Loading...
HomeMy WebLinkAbout20210403 Ver 1_USACE Bulletins 2-9-22_20220209PIN: 061 f,87-.A77 4 / I D�JAMES R 5745 pG I I / BC ZONI ) I�SE: RES( N OATH 0 100 1 1 u /< J: 0619-57-3665 1// VI_ D. TWEED (LE) BARA H. TWEED (LE) II B 5050 PG 753 I BC ZONING: R-1 RESIDENTIAL__, - \A,\ \\ \ I I �\ III II / / I IIl A\���\\\�\\; )J))Il// 111IIII :\\\�\�\\� N,%III//IIi1l Civil Design Concepts, PA NCBELS C-2184 USE: 12E IDEN7TIAL \ PROPOSED WETLAND IMPACT 3 (324 SF) Kt61 55-241 \ �\ \ JOHN MU(J5Y M205)50 �59-7\ \ \\\ RFYDENTIA\ \ \ \ \ \ v � PIN: 0619-88-2565 JAMES * MARY MUNDY DB 1553 PG 455 \Bc1 ZONING: UR A U F: RESIDENTIAL I� • .. • PROPOSED STREAM IMPACT 2 (79 LF, 388 SF AREA) PROPOSED WETLAND IMPACT 4 (596 SF) \Vv \\III II I (0l l / / /ii \\V��/��/� \ C M Ry �\RS \\\ \ \ B D�zoG \ \ 1 \ \ \ 1 \ a.zoNli�G: u 5 \ \ US%.: RE51 ENTI PROPOSED STREAM IMPACT 1 (98 LF, 443 SF AREA) / Il ltiII/ ❑ /1 1 111 I PIA'96LY@7d7�5 II I I I II 111 1 ( r II l /i / 7z , zz/�— \�,�� -/ % = 1(-LZ JE551CA AO I / \ f75�: RESIDfN�A9 / I\� \\\\ � N ( ( r / / � // // JAi## FA4EID7iID�_ �\\\\ \ B 20 2W �71(I / r / \ i \ \ \ I r — — iB �\�\\ � i�i �� De�Z 42 i /\\��\�\\\�\�\\ \\\\\\\\\i\ \ ll(/i//�//ice NOTE: STREAM IMPACT AREAS ARE MEASURED FROM THE TOPS OF BANKS AND THE PROPOSED LIMITS OF GRADING. 55, \\ BROOKS COVE STREAM IMPACT MASTER BULLETIN FEBRUARY 2022 N OprN 0 30 / / e4 / / / / PROPOSED STREAM IMPACT 1 (98 LF, 443 SF AREA) co \1 8S `S' V.:2423.4' —�I V.: 242 I.9' EXISTING TOP OF BANK (TYP) cp Civil Design Concepts, PA NCBELS #: C-2184 EXISTING STREAM "SOUTH" EXISTING STREAM BUFFER (TYP) INSTALL TEMPORARY SANDBAG WALL FOR STREAM DIVERSION DURING HEADWALL AND BYPASS PIPE INSTALLATION (SEE DETAIL D3.02) 2432 2430 NOTE: STREAM IMPACT AREAS ARE MEASURED FROM THE TOPS OF BANKS AND THE PROPOSED LIMITS OF GRADING. PROPOSED BYPASS PIPE (SEE DETAIL D3.02) PROPOSED STORM SYSTEM (TYP) PROPOSED PERMANENT 42" HDPE DOUBLE PIPE CULVERT STREAM CROSSING. 2440 —2440 2430— HDPE®2.6% 2420- 2410— m U N m U d- aD N aim N 0 + d N d c Q 0 0 Iz 0 0 FINISHED GRADE PROPOSED STORM CROSSING m U m 0 EXISTING GRADE 2420 2410 2400 ' 2400 o o ,- o 0 o+ + + THE 42-INCH HDPE PIPES SHALL BE INDIVIDUALLY WRAPPED IN FILTER CLOTH. THE PIPE INVERT IS TO BE FITTED WITH "FLEXI BAFFLE" CULVERT BAFFLES BY S. SCOTT AND ASSOCIATES, OR APPROVED EQUAL, AND INSTALLED PER MANUFACTURER'S STANDARDS. THE BAFFLES SHALL BE INSTALLED AT 8-FOOT SPACING AND NO CLOSER THAN 4 FEET TO A PIPE JOINT OR END. THE BAFFLES ARE TO BE ATTACHED TO THE HDPE INVERT BETWEEN THE CORRUGATIONS WHERE THE FULL WALL THICKNESS IN PRESENT. CULVERT 3 BROOKS COVE STREAM IMPACT 1 IMPACT BULLETIN FEBRUARY 2022 N OprN I THE 42-INCH HDPE PIPES SHALL BE INDIVIDUALLY WRAPPED IN FILTER CLOTH. THE PIPE INVERT IS TO BE FITTED WITH "FLEXI BAFFLE" CULVERT BAFFLES BY S. SCOTT AND ASSOCIATES, OR APPROVED EQUAL, AND INSTALLED PER MANUFACTURER'S STANDARDS. THE BAFFLES SHALL BE INSTALLED AT 8-FOOT SPACING AND NO CLOSER THAN 4 FEET TO A PIPE JOINT OR END. THE BAFFLES ARE TO BE ATTACHED TO THE HDPE INVERT BETWEEN THE CORRUGATIONS WHERE THE FULL WALL THICKNESS IN PRESENT. EXISTING STREAM "NORTH" EXISTING 2' CONTOURS PROPOSED STREAM IMPACT 2 (79 LF, 388 SF AREA) PROPOSED BYPASS PIPE (SEE DETAIL D3.02) PROPOSED PERMANENT 42" HDPE DOUBLE PIPE CULVERT STREAM CROSSING. PO? 1. ip Design Concepts, PA NCBELS #: C-2184 NOTE: STREAM IMPACT AREAS ARE MEASURED FROM THE TOPS OF BANKS AND THE PROPOSED LIMITS OF GRADING. INSTALL TEMPORARY SANDBAG WALL FOR STREAM DIVERSION DURING HEADWALL AND BYPASS PIPE INSTALLATION (SEE DETAIL D3.02) PROPOSED 2' CONTOURS PROPOSED STORM SYSTEM (TYP) I I 2< EXISTING TOP OF BANK (TYP) EXISTING STREAM BUFFER (TYP) PROPOSED WETLAND IMPACT 2 (1,377 SF) 2460- 2450 FINISHED GRADE 2460 PROPOSED STORM CROSSING 2440- 2430— Q 0 O 0_ 2420- 0 0 0 N O PE. 0 3.4% /19 0 N N 0 0 0_ CULVERT A 2450 EXISTING GRADE —2440 —2430 —2420 o 0 + + BROOKS COVE STREAM IMPACT 2 IMPACT BULLETIN FEBRUARY 2022 CIRCULAR CULVERT WATER SURFACE STREAMBED MATERIAL —� SEE NOTES BELOW Val -I Mw1 I MIN COVER (SEE TRENCH DETAL) INITIAL BACKFILL -MPACTED TO 98% F STANDARD PROCTOR) HAUNCH (COMPACTED TO 98% OF STANDARD PROCTOR) SUITABLE FOUNDATION NOTES: 1. CULVERTS GREATER THAN 48" IN DIAMETER SHALL BE BURIED AT LEAST ONE FOOT BELOW THE BED OF THE STREAM 2. CULVERTS 48" IN DIAMETER OR LESS SHALL BE BURIED 25% OF THE TOTAL DIAMETER BELOW THE BED OF THE STREAM cl Design Concepts, PA NCBELS #: C-2184 STREAM CULVERT NOT TO SCALE Dewatering Device or dirt/sediment bag) Flow Discharge Pump Into Velocity Dissipater Discharge Hose Dewatering Pump (as needed) Discharge Hose Work Area Length Not To Exceed That Which Can Be Completed In One Day Sheeting Flow Intake Hose Sump —hole Or Pool 12" Min Depth 2' Min Diameter Diversion Pump Base Flow + 1 Foot (2 Foot Minimum) Cross Section Of Sandbag/Stone Diversion SECTION A -A PUMP AROUND / DEWATERING PLAN VIEW DETAIL NOT TO SCALE BROOKS COVE STREAM IMPACT DETAIL BULLETIN FEBRUARY 2022