L = 17320' L = 124J2' T = 10376' T = 6772' R = 125.00' R = 125.00' DETAIL M DETAIL B FALSE SUMP -L Itv. . s O1ej FALSE SUMP P/ Slo /2/+77.84 Outside Ditch (Not }a Scale) (4' �' /(.( (LT) Ditch �Z ° Traffic Flow D = 0 29 /5.4 �OutsideftTzo:l 7 2'L = 2.%2.77' �,T = 1.4588/' -- s — etc. R = (),50.' S-Ditch Slope rE Proposed Ditch S=Ditch Slope (j Proposed Ditch B = ^(� FROM STA. 711 RT FROM STA. 116+15 LT FROM STA. 12+25 RT FROM STA. 120+15 LT u 2 U CQ DETAIL C FALSE SUMP I Not to Scale) Medion Ditch _ 9 --•II2 �•- See ChoN Belawl �� 20' GI s — etc. S=Ditch Slope 4 Proposed Ditch FROM STA.116+15 CL PROJECT REFERENCE NO. SHEET NO. R-0623 12 RM/ SHEET NO. IOADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION SEE SHEET 40 & 2-1 :H DETAILS VAR/ES TYPE B-77 TYPE B-77 yf p ry .— R N N Q � N o N 4— TYPE B-77 VAR/ES TYPE B-77 TYPE 8-77 TYPE B-7 TYPE 8-77 TYPE B-77 VARIES BRIDGE IN RELATION TO PAVEMENT SKETCH W U W ( r f L L L L L L C Lt l a ^^ \' a v i i LU Z J V Q DETAIL A o DETAIL B FALSE SUMP FALSE SUMP I Naro Ral¢I G ( Not to S le) Outside Ditch Outside Ditch 4 011 Troffic Flow 7 GI GI ..-S— etctc ..- S _ . S=Ditch Slope (E Proposed Ditch S=Ditch Slope 4 Proposed Ditch FROM STA. 137+35 LT FROM $TA. 137+35 RT FROM STA. 140+85 LT FROM STA. 140+85 RT DETAIL C FALSE SUMP ( Not to Scale) Median Ditch 9 2 f.- sae Iran below) '0, GI -- S — etc. S=Ditch Slope 4 Proposed Ditch FROM STA.129+85 CL FROM STA.133+55 CL FROM STA. 137+35 CL FROM STA.140+85 CL -L- Pit Sto 121+77B4 Pls Sto 137+2221 Pt Sto 180+92B8 A = t4'09'16.6(LT) 6s = 0'26'19- 6 = 73'56'47.r(LT) D = 0' 29' 15.4' 6s = 0' 54' 16.8' D = r 00' 187' L = 2.90277' Ls = 180.00r L = 7.356.47' T = 1.458Br LT = 100.4r T = 4,29ID8' R = 11750.00' ST = 79.60' R = 5.700A0' e = N.C. PROJECT REFERENNO. CE SHEET NO. R-0623 13 RV SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO NOT LISR FOR CONSTRUCTION FOR PROFILE OF LINE -L- SEE SHEETS 40 AND 41 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS DETAIL FALSE SUMP (Nof b SU Outside Ditch - I2,e•I Tm iic Fl- 20.1 '1 F GI �- S _ efs. S=Ditch Slope Proposed Ditch FROM STA. 144+35 LT FROM STA. 147+85 LT u L 2 U N -L - P1 S1a 180+9288 A = 73' 56' 47P (LT) D = r 00' 187" L = 7.356.47' T = 4291.08' R = 5700.00' -BL- 525 PINC 103+75.95 DETAIL B FALSE SUMP ( Net to Scale) Outside Ditch Traffic Flow _ GI �- S _ etc. S=Ditch Slope 4 Proposed Ditch 4/ FROM STA. 144+35 RT FROM STA. 147+85 RT DETAIL C FALSE SUMP ( Not to Scale) Medien Difrh 9" 2'f. ee choa eelowl 20'Zetc. S _ S=Ditch Slope 4Proposedc FROM STA. 147+85 CL ILn c% v PROJECT REFERENCE NO. SHEET NO. R-0623 14 RV SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS pD I., I'll F FOR CONSTRUCTION FOR PROFILE OF LINE -L- SEE SHEETS 41 AND 42 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS 5" MONOLITHIC CONC. ISLAND z z 45' & 30' END C/A ENO FENCE ".'. ` `yam CHARLES INGRAM DS 225 PG 139 PC A SLIDE 557 • + • / PASTURE +47 47 �K BASE DITCH SEE DETAIL 'XX' BASE DITCH +67.50 SEE DETAILAXX' 71.21' CLA S RIP RAP ES 3 TONS W O W ' R� cii '— a p k CLASS B �/ IF RA N Q EST. 3 TONS a gi O ✓ EST. 10 SY GF v° 1 4' P (V - —p to 1— 2' P.S. tsm Q O O RCPIVN O o � — is a pR�,g� 4/ SNGRAM "ql LU _ + L U ENDOFENCE `� 2 u Q +56 -L- 147.11' R� 5 ESE O g" 1 F 48° b � I .CHARLES SA NDER /, s1 DB 1 PG 3 42 �1z a � /moo FF SH 6- STq 33 / 23 -Y6- I`• .00' RT RT C BT BEG (/ ) _1 V v ICI to ISFo �Q saK I -- AI 210.63' (EX. RNJ) I \ALY \ADBS706 AUNDERS PII C 530 S 7958'4T' W 260.7 R0623-1 (GPS) BL- PINC 112+81.68 - 43 PRISCILLA MORRIS & -BY6- PINC 10+88.72 DAMES SAUNOERS n \ \ ' Dill 706 PG 594 N 577554 E 1732002 � �\ �_BM#20 ELEVATION = 610.97' \ BY6 STATION 12+64 102 RIGHT RR SPIKE IN BASE OF 20" TWIN WHITE OAK \ 5" MONOLITHIC CONC. ISLAND ® \ \, BY6- 590 POT 5+00.00 POND BEG C/A BEG FENCE -BL- 527 PING 115+54.51 -Y6-POT Sto. /5+58.39= C_ -L-PX Sto.153+86.46 c _ c502 — R WOODS r P.S. RUINS 1510 2GI-D ES 2GI 509 2GI sl +25 -L- IS 150'RT . \ / C 62 -L - P/ Sto 180+92.88 A = 73'5647.rQT) D = f00'18.7' rn L = 7.356.47' T = 4,29/A8' R = 5.700A0' Z -BL- 529 PINC 120+79.33 -BL- 528 PINC 117+16.49 44 CAROLYN PLOWMAN DB 665 PG 840 PC C SLOE 182E PROJECT REFERENCE NO. SHEET NO. R-0623 15 RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION FOR PROFILE OF LINE -L- SEE SHEET 42 FOR PROF LE OF LINE -Y6- SEE SHEET 51 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS 00 1so' —i -16 :0' C C C C _ C _ i r 1515 FL-1 FIELD 2GI �FS rn TREES 4' PS 4'P.S.-------- n «� D 0 M + r P.S. �A 513 V ' t 5t4 2GI I p' P.S. •DLn 8' X 21' PS PAD 1- 'T O N 4' P.S. O rn 2GI-A rn 1512 FE_P I rn rn i C C C 150' 01 C —R 44 CAROLYN PLOWMAN DB 665 PG 840 PC C SLIDE 1828 PEKIN RD. ACT 2014 SR 1005 ADT 2040 1,910 2,000 Y 300 600 30� 600 6,610 -L- y 6,910 9,300 9,600 -L, 10 S210 300 00 r 1,431 1,700 PEKIN RD. SR 1005 v DETAIL FALSE SUMP I No��o 5<alel G90 Outside Ditt,h _ 12 O' _ ~Tmffi<Flo �D.1 2U:1 'I f GI S=Ditch Slope 4 Proposed Ditch FROM STA. 155+10 RT FROM STA. 158+15 RT FROM STA. 162+55 RT DETAIL B g FALSE SUMP ( Notto Scale) Outside Ditch Traffic Flow / 12,1_ �1 f GI — S — etc. S=Ditch Slope Proposed Ditch FROM STA. 155+10 LT / FROM STA. 158+15 LT J W W 01) W N W �3 BERM DITCH SEE DETAIL AA -L- Pt Sto 180+92.86 DETAIL A x DETAIL B g A = U5647.r(LT) f� FALSE SUMP FALSE SUMP D = r w 18.r Norm scmal ( Not to Scale) L w 7.356.4T I Outside Ditch T = 429tA8 Outside Ditch '120,� TrafFc Flow Q7 R = 5.700.00r / r aFr o.> 20;1 'i 2' — GI S — S — etc. / S=Ditch Slope Proposed Ditch S=Ditch Slope 4 Proposed Ditch FROM STA. 170+65 RT FROM STA.166+65 LT 44 FROM STA. 170+65 RT FROM STA. 170+65 LT FROM STA.177+65 LT CAROLYN PLOWMAN DB 665 PC 182 / PC C SLIDE 1828 -BL- 530 PINC 125+08.10 -BL- 531 PINC 127+28.31 -BL- 533 PINC 131+58.38 45 -BL- 532 PINC 129+68.26 MARK BRAS ELL / DB 639 PO 653 nti P� a ym' = do LAT 'V' DITCH SEE DETAIL G Z BERM DITCH STANDARD BASE DITCH CLASS B RIP RAP ENO C/A BEG C/A 150' jy SEE DETAIL HH FENCE IN FENCE SEE DETAIL P \ `EST. 18 CY DDE EST. 2 TONS +00 +60 \ E5T.40 SY PSRM EST.7 SY GF C DETAIL C FALSE SUMP ( Not to Scale) Median Ditch I� 9 2 f Isaa Chan SO )) GI s — era. S=Ditch Slope 4 Proposed Ditch FROM STA. 166+65 CL FROM STA. 170+65 CL FROM STA.177+65 CL -BL- 534 PINC I33+34.40 WOODS -BL- 535 PINC 136+15.01 PROJECT REFERENCE NO. SHEET NO. R-0623 16 RNd SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION FOR PROFILE OF LINE -L- SEE SHEETS 42 AND 43 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS 1605 Q BDO 2GI C BEGIN SBG -L- 171+05 604 FS F WOODS 2GI J <>— 609 FS a AT- iK 2GI FSf _~ —16oz 2GI- 1+ f� GI C \ WOODS 16007 C C CLASS B RIP RAP C C C EST. B TONS EST, 21 SY GF +0' 750' 150, I 45 STANDARD BASE DITCH MARK BRASWELL SEE DETAIL II DB 639 PG 653 EST. 600 CY DDE TDE 277' +21 n r_J F � L F m -L- I72+75 C 611 C C C C C �FS 1 C — C _. 2GI 1613 r N mlo GRAU 350 TL-3 CLASS B RIP RAP CLASS B RIP RAP EST TONS EST.8 TONS EST. 10 SY GF EST. 21 SY GF LAT BASE DITCH SEE DETAIL R D 4— Z P.S. 161] -.j 2GI P + O O Ln +� m ----CAT _ _ _ m F N � T / /F �F F F m F C � BM1121 ELEVATION = 563.44' N 577921 E 1734069 BL STATION 131+98 100 RIGHT RR SPIKE IN BASE OF 12" TWIN HICKORY S )y GSes 93 f -BL- 536 PINC 139+61.T1 45 \ P/ Sto 180+92.88 a A = 73' 56 47J' QT) � D = P 00' 18.7' L = .' 4291A8�O T = 4,29/' R = 5.700A0 -RI - —,3R PINC 141+IR 7R 10 MARK BRASWELL ) t0 DB 639 PG WE 1 1 Lu \ I N BEGIN SBG Lu -L- 179#55 \ Lu \ F \ N = \\ _ F F F F \54 C)F \ +50 O CAT-1 F \ � F �- ' nosGill \\ O r— � 1Ja6 , Q FS 2Gl FS EIP --- � 2'PS. noa 2G1 J � 4 PS �y uj _Z J F —F_ F '` F / C i U / F F a R 45 MARK BRASWELL / DB 639 PG 653 w000s -ET- 537 PINC 142+90.46 / DETAIL A DETAIL C FALSE SUMP FALSE SUMP ( trot to stela) I Not to S<alel / Median Di}ch _ Outside Ditch _ IZ.o,12' I GI See Ch., Below) S=Ditch Sloe ¢ Proposed Ditch S=Ditch Slope 4 Proposed Ditch FROM STA.185+65 RT Ditch Grade L Ditch Grade L / 0.0% To 2.0/ 20' Over 4.0% To 6.0% 40' Over .0 a TO 4.0% 1 30' 1 Over 6.0% 1 50, FROM STA. 180+65 CL FROM STA. 183+65 CL FROM STA. 185+65 CL FROM STA. 189+85 CL 47 DORTHY CAUDLE DB 456 PG 582 �t C w000s / — � F � SPECIAL JB vuMH 4— 4� FS _ — `I"2 C C CL B RIP RAP EST.3 TONS EST. 10 SY GF 45 MARK BRASWELL IDS 639 PG 653 -BL- 539 PINC 147+23.92 -T5-539 POT 6+54.94 REBAR & CAP SET k ODSAT BASE DITCH EE DETAIL G _ PROJECT REFERENCE NO. SHEET NO. R-0623 17 RJW SHEET NO. IOADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION FOR PROFILE OF LINE -L- SEE SHEET 43 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS r� WOODS J BERM DITCH BEG C/A / LAT BASE DITCH LAT BASE DITCH SEE DETAIL AA / SEE DETAIL L SEE DETAIL G END C/A +95CE l {{ ENCE l 7 _- l hj CLASS B RIP RAP EST.2 TONS / r no] EST. 7 SY GF / / Z _ _ \ 1713 ` ° l ZG fND SBG ' D noe Z' PS. / J I I / 1+ 1709 2GI FS �' P.S• 93.69 O / EIP TO Cl f50 4' .$. O CAT-1 N m BASE DITCH SEE DETAIL HH EST. 50 CY DDE SY PSRM i i —F F WOODS i 140' \ CLASS I RIP RAP `EST. 57 TONS EST. 104 SY GF RIP RAP BANK"NLY 47 DORTHY CAUDLE OB 456 PG 582 WOODS iF — F -BL- 540 PINC 150+28.93 m 48 aD JOHN WILLIS OB 685 PG 905 DETAIL DETAIL FALSE SUMP l xa to swlel FALSE SUMP c � Not to Scall e) Outside Ditch Outside DitWh Traffic Flow 2.0' 2'�- GI S — etc. S=Ditch Sloe 4 Proposed Ditch S=Ditch Slope CE Proposed Ditch FROM STA.193+15 RT FROM STA. 193+15 LT FROM STA. 196+65 RT FROM STA.196+65 LT FROM STA. 199+65 RT FROM STA.200+15 IT FROM STA.204+15 IT 47 DORTHY CAUDLE OB 456 PG 582 F- Lu h uj W N J Wr _. _ J 2 U t t -L- P/ Slo 180+92.88 A = 73' 56' 47.P (LT ) D = l' 00' 18.7' L = 7.356.47' T = 429/A8' R = 5.700.00' 3M#22 ELEVATION = 552.80' Ni c�7g3n4 F 17�1)gng 48 JOHN WILLIS OB 685 PG 905 DETAIL C FALSE SUMP �—.20' NSlMedian Ditch .. ChoZ S=Ditch Slope 4 Proposedc q_4) 14 FROM STA. 193+15 CL O FROM STA. 196+5 CL �Q- FROM STA. 200+15 CL -BL- 542 PINC 157+19.37 / -BL- 544 PINC 162+56.69 OUTNLpETU TYPICAL LLErt t0 — i00V60NSTK", NATURAL gad p�y� `GROUND YL 1'�a ¢v►MO � COR FeER IRIte, / CUSS v RP —Z �, Ni FEIER FI t1, N r rFr M r R CON rCON Z rEr N r �i' ExuNEI aFLa SIR[W HN EST TONS CLASS 'Il'= 70 TONS EST FILTER FABRIC = 90 SY EST COIR FIBER MATTING = 90 CY DOE = 140 CY PROJECT REFERENCE NO. SHEET NO. R-0623 18 KW SHEET NO. :OADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO NOT t"SE FOR CONSTRUCTION FOR PROFILE OF LINE -L- SEE SHEETS 43 AND 44 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS r a s 53.5� 1 (1 rn rn N rn e M � LAT 'V' DITCH SEE DETAIL JJ RIP RAP AT EMBANKMENT SEE DETAIL EE a a DETAIL FALSE SUMP I Nol to Scale) C Outside Ditch 20:1 'I S=Ditch Slope (j Proposed Ditch FROM STA.209+35 LT FROM STA.211+35 LT FROM STA.213+85 LT FROM STA.217+85 LT kE1T 70 R&DTT ATURAL I&SA46014STE1ra sa N stE :�pd its GROUy. cm 10e WIINc — -� �naluE `•'� � ti ur yr mIrM srEEW am eEv " c"wtEia. EST. COIR FIBER MATTING 150 SY DDE = 690 CY DETAIL C FALSE SUMP (Not to Scale) Median Ditch _ 9" .I 2' ae Chmt Below) —erf— 20' -- { GI 5 etc. S=Ditch Slope Q Proposed Ditch 48 JOHN WILLIS_ 48 JOHN WILLIS OB 685 PG 905 -L - P1 Sto 180+92.88 Pis Sto 212+1827 p = 73' 56' 47.r (LT) es = 0' 54' 16.8' D = r Oa 187' Ls = 180.W L = 7r356.47' LT = 120.00' T = 4291.08' ST = 60.00' R = 5.700A0' 7h A r' APO PROJECT REFERENCE NO. SHEET NO. R-0623 19 RNd SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY FLANS W NOT USE FOR CONSTRUCTION FOR PROFILE OF LINE -L- SEE SHEET 44 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS J J 7 r 0 v U Q FROM STA.211+35 CL FROM STA. 213+85 CL FROM STA. 217+85 CL 5u' I A LL LL Cr L.L LL V; C C 4 COX Q N V 1 1 LL L H Q �! PROJECT REFERENCE NO. SHEET NO. R-0623 20 RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION 7 FOR PROFILE OF LINE -L- SEE SHEETS 44 48 qh AND 45 JOHN WILLIS �PO SEE SHEETS 2-H & 2-1 DS 685 PG 905 FOR DRAINAGE DITCH DETAILS -EL- 5-�1 PW� 1 5 (7.15 -BL- 552 PINC LAT 'V' DITCH -BL- 550 PING 182+30.08 CLASS B RIP RAP SEE DETAIL E -BL- 549 PING 178+78.12 EST.2 TONS CU70VER EST. 7 SY GF1 CLASS B RIP RAP r EST. 2 TONS CUTOVER +00 0 140 --- - - WOODS +00 1+50 JR +00 130' \ , R R E • � GIN END SSG i_ 1Q12 F f.CAT-1 C — — — — 2 ooa Ski GRAD 350 \ •+' > 4' Ps. — — — — +75 ' mt`" 4'P.S. — + 5 N N — r Ps. _ N N Da5 E Fs _ / , / 2GI GI FS rPS. tom 1914 2GI SBG 002 CAT-1 � � 4'P.S. - .. -- � — 2GI /F F F F zooe O /C F F F \ \- F � — F F \ F F \ \ / / BEGIN C/A / — _� F F ,�� p F END F SSG FENCE /\ s So +14 R FENCE A — — — J • - +54 — — LAT 'V' DITCH r CUTOVER 6d ACCESS \ SEE DETAIL A 4 PO/NT DETAIL C FALSE SUMP Not to Scale) Median Ditch _ 9 �2 f. S- Chart Below) 20' GI S — etc. S = Ditch Slope 4 Proposed Ditch I TREES 48 JOHN WILLIS DB 685 PG 905 WOODS CN LLI LLI V) LLI LLI V) 0 0 T CN M CN Q H tN J I LL.I J U Q E FROM STA.221+85 CL FROM STA.230+65 CL PROJECT REFERENCE NO. I SHEET NO. 1 0 Ln s a O H LL1 Lu tN LL! Lu to O O (V M CV Q H tN I J I Lu _Z J U H I BIV#23 ELEVATION - 553.52' N 582239 E 1738319 BL STATION 193+59 83 RIGHT RR SPIKE IN BASE OF 14" TWIN HICKORY JOIN WILLIS OB 665 PO 9O5 �q5 woods m B MINVE NOOD 08 129 PO 56 49 MIN+IE WOOD O6 129 PG 56 DETAIL B hF FALSE SUMP Not to Scolel I Oohide Ditch Troffi�Flow 1p 'l f � 2s. GI t S — etc. S=Ditch Slope 4 Propod Di}ch DETAIL C FALSE SUMP (Not to Scolel Median Ditch 9 2 �« see Chan W—) 2, S — etc. S=Ditch Slope 4 Proposed Ditch " SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION FOR PROFILE OF LINE —L— SEE SHEET 45 SEE SHEETS 2—H & 2-1 FOR DRAINAGE DITCH DETAILS 0 5" MONOLITHIC CONC. ISLAND I (V F— LU LJJ N Lu LLJ N O O (V V Q ►� FROM STA.234+40 LT FROM STA. 238+65 LT FROM STA.234+40 CL FROM STA.243+15 CL +60 -Y8 i\ 30' PIT. \ END C/A END FENCE ®WOOD Do12 \ DB 129 PC n LAT BASE DITCH �I 1 tt Q IS NF_N RZ J CAT -END +85- .4 w Z i 9 -YB-PC Sto.14+369/- _ D% L -POT Sto. 247+50Z3% aa 0 _Y8_ P1 Sto 15+9/J8 A = 14'04'01.4 (LT) D = 3' 10' 59.2' L = 441.93' T = 222D8' R = 1,80UW -BY8- 591 POT 5+00.00 / -Y8- POT STAI1+60 50' LT BEG C/A 30' LT BEG FENCE GRADE TO DRAIN R0623-3 (GPS) \ -BL- PINC 206+28.76 = -BY8- PINC 9+12.10 o \ n \ \ +14 , Rol DETAIL C FALSE SUMP ( Not to Scale) Median Ditch - 9" -�II 2' I•- ea Ch.1 Below) � 20' —mot Z - s— S=Ditch Slope 4 Proposedtc FROM STA.250+00 CL FROM STA.252+85 CL 5/ RICKY HARRIS OB 489 PG 509 PC D SLOE 124D -BL- 558 PINC 209+36.03 CLASS I RIP RAP EST. 11 TONS EST. 22 SY GF \ \ BM#24 ELEVATION = 544.19' \ N 584357 E 17 9051 BL STATION 215+48 4 9 LEFT RR SPIKE IN BASE OF I " TRIPLE WHITE OAK \ m F \ �P� o vs <o y e\ F oT v PROJECT REFERENCE NO. SHEET NO. R-0623 22 RM/ SHEET NO. IOADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION FOR PROFILE OF LINE -L- SEE SHEETS 45 AND 46 FOR PROFILE OF LINE -Y8- SEE SHEET 52 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS -BL- 559 PINC 212+47.30 STANDARD BASE DITCH \ LAT BASE DI LAT BASE DITCH SEE DETAIL HH \ \ \ SEE DETAIL SEE DETAIL G / EST. 15 CY DDE \V \ EST. 22 SY IS. p CCLL,,qq� + / \ 1eCCESS TREES EST. 2t TONS RAP TOE PROTECTION TOE PROTECTION \ NT (� END C/A BEG C/A C C 30,E i— ` NT�S M ' 11 h FS O: 2GI L!T AT-1 22.2 0, N a.l MW 'a��— —cmmm :ems \117 \. a II O 140' \ a 4r DB IWPD 4M \ a \ \ 9F�A (03 22 GL END C/A u•�Pj END FENCE GRADE TO DRAIN \� 1 TO EXISTING DITCH WOODS 49 °O � MINNIE WOOD OB 129 PG 56 y�°o py 4i F" A0 J: O�A2AW +70 -YB- �06 30.04 ' RT. BENSON MORRIS / OB 283 PG 265 / -Y8-POT St< / 5" MONOLITHIC CONC. ISLAND 0 TOE I R S 90 -L- 140' CUTOVER 77\ GRADE TO DRAIN TO EXISTING DITCH \ a ° ` P \\so +70 -ve- -YB- 2G + C EG FEN BFENCE \\\\\\PASTURE \. \\ \ EST. 7 SY GF SEE DETAIL F SEE DETAIL F FENCE +93 \ \ CE +53 N � \ � T E� F \ \ Lu 2216 F F l � C C C \C \ N F C C — � 2223 -1 — \ \ ., W 15" / CUTOVER Ln � \\ \ W ES OWS END SBG 2 ELBOWS \ T (n 2GI 221) GRAU-350 - \ 4'PS. 4'P.S. v N R 42' /5' --�- N + ip � � Q,5' 4� ` * FS 2' P.S. 2GI 22 2' P.S. S. 2GI -L- 2221 15" RLO CP_ly N 3/" 55' 12.9' E N R 34' DI 2' P.S. © Q R r los' �► H TREES 2GI CAT-i - - 4PS J 221jr 9 END 56G� (\'CUTO F C C C --.'t�-- Lu LuF 'v'3 �, J BACKFILL EXISTING CHANNEL TOE PROTECTION F O SEE DETAIL F ,. R Q C O3 u // CLASS B RIP RAP ' / EST. EST14 TONS SY GF \ / STANDARD BASE SEE DETAIL T EST. 12 CY DDE EST. 15 TONS CL I RIP RAP RICKY HARRIS EST.40 SY GF 08 489 PC 509 -BL- 560 PINC 2I6+48.85 PC D SLIDE 1241, TROY CANDOR RD. 1.321 1,500 e 200 r 210 200 , NL 300 ' NC 2427 6,910 -L- � 7,031 TROY BYPASS 9,600 z0o� 9,900 200 400 0 >I I h n N 1,a21 ACT 2014 1,600 ACT 2040 TROY CANDOR RD. DETAIL A N g DETAIL B f FALSE SUMP FALSE SUMP I N., to 8colel c (Not to Scale) Outside Ditch Outside Ditch I2 a, Traffic Fla- . ,0.1 20:7 'I f7 +- 2"- G' GI s — — S — eta. S=Ditch SIo e (j Proposed Ditch S=Ditch Slope 4 Proposed Ditch FROM STA. 261+15 RT FROM STA. 261+15 LT BASE DITCH SEE DETAIL WW EST. 20 CY DDE EST. 50 SY PSRM LAT BASE DITCH SEE DETAIL G CN CN CLASS B RIP RAP 0E5T.2 TONS + EST. 7 SY GF 14 W W T CUTOVER V) 2301 W C C 15" vd W 2 ELBOWS —/ V) C B 2G1 F O 4'PS. a O + \ a N L J \ \ d F N \, 12305 S a \\ O rPs. V) \ \ a A A -p5 GRAU-350 GI\ \ W �2 �C \ \ f\ 303 J \ \ BEG C/A 7 REE$ \ \ FENCE 70 E = \ R V \\ RIPRA Q` \ END C/A CLASS B A(,CE \ 2 FENCE EST.2 To +IO PO T o� kST.7 SY GF I I LAT 'V' DITCH SEE DETAIL BB DETAIL C FALSE SUMP (Not to Scale) Median Ditch 9 .I 2 f . e Chart Below) 20' GI S — etc. S=Ditch Slope CL Proposed Ditch END C/A FENCE `� N 3/'55'l29'E / FROM STA. 261+15 CL FROM STA. 266+15 CL FROM STA. 271+15 CL -nL- 'Jb.J PINC, �123+ LAT 'V' DITCH SEE DETAIL UU 60 ACC 5 / Pol / BEGIN L' C.-1 SPRING X • / / 1 �E + F R / ^ 2318 CLASS IP RAP ST.72 TONS GF /PAINT FFENCE A / i / CIgSS B RIP RAP +84 I LAT BASE DITCH / EST. 8 TONS J SEE DETAIL G / EST. 28 SY GF END C/A FENCE P \�T f OT V e\ \ \F F 5/ RICKY HARRIS DB 489 PG 509 PC D SLIDE 1240 PINC 225+76.03 LAT BASE DITCH rSEE DETAIL IC CUTOVER S RIP RAP BERM DITCH E 2 TO T. . SEE DETAIL P . 7 SY GF TREES -L- / TREES 2311 N CAT-1 151, 1 CUTOVER 2 ELBOWS END SBG - /• _ F F F F F F F /• a _, \ CLASS B RIP RAP EST.2 TONS EST. 7 SY GF CLASS I RIP RAP LAT BASE DITCH EST. 33 TONS SEE DETAIL G EST. 62 SY GF RIP RAP BANKS ONLY 8 RICKY HARRIS OB 489 PG 509 PC D SLOE 124D PROJECT REFERENCE NO. SHEET NO. R-0623 23 RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION FOR PROFILE OF LINE -L- SEE SHEET 46 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS LAT BASE DITCH SEE DETAIL L d' CN W _W 2 V) W Uj + rA 2'Ps. 2316 Gl/ e ' 1 N CV 4.s. s Q V) LU F TOE PROTECTION SEE DETAIL FM CLASS I RIP RAP EST. 20 TONS M EST. 39 SY GF ``WW RIP RAP BANKS ONLY STANDARD BASE DITCH SEE DETAIL KK EST.4 CY DDE O� DETAIL A h g DETAIL B FALSE SUMP FALSE SUMP (Not w Sral,) c ( Not to Scale) Outside Trafc Fo- Outside D h -Izo1_ 7 2 r. cl GI s— s— am. S=Ditch Sloe ¢ Proposed Ditch S=Ditch Slope 4 Proposed Ditch FROM STA.275+15 RT FROM STA.275+15 LT FROM STA.278+65 RT FROM STA. 278+65 LT FROM STA.282+10 RT FROM STA.282+65 LT 60' ACCE END A POIN +130' N sP�(Ns43 S 1' ' • C BEG C/A / f , ./ / / / +42FENCE �C V) ' • y/ RIP RAtK/ LLI / PROTE ON N 72413 4•PS Y I N O 0 + r N N 3f 55' 1 E -Ps. to - J4 W J C E E. r �p 140' PINC 233+72.74 DETAIL C FALSE SUMP ( Not to Scale) Mad an Ditch _ 9" .I 2' ee Chart Below) �— 20' —mot GI S — tc. S=Ditch Slope 6 Proposed Ditch FROM STA. 275+15 CL FROM STA.278+65 CL 5/ RICKY HARRIS DB 489 PG 509 PC D SLIDE 124D + 640 /40676 EIP 33 0. ss 9. EIF J• B) DE DS 662 PG 535 \DA PCC D SLIDE 1240E 124D -BL- 567 PROJECT REFERENCE NO. SHEET NO. R-0623 24 RV SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO NOT LISR FOR CONSTRUCTION -F FOR PROFILE OF LINE -L- SEE SHEETS 46 AND 47 SEE 2-H & 2-1 FSHEETS FOR DRAINAGE DITCH DETAILS —�� V, PINC 240 57.20 N 58 BM 25 VATION = 487.52' BL STATI 183 LEFT RR IN OF 10" PINE \BA 00 +s2 52' 130' 130'� E C SPRING �c N CUTOVER LLJ 2G1 2G1 � boe �C _= C W T ` 3411 m � r,� CIITOVER � `C y - 9P,5 2402 W n o ` 2GI -A (n � 7 FS FS N 2GI 7 2G �- z4to 2GI-A bos n Po 0 �► 2'?5. a 00 0 N FS �'rcJ 409 — — _ _ 4'PS. Q 2GI � \ _ � zGl _ � � � spy \ \ \ too) O:97.86 50I� — \ \ GRAU-350 2 ' 140' / \ \ 2GI � +97.86 1ao i c C C C \ \ _ 406 _C I LLJ f� V C C C BEGIN SW • , R — c —T �E 140 E� C CUTOVER z TREES L-TS Sto.273+97B6 -L-SC Sto.275+9786 J RICKY HARRIS -L - Pls Sto 275+3120 P1 Sto 282+88B3 6s = 2' 17' 30.6" A = 30' 54' 02.0 (RT) Ls = 200.W D = 2' 17' 30.6' LT = 133.34' L = 134829' ST = 66.68' T = 690.96' R = 2.500.00r OB 489 PG 509 PC D SLOE 124D 0 —OL— JOO III G`iGT_ -T7-568 POT 6+11.58 ELEV=475.07 REBAR & CAP 52 DANNY V.DEBERRY 06 662 PC 535 PC D SLOE 124D CLASS B RIP RAP EST.8 TONS EST. 21 SY GF LAT BASE DITCH SEE DETAIL R RIP RAP AT • I EMBANKMENT (� SEE DETAIL EE 1~JJ Sr_ 1S� N W F\ W 3 N al r O A� 1 O cM Go 1 J 212' DETAIL DETAIL B FALSE SUMP ff i Not m s O1el FALSE SUMP ( Not to Scale) I Outside Ditch Outside Ditch �lz o,� Traffic Flow 7D `Tropic F� 2'�- O1 GI FS— _S— etc. S=Ditch Slope Proposed Ditch S=Ditch Slope fL Proposed Ditch FROM STA.285+35 LT FROM STA. 293+85 RT FROM STA. 289+35 LT FROM STA. 293+85 LT WOODS -L- rUL GOJ T/JAO END RCBC F � FS 2G1- �� N m m� 4' PS• FIP TO f,L 1 �111 RCBC t�EI� 4'1 SF AT-1 #00 L� �EMD SBG 1� STANDARD BASE DITCH 0 SEE DETAIL MIA EST.170 CY DDE WOODS / B9e/, /6•w = e°�' \ -BL 569 PINS 2961 j.46 EST. 76 SY PSRM -BL- 570 PINC 249+69.29 Y BERM DITCH %r• �BL- 57 S PNC 2 2+84.03 SEE DETAIL AA RIP RAP DITCH BANK LAT BASE DITCH / POND CLASS I RIP RAP SEE DETAIL LL EST. 28 TONS 170' +0, PO.ND 1 EST. 60 SY GF LAT *DITCH 4 \ E SEE IL CC WE � LAT BASE DIT SEE DETAIL R CLASS B RIP RAP EST.2 TONS EST. 7 SY GF P.S. C FS DETAIL C FALSE SUMP (N ot tSl Median Ditch - See Choa Below) GI S — etc. S=Ditch Slope 4 Proposed Ditch PROJECT REFERENCE NO. SHEET NO. R-0623 25 RNd SHEET NO. '.OADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION FROM STA, 285+35 CIL FROM STA, 293+85 CL Q MARY SMITHERMAN /Js Fi F/P sr I I FOR PROFILE OF LINE -L- SEE SHEET 47 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS DB 129 PC 121 04 _� — z6" FS 2GI-A 2GI-A zsos N 0 z 8' X 21'P.s. PSRM PAD 5o9 -L- R 34' a -- DI 2' PS. R 20' 15 CP_IV R � �R 42' R CHORD R zsio W Z RIP RAP AT EMBANKMENT CLASS IRI P -- 4� • s EST. 15 TONS _ ` \\ WOODS CLASS B RIP RAP SEE BASE DITCH EST.2 TONS SEE DETAIL R +14015 EST. 7 SY GF +46.15 J 120' W SEE DETAIL WWW EST. 30 SY GP r— C O l� p \ LAT BASE DITCH SEE SEE DETAIL CC CLASS B RIP RAP EST.7 TONS 4Iy I + 1 LAF BASE DITCH FfAIL NN C% WOODS EST. 7 SY GF +87 40 212' 5/ RICKY HARRIS DB 489 PC 509 PC D SLIDE 1240 9,ssse•s -L-CS Sto.289+46J5 \ -L-ST Sto.29/+46J5 MARY © ERMAN \ DB 129 PC 121 Pi Sto 282+88.83 & = 30" 54' 02A' tRTt Sto 290+1 es 9s = 2'1' 30E \ D = 2' l7' 30.6 Ls = 200.00' L = 1 LT = 13 T = 690.98' 690-W \ ST = 6668W R = 2.500.00' 5" MONOLITHIC CONC. ISLAND 0 5" MONOLITHIC CONC. ISLAND SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS Q MATCH LINE _ igg\.F END C/A END FENCE +42.30 -Y9- 90' RT. -Y9-PT S1o.20+42.30 -BY9- 607 PINC 16+27 MARRY cV R=1d w W N b � c LL 0 II m 2GI o LLB + N FS \ 0 4 L(i O, N 6i 24' 16I N N J 4' Ps. I STA 19+00 61 EXIST. NC 2427 6,648 8,800 i 790 5 859 y 70n0 g,100 s � ,>y sp •o.'s• 7,031 9,900 / �a 12,100 - - INC 2427 17,300 TROY BYPASS ADT 2014 ADT 2040 -Y9- P1 S(o 18+1824 78 A = 33.02.25.T' (LT) D = 7'09 43J' JAMES HAYWOOD +42.30 -Y9-L = 46133' 90' LT. OB 154 PG A2 680 1252 PG BEG C/A T = 23728' 0�9 6552 BEG FENCE R = 800.00r 1 -BL- 573 PINC 257+73.74 \ " S WOODS 269>922• •3S. F I © \ II1V /I MARY SMITNERMAN 06 129 PG 121 +8 7B 150' \ IC- _ c — c — c — 155' I F — W c C Z C .J 1 W, Fp I l50'TAPER PROJECT REFERENCE NO. SHEET NO. R-0623 26 RM/ SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER PRELIMINARY PLANS \ DO NOT USE FOR CONSTRUCTION \ FOR esr \\ \\ \\\ AND P48 FILE OF LINE -L- SEE SHEETS 47 A \\\ yG \\\ FOR PROFILE OF LINE -Y9- SEE SHEET 53 'V 2p 92 \ \ O R0623-6 (GPS) -BYII- PINC 23+25.65 STANDARD BASE DITCH \\ \\\ \ \\ ,SEE DETAIL 00 EST. 18 CY DDE / \\ TRUSTEES OF CALVARY TEMPLE DB 389 PG 890 LAT 'V' DITCH / SEE DETAIL B8 @�'/ WOODS I S LAT 'V' DITCH SEE DETAIL E R 1 18" vd 2619 2GI 4' .G. • BM#26 X 2 ELBOWS 15" GRAU 350 2GI 2612 2 ELBOWS r F F F F F F — zble £ND SW F BEG C/A g£G/N SBG F -L- 305+45 FENCE A + pCE -L- 299+75 R CHORD rr1jD� ooS -1 0 � V-- POINT 120' m CLASS B RIP RAP EST.2 TONS +60 EST.7 SY GF STANDARD BASE DITCH SEE DETAIL HH 164 -BL- 572 PING 254+88.11 = J' EST. 98 CyDDE Q.t� EST. 160 SY PSRM -BY9- 572 POT 19+67.25 pY DETAIL A FALSE SUMP iF / '--TreRl�ln—�o.. 20:1 p r S=Ditch Slope 4 Proposed Ditch + +30 FROM STA. -L- 295 + 85 LT 320 TDE FROM STA.-Y9- 19-65 RT FROM STA. -Y9- 2 2+65 RT DETAIL C FALSE SUMP DETAIL B Nf 1Not/o Scolel FALSE SUMP /� Median Ditch I Not E SUMP O't'iae Ditch 9" Traffic Flow �S— GI \ S=Ditch Slope S=Ditch Slope fL Proposed Ditch-1 I Oy% 0 2.0% 20' Over 4.0% FROM STA.-Y9- 19+65 LT er 2.0% To 4.0% 30' Over FROM STA. -Y9-22+65 LT / �� FROM STA.299+70 CL FROM STA. 302+85 CL Q 136' ~ CLASS B RIP RAP TDE EST. 3 TO AT 'V' DITCH EST. 10 SY GF SEE DETAIL E CLASS B RIP RAP EST. TONS 170' STANDARD BASE DITCH 7 EST. 7 SY GF +00 SEE DETAIL 00 EST. 26 CyDDE -- F F LAT 'V' DITCH SEE DETAIL JJ N 56 251T E 3p0 05 WOODS I -BL- 574 PINC 261+32.06 woaos O. .. EIP 5 -L-SC S1o.301+83.78 / O RAVONDA N4LIAM5 Q / Do 640 MARY SMITHERMAN / N DO 1� PG'r BM# ELEVATION = 529.27' N� STATION 260+69 75 RIGHT —BL— 775 PINC 264+72.03 N 587053 E 1742594 RR SPIKE IN BASE OF 18" WHITE OAK N 55gyO4•E �� / P +44 7 Pis 510 30i+17J2 1 Sto 312 8 6s = 2' 17' 30.6- A = 45' 59' 18.5' (RT) Ls = 200.00' D = 2' 17' 30e Ditch LT = 133.34' L = 2,006.63' ST = 66.68' T = I.M.89' R = Z500.00' se = O05 p 40' 50 0 5" MONOLITHIC CONC. ISLAND 77 UNITED STATES OF AMERICA OB 89 PC 145 WOODS r---Y11- STA.31+00 /---R30' 1'3:45-', CLASS . RIP RAP — EST2 TON$ — EST.7 SY GF 20 -Y11- \~ EX. RN✓ waoD C i / 270, 55 g5®pF 1: iso' / �/ / CALVARYE TEIAPLE PIBNC 06 389 PG 890 PINC -167+51.72 LA7 V DITCH IV Tr� SEE DETAIL E N «_ M W 702 2GI n �- 0 �Z 2GI 03 Ell Ir 5 l i / m / +14 -L- �(1 WOODS c +63 -L- N P SPECIAL CUT DITCH + SEE DETAIL PP 160. O` 55 s DANNY SEDBERRY OB 599 PG 239 e14/ '?o PC E SLbE 95D 8 96A / e � m F j LAT •V' DITCH SEE DETAIL 1J � RAVONDA WILLIAMS OB 640 PC 71 - Ell, —D III— J PINC 31+60.31 GRADE EXISTING DITCH TO DRAIN TO PROPOSED DITCH GLEN RD. 731 '1T606- 100 d M 631 100q00 w ~ NC 2427 12,100 -L- 12,641 TROY BYPASS 17,300 118,200 �10 —0 TO0 200 I � o� 210 300 ADT 2014 ADT 2040 HOLLY HILLS DR. STANDARD BASE DITCH SEE DETAIL QQ ES,T. 218 CY DDE EST. 86 SY PSRM o,,, a`5` 18.83 - 34' 2' PS. 0 R 42' -y/0- / BEGIN CONSTRUC P/ Sto /7+5656 -Y10- STA/4+00 A = 36 Or 115' (RT) D = 5' 43' 465' T628.67'w FAMILY WORSHIP MINITRIES. NC. = 3250 69°ZSti OB 422 PG 850 R = 1,000L s 115 f.;.;f I -Y10- WOODS 2 c 27 BST =_NC 24127 BST r FS ISBKBUS f \ --SK STEPS ,,frvY GR \ Ys7 TREES L _ — — / 1 1 24' EX WALL * AEAND 20 -nl- - 46.69' LT 0 -YI/ + 4'4 GRASS 150• -nl- 45.9 ' +00 K C PUE� w =Yn= 2712 w50Dn FS *GUY +4 -L- 2GI 120' RT. C C C — FS PINC 273+68.89 -Y70-POC 17+498 -L- POC 3/8+75.79 / EIPC BERM DITCH CONC SEE DETAIL AA MON (� C /� 1 Q �^' � \ o\ems \ DANNY55EDBERRY DITCH UNER'e O OB 599 PC 239 SEE DETAIL Q - G�.�PC E SLIDE 95D & 96e NO ASIATED \ W / PIPING FOUND \ m RODNEY LOFLIN 2 08 643 PC 654 DB 148 PC 5a \ \ \ -YIO- PRC 20+ 2 +34 90, n \ \ Q +56 -YIo- _L OOLIA LOFLIN 94' RT +2 P1 Sto 312+44.67 \ \ OB 313 PG 603 + 8 A '9BB dF D = 2' 17 ' 18.. (RT) ECONC \ MON CL45B RIP RAP ST.2 TONS L = 2.006.63, -Y/OA-POT Sla.12+4282 Ho \ f+� EST.7 SY GF T = 1.060.89' °D t R = 2500A0' BM#27 ELEVATION = 515,1\ + se = OA5 N 586952 E 1744242 j BY10 STATION 13+48 47 LEFT 5 S 83'05'13' E 249.00' RR SPIKE IN BASE OF 10" PINE SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS DETAIL A FALSE SUMP (Not to Bmlel Outside Ditch '1 _ Iy,Od_ TroRic F�,NO.� 20:1 f GI S=Ditch Slope Proposed Ditch FROM STA.313+65 RT FROM STA.315+60 RT FROM STA.320+00 RT DETAIL C FALSE SUMP ( Not to Scale( Median Ditch _ 9" 2' �.- ea Chan B.II � GI —S— etc. S=Ditch Slope 6 Proposed Ditch FROM STA. 313+65 CL '.�I KUL.I IUIV BEG -Y/OA-17+75 'CYCDENOTES CONC.VALLEY GUTTER 8 f -Y10A-P/NC 10+98,63 5R 25'7 OL OFLN A- POT 10+00DO DO 132 520 - POC 22+03.39 S ,_ 9E S 7_9*07.21 150.00' -BY10- 594 4� POT 16+10.15 _ ISEKB Eb I��u EARNEST NAYWC OB 149 139 OB 149 RC MO 0 1 I! PROJECT REFERENCE NO. SHEET NO. t\\A 1\ _ 1 00 -Y10- 40' LT. WE `' BEG CIA BEG FENCE R-0623 27 RW SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER TOWN OF TROY I OB 430 PC 629 WOODS PRELIMINARY FLANS DO NOT USE FOR CONSTRUCTION +48,65' FOR PROFILE OF LINE -L- SEE SHEET 48 \ FOR PROFILE OF LINE -Y10- SEE SHEET 53 FOR PROFILE OF LINE -YIOA- SEE SHEET 55 -BL- 579 278+09.08 = -BY10- 579PINC 11+13.44 = -BYII- 579 POT 38+04.05 +03.60 \\ -Y10- +28.00-L Ex. 157' LT �\\\.^ AGP � lsso•LT rl- (V H LU W V LL U V C u c c DETAIL A DETAIL B FALSE SUMP rJmro scmel FALSE SUMP I c (Not to Scale) Outside Ditch Outside Ditch Traffi�Flow Trams—��.o'— 0.7 2, GI f S — etc. S=Ditch Slope ¢ Proposed Ditch S=Ditch Slope 4 Proposed Ditch FROM STA. 322+15 RT FROM STA. 322+75 LT FROM STA. 322+1RT FROM STA.325+15 LT FROM STA. 325+25 RT RT FROM STA. 325+17 LT FROM STA. 3 FROM STA. 331+31+15 5 R7 _ S 6393'03' E 223.997 BRYAN REYNOLDS DB 674 PC 1176 a DETAIL C FALSE SUMP ( Not to Scale) Median Ditch _ 9 2 f . See Chart GI S_ etc. S=Ditch Slope 4 Proposed Ditch FROM STA.322+15 CL FROM STA.325+15 CL FROM STA. 331+15 CL 59 VY TOWN OF TROY OB 430 PG 629 -BL- 580 PINC 281+54.43 -BL- 581 PINC 287+46.69 -L - P1 Slo 312+44.67 Pls Sto 322+57A8 A = 45" 59' 185" (RT) es = 2' 17' 30.6 D = 2' 1730.6 Ls = 200.00' L = 2.006.6Y LT = 13334' T = 1,060.89' ST = 66.68' R = 2500.00' se = 0.05 55 DANNY SEDBERRY DB 599 PC 239 PC E SLIDE 95D & 96A PROJECT REFERENCE NO. SHEET NO. R-0623 28 RV SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER � Z PRELIMINARY PLANS DO NOT IISF FOR CONSTRUCTION FOR PROFILE OF LINE -L- SEE SHEETS 48 AND 49 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS 0- N F— LU LU V) LU LU V) O C") M C") H N I J LLJ Z J _ V H Q ►-4 Ma �� S 6394'31' E ISO.16'� O f0 ZZ �P i� Zn U q W p t]� O� NOT TO SCALE TYPE B-77 TYPE B-77 t r r _ TYPE B-77 5'9 TOWN OF TROY 08 430 PG 629 TYPE B-77 00 T LT - N +62.50-L- 130' LT 145 LT L r 135' LT +97.50-L- W +ao BEGIN BRIDGE LUG PUE PUE tio'LT 120' -L- STA337+8269 = R N BEGIN APPROACH SLAB -L- SFA337+5B58 W — — c \5�� i N F �— — — MASS 1RIP RAP 904 2GI FS W\ FILTER FABRIC LO 4PS. = TpJ2 M ~ N p M s 62 or ll 2GI- --------- - �G 905-W------TYPfl;'M35 L T GM SBG OV X/ST. J Tr0 - -- - -TV 2903 - D T U 35 - - - - - - - - w BEGIN APPROACH SLA W �— _ -L- STAjIZ++5.32 Z J z90) L n BEGIN END /A FENC l C/A FENCE DETAIL TAIL B FALSE SUMP I Nol to Swle) 'FALSE SUMP DETAIL C FALSE SUMP ( Not to Scale( Median Ditch _ 9 .I 2' ee Chart Belaw) GI . 5 - etc. S=Ditch Slope rk Proposed Ditch Ditc Gra e L Ditch Grade L 0.0% To 2.0% 20 Over 4.0% To FROM STA.337+75 CL FROM STA.345+85 CL - - CLASS II RIP RAP AT BM#28 ELEVATION = 405.03' m g EMBANKMENT N 586137 E 1746210 s SEE DETAIL SS BL STATION 300+22 19 LEFT TREES PERMAMENT ROCK CHECK DAM X MARK ON NE WING WALL OF BRIDGE OVER / SEE DETAIL WWW GH WATER MARK LITTLE RIVER ON 24/27 // 160' / LEV=382.99' LAT GRASS SWALE CLASS B RIP RAP FOR IE B30E 1 FT BER 20090N r SEE DETAIL RR /- ESL 7 SO NI GF NO OWNER IN T 8'0 BEGIN BR�iDGf U +� +56 F3 R LAT BASE ITC y 150' SEE DET TT CLASS I RIP, P m r1, LAT SEE BASE DITCH SEE DETAIL TT _ 00 160' 0' CLASS II RIP AT 55 EST. 20 TO / F3 v 0 KMRAP ENT CLASS I RIP AP BDETAIL EST. 39 SY \j EST. 3 TONS SEE SS DANNY SEDBERRY CLASS IRIS`. P EST. 7 SY GF DB 599 PG 239 EST.3 TONY GRASS PC E SLIDE 950 & 96A EST.7 SY GF CARL EUGENEE MANESS pb O O OB 332 PG 244 y�ry 1-BL- 582 PINC 296+95.01 4f pb ' 00 y a a ter: BRIDGE PROJECT REFERENCE NO. SHEET NO. R-0623 29 RAY SHEET NO. S ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS O� Z DD V2JT I111, h`DR CONBTRUCTION FOR PROFILE OF LINE -L- SEE SHEET 49 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS STANDARD BASE DITCH SEE DETAIL S EST. 80 CY DDE WOODS 1 ' END C/A FENCE e <r CLASS IIRIP RB'I F i\ F, .. 9s Bq9—O C Ln 8\ FILTER FABR16-7 i0 S1�pR PT. END APP790ACH SL 151, w/ 2 ELBOWS 1 / ,hd \ c 19•• ELBOW W ,.STA 341+21,60 z9t1 PASTURE 291D + G U 350 / / < 2GIO WOODS FS z91e N 15" RCP -IV P / 4P O GI 2GI N O BK COLUM 48' WD AIL 48" WD RAIL & ISBW ASSOCIATED 5 >< A 0 ucT 919 r6" vo -- -------- TV F- - ----- co 50ry °4- - - -� REMOVE - - - - - ,a , I END All O n END B I -L- ST P m ? f -L- 341 S 6g•49'16 T BASE DITCH _ \ SEE DETAIL 1 �2 ^ \ F 3 �9 \ 9 D 5N. WOODS 62 MARY ALLENE WILLIS TRUSTEE DB 366 PG 421 (AATUR) N r 4'PS. J ZAT-Tr ro r ro 2GI T _ W C C i Z 2 ELBOWS 6j ORELIA MORRIS T J — OB 168 PG 767 „ter / - C C C S 49,S9,t6•E J- i U 44• 149.8 E 130, S 6EIP 149.80' CLASS B RIP AP EST.3 TONS / /- EST.10 SY GF � / ' WOODS 1 QG Q�Z e/Po/ o (Not to Sc le( � Outside Ditch Traifc�— � 20:1-�z.o'f.- Outside Ditch Traffic Flow 7 I I' 10' �12'f G1 +S_ GI etc. S=Ditch Sloe � Proposed Ditch FROM STA. 333+65 RT FROM STA. 345+85 LT S-Ditch lope FROM fL Proposed Ditch STA. 334+85 L7 FROM STA. 343+35 RT aS . S S` ti o ,ry0 O �O 2 BRIAN MORRIS o OB 627 PG 752 PROJECT REFERENCE NO. SHEET NO. R-0623 30 RM/ SHEET NO. DETAIL A DETAIL B DETAIL C I ROADWAY DESIGN HYDRAULICS FALSE SUMP IN.10 scale) FALSE SUMP FALSE SUMP ENGINEER ENGINEER e ( Not to Scale) (N ot Sl Outside Ditch Medinn DitchOutsideDth Iz 0, Troffi�Flow81FOBChoZG1 IDRELIMINARY FLANS }000 NOT USE FOR CONSTRUCTION c. S=Ditch Slope S=Ditch Slope 4 Proposed Ditch S=Ditch Slope 4 Proposedc FROM STA. 347+85 LT FROM STA. 347+85 RT Ditch Grade L Ditch Grade L w FROM STA. 350+75 L7 0.0% To 2.0% 20' Over 4.0% To 6.0% 40' 1- FROM STA. 352+35 LT Over 2.0% To 4.0% 30' Over 6.0% 50' o N FROM STA. 358+15 LT FROM STA. 359+35 L7 FROM STA. 347+85 CLFROM STA.351+35 CL FROM STA. 354+35 CL a- z FOR PROFILE OF LINE -L- SEE SHEETS 49 FROM STA. 358+15 CL AND 50 OQ I SEE SHEETS 2& 2-I DI Z FOR DRAINAGE DITCH DETAILS CLASS B RIP RAP e� c / EST. 2 TONS BRIAN MORRIS -L-TS Sto. 347+70.36 / ss �Py EST.7 SY GF DS 627 PG 752 pG� -L-SC Sto.349-155636 eP �� �55 \,v � w X 255' w G FENCE STANDARD B DITCH ,...7D€...... +4/57 SEE DETAIL Q o/ a 140' / // ~~.^ I I SMALL TREES / // / 1605 X' BERM DITCH I► 140' / EAT BASE DITCHei w I - SEE DETAIL AA W W R = CHORD l��E j BEG C/A � �►) FENCE +2987 3001 / f 0 4'PS FS j TREES \ I M DUCT — PED X FS 211I I� _ y O JEND `C/A 4'PS a1 b. FENCE FS tAATURI �� V.! +20 — SOi 5 T7'04'16'E— WD POST U 0 MTL GATE / 12 C,'pj40 PUE PUE PUE + 3 PUE PUE BEG C/A +50. / - - FENCE 130' 130' RT +BD 6P o5 L- MARY ALLENE WILLIS TRUSTEE 145'RT QaJ +t8.00-1.- BB 366 PG 421 WOODS SEE DETAIL L ';Q II I PASTURE d END A D DRAIN POND REMOVE DAM ? j X) FENCE ^ F95 W X +79.31 40' POND POND +65 ' 140' �I - r � p O gals ELBOW + BDO Z 3oa6 CC C' y ` rn _ 3009 { P / Q 30 3 EIP •O TF'"Daq. i KEY PAD MTL GATE C 2G p NPNT 2GI ' FS oo] �"'"•'- { FOR GATE WHOP 24" P-III S vl FS e r 1.4 2GI 30"FRCP-111� FS E 3mo NO - Ln �{ 2G1O�d x X�x mz 4 p ANDXTEND I—X— «���� RETAIN I - 01 FS FS- _ - I II I - oo Ml —= -L - 1- RETAI -WNC W---__________e -MONTGOMERY ------------n- p•PS. Q _�� 24/27 BST CO. O r50 RETAIN CAT-1 - " AATUR a Ln --- _— ----"— I �" fow— rn CAT 1 GRAU 350 F _ F V: �IRIP RAP S 56b2.12. 188.44\ END C/A FENCE _ I F BEG C/A FENCE o-coar r a"^^RENT Nate ns[u[NT m ii_f nor rcamAnENr +40 w000s +00 rn{ NAce EA SEMEN, / R .. / —PUE R EIP S 62'03'49•E - PUE PUE w PUE PUE - PUE �� 1 p PUE PUE PUE - / P J E �� I 64 SOiL h 130 I ORELIA MORRIS 1", RT -1 -L- CLASS B RIP RAP 145'RT - 4 -L- DB 168 PG 767 +65 1451RT EST. 5 TONS _ SOIL _ — — — — — - -' / 145' RT -L- 145' RT DS RT ) I 155' RT WOODS / I 155' RT EST. 17 SY GF + 7 -L- +76.00 -L- 144.50' RT 144.50' RT / / +95.50 -L- 144.50' RT 144.50' RT i I I \ \ 55' RT 1as RT -EL- 585 PNC 39+38.23 ) -BL- 584 PINC 311+04.35 \N 3Bb 4620 q9 -L - o, q Pls Sto 348+9036 P1 Sto 356+97.44 es = r 21' 25z A = 22' 14' 41.9 (LT) \ Ls = 180DU D = r 30' 28A' LT = 120.00' L = 1.47534' ST = 60.00' T = 747.08' \ R = 3,800.00' se = 0.04 "� N 6 a DETAIL FALSE SUMP F IN. to 5colel � Outside DitchwTr�o�0:1 - 13 p.lI _G.S=Ditch Slope -. Proposed Ditch FROM STA.362+10 LT DETAIL C FALSE SUMP ( Not to Smle) Median Ditch _ See Chan SeIo ) —.,�-- 20' —�{ GI _S— etc S=Ditch Slope fL Proposed Ditch FROM STA.362+10 CL FROM STA.365+00 CL fz 65 R0623-7 (CPS) ROSE BOWMAN -BL- PINC 325+91.85 IDS 143 PG 565 BIV#29 ELEVATION - 477.44' N 585469 E 1747984 BL STATION 319+68 105 LEFT RR SPIKE IN BASE OF POWER POLE (CP&L #AAL`3 END C/A + ONCE BEG C/A FENCE +78 SMALL TREES -L-ST Sto..366+0570 BERM DITCH SEE DETAIL AA -L-CS Sto. 364+2570 I 10 4 + 0' 52555'MED/AN TRANS/TIDN q C q + < < 100' N 7'SI' CHORD C 00 © FS - C E.S N / -J 4'PS. REM 2GI-c'�C3—zT1� _. �a ii R MOVE g �� ONTGOMEf Y CO F F 'F �/ NGOG1 PERINEI CLASS B RIP RAP GRAINAGE EASE EST.3 TONS C EST. 10 SY GF TOE PROT — PUE — PUE t06 -L- + 2 -L- 130' RT 155' RT 145' RT 145' RT 155' R +30 WOODS 64 ORELIA MORRIS OB 168 PG 767 PROJECT REFERENCE NO. SHEET NO. DETOUR DESIGN SPEED = 45 MPH R-0623 1 31 I IVW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION FOR PROFILE OF LINE -L- SEE SHEET 50 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS EARLE POOLE OB 274 PG 300 L z END TIP PROJECT R-0623 -L- POT Sta. 368 + 00.00 END C/ FENCE -L- ST 368+Op CONc Rw \po RETAIN 100' +00 \\ 74.95' WOODS dk CONC IIW WOODS (EX. RW 310B st Nq 105.31' 105.33' GRADER BLADE _ EXSTNW R/N ' 1() p NC 24/4 BL BST ~� W -- — — CB RETAIN FS _ ti a RETAIN o NC 4/27 EBLo BST �♦ o �� W 15' RCP 5533.3 \�— DETAIL 3 END C/A FILL TO RAY LIMITS Z+Y FENCE .I.BEG ROCXPION T\N65 481. C v. 2GI 70 1B v✓M 2GI 3106 ASSOL'IAT'E�� '. PIPING FOUND C/A FENCECELEVATION +25 I ROR - E%iSiING Riw q — C C3 C % PUE PLIE F F F, m DU DUE roNB +25.70 i WOODS +00 _L- 153' RT 130'.' END C/A FENCE -L- STA368+00 REMOVE RISER AND OUTLE 130' PIPE FROM POND -L- BREACH DAM -L- RT EXCAVATION=305 CY w \ 1474T RT ✓y� I2" RC 4to'--\DRAIN POND +20 -L- 155' RT +39 -L- WOODS TOF � S 1 145' RT \EMOVE \ 145' RT J TOE\ ---is �Y TOE\ 6b 0 0 r TOE ORELIA MORRIS 35 290' DS 152 PG 486 -L - P1 Sto 356+97.44 PIS Sto 364+85.70 A = 22' 14' 41.9' QT / 9s = r 21' 25.2 D = i 30' 28A' Ls = 180.00' L = 1.47534' LT = 120.00' T = 747.08' ST = 60.00' R = 3.800A0' se = 0.04 NC 24/27 WBL 85T Sa II MONTGOMERY'C0. NII RETAIN NC 24�27 EBL BST — — (AATUR) __ t - - EXISTNIG R/M ' MTL W GATE +00 WOODS 75.05' I W (EX. RW) 1 +00 I \ 130' W0005 N: ALLENE WILLIAMS OB 243 PG 823 I I O m 0 to W \ H \ eN -Y12- F\ Pl Sto \ 17 +04N � = 54'38 51.2. (RT) L = 19ob2' F\ T = 10 0. R = 200.00' ;to.16+01.62 \ 081A528LPCS685R PC D SLIDE I&D Tgffs O w IcA. NV V' DITCH SEE DETAI 37 �y JOHN C. KING. JR. & P y FREDRICK H. TAYLOR 'S OB 299 PC 622 OB 299 PC 618 203 CLASS B RIP RAP .`` EST.2 TONS EST.7 SY FF -Y/2-PT St O O ��� P... 19, V�) RETAIN C4, f WOODS R 50.00' 3202 2GI / Fs R 15' +65 -Y13- -Y12-POT Sto. 18' 55' LT BEG CIA -Y/3-POC Sto. /6• BEG FENCE 37 JOHN C. KING. JR. & FREDRICK H. TAYLOR OB 299 PC 622 DB 299 PC 618 DETAIL B FALSE SUMP ( Not}. Scale( Outside Ditch Traffic Flow �2 �« GI S — etc. S=Ditch Slope 4 Proposed Ditch FROM -Y13- STA. 15+65 LT FROM -Y13- STA. 17+65 LT AXLE N 22t86126_ N 21'S2'tT E _ N 49.44' 6' W �PQ I EIP EIP 602 86 \F\ JBR. LLC m oqs OB 628 PC 154 e PC E SLIDE 1438 sFry\ u � cd as Fryr GRADE TO DRAIN m \ TO EXISTING DITCH t Ess 8� -Yt3- PC 10f76.56 -113- POT /0+00.00 DB 328 PG 883 \ \ F + -Y13- / 60' RT. +56.90 -Y13- \ \ 282'TRANSITION l CRASS +50 -YI3-\ 62' RT. / a 30'(EX. F, \ .SN R I I CANOPY C � / 2pN w 30"C&G G SS S I EN5 r Ow N NR)) o N o 30 C& /W 6 --- 8 2'Ps. tit EIP F - ro C&C tow W I T 9.90' Elp sic TO CL� �T 6" 30' C&G W \ F BEGIN CONSTRUCTION +40.50 -Y13- C J + -LT +31 -Y13- FO TE 55' LT m a LT N \s ° -Y13- POT I0+50 +48.50 Y13- rn w GR 77.50' LT +28.50 -Y13- y - \ + F u, n 83.50' LT --. 30' CUTOVER -- - \ o -Y4-POT Sto.10+00.00 Ilm o� - N i 0 A2) WM's 70 F PIPING OOUNOG 69 CARL MANESS N 40.06'05-E DB 229 PC 379 co.00• BUFFA BUIE OB 612 PC 381 Eia -Y4-POT Sto.11+22.46 w 129.22' o�F -Y13- P1 Sto 15+41.58 A = 34' 26' 54.Y (LT) F% \ D = 3' 49' 1/.0' L = 901.86' T = 465.00 a AL J. LINCOLN \ \ R = 1.500.00' w DS 185 PC 825 oN R2527-II (GPS) -BY5- POT 20+25.60 N 37.OS'36' E I03.30`----I( I \ PROJECT REFERENCE NO. SHEET NO. R-0623 32 RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION FOR PROFILE OF LINE -Y12- SEE SHEET 54 FOR PROFILE OF LINE -Y13- SEE SHEET 54 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS z O 2 O 43 PRISCILLA MORRIS & JAMES SAUNDERS OB 706 PG 534 L0 a— Lu LLJ N 3 LLJ AMES SAUNDERS R LLJ Dill 706 PG 530 N ' F. so- '301 LT CULTIVATED FIELD 0 OcIP EXISTWG R/N EfP w -- --- — r t~ -^I 0 EXISTIK R/W 3 END CONSTRUCTION +SO-Y6-_Y6_ STA/9+50 LLJ 30', 50' RT Z WOODS J U C MATCH LINE -Y7- STA 14+50 SEE SHEET 34 r � / \ LAT BASE DITCH SEE DETAIL G - 598 PINC -Y7- 14+25 mig WOODS R FS T FO- EIP \ \ \ 9 S B9 00• w!\ 42 CHARLES SAUNDERS DO 100 PG 903 DST R0623-2 (GPS) -BY6- POT 19+81.06 = -BY7- POT 5+00.00 BEGIN SBG -Y7- 14+25 43 ism PRISCILLA MORRIS & JAMES SAUNDERS FS DB 706 PG 534 CLASS B RIP RAP u EST.2 TONS EST.7 SY GF 72 N 6-POT LANE POOLE.JR. 06 456 PG 653 K50' 0' TREES — ----- T TT FO T FO T WM � NO ASSOCIATED ❑GONG SEPTIC TANK - PIPING FOUND GRASS DBS�I� PG W325 - ,So 5 J6300 00•f 3 0p 0,99 0.5F N N DETAIL DETAIL B T FALSE SUMP F� (Nat to s<m.) FALSE SUMP �I I_ Outside Ditch Outside Ditch �lT 0,f Traffic Flow /0 Tro�F�o—�o.Y 2'� GI GI t S _ S _ etc. S=Ditch Slope Proposed Ditch S=Ditch Slope fL Proposed Ditch FROM STA. -Y7- 13 + 65 RT FROM STA. -Y7-13+65 LT PROJECT REFERENCE NO. SHEET NO. R-0623 33 RNd SHEET NO. '.OADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION FOR PROFILE OF LINE -Y6- SEE SHEET 51 FOR PROFILE OF LINE -Y7- SEE SHEET 52 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS CAPELSIE RD. ACT 2014 SR 1519 ADT 2040 310 400 �Y z I 310 00 40� -100 1,431 1 1,121 1,700 -Y6- PEKIN RD. 1,300 SR 1005 E N O �J 0 S E EARTH DAM r + -- ,Q 70' Y `T 2GI-TB 7 ft \ a, N es \ \ Q Z -Y7A- \ \ Pl Sto 10+58J8 Pl Sto Z 19' 194 \ A = 6'27' 33j tLTI D = 263 l9B'fRTI \ D = lr 27' 330' D = 28' 38' 52.4• L = 5425' L = 112,6Y T = 27J5' T = 57.W R = 5W.W R = 200DU \ s 43 �� PRISCILLA MORRIS & JAMES SAUNDERS 11 -BY7- 603 POT 21+28.82 / DB 706 PG 534 -BY7- 99 PINC 11+10,86 �eezc -Y7-PC Sto.16+9678 WOODS TOE PROTECTION SEE DETAIL F 7 t 6 0 � O CAROLYN PLOWMAN DB 665 PG 840 PC C SLIDE 026 / III ) -Y7A-P i -BY7- 602 PINC 18+48.06 \\ C +70 -Y7A- + \ (EX. RhV ` \ C �\\ \ R 30' -Y7-PT Sto.19+56.66 c / '51 Al / +67.81 -Y7- y� 40' RT 466 -Y7- � C GI -Y7-F FS = / 10 U-350 F5 2GI a4oa -BY7- 601 PINC 16+18.45 3405 CL B RIP RAP EST.2 TONS EST. 7 SY GF WOODS -BY7- 600 PINC 13+69.63 w' P1 Sto /8+355/ p = 49' 37' 59D' (LT) D = /9' 05' 549' L = 259B8' -Y7- P1 Sto 22+8595 A = 42' 59' 205' (RT) D = /9' 05' 549' L = 225D9r P1 Sto 24+98D1 A = l 5r lL4 tLTt D = r l8' 07B' L = 142.3r \ T = 13870 T = III T = 7IJ6' a \ R = 300.W R = 300D0' R = 4.400D7 -o N m G' i \ \ N c 0 \0 �aj S lq 23'S 0 0 )e95.8y2 E U� W � � 0 G OD' \ C \0 WOODS S 79' 02' 52D' E Sto. 23+92.90 +92.90 -Y7 40' LT !q� JAMESLSAUNDERS B DB 706 PG 534 WOOD, PROJECT REFERENCE NO. SHEET NO. R-0623 34 P,W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION ® FOR PROFILE OF LINE -Y7- SEE SHEET 52 FOR PROFILE OF LINE -Y7A- SEE SHEET 55 MARK BRASWELL DB 639 PG 653 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS GRADE TO DRAIN =� Ex's r 644TOR) Sq IS1919 _ Exisrw� ai - w nYo. GRADE TO DRAIN _ DETAIL A =" DETAIL B FALSE SUMP FF FALSE S (Not to Scale) le) I Outside Ditch Oolside Ditch 'l2 e,� Traffic Flow 2' l0 �.- GI etc. S=Ditch Slope ¢ Proposed Ditch S=Ditch Slope fp Proposed Ditch FROM STA. -Y7-18+85 LT FROM STA. -Y7- 18 + B5 RT -Y//- P1 Sto /7+16.78 A = //' 52' /4.5' (RT) D = l' 47' 25.8' L = 662-W T = 332M' R = 3200.W �3 LEONARD RAY MORRISS AND WIFE ay v ORELIA MORRIS 5 ti DB 152 PG 483 �w -Y9-PC Sto.10+0000 a� .SqO ham' �^i S t� ooy ao qe. 6 ANGLE IRON 9. AXLE 9991 v 93, R N \ / �1w WNFRED LEMONDS DB TOIPG BW BEGIN OVERLAY -YN- POT 13+50 +84.09 30', 35' LT. \ . 2-5 1A \ \ N +83 -Yll- j \ rn 44.58' LT R GRASS I � \ - -Y9- P/ Sto /0+6/.82 P/ Sto 14+1930 DETAIL A B A = 3'36'/33'tRT1 A = 45'26'23.0'(RT) AA FALSE SUMP D = 2 54569 D = 28' 38' 52.4' I R.f f. L = 123.59' L = 158.61' of,tside Ditch �2.0' . T = 61,82' T = 8374' fir°-�oa 20:1 R = 1965A0 R = 20000 G1 S- S=Ditch Sloe Proposed Ditch -BY9- 604 POT 5+00.00 FROM STA.-Y9-16+15 RT I+ 73 GEORGIA-SOUTHE ASTERN LAND CO. -BYII- 596 DB 679 PG 657 PINC 10+72.14 WOOI, I \ \GCT \ 3505 \2C +00 -Y9- % R _ PUE LLRU GRASS PUE +87 54 BRT. I I +05 90' RT. +40 7L, +84.09 m +00 I I nl I 3 +U. 7 55' RT. 30', 70' RT. I I I 4•.7 90' T -Y9-PC Sto.15+8 63' RT GRADE TO 74 Z DRAIN JERRY ARNOLD WOODS DB 423 PG 26 75 7fi CONSTRUCTION DAVID BEAMAN 'OT STA 12+84 W. THOMAS JOHNSON Q DB 562 PG 643 -YlI-PC Sto. 13+8 09 DS 628 PG 628 o^ -Y9- P1 Sto /8+182, A = 33' 02' 2. D = 7' 09' 43J L = 46133' T = 23728' R = 800.W IS 81.0- N 82'34.33' W -'- '9-PC Sto.13+3556 -BY9- 605 PINC 8+90.84 DE TO DRAIN R0623-5 (GPS) -BY9- PINC 10+54.12 n.50'LT -BYII- PINC 14+84.81 GRASS +92 -Y9- 55.72 / / +51.82 -Y9- / ,26.14' 3510 7'7 UNITED STATES OF AMERICA OB 89 PG 145 Irn PROJECT REFERENCE NO. SHEET NO. R-0623 35 KW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS OD NOT t7SE FOR CONSTRUCTION FOR PROFILE OF LINE -Y9- SEE SHEET 53 FOR PROFILE OF LINE -Yll- SEE SHEET 54 SEE SHEETS 2-H & 2-1 FOR DRAINAGE DITCH DETAILS 1/1OC. I / / i 111T.1\e // �.. t �11r'.111911@. GRADE• DRAIN �p WOODS END GRADE AND PAVEMENT TRENCHLESS INSTALLATION .'1.;m.n.o.... a\m9.P171 ,�;� I r1 0 WELDED STEEL f1Yxr.11R�r1;I\ 19IfVON111 � JInCOLLAR , 191.... s 40011111oo1ar�. .111111a 1 WOODS # � �ov11.o1or v.:um.111uurivu.0 .\ o1�1n... . �rnn�11.1aorrnuracac.rs s� ` .u�.• . -�111��� jYL`C•� I fAW. • TGOIXERY co.. 3503 F wo G; 3502 U E 509 .' PI E I CLASS B RIP RAP EST.2 TONS EST.7 SY GF \ +12. 2 -Y- \ \ I 90, LT SPECIAL\C0Y DITCH I - +30 - - SEE DETAIL GG 9 N ' - 9-PT 5io. I 2= Sto. l9 5 \ -BY9 606 PINC 2+95.78 e EI� o Q MARY SMITHERMA` \ \ OB 29 PG 21 \ A U k 0 � 0 P 1q M +65.50 -Y11- 70.12' RT LAT 'I DITCH SEE DETAIL UU T'8 JAMES HAYWOOD DB 154 PG 42 OB 166 PG 680 DS 252 PG 652 PAGE ST. 2,962 3,500 PN M 210 Y _700 300 J NL -100 4,107 -Yll-� 5,900 BUS NC 2427 3 897� 00 5,600 -100 6,648 8,800 ADT 2014 ADT 2040 -100 -100 _i NC 24/27 L,sT -_ EIP 20.I c o N N ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■RIGHT . . E DITCH ------- PIPE WDRAULIC DATA D E' , , YRS -■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■ EL 540-70' �■■■■■■■■■■■■■■■■■■■■■■iiiiiii�ifiiii�'i'i■�■■■■■■■■■■■■■■■■■\I■■� me ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ �!■■■■■■ :iii■■■■■■■■iii■■I■■ ■■■■■■i�___,■■■■■■■■■■■■■■■■■■■®■■■■■■■■■■■■■■e■■_____�■■ .. , . ■■■■■■i ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■.PEN ■ i■■� ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■i■■■■ , . ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ... ■■■■■■■■■■■I "EL ' -'' 1■■■■■■■■■■■■`■��■■■■■iii'ii■■■1■■■■■■■■■■� �■■■■■■■■■■i�ill�ii!iiiii:iri®���i�i�i■■■■■■■■■■■■■�1■■■■■■■■■■� �■■■■�!i!����iiiiiiiiiiii=ii=its■■■■■■■■■■■■ill■1■■■■■■■■■■� �■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■iiA■■■■■■■■�1■■■1■■■■■■■■■■� ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■iiA■■■■I�i■■■■�----1■■■■■BEGIN ELEV. 551 43 GRADE ���■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■i■■■■r■■■■■� M■■■■ INGIN11 ENGINEER '.■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■NONE PRELIMIPLANS - „ ■■■■■■■■■■■■■■■■■■■■■■■■■■E■■■■■■EEEE■■■■I EL :. IENNE VC BEGIN GRADE m■IL_-- ' J■■■■■■■■■■■■■■■■■N■O■■E■■■■■■N\!NNii■NNE'■■■■■■■■■M �■E_E:EEE■■■■■■■■■■■■■EEEE®E�EEEE,�EEE■E: ■NEE■E ■■■ = E■EEEE■■� �■■■■■■NN■NEE■Ri■NQii■■■■N■■�iIN�-! : = ■■■ = ■■■��■E■■®��N■■1■E � N■■■■� ■■■■e==oEir�EE■■■■■■■■■■i■■■■EEEE■NEE■■E��■■■NE��■■E�■EEE■■■■� �■EEEEEEEEe�.EEO■■■■■■■■■■i■■■■EEE®■NEE■■E��■■■EE��■■■■■E®■■■■� .�■■■■■■■■�.-�EEE!�i■■■NEE■■■■■■■■■■■■■■■NN■■■■■■■■■■� �EEEE■■r�E'- -. „■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ME ■\�■■■■■■■■■■■■■■■NEE .:, �■EE��==EEO■■■■■■■■■■■■■■E■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■� ME ME ,, 41 42 �■■EE,.;.EEO■■■■■■■■■■E■■■■■■■■■E■■■■■■■■■■NEE■■■■■■■■■■■■■� ■■�■�ii■■■N■■■■■■■E��E■■E■■■■N�■■■■■�I■■E■■■■O■�N7■■■■NEE■■ . , .. No ME EN■NENN■Nse■N■i:■■-NE■■■■ : IN■■■■_� :E■NOON■ E ■■■■M =138 ■■E■� K ■■■■■!IN■ICNN■■■i■■■■�ii■D■NNiN■N�G�■■■■ E■■■■■■\lMEMEMI1\■■■■■MEOEM �■■■■■EEEE■■E■■■NEE■■■ri■ : E •-E EESEesEVE�`==of=E........E■� �■■■■■EEEE■■E■■■NEE■■■I■■ ■ E�EEE■■■■■■■■■NE-■--.EEe�EEE•E�.�l� : M■■■■■■■■■■■_________NlIMNEE®■E■■i■- �■E■E■E■E■EN ' ' " e="■ERI■EEE■■i■■i ■E■E■iEEE.ENOMONEEme DRAINAGE ,, , - ; . , . - ,, ■■■■■■■■■■■,- ��■■EM■SEE■i�■EiMWEENN ■e■■I■ME■NI■■■ ., DESIGN HW ELEVATION = 53820 FT . BASE DISCHARGE = cm CFSOMMEMP Mir ; ', ' ■■■■■■■■■■■ ■■■NEE■EEE'AilM ■E ■� E i ■■��E■■ .. - . _MEMOMEM , - , - -AR ,. - 'TELEVATION' - . • - , - - , - : .. �■■E■E■E■E■E OVERTOPPING . ■■■■CIE■■■■■iE■i OVERTOPPING ELEVATION 6, ■EEN .1MMIMEN®IEE■EN • 1 EE DITCH LEGEND III SHEETS 7 & 8 FOR PLAN • . 0 ME ENGINEER ENGINEER �RIGHT DITCH ■■■■■■■■■■■■■■■■■■■____�■■■■■■■r---VC ■■■■■■■■ /jo(y PRELIMI PLANS li,52 ■■■■■■■■■■■•e_�-■■gees■■■■■■■■■■■■■■■■■■■■■:■■■■■■■■■■■■■■� . ., .. .: NEW CULVERT HYDRAULIC DATA BASE DISCHARGE S own MIS OVERTOPPING ELEVATION = 523.3 FT ■■■■■■.iii0■■■■■■■■■■■■■■iii■■iiii:■■■■:;■■■iiiiCii■■■■A■■� ■■■■■�1C�i®■■■■■■■■■ii�iii�i�iiiiQi■■■����■, , ::�!■iii■■■i■■■i■■� MMMMMMM imma PIPE HYDRAULIC DATA Ism I DRAINAGE AREA = 482 AC REEF OVERTOPPING ELEVATION = 517.5 FT I■■■■■■5 mmmmm �■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!� • • • • 1 • • 1 81 DITCH LEGEND SEE SHEET 9 & 10 FOR PLAN OF -L- OEM ■■■■■■■■■■■■■■■■■■■■■ ' " ' ' 1■■■■■■■■■ ME OVERTOPPING FREOUENCY = 500: YRS 11 ■■■■■■■■■■■■■■■■■■■■■■■■■■■■:■���������J■■■■■L_—J■■■■■■ME �■■■■■■■■■■■■Zvi■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■i�iioi■■■� .. ., ., ■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■ - - ■■■■■■■■■■■■■■■EM■■■■■■■■■■■■■■■■■■■■■■■■■����a■■'-. , , ;A .. -' - ' ■■■■■■■■■■■■■■■� M■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ; DISCHARGE - HW ELEVATION = 5. FT ■■■■■■■■■■■■■■■M ■■■■■■■■■■■■■■■■■■e�iirl�■■■■■■■■■ESIGN //00EAARR ' - . , ■■■■■■■■■■■■■■■MN BEMEMEMEMEMMOMMMEM ., OVERTOPPING ==-- - ■i■■■■:!■■■■■■Qii■■■■■■■■■■■■■■■■ - ■■■■■■■■■■■■■■■NE �■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■i�!■■■■■■■■■ice■■■■_■■■� DITCH LEGEND SEE SHEETS 11 & 12 FOR PLAN OF -L- INGIN11 ENGINEER ■■■■■■■■■■■■■■■■■■■■��eSZ���■■■■■■■■■■■■■■■■ ME ■■■■■■■■■■■■■■■■■es■■■■■■ ■■■■■■■■a■■■■■■■■■■■■ ■■■■■■■■■■■■■■■v■■■■■■■■■____■■■■■■■■■■■■■■■■■■■■■______ 107 0• 109 MESEE SHEETS 12 & 13 FOR PLAN OF -L- 11 EM■■■■■■■■■■■■■■■■■■■■■■■■■■■■••',■■■■■■■■■■■����■■■■■ 11 ME■■a■■■■■■■■■I - IRM ,. „ I■■■■■■■■■■■���%i�■■■■■■■■■1�=oii■■■■■■■■■� -me BRIDGE HYDRAULIC DATA , ,. BASE DISCHARGE = J." CFS�MMMMMMM � = ; = = - ELEVATION � • ;; � - - . , .. " • . AT DATE OF SURVEY = 449-3 FT EMEMEMEM !�■■00m■■■■■■■11!!�m�MEiFimmf I■■I■■■■■■■■■■osio■■■ ■■■■■■!a M■■■■■■emm :; il■11klism 0i■■IoNFANI■SIO■■■■ENE 'R■■■■■■■ ■■■■■■� .. , ■■■■■■■M■■■I■11�1■■ -I■■INMIA■I■EI■MeMEN®E1l� .. EM■■■■ ■■■■■■ .. , ■■■■■��■I■11■■■I����I■�■'ii■■■� .; ■■■■■ ■■■■■■ME ! ■�e�■��� .. � �11:� Maii.9 mrlizmmmm■■!le®■■■■■■■■ ■■■■■■Ws MEMEMEME • 1 SEE SHEETS 13 & 14 FOR PLAN OF -L- RROI REFERENCE NO. SHEET NO. - R-0623 4/ ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION -L- 650 63 620 / / P1 EL VC = 143+00.00 = 592J5' = K=154 720 600 / '01t ►32 1570 Lr 10, .00 Soo 133 134 135 136 137 138 139 140 141 142 143 144 145 146 DITCH LEGEND SEE SHEETS 14 & 15 FOR PLAN OF -L- PROJECT REFERENCE NO. SHEET NO R-0623 1 42 LEFT DITCH -L- ROAD SIGN ENGINEER HYDRAULICS ENGINEER RIGHT DITCH - - - - - - - PRELIMINARY PLANS Do NOT ISR FOR CONSTRUCTION _ 620 PI = l5/+10.00 EL = VC = K = 602-W 350' 189 620 610 34% Ann �In B G/N ITC RT �' '' EN D/T H R E E A /5 . = 5 +50 g * � M sT EL. /53 5 00 JO' 570 4ltnW m W 146 147 148 149 150 151 152 153 154 155 156 157 158 159 SEE SHEETS 15 & 16 FOR PLAN OF -L- PI = 169+50.00 EL = 59327' VC = 36V K=/57 Ain 112.8i SRO BEGIN bITCH RT S7 E A 17/ = 5 00 L00' BE IN D TCH LT 560 ST EL. l7/+ = 56 0.00 159 160 161 162 163 164 165 166 167 168 169 170 171 172 DITCH LEGEND SEE SHEETS 16 & 17 FOR PLAN OF -L- PIPE HYDRAULIC DATA DRAINAGE AREA = 8D4 AC OVERTOPPING DISCHARGE = 80 OVERTOPPING ELEVATION = 578B FT • 180 ■■■■■�e�■����••.■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■W �■■■■■■■■i■i■■1���'i■■■i°i■ism■■■■■iiiiiii■■■■■■■■■■■\il�iii■■� ■■■i��11.- ■■■�iii1■1■■■■ii■■i�■■■■■■■■■■■■■■■iiiiiii■■■■■■■■■i■■� �■■■��'- ' ■■■■�■i��i■ill■�■I■■■■■■■■■■■■■■■■■■■■■■■iii�iiii■�■■� DRAIPIPE HYDRAULIC DATA NAGE ; . - OVERTOPPING ELEVATION = 531D FT M■■■■■■■■■■■■■■■■ =1■■■■■■■■I ■■■■■■■■■■■■■■■■■■■■■■� , • 190 185 186 DITCH LEGEND SEE SHEETS 18 & 19 FOR PLAN OF -L- 10AD.1,L)ESIGN HYDRAULICS ENGIN ER ENGINEER PRELIMI PLANS RIGHT DITCH ------- ■i■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■iiiiii■■■ �■■■■■■■■■iiiiiiiiiii■■■■■■ii■■■■■■■■■■■■■■■■■iii■■ ■■■■■■■ii■■■ii■■■■■■■■■■■iiiiiiii■■■■■■■■■■iiiiii■������� �■■�■■■■■■■■■■■■■■■■■■■■■iiiiiiii■■■■■■■■■■i■■■■■■■■■■■■■� ■■■iQii■■■■■■■■■■■■■■■i■iiiiii■■■■■■■iiiiiiiiiii■i■■■■■■� �■■■■■■i■iii■■■■iii■■■iiiiiiiii■iiiii■iiiiiiiiiii■i■■■i■■� �■■■■■■■��i■iii■■rQii■iiiiii' : �i��■iiii■ ': ' . "iiiiiiiiiiiii�si� 135 NVKC Mel • • , MMMMMMMMMM mill■I"��������i■■■■�■..iiii■■■■ii.r�'■iiii■■■■■■■■ ... ,CULVERT..HYDRAULIC ,,DATA ; - 'ELEVATION.0 - : - , - - DISCHARGE' OVERTOPPING-'ELEVATION� . ■■■■■■■■■ = iii ■■ii'l�1■■■■il��iiisii'1i-_ ■■■■■■■■■■� ■■■■■■■■■�!■■, : i ■■■1�11 ■ !■iiii■izii� ,. ■■ : i = ■■■■■■■■■ , or !■■■■■■■■■■■■■i■ ■■ =■iii■ : i = : ■■ i■■■■iii®■■■■■■■■■!� ■■■■■■iii■■■■■ ■i ■■■■■ � - ■i ■■ii■■■■ir■■■■■■■■■■■� ..■■■■■■■■i■■■ii■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■i■iii'iiiii■.. ■■■■■■i■■■■■■■■■■■■■■■■■i■■i■i■■■■■■■■■i■■■����i��■■■■■■ISM ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■iiii■■■■■■i■=■■■■i■■■■■■■� ■■■■■■■■■■■■■■■■■■■■■■■■■■iiiii■■ies=oiii■■■■■ii■i■■■■■■ME ■■■■■i■■■■■■■■■■■■■■■■iiii■iiiiii■■■■■■■■■■■■■iii■■■■■■■� ■■■i■■■■■■■■■■■■■iiiii■■■iii■■■■■■■■■■■■■■■i■■■i■■■■■■■■ME �■■■■■■■i!�iCi�i=iii■■■■■■■■■■■■■■■■■■■■■■■■■i■■■■■■■■■■■■� ■■■_■iAits■ii■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■� ■ii/i'fiiiiiiiiiiiiiiiiiiiiiiii■iiiiiiiiiiiiiiiiiiiiiiiiiiME „■■iii■■■■■■■■■■■■■■■■■■■iiiiii■■■■■■■■■■■■■■■■■■■■■■■■■■■.. ■■■■■■■■■■■■■■■■■■■■■■■iiiiii■■■■■■■■■■■■■■■■■■■■■■■■■■■ME .•,■■■■■■■■■■■■■■■■■■■■■■■iiiiii■■■■■■■■■■■■■■■■■■■■■■■■■■■!� ■■■■■■■■■■■■■■■■■■■■■■■■iiiii■iiiiiiiiiiiii■■■■■■■■■■■■■ME • 1 DITCH LEGEND SEE SHEETS 20 & 21 FOR PLAN OF -L- PROJECT REFERENCE NO SHEET NO. R-0623 45 LEFT DITCH ROADHS ENGINEER PRELIMINARY PLANS DO NOT USE FOR --RICTION RIGHT DITCH - - - - - - - L Pl = 225+00.00 EL = 57170 VC = 925' K=153 5190 cl:o M 97 f J145 % a u570 2 � W I J W WOZ 0400 tr * '- 550 d M o 5AQ11 � In d o v L Ln J p a q 2 V1 In 11 � * Q W ti N �d O V N Ln W m I W V N �tito In 5301 1I z u J 0 1 Z J 11 J 0 1 2 �I 11 m I ka 224 225 226 227 228 229 230 231 232 233 234 235 236 237 SEE SHEETS 21 & 22 FOR PLAN OF -L- -L- Lr tr PI = EL VC K=534 247440.00 = 539A0' = 200' - /. 98 �— f -1/ 598 ,kc 540 -J/ 520 END D TCH LT 590 PIPE HYDRAULIC DATA -L- Sto. 242+20 DRAINAGE AREA = 345 AC DESIGN FREOUENCY = 50 YRS DESIGN DISCHARGE = 68 CFS DESIGN HW ELEVATION = 526J FT l00 YEAR DISCHARGE = 80 CFS /00 YEAR HW ELEVATION = 5265 FT OVERTOPPING FREOUENCY= 500+ YRS OVERTOPPING DISCHARGE = 180 CFS OVERTOPPING ELEVATION = 531.8 FT 54' PIPE g* � - - S E .= 6A A.0 +65. 0 BE IN Di TCH T v n Ln 11 -L EL. Sr 52 24/+ 50 0.00 a W 500 500 490 490 237 238 239 240 241 242 243 244 245 246 247 248 249 250 DITCH LEGEND SEE SHEETS 22 & 23 FOR PLAN OF -L- ENGINEER ENGINEER RIGHT DITCH ------- PIPE HYDRAULIC DATA MEN PIPE HYDRAULIC DATA DRAINAGE AREA = 77.5 AC Mom DRAINAGE AREA = 5JJ AC PRELIMI PLANS MENEM DESIGN DISCHARGE = 140 CFS DESIGN HW ELEVATION = 514.7 FT Mom DESIGN DISCHARGE = /9 CFS DESIGN HW ELEVATION = 525D FT Effilmomm /00 YEAR DISCHARGE = 164 CFS mom /00 YEAR DISCHARGE = 21 CFSl /00 YEAR HW ELEVATION = 515�4 FT /00 YEAR HW ELEVATION = 525-3 FT OVERTOPPING DISCHARGE = 440 CFS OVERTOPPING DISCHARGE = 24 CFS OVERTOPPING ELEVATION = 5277 FT ONE OVERTOPPING ELEVATION = 525,6 FT MOMMENEW ■■■■■■■■i■iii■■■■■!!!■■■■■■■■■i■■■■■■■■iTiQ■■■■■■■■■■■■■■■M ■■a■■■■■■■■■■■■■■■■■■i■■■■■■■■■■■■■■■■■■■■■■i■s■■::■■s■W we ■ ■■I■■ ■■■■1 ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■i■!■'■■■■■■■Me PIPE HYDRAULIC DATA met DRAINAGE AREA = 729 AC MEMINIMMIMIRKWHIRIMI—Em elm ■■■■■■l■�i■■■■®■■■■■■■■■■■■■■■■■■■ ■■■■■■®■■■ ■f■■� - DISCHARGE - ttill■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ OVERTOPPING ELEVATIO ■■■■■■■■■■��■■■ : / 1 251 252 253 254 255 256 257 258 259 260 261 2o ■■r■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ We me 00-0030001 We EL 5/9-W ME■■■■N■■■L__J■■■■■■■■■■■■■■ ■■■■■■■■■■I■■■■■■■■■■ii■■=■■■■� : We me ■■■■■■■■■M�'■■■!•!■■■iii■■r■■■E■■■■■■■■I■■■r■■■■■■■■■■■■■■■ems me I Ism ■■■■■■■[■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ • 1 • 1 !■■■�■�■■IA_ ■■®■■■■■ -HYDRAULIC DATA ■■■■■F ----- ,— DATA i■■■■■■■■■■■■,, - ,,,. ;• - ,-. .. - - ' ■■■■■I ,-. .. : -• -■■■IN■-10■■NE■■■■■■■■■■- ■■■■■■■■■■■■■ME !�■■■■�■■1■i■■■■■■■■■ ■■■■■I ■■■■■■■■■■■■■! We -- DESIGN HW ELEVATION = 500.3 FT DISCHARGE DESIGN HW ELEVATION = 502D FT /00 YEAR DISCHARGE = 95 CFS 000001 /00 YEAR DISCHARGE = 38 CFS EMOMMEMEMEMEMEN OVERTOPPING DISCHARGE = 260 CFS OVERTOPPING DISCHARGE = 48 CFSEMOMMEMEMEMEMEN OVERTOPPING ELEVATION = 511.3 FT Nommol OVERTOPPING ELEVATION = 502,6 FT 263 264• •• 267 268 269 270 I DITCH LEGEND SEE SHEETS 24 & 25 FOR PLAN OF -L- PRELIMI PLANS EL 141 mmlVC m■■■■■■■■■■■■■■■ CULVERT - . DATA % DISCHARGE - %• - - - :: _ HW ELEVATION = 479J7 FT OVERTOPPING FREOUENCY= MOO YRS OVERTOPPING ELEVATION FT ■■■■■■i ii ■ ifi■Si■■■ii■■■■■■■■I■■ -!■■■= w■■■■■■■■■■■■■■■ ■■■■■■ ICI■!■■i�■I�■■■■■■■AI■■■■■■■!� ■■■■■■■■■■■■■■■ ■■gym■■■I■I�■■■■■■■�'�■ •• ■■■I■■■®■■■� NoBASE MEMEMEMEMEMEMEME • 280 281 282 283 284 285 286 287 288 289 ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■��i■i■ �■■■■■■■■■■■■■■■■■■■■� � ■■■■■■■■■■■■■■■■■■■■■_■�■wit■■ -• ■■■■■� me me 289 • / • . 300 1 1 LEGEND SEE SHEETS 26 & 27 FOR PLAN OF —L— ■■■■■■■■■■■■■■■■■■■■■■■■■■■■��iii����■■�■■■■■■■■■■■■■■■DITCH ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■IN■■■■■■■■■■■■■■■■■■■■Ism t7,7■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ �•, ■■\lil■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■W ■■■■■■■a■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■M I Me ■■■■■■■■■■■■■■■■■■■■■■■■■■r■■■ ®:�■a■■■■■■■■■■■■■■■■■■■■■.W !■■■■■■■■■■■■■■■■■■■�■■■■��®■■■■■■■■■ram!\■■■■■■■■■■■■■■■W �■■■■■■■■■■■■■■■■■■■ilk■■■■�®��■■■■■■■■■■■■��a��■■■■■■■■■■� We 315 • , ����''■_■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ PRELIMI PLANS mil■�■� - PI 334+20.00 VC 660' BRIDGE HYDRAULIC DATA DESIGN ■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■ a 1■ • • ;DISCHARGE ASE -. :; ., - =■■ �'►�■1�1■R�■1■■1■� • • HW ELEVATION = ''�1�1■ .■■■■■■■■■■■■■■■ - • • •BASE OVERTOPPING - ■■■■■■■■■■■■■■i�i■■■ ■ •, ■ ■■ OVERTOPPING ELEVATION = 4152r FT AT DATE OF SURVEY FT 328 • 330 331 332 333 334 335 336 337 3h 339 340 341 DITCH LEGEND SEE SHEETS 29 & 30 FOR PLAN OF -L ■■■■■■■■■■■■■■■■■■■■■■■■ •• ■■■■■■■■IW .. MEMEMEMEMEM� 449-3 VC 300' EM■■■■■■■■■■■■■■■■■!!■■■■■■■■■■����■■■■i■■■■■■■■■■■■! ' ■■■■■■■■■■■■■■■■■I • 1■■■■■■!■■■■■■■■■■■ = ■■■■E■■■■■■■■■� `_m_mJ�MowEXIST.PIPE ■■■■■■■■■■■■■■■■00 ��■■■■■■■■■■■■■�■■■�■■■■■■■■ HYDRAULIC DATA .. ■■1!■■■■Q�ii■■■■■■■■■■■■■■■■■■■■ DRAINAGE .. DESIGN - • - ■■■■■■■■■■■■■■■■■!l '•.• ■■■■■ = - ■■■®�: ■■■■■■■■■■■■■■■■ , DESIGN; ELEVATION ■■■■■■■■■■■■■■■■■EN • ■■■■■�■���■■■■■■■■■■■■■■■■■■■ • - , OVERTOPPING :DISCHARGEPPING - YEAR HW • •. - ■■■■■■■■■■■■■■■■■M ■■■■�®��■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■� OVERTOPPING ELEVATION = 438J FT M■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ • • DITCH LEGEND SEE SHEETS 30 & 31 FOR PLAN OF —L— PROJECT REFERENCE NO SHEET NO. R-0623 1 50 590 LEFT DITCH — — L— ROE GIINWAYEERSIGN HYDRAULICS RIGHT DITCH - - - - - - - 510 PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION PI EL VC K=147 = 365+25.00 = 49298' = 400' Soo 480 480 ND DITC f RT LC BEG W Di H RT TA 62+ E .474 460 STA 3621 94 L.67 85 354 355 356 357 358 359 360 361 362 363 364 365 366 367 SEE SHEET 31 FOR PLAN OF —L— SEE SHEET 6 FOR PLAN OF —Yl- -Yl- -L- ]BEGIN GRADE -Y1B- -Y1- STA. 17+62.86 ELEV. 568.56 END GRADE -Y1- STA. ELEV. 565.80 -Y1B- 20+00.00 PI= EL VC K 15+20.00 = 57I.40 = l00' = 70 P/= EL VC K=79 /9+00.00 = 56620' = 100' 570 560 540 530 520 -900 — — I-) A2 i 570 +) 0 u6% r i o 17�560 . — — — — — — BEGIN GRADE -Y1A- -Y1- STA. 14+00.00 ELEV. 572.12 AS 0550 N 550 END GRADE -Y1A- Y1- STA. 16+64.63 ELEV. 568.47 END GRADE L- STA. 368+00.00 ELEV. 494.55 CA cv i `n Lq O O O ' W N = 1 540 W I p W ti O Ln � �: W ' W W W 530 520 367 368 369 370 13 14 15 16 17 18 19 20 21 MINSEE SHEET 7 FOR PLAN OF -Y2- SEE SHEET 8 FOR PLAN OF -Y3- PIPE HYDRAULC DATA DRAINAGE ;.:ELEVATIONNo 0 OVERTOPPING AR . ,UENCY ,;OVERTOPPING DISCHARGE = 50 - ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I ■■■■■■■■■■ .. . ENGINEER ENGINEER PRELIMI PLANS ■■■■■■■■■■ ■■■■■■■■■■■■■■■■■I MEN �■■■■■■■■■E----■■■■■■■■■■■■■■■■■I ■■ NONE ■�■■■■NEE■■■■■■■■■■■■■■■■■■■■■■`��������BEGIN ____,■■■■■■����� GIN GRADE , STA. J��■■■� �t� NOON■■■■■■■■NEE-m■■■■■■■■■■■■■■■■■E\� :, 'NOON■■■ -Y3- - 52._� ,''1■III_--_E ., ,. ■\r■■■■E■■■■■■■■■■■1 . .. 540 NOON■■ , 530 510 500 ■■\E� , 1 m■\■■■■■■■■■■■■■■■■L__J■■■■■■ ■■■■■■ ■■O1\I IOI■■■■■� ■■ \■■■■■■■■■■■■■■OE■■!O■■■■■ ■■■■■■ ■■O'!��i■■■iII■■■■■■� MR., ■■■■■■■■■■■ONOe�:ri�1�■r■=O■ ■■■■■■ ■■■■■�O!!!►■ MEMO ■■= �■■■ \EEEDNii_r■E■■■■■■■■■■■■■■■ NOON■■ NOON■■:' " E�E�' I�■■■■■■� ■■i■!'!'E%■■■■■■■■■■■■■■■■■■■550,NOON■■520 ■■■Esi■OE■■■1■■■■■■■� ■■■■.ii.■E■■■■■■■■■■EEND -GRADE -,NOON ■■■■■■ ■■■NEE■■ =■�1■■■■■■■� , , , ,NOON ■■■■1 " ' , -' ■■■■■■■■■■■E NOON■■ ■■■■■M - ■E■OR■■■■■■■NE ME■■■■L__J■■■■■■■■■■■■■■■■■■■■ ■■■■■■ ■■■■NEE■■I11■■■■■■■� me ■■■■■■■■■■■■■■■■■■■■■■■■■■■■530MINIMEMIN ■■NONE ■■■■IIE■■■■■■� ME ■■■■■■■E■■■■■■■■■■■■■■■■■■■■ ■■■■■■ ■■■■■■■■■■■■■■■■■■ME ml ■■■■■■■■■■■■■■■■■■■■■■■■■■■■520 ■■■■■■.•,■■■■■■■■■■■■■■■■■■M MESEE SHEET 6 FOR PLAN OF -Y5- SEE SHEETS 15 & 33 FOR PLAN OF -Y6- FEE MEN ——1■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■E■■■■■■■■■■■■■■■■ME ----■■■■■■■■■■■■■■■■E■■■■■■■■■■■■NEE■■■■■E■■■■■■■■■■FEE No MEN ME■■■■O■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■0��,■■■■■■lMM PI , ... ■■■■■■■■■■■■■■■■■■■■■■■■■■■■1 :f �1 ■■■■■■■■■■i■■mi■■■■■■m .,, 560 - me ■E■ ' I■■■■■■ NOON■■■—:—.7■■■■■■E■■'O■■=a�i�iEiEEi■�EQ ' .,. �■\\■■i■■i�■■■■■■ ■■■■■■■1 NOON■EE'i■i��i■EIS■■■■■■■■■■■■■11■� ■iE!! ! E■■■■■ ■■■■■■■■■■■■NEE■SE■■1■■■■L' - . : ' . , . 6' ■■■■■■■■11■ • . ■■ ��Eil■■'■■■■ - ■■I■■■■■■■ E■a■N�wmm2-,- ■■■■�■■■■I. me ., ■■■■Immnm■■■■■■■1 6A- . ; , .. .m■■■1END■� . ... ,1■ . N■■■■■■■■■■ADE ■■1 MEN ■■■■■■`■■■■i■■■■■■■■■■■■r■■■■r■MIN m■■L��a■I■■■■■■■ BEGIN :. 01700.00 M■■■■■■■L' ' : • 1■ NOON I■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■� m■■■■■■■`.gmmmm.1■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ME me MIN ME ,. ■■■■■■■E■■■■■■550■■■■■■■■■EE■■■■■■■■■■■■■■■■■■■■■■■■■■■■■� DITCH LEGEND SEE SHEETS 33 & 34 FOR PLAN OF -Y7- INGIN11 ENGINEER PRELIMI PLANS =,,7����� �■■■■JENE PIPE HYDRAULIC DATA DRAINAGE AREA = 28 AC RS DISCHARGE/00 YEAR _ , 60 FT OVERTOPPING - - -DISCHARGE � ;, - .. ■■■■� 7■■■■■■■■■■■■■■■■■■■■■1; 1■■■■■■■■■ram ... ■■A■�■■r■■■■■■■■■■■■■■■■■■■■■15 100000011001 �• • ■■�� I■■fi■■s■■■■■■■■■1 „9■■■■■■■■■■■■■■■■■r■■r■■■■■■■■e■i■■■■■■■■■■■■■■■■■� ■■■■■■■■■■■■■■■■��■�■■■■■�i■ •. ■■1 SEE SHEET 34 FOR PLAN OF -Y7- SEE SHEET 22 FOR PLAN OF -Y8- NO NO NO NO NO MEMO 550 , . ,.■■■■■■■■■■■■■■■■■■■■■■■■■■■■■r■■■■ EL 541.08,■■■■■■■■■■■■■■■■■■■■■■■� .,, ■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■1 -EL ■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■`��11■■■�!■■■■■■■■ .:, ,.1■■■■■■■� 5 •.■i■■Q�■■■■■■■■■■■■■■54011IMEMENEE�■■m■■■■■■■■■■■LJ11111111111111101 ■■■■■■■■�■■■■■■■■■■ ■■■■■■1■■■■■■■■i�ii■i`■��■I�■■■■■■■■NO ■■■■■■■■■■�■■■■■■■■■■ ■■■■■■LYGIN----7■■■11■■■1�■���■���■■■■� : ::. ■■■■■■■■■■It■■■■■■■■■ ■■■■■■LEV I■■■■�■■■■� ____J■■■11■■■I ■■■■■■■■■■It■■■■■■■■■ ■■■■■■■■■■i----�1■■■�����J■■■■■■\■■� : :.:■■■■■■■■■■■■■■■■■■� ELEV.■■■■■ END GRASTA , , , , ii■■■■■■■■■ ■■■■■■■■■■� ■■■■■■■�■■■■■■■■■■■■510■■■■■■■■■■■■■■■■■■■■■■■■VEGMTBM1■■■■111 , 00 I■■■■NN ■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■ „ -■■■■■■■■■■■■■■■■■■■■490 ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■- SEE SHEETS 26 & 35 FOR PLAN OF -Y9- PROJECT REFERENCE NO. SHEET NO. - Y9 ■`/. - R-0623 53 ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER PROPOSED ND RCU PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION P1= EL VC K 12+20A0 = 55268' = 120' = 53 P1 EL VC K = 14+50.00 = 550.65' = 80' = 30 -560 P1= EL VC K 17+00.00 = 547-W = = 204 200' 560 P1 = 22+OOAO EL = 530.00' VC = 200 K = 88 (+11. 000 (- .882 '. f_ / ( 1180 '• 550 — _ s — — — 540 540 BEGIN GRADE -Y9A- -Y9- STA. 11+50.00 ELEV. 551.70 BEGIN GRADE -Y9B- -Y9- STA. 15+55.72 ELEV. 551.65 (_ _ 530 END GRADE -Y9A- Y9- STA. 15+18.68 ELEV. 551.89 X316 520 520 GRADE STA. 23+66.36 527.81 END -Y9B- 510 ELEV. 500 11 12 13 14 15 16 17 18 19 20 21 22 23 24 SEE SHEET 27 FOR PLAN OF -Y10- -Y10- 540 P1= EL = VC = 22+35.00 529.60' 225' S40 530 11 O9 ' — 6 P1= 15+30.00 = = = /9 505.82' 120' ' I 520 Pl = EL = VC = 18+60A0 499-W 75' EL VC K 510 i non Gv'• END GRADE -Y10B- Y10- STA. 23+50.00 ELEV. 523.97 500 BEGIN GRADE -Y10A- Y10- STA. 14+00.00 ELEV. 515.41 _ 490 BEGIN GRADE -Y106- Y10- STA. 17+97.88 ELEV. 500.52 END GRADE -Y10A- -Y10- STA. 17+01.32 ELEV. 504.11 480 480 AM 470 11 12 13 14 15 16 17 18 19 20 21 22 23 DITCH LEGEND SEE SHEET 35 FOR PLAN OF -Yll- PROJECT REFERENCE NO SHEET NO. R-0623 54 LEFT DITCH ROENGINEER WAY SIGN HS ENGINEER RIGHT DITCH - - - - - - - PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION PI EL VC K=85 = 16+95.00 = 56124' = 600' 560 + � IIEND GRADE Y11- STA. 22+00.00 ELEV. 540.77 1 560 550 ND DITCh RT 540 - ' BEG D17 CH A T 530 BEGIN GRADE -Yll- STA. 13+50.00 ELEV. 550.89 STA.0+ EL. 435 ti)30 L ;yB ' 520 � sm N L 510 Lu Lu 510 500 12 13 14 15 16 17 18 19 20 21 22 23 24 25 SEE SHEET 32 FOR PLAN OF -Y12- SEE SHEET 32 FOR PLAN OF -Y13- -Y12- -Y13- PI = 17+80.00 EL = VC = 56420 /0 PI V VC = 17+00,00 = = K = oo l00, 80 P1= VC = K = 1I+60A0 200' 87 PI EL = 15+80.00 = VC = K = 554JY l00' 30+1539 570 560 550 540 530 EL VC K =/56524' = 200' - 228 . 570 62'. f / +>4. 3�- 560 END GRADE -Y12- STA. 18+13.82 ELEV. 564.07 _ " - BEGIN GRADE -Y13A- STA. 10+50.00 ELEV. 565.87 550 BEGIN GRADE Y12- STA. 15+00.00 ELEV. 553.11 END DITC q R BEGI V DI H A F STA /7+ EL 535 540 STa 6+00 EL.S 7.0 530 520 14 15 16 17 18 10 11 12 13 14 15 16 SEE SHEETS 10 & 32 FOR PLAN OF -Y13- SEE SHEET 34 FOR PLAN OF -Y7A- ENGIN ER ENGINEER PRELIMI PLANS ME --JIM MM■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■r "■■■■■■MM■i■■■■■■■■■■■■■■■■■■11■■�--7■■■■■■i . . . .,1■■■■■■■i�■■■ :,1■■■■■i MEMEMEMMEMEMEME ■■■■ ■■1 1■�1!!!�■EM■■■■EM lily■■r■■■ I ■■iio�'iiiiii�■ .��!�i■■11■■r■■ri■!!!ii�J■■■■■■ ■■1 1■i ■■■■= ■■■■■■■■■■■■■■■■■I■iif i =o riiii■■■■■■■■ ■■1.,,1■■0i .,, M■■■■■■■■■■■I ' . - ' . ..: 1■■■f1■■■■■■■■■■■■■■■■■ 556.63 ■■1 ., ■■1 1000■■P....�1■■� ' 1■■m ■■■■■■■■■■■■■■■■■■■■I ��i■■iii ii■■■■■■■ ■■1 ■■■■■■■■■■■■■■■■■■■■■i��®■■■■■■■■■■■■■ ■■1 1■■■■■r■�i■r■■MM ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■.■■1.1■■■■■■■■■■■■■IW ME■SEE SHEET 27 FOR.. ■■■■■■■■■■■■■■■■■■■■■■■ISEE SHEET 9 FOR PLAN .. 1■■■■■■■■■■■■■■■M ME ME■■� �• ■■■■■■■■■■■■■■■■■■■■■■■■■L � 7■■■■■■■■■■■■■■■� ME■■t------■■■■■■■■■■■■■■■■■■■■■■■■■L-----J■■■■■■■■■■■■■■■MEME ME ■■■■��1 r - ■■�■■■■i■■■■■■■■■■■ , . ■■■■■■■ ' ';; ■■■■■■��■■■■■■■■■■■■■■■■■� W MEN , . 560 550 540 , 520 510 500 ■■■mmm■■■■■� .� ••7■■■■■■■■ ' 560 550 , 520 ,. ■■■■■■EM . • , ..:1■■MEMM •. ��J■ ■■■■ ■■IlF.! AMME■■■■I ■■■■■■■■■ ■■■■■■EM MMOM■■■■■■ w■■■`■■ri!!%■■ 530 520 , 500 490 .., ■■■■■■■■■ ■■■■A1i i\■■`■■i■■■■■■■■ ■■■■■■= ■■■�••• i ` ii i■ ■■■■■■■■■ ■■■■lii iii � ■■■■■■■■ ■■■■■■= W ■■■■II r■■■■■■ ■■■■■■■■■ ■■■�I■■■iii■i ii�iiiii■■■■540 ■■■■■■= MO■■■i ■■■■■■■ ■■■■■■■■■ ■■■■1�����1■■■■�1■■■■■■■■ ■■■■■■� 1■■■■a w■■■II ■■■■■■■ ■■■■■■■■■ ■■■■1 ; V1- --7■■ ■■■■■■= MM■■■COSTA ■■■ ■■■■■■■■■ ■■■■■■■■■i■■■■■�____J■■ ■■■■■■= „■■R�V.��_J■■■ ■■■■■■■■■ ■■■■Mi1lMENNI■■■■■■■■■■■■ ■■■■■■= MO■■■■■■■■■■■■ ■■■■■■■■■ ■■■■■iii .•, is ■■■■iii■■■■■■ ■■■■■■= !�■■■■■■■■■■■■ ■■■■■■■■■ ■■■■■■■■ii■■■■1■ii■i■■■■■510 ■■■■■■= ME■■■■■■■■■■■■ ■■■■■■■■■ ■■■■■■■■i®■■■■■■■■■■■■■ ■■■■■■ME !�!■■■■■■■■■■■■ ■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■= PROJECT REFERENCE NO. SHEET NO. R-0623 56 SEE SHEET 4 FOR PLAN OF -DR4A- SEE SHEET 8 FOR PLAN OF -DR8A- ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER DR 4A DR8A PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION END GRADE -DR4A- ELEV. 541.33 STA. 11+57.48 540 530 520 510 500 490 4,90 PI 11+30.00 EL = VC = 52489' 50 P1= 10+35.00 EL = 532J/' VC = 25' Lo P/ = EL = L = I1+4000 54098 25' I )2.30W540 `+1 qq8 — BEGIN GRADE -DR8A- STA. 10+40.00 ELEV. 531.73 END GRADE -DR8A- STA. 11+82.02 ELEV. 525.41 .520 BEGIN GRADE DR4A- STA. 10+04.00 ELEV. 532.82 10 11 11 12 DITCH LEGEND SEE SHEET 11 FOR PLAN OF-DR11A- LEFT DITCH — — RIGHT DITCH - - - - - - - DRIIA- BEGIN GRADE -DR11A- STA. 10+47.34 ELEV. 511.78 550 8EGIM DITCH R IPl = 13+7500 EL = 53850 VC = 75' K = 5 EN DlT R STA/ +25 EL.5 2.85 STA 14+2 EL. i3421 SAO END GRADE -DR11A- STA. 14+30.0 ELEV. 534.88 i (`+)1 Pl = 11+0 0'0 i8 EN DITCH LT0520 �=512.84' VC STA14+25 EL. 33 BEG/ V D/ H L 510 551 STA 3+25 EL. 325 500 490 10 11 12 13 14 i S 5 5 s S {$ ) 2 2 2 2 Cl) \ \ \ \ \ \ } \ / t \/ S \{ \{ ( @ /(CD » 2 \\) \ )�® \ CL x $)_ < () 0 71 )\ 2-�»}a m �)�S§ - - - - / ( °� K m =k2( § CL a )9 # jCD g A®_-�_ (% \ CD mo °o _! $ _ \® > _ ■ . } Cl) \\\\ \ 2ƒi92/ } ( \19(} »!:\�S �El�® C) »@ac a3 Ecosystem Enffmenient PROGRAM March 7, 2014 Mr. Richard W. Hancock, P.E. Manager, Project Development and Environmental Analysis Unit North Carolina Department of Transportation 1548 Mail Service Center Raleigh, North Carolina 27699-1548 Dear Mr. Hancock: Subject: EEP Mitigation Acceptance Letter: R-0623, Troy Bypass — NC 24 / 27 from SR 1138 (Dairy Road) to East of the Little River, Montgomery County The purpose of this letter is to notify you that the Ecosystem Enhancement Program (EEP) will provide the compensatory stream and wetland mitigation for the subject project. Based on the information supplied by you on March 6, 2014, the impacts are located in CU 03040104 of the Yadkin River basin in the Southern Piedmont (SP) Eco-Region, and are as follows: ' Yadkin Stream Wetlands Buffer (Sq. Ft.) 03040104 Non- Coastal Sp Cold Cool Warm Riparian Riparian Marsh Zone,I Zone 2 Impacts 0 0 4,558.0 1.19 0.03 0 0 0 (feet/acres) *Some of the stream and wetland impacts may be proposed to be mitigated at a 1:1 mitigation ratio. See permit application for details on the mitigation ratio proposal. EEP is proposing to provide.riparian wetland mitigation for all wetland impacts associated, ith_thisproject: This mitigation acceptance letter_replaces the mitigation acceptance letter issued on February 25, 2014. EEP commits to implementing sufficient compensatory warm stream mitigation and riparian wetland mitigation credits to offset the impacts associated with this project as determined by the regulatory agencies in accordance with the N.C. Department of Environment and Natural Resources' Ecosystem Enhancement Program In - Lieu Fee Instrument dated July 28,-2010. If the above referenced impact amounts are revised, then this mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from EEP. 8420. cc: If you have any questions or need additional information, please contact Ms. Beth Harmon at 919-707- Sincerely, nt Supervisor Ms. Liz Hair, USACE — Wilmington Regulatbry Field Office Mr. David Wainwright, Division of Water Quality, Wetlands/401 Unit File: R-0623 Revised R"tOr6tg... E ... Prot", " Our St -a& TA Rc®EW North Carolina Ecosystem Enhancement Program, 1652 Mail Service Center, Raleigh, NC 27699-1652 / 919-707-8976 / htto://Portal.ncdenr.org/web/eeo