Loading...
HomeMy WebLinkAbout20140277 Ver 1_401 Application_20140314 Axiom Environmental, Inc. 218 Snow Avenue, Raleigh, North Carolina 27603 919-696-3045 March 20, 2014 Mr. Andy Williams U.S. Army Corps of Engineers Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 RE: Application for Section 404 Nationwide Permit 14 and Section 401 Water Quality Certifications for TIP Project# U-4726DD, Rogers Road Sidewalk Project, SR 1729 (Rogers Road) Sidewalk from SR 1172 (Homestead Road) to Meadow Run Court, Carrboro, Orange County, NC, Federal Aid Project No. STPDA-0702(22) Dear Andy, The Town of Carrboro, Public Works Department proposes to construct a 5-foot wide concrete sidewalk along SR 1729 (Rogers Road) in the Town of Carrboro from SR 1777 (Homestead Road) to Meadow Run Court (Figure 1). Information within this package has been prepared to support the application for authorization of impacts by Nationwide Permit (NWP) 14 (Linear Transportation Projects), along with the associated N.C. Division of Water Resources (NCDWR) Water Quality General Certification 3886 and a Riparian Buffer Authorization. A draft Categorical Exclusion (CE) Action Form for the U-4726DD project has been prepared and is attached. The CE will be finalized following a currently unscheduled public workshop and will then be submitted to the N.C. Department of Transportation, Program Development and Environmental Analysis Branch for review and approval. Project Purpose and Need The purpose of this project is to provide an alternate mode of transportation (pedestrian). The project will provide a pedestrian circulation network to improve mobility and expand access to downtown Carrboro, schools, parks, bus stops, businesses, residential areas, Town buildings, and other facilities. This project is a part of the Town of Carrboro’s sidewalk construction plan that was approved in November 2003. Mr. Andy Williams Axiom Environmental, Inc. March 20, 2014 page 2 Project Description A 5-foot wide concrete sidewalk, to be used as a pedestrian path, will be constructed along SR 1729 (Rogers Road) in the Town of Carrboro from SR 1777 (Homestead Road) to Meadow Run Court (Figure 1). The length of the project will be approximately 5700 feet. The project will provide sidewalk connectivity along Rogers Road to Homestead Road and Meadow Run Court. The study area associated with this project encompasses approximately 3.3 acres. The Town of Carrboro, Public Works Department is requesting an approved jurisdictional determination for streams and wetlands within the project area in conjunction with this permit application. Water resources in the project area are located within U.S. Geological Survey (USGS) Hydrologic Unit (HU) 03030002 (NCDWQ sub-basin 03-06-06 of the Cape Fear River basin). Jurisdictional surface waters, wetlands, and riparian buffers are anticipated to be impacted by project activities. Surface waters impacted by the U-4726DD project drain to Bolin Creek. Bolin Creek is listed by the NCDWR as a Watershed-V (WS-V) Water with the supplemental Nutrient Sensitive Waters (NSW) classification. Bolin Creek is not listed anywhere on the North Carolina 2012 Final 303(d) List of Impaired Waters. A Stormwater Management Plan is included in this package. Attached to this letter are the following items.  Pre-Construction Notification (PCN) Form  Figure 1. U-4726DD Project Location Map  U-4726DD Draft Categorical Exclusion Action Classification Form dated October 7, 2013  U-4726DD Wetland and Surface Water Impacts Permit Drawings dated October 17, 2013  U-4726DD Wetland Permit Impacts Summary sheet dated January 20, 2014  U-4726DD Preliminary Design Plans dated October 7, 2013  U-4726DD Stormwater Management Plan dated November 22, 2013  A CD with digital files (in .pdf format) of all information included in this package Based upon Preliminary Design Plans, construction of the Rogers Road sidewalk is anticipated to permanently impact a total of 17.3 linear feet of stream and less than 0.01 acre of jurisdictional wetland in each of two locations. Table 1 and the attached Wetland Permit Impact Summary summarize the total impacts to jurisdictional areas. Impact sites are described below and depicted on the attached permit drawings. Table 2 lists the geographic coordinates of the project impact sites. Mr. Andy Williams Axiom Environmental, Inc. March 20, 2014 page 3 Table 1. Project Impacts Site Impacted Waterbody Permanent Stream Impacts (feet) Temporary Stream Impacts (feet) Total Stream Impacts (feet) Permanent Wetland Impacts (acres) Temporary Wetland Impacts (acres) Total Wetland Impacts (acres) 1 UT to Bolin Creek (Stream S1) 9 13 22 >0.01 -- >0.01 2 UT to Bolin Creek (Stream S2) 9 11 20 >0.01 -- >0.01 Total 18 24 42 0.02 -- 0.02 Table 2. Project Impact Locations Impact Site NC State Plane, feet (NAD 83) WGS 84, decimal degrees Easting Northing Latitude Longitude 1 1,974,581.661 804,503.282 35.960425 -79.085888 2 1,976,170.313 801,251.598 35.951496 -79.080512 Impact Site 1 Impact Site 1 involves the extension of the culvert conveying an unnamed tributary (UT) to Bolin Creek under Rogers Road in order to construct a 5-foot wide, concrete sidewalk along the west side of the roadway. The existing 48-inch corrugated metal pipe (CMP) will be extended by 9 feet with a 48-inch corrugated steel pipe (CSP) extension that incorporates a gasket sleeve connection and an endwall. Temporary impacts due to stream dewatering during construction total 13 feet. Grading of the roadway slope to widen the roadside area appropriately for the five- foot sidewalk is anticipated to permanently impact less than 0.01 acre of jurisdictional wetland (Wetland W1), and mechanized clearing for grading preparation will also impact less than 0.01 acre of Wetland W1. Due to the minimal width of the proposed fill slope, total permanent impacts to Wetland W1 are less than 0.01 acre. This wetland area is a North Carolina Wetland Assessment Method (NC WAM) Headwater Forest wetland with an overall functional rating of Low. Impact Site 2 Impact Site 2 involves the extension of the culvert conveying an unnamed tributary (UT) to Bolin Creek under Rogers Road in order to construct a 5-foot wide, concrete sidewalk along the west side of the roadway. The existing 48-inch CMP will be extended by 9 feet with two 54- inch CSP extensions that incorporates gasket sleeve connections and endwalls. Temporary impacts due to stream dewatering during construction total 11 feet. Grading of the roadway slope to widen the roadside area appropriately for the five-foot sidewalk is anticipated to Mr. Andy Williams Axiom Environmental, Inc. March 20, 2014 page 4 permanently impact less than 0.01 acre of jurisdictional wetland (Wetland W1), and mechanized clearing for grading preparation will also impact less than 0.01 acre of Wetland W1. Due to the minimal width of the proposed fill slope, total permanent impacts to Wetland W1 are less than 0.01 acre. This wetland area is a North Carolina Wetland Assessment Method (NC WAM) Headwater Forest wetland with an overall functional rating of Low. Since project impacts do not exceed mitigation thresholds for requested permits, no mitigation is proposed for the proposed project. Again, the Town of Carrboro is requesting authorization for Section 404 jurisdictional area impacts associated with the construction of a sidewalk adjacent to Rogers Road under NWP 14 (Linear Transportation Projects), along with the associated NCDWR Water Quality General Certification number 3886and Buffer Authorization. In addition, the Town of Carrboro is requesting an approved jurisdictional determination for the project area in conjunction with this permit application. Thank you for your time and consideration of this important project. If you have any questions regarding this request, please contact Sandy Smith (Axiom Environmental, Inc.) at 919-270-9316 or ssmith@axiomenvironmental.org, Bill Hamilton (Sungate Design Group) at (919) 859-2243 ext. 206 or bhamilton@sungatedesign.com, or the Town of Carrboro point-of-contact, George Seiz, at 919-918-7427 or gseiz@ci.carrboro.nc.us. Yours truly, Alexander P. (Sandy) Smith Axiom Environmental, Inc. Cc. Cherri Smith, N.C. Division of Water Resources George Seiz, Town of Carrboro Bill Hamilton, Sungate Design Group Axiom Environmental, Inc. 218 Snow Avenue, Raleigh, North Carolina 27603 919-696-3045 March 20, 2014 Ms. Cherri Smith N.C. Division of Water Resources 1601 Mail Service Center Raleigh, NC 27699-1601 RE: Application for Section 404 Nationwide Permit 14 and Section 401 Water Quality Certifications for TIP Project# U-4726DD, Rogers Road Sidewalk Project, SR 1729 (Rogers Road) Sidewalk from SR 1172 (Homestead Road) to Meadow Run Court, Carrboro, Orange County, NC, Federal Aid Project No. STPDA-0702(22) Dear Cherri, The Town of Carrboro, Public Works Department proposes to construct a 5-foot wide concrete sidewalk along SR 1729 (Rogers Road) in the Town of Carrboro from SR 1777 (Homestead Road) to Meadow Run Court (Figure 1). Information within this package has been prepared to support the application for authorization of impacts by Nationwide Permit (NWP) 14 (Linear Transportation Projects), along with the associated N.C. Division of Water Resources (NCDWR) Water Quality General Certification 3886 and a Riparian Buffer Authorization. A draft Categorical Exclusion (CE) Action Form for the U-4726DD project has been prepared and is attached. The CE will be finalized following a currently unscheduled public workshop and will then be submitted to the N.C. Department of Transportation, Program Development and Environmental Analysis Branch for review and approval. Project Purpose and Need The purpose of this project is to provide an alternate mode of transportation (pedestrian). The project will provide a pedestrian circulation network to improve mobility and expand access to downtown Carrboro, schools, parks, bus stops, businesses, residential areas, Town buildings, and other facilities. This project is a part of the Town of Carrboro’s sidewalk construction plan that was approved in November 2003. Ms. Cherri Smith Axiom Environmental, Inc. March 20, 2014 page 2 Project Description A 5-foot wide concrete sidewalk, to be used as a pedestrian path, will be constructed along SR 1729 (Rogers Road) in the Town of Carrboro from SR 1777 (Homestead Road) to Meadow Run Court (Figure 1). The length of the project will be approximately 5700 feet. The project will provide sidewalk connectivity along Rogers Road to Homestead Road and Meadow Run Court. The study area associated with this project encompasses approximately 3.3 acres. The Town of Carrboro, Public Works Department is requesting an approved jurisdictional determination for streams and wetlands within the project area in conjunction with this permit application. Water resources in the project area are located within U.S. Geological Survey (USGS) Hydrologic Unit (HU) 03030002 (NCDWQ sub-basin 03-06-06 of the Cape Fear River basin). Jurisdictional surface waters, wetlands, and riparian buffers are anticipated to be impacted by project activities. Surface waters impacted by the U-4726DD project drain to Bolin Creek. Bolin Creek is listed by the NCDWR as a Watershed-V (WS-V) Water with the supplemental Nutrient Sensitive Waters (NSW) classification. Bolin Creek is not listed anywhere on the North Carolina 2012 Final 303(d) List of Impaired Waters. A Stormwater Management Plan is included in this package. Attached to this letter are the following items.  Pre-Construction Notification (PCN) Form  Figure 1. U-4726DD Project Location Map  U-4726DD Draft Categorical Exclusion Action Classification Form dated October 7, 2013  U-4726DD Wetland and Surface Water Impacts Permit Drawings dated October 17, 2013  U-4726DD Wetland Permit Impacts Summary sheet dated January 20, 2014  U-4726DD Buffer Impacts Permit Drawings dated October 7, 2013  U-4726DD Buffer Impacts Summary sheet dated January 13, 2014  U-4726DD Preliminary Design Plans dated October 7, 2013  U-4726DD Stormwater Management Plan dated November 22, 2013  A CD with digital files (in .pdf format) of all of the above information  A check for the minor water quality application fee of $240 Based upon Preliminary Design Plans, construction of the Rogers Road sidewalk is anticipated to permanently impact a total of 17.3 linear feet of stream and less than 0.01 acre of jurisdictional wetland in each of two locations. Table 1 and the attached Wetland Permit Impact Summary summarize the total impacts to surface waters and jurisdictional wetland areas. Table 2 and the Ms. Cherri Smith Axiom Environmental, Inc. March 20, 2014 page 3 attached Buffer Impacts Summary summarize the total impacts to riparian buffer areas. Impact sites are described below and depicted on the attached permit drawings. Table 3 lists the geographic coordinates of the project impact sites. Table 1. Project Impacts to Surface Waters and Wetlands Site Impacted Waterbody Permanent Stream Impacts (feet) Temporary Stream Impacts (feet) Total Stream Impacts (feet) Permanent Wetland Impacts (acres) Temporary Wetland Impacts (acres) Total Wetland Impacts (acres) 1 UT to Bolin Creek (Stream S1) 9 13 22 >0.01 -- >0.01 2 UT to Bolin Creek (Stream S2) 9 11 20 >0.01 -- >0.01 Total 18 24 42 0.02 -- 0.02 Table 2. Project Impacts to Riparian Buffer Areas Buffer Impact Site Buffered Waterbody Impacts (square feet) Allowable Zone 1 Zone 2 Total 1 UT to Bolin Creek (Stream S1) 1270 811 2081 2 UT to Bolin Creek (Stream S2) 977 567 1544 Total 2247 1378 3625 Table 3. Project Impact Locations Impact Site NC State Plane, feet (NAD 83) WGS 84, decimal degrees Easting Northing Latitude Longitude 1 1,974,581.661 804,503.282 35.960425 -79.085888 2 1,976,170.313 801,251.598 35.951496 -79.080512 Impact Site 1 Impact Site 1 involves the extension of the culvert conveying an unnamed tributary (UT) to Bolin Creek under Rogers Road in order to construct a 5-foot wide, concrete sidewalk along the west side of the roadway. The existing 48-inch corrugated metal pipe (CMP) will be extended by 9 feet with a 48-inch corrugated steel pipe (CSP) extension that incorporates a gasket sleeve connection and an endwall. Temporary impacts due to stream dewatering during construction total 13 feet. Grading of the roadway slope to widen the roadside area appropriately for the five- foot sidewalk is anticipated to permanently impact less than 0.01 acre of jurisdictional wetland Ms. Cherri Smith Axiom Environmental, Inc. March 20, 2014 page 4 (Wetland W1), and mechanized clearing for grading preparation will also impact less than 0.01 acre of Wetland W1. Due to the minimal width of the proposed fill slope, total permanent impacts to Wetland W1 are less than 0.01 acre. This wetland area is a North Carolina Wetland Assessment Method (NC WAM) Headwater Forest wetland with an overall functional rating of Low. Construction at this site will result in impacts to 1270 square feet of Zone 1 buffer and 811 square feet of Zone 2 buffer for a total of 2081 square feet of impacts to the riparian buffer. Included within this impact area is a drainage feature that discharges stormwater directly into the riparian buffer. Multiple stormwater discharge options at this site were evaluated in an attempt to avoid buffer impacts, including the location of a drainage structure in a sag over the existing 48” CMP and utilizing the existing outlet, relocating the 2-grated inlet (2-GI) and outlet outside the buffer, and trying to route the drainage pipe from the proposed 2-GI through a Junction Box to an outlet outside the buffer limits. The proposed 2-GI location was the only option deemed feasible with the project elevation constraints. In order to minimize impacts to the riparian buffer and associated surface water, stormwater treatment has been maximized prior to entering the buffer. The proposed location of the 2-GI provides stormwater treatment with approximately 220 linear feet of proposed grass swales to treat stormwater generated within the 0.19 acre drainage area of the 2-GI. The necessary length of grass swales for a drainage area of this size is 19 linear feet (100 linear feet per acre) for effective treatment. The discharge velocity at the end of the rip rap dissipator is calculated at 0.8 feet per second for a 10 year storm event. Impacts to riparian buffers as a result of road crossings are listed as “Allowable.” Impact Site 2 Impact Site 2 involves the extension of the culvert conveying an unnamed tributary (UT) to Bolin Creek under Rogers Road in order to construct a 5-foot wide, concrete sidewalk along the west side of the roadway. The existing 48-inch CMP will be extended by 9 feet with two 54- inch CSP extensions that incorporates gasket sleeve connections and endwalls. Temporary impacts due to stream dewatering during construction total 11 feet. Grading of the roadway slope to widen the roadside area appropriately for the five-foot sidewalk is anticipated to permanently impact less than 0.01 acre of jurisdictional wetland (Wetland W1), and mechanized clearing for grading preparation will also impact less than 0.01 acre of Wetland W1. Due to the minimal width of the proposed fill slope, total permanent impacts to Wetland W1 are less than 0.01 acre. This wetland area is a North Carolina Wetland Assessment Method (NC WAM) Headwater Forest wetland with an overall functional rating of Low. Ms. Cherri Smith Axiom Environmental, Inc. March 20, 2014 page 5 Construction at this site will result in impacts to 977 square feet of Zone 1 buffer and 567 square feet of Zone 2 buffer for a total of 1544 square feet of impacts to the riparian buffer. Impacts to riparian buffers as a result of road crossings are listed as “Allowable.” Since project impacts do not exceed mitigation thresholds for the requested permits, no mitigation is proposed for this project. Again, the Town of Carrboro is requesting authorization for Section 404 jurisdictional area impacts associated with the construction of a sidewalk adjacent to Rogers Road under NWP 14 (Linear Transportation Projects), along with the associated NCDWR Water Quality General Certification number 3886 and Buffer Authorization. In addition, the Town of Carrboro is requesting an approved jurisdictional determination for the project area in conjunction with this permit application. Thank you for your time and consideration of this important project. If you have any questions regarding this request, please contact Sandy Smith (Axiom Environmental, Inc.) at 919-270-9316 or ssmith@axiomenvironmental.org, Bill Hamilton (Sungate Design Group) at (919) 859-2243 ext. 206 or bhamilton@sungatedesign.com, or the Town of Carrboro point-of-contact, George Seiz, at 919-918-7427 or gseiz@ci.carrboro.nc.us. Yours truly, Alexander P. (Sandy) Smith Axiom Environmental, Inc. Cc. Andy Williams, U.S. Army Corps of Engineers George Seiz, Town of Carrboro Bill Hamilton, Sungate Design Group 3DJHRI 3&1)RUP±9HUVLRQ4January 2009 2IILFH8VH2QO\ &RUSVDFWLRQ,'QRBBBBBBBBBBBBB ':4SURMHFWQRBBBBBBBBBBBBBBB )RUP9HUVLRQ4January 2009 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing D7\SH V RIDSSURYDOVRXJKWIURPWKH&RUSV6HFWLRQ3HUPLW6HFWLRQ3HUPLW E6SHFLI\1DWLRQZLGH3HUPLW 1:3 QXPEHURU*HQHUDO3HUPLW *3 QXPEHU F+DVWKH1:3RU*3QXPEHUEHHQYHULILHGE\WKH&RUSV"<HV1R G7\SH V RIDSSURYDOVRXJKWIURPWKH':4 FKHFNDOOWKDWDSSO\  :DWHU4XDOLW\&HUWLILFDWLRQ±5HJXODU1RQ-XULVGLFWLRQDO*HQHUDO3HUPLW :DWHU4XDOLW\&HUWLILFDWLRQ±([SUHVV5LSDULDQ%XIIHU$XWKRUL]DWLRQ H,VWKLVQRWLILFDWLRQVROHO\IRUWKHUHFRUG EHFDXVHZULWWHQDSSURYDOLVQRWUHTXLUHG"  )RUWKHUHFRUGRQO\IRU':4 &HUWLILFDWLRQ <HV1R )RUWKHUHFRUGRQO\IRU&RUSV3HUPLW  <HV1R I,VSD\PHQWLQWRDPLWLJDWLRQEDQNRULQOLHXIHHSURJUDPSURSRVHGIRU PLWLJDWLRQRILPSDFWV",IVRDWWDFKWKHDFFHSWDQFHOHWWHUIURPPLWLJDWLRQEDQN RULQOLHXIHHSURJUDP <HV1R J,VWKHSURMHFWORFDWHGLQDQ\RI1&¶VWZHQW\FRDVWDOFRXQWLHV,I\HVDQVZHUK EHORZ<HV1R K,VWKHSURMHFWORFDWHGZLWKLQD1&'&0$UHDRI(QYLURQPHQWDO&RQFHUQ $(& "<HV1R 2. Project Information D1DPHRISURMHFW E&RXQW\ F1HDUHVWPXQLFLSDOLW\WRZQ G6XEGLYLVLRQQDPH H1&'27RQO\7,3RUVWDWHSURMHFWQR 3. Owner Information D1DPH V RQ5HFRUGHG'HHG E'HHG%RRNDQG3DJH1R F5HVSRQVLEOH3DUW\ IRU//&LI DSSOLFDEOH  G6WUHHWDGGUHVV H&LW\VWDWH]LS I7HOHSKRQHQR J)D[QR K(PDLODGGUHVV RogersRoadSidewalkProject Orange Carrboro U-4726DD NCDOT ExistingandproposedNCDOTright-of-way 14  3DJHRI 4. Applicant Information (if different from owner)  D$SSOLFDQWLV$JHQW2WKHUVSHFLI\ E1DPH F%XVLQHVVQDPH  LIDSSOLFDEOH  G6WUHHWDGGUHVV H&LW\VWDWH]LS I7HOHSKRQHQR J)D[QR K(PDLODGGUHVV 5.Agent/Consultant Information (if applicable) D1DPH E%XVLQHVVQDPH  LIDSSOLFDEOH  F6WUHHWDGGUHVV G&LW\VWDWH]LS H7HOHSKRQHQR I)D[QR J(PDLODGGUHVV GeorgeSeiz,PublicWorksDirector TownofCarrboro 301WestMainStreet Carrboro,NC27510 919-918-7427 919-968-7728 SandySmith,ScottDavis AxiomEnvironmental,Inc. 218SnowAvenue Raleigh,NC 919-270-9316(SS),919-696-3045(SD) -- ssmith@axiomenvironmental.org,sdavis@axiomenvironmental.org TownofCarrboro 3DJHRI 3&1)RUP±9HUVLRQ4January 2009 B. Project Information and Prior Project History 1. Property Identification D3URSHUW\LGHQWLILFDWLRQQR WD[3,1RUSDUFHO,'  E6LWHFRRUGLQDWHV LQGHFLPDOGHJUHHV /DWLWXGH/RQJLWXGH F3URSHUW\VL]HDFUHV 2. Surface Waters  D1DPHRIQHDUHVWERG\RIZDWHUWRSURSRVHGSURMHFW E:DWHU4XDOLW\&ODVVLILFDWLRQRIQHDUHVWUHFHLYLQJZDWHU F5LYHUEDVLQ 3. Project Description D'HVFULEHWKHH[LVWLQJFRQGLWLRQVRQWKHVLWHDQGWKHJHQHUDOODQGXVHLQWKHYLFLQLW\RIWKHSURMHFWDWWKHWLPHRIWKLV DSSOLFDWLRQ   E/LVWWKHWRWDOHVWLPDWHGDFUHDJHRIDOOH[LVWLQJZHWODQGVRQWKHSURSHUW\ F/LVWWKHWRWDOHVWLPDWHGOLQHDUIHHWRIDOOH[LVWLQJVWUHDPV LQWHUPLWWHQWDQGSHUHQQLDO RQWKHSURSHUW\ G([SODLQWKHSXUSRVHRIWKHSURSRVHGSURMHFW   H'HVFULEHWKHRYHUDOOSURMHFWLQGHWDLOLQFOXGLQJWKHW\SHRIHTXLSPHQWWREHXVHG   4. Jurisdictional Determinations D+DYHMXULVGLFWLRQDOZHWODQGRUVWUHDPGHWHUPLQDWLRQVE\WKH &RUSVRU6WDWHEHHQUHTXHVWHGRUREWDLQHGIRUWKLVSURSHUW\ SURMHFW LQFOXGLQJDOOSULRUSKDVHV LQWKHSDVW" <HV1R8QNQRZQ &RPPHQWV E,IWKH&RUSVPDGHWKHMXULVGLFWLRQDOGHWHUPLQDWLRQZKDWW\SH RIGHWHUPLQDWLRQZDVPDGH"3UHOLPLQDU\)LQDO F,I\HVZKRGHOLQHDWHGWKHMXULVGLFWLRQDODUHDV" 1DPH LINQRZQ  $JHQF\&RQVXOWDQW&RPSDQ\ 2WKHU G,I\HVOLVWWKHGDWHVRIWKH&RUSVMXULVGLFWLRQDOGHWHUPLQDWLRQVRU6WDWHGHWHUPLQDWLRQVDQGDWWDFKGRFXPHQWDWLRQ   5. Project History D+DYHSHUPLWVRUFHUWLILFDWLRQVEHHQUHTXHVWHGRUREWDLQHGIRU WKLVSURMHFW LQFOXGLQJDOOSULRUSKDVHV LQWKHSDVW"<HV1R8QNQRZQ E,I\HVH[SODLQLQGHWDLODFFRUGLQJWR³KHOSILOH´LQVWUXFWLRQV    6. Future Project Plans D,VWKLVDSKDVHGSURMHFW"<HV1R E,I\HVH[SODLQ   -79.083575 BolinCreek C;NSW CapeFear Thesitegenerallyconsistsofmaintainedroadsideshoulders,utilitylines,residentiallawns,andscatteredforestedges.Landuseconsistsoflow- densityresidentialdevelopmentalongRogersRoad,interspersedwithfragmentedforestedareas. Pleaseseeattachedcoverletter. Pleaseseeattachedcoverletter. AxiomEnvironmental,Inc. -- -- 35.958637 S.Smith,S.Davis 3DJHRI 3&1)RUP±9HUVLRQ4January 2009 C. Proposed Impacts Inventory 1. Impacts Summary D:KLFKVHFWLRQVZHUHFRPSOHWHGEHORZIRU\RXUSURMHFW FKHFNDOOWKDWDSSO\  :HWODQGV6WUHDPV±WULEXWDULHV%XIIHUV2SHQ:DWHUV3RQG&RQVWUXFWLRQ 2. Wetland Impacts ,IWKHUHDUHZHWODQGLPSDFWVSURSRVHGRQWKHVLWHWKHQFRPSOHWHWKLVTXHVWLRQIRUHDFKZHWODQGDUHDLPSDFWHG D :HWODQGLPSDFW QXPEHU 3HUPDQHQW 3 RU 7HPSRUDU\ 7  E 7\SHRILPSDFW F 7\SHRIZHWODQG G )RUHVWHG H 7\SHRIMXULVGLFWLRQ &RUSV  RU ':4 RWKHU  I $UHDRI LPSDFW DFUHV  : : : : : : JTotal Wetland Impacts: K&RPPHQWV    3. Stream Impacts ,IWKHUHDUHSHUHQQLDORULQWHUPLWWHQWVWUHDPLPSDFWV LQFOXGLQJWHPSRUDU\LPSDFWV SURSRVHGRQWKHVLWHWKHQFRPSOHWHWKLV TXHVWLRQIRUDOOVWUHDPVLWHVLPSDFWHG D 6WUHDPLPSDFW QXPEHU 3HUPDQHQW 3 RU 7HPSRUDU\ 7  E 7\SHRILPSDFW F 6WUHDPQDPH G 3HUHQQLDO 3(5 RU LQWHUPLWWHQW ,17 " H 7\SHRI MXULVGLFWLRQ  I $YHUDJH VWUHDP ZLGWK IHHW  J ,PSDFW OHQJWK OLQHDU IHHW  6 6 6 6 6 6 K Total stream and tributary impacts  L&RPPHQWV    Fill HeadwaterWetlandNo Corps 0.001 No Corps 0.001 Yes/No- Yes/No- Yes/No- Yes/No- Impactswilloccurinthemaintainedright-of-wayof RogersRoad. CulvertUTtoBolinCreek PER Corps 48.8 UTtoBolinCreek 412.6 UTtoBolinCreek 48.5 UTtoBolinCreek(SB)410.9 40.8 TotalImpactsinclude17.3linear feetof permanentimpactsand23.5linear feetof temporaryimpactsattwoimpactsites. P P - - - - Fill Chooseone Chooseone Chooseone Chooseone HeadwaterWetland Chooseone Chooseone Chooseone Chooseone P T P T - - Culvert Culvert Culvert Chooseone Chooseone PER PER PER - - Corps Corps Corps - -  3DJHRI 4. Open Water Impacts ,IWKHUHDUHSURSRVHGLPSDFWVWRODNHVSRQGVHVWXDULHVWULEXWDULHVVRXQGVWKH$WODQWLF2FHDQRUDQ\RWKHURSHQZDWHURI WKH86WKHQLQGLYLGXDOO\OLVWDOORSHQZDWHULPSDFWVEHORZ D 2SHQZDWHU LPSDFWQXPEHU 3HUPDQHQW 3 RU 7HPSRUDU\ 7  E 1DPHRIZDWHUERG\ LIDSSOLFDEOH F  7\SHRILPSDFW G  :DWHUERG\ W\SH H  $UHDRILPSDFW DFUHV  2 2 2 2 I Total open water impacts  J&RPPHQWV  5. Pond or Lake Construction ,ISRQGRUODNHFRQVWUXFWLRQSURSRVHGWKHQFRPSOHWHWKHFKDUWEHORZ F :HWODQG,PSDFWV DFUHV  G 6WUHDP,PSDFWV IHHW  H 8SODQG DFUHV  D 3RQG,'QXPEHU E 3URSRVHGXVHRU SXUSRVHRISRQG )ORRGHG)LOOHG([FDYDWHG)ORRGHG)LOOHG([FDYDWHG 3 3 ITotal: J&RPPHQWV  K,VDGDPKLJKKD]DUGSHUPLWUHTXLUHG"<HV1R,I\HVSHUPLW,'QR L([SHFWHGSRQGVXUIDFHDUHD DFUHV  M6L]HRISRQGZDWHUVKHG DFUHV  N0HWKRGRIFRQVWUXFWLRQ 6. Buffer Impacts (for DWQ) ,ISURMHFWZLOOLPSDFWDSURWHFWHGULSDULDQEXIIHUWKHQFRPSOHWHWKHFKDUWEHORZ,I\HVWKHQLQGLYLGXDOO\OLVWDOOEXIIHULPSDFWV EHORZ,IDQ\LPSDFWVUHTXLUHPLWLJDWLRQWKHQ\RXMUSTILOORXW6HFWLRQ'RIWKLVIRUP D.3URMHFWLVLQZKLFKSURWHFWHGEDVLQ"1HXVH7DU3DPOLFR&DWDZED5DQGOHPDQ2WKHU E %XIIHU,PSDFW QXPEHU± 3HUPDQHQW 3 RU 7HPSRUDU\ 7  F 5HDVRQIRULPSDFW G 6WUHDPQDPH H %XIIHU PLWLJDWLRQ UHTXLUHG" I =RQH LPSDFW VTXDUH IHHW  J =RQH LPSDFW VTXDUH IHHW  % % % % % % KTotal Buffer Impacts: L&RPPHQWV  Chooseone Choose Chooseone GradingforsidewalkUTtoBolinCreek(StreamS1)No1,269.9811.2 GradingforsidewalkUTtoBolinCreek(StreamS2)977566.8 2,246.91,378 CompleteZone1andZone2bufferimpactstotal3624.9squarefeetofAllowableImpacts. - - - - Chooseone Chooseone Chooseone Choose Choose Choose Chooseone Jordan P P - - - - No Yes/No Yes/No Yes/No Yes/No ) 3DJHRI 3&1)RUP±9HUVLRQ4January 2009 D. Impact Justification and Mitigation 1. Avoidance and Minimization D6SHFLILFDOO\GHVFULEHPHDVXUHVWDNHQWRDYRLGRUPLQLPL]HWKHSURSRVHGLPSDFWVLQGHVLJQLQJSURMHFW   E6SHFLILFDOO\GHVFULEHPHDVXUHVWDNHQWRDYRLGRUPLQLPL]HWKHSURSRVHGLPSDFWVWKURXJKFRQVWUXFWLRQWHFKQLTXHV   2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State D'RHVWKHSURMHFWUHTXLUH&RPSHQVDWRU\0LWLJDWLRQIRU LPSDFWVWR:DWHUVRIWKH86RU:DWHUVRIWKH6WDWH" <HV1R  E,I\HVPLWLJDWLRQLVUHTXLUHGE\ FKHFNDOOWKDWDSSO\ ':4&RUSV F,I\HVZKLFKPLWLJDWLRQRSWLRQZLOOEHXVHGIRUWKLV SURMHFW" 0LWLJDWLRQEDQN 3D\PHQWWRLQOLHXIHHSURJUDP 3HUPLWWHH5HVSRQVLEOH0LWLJDWLRQ 3. Complete if Using a Mitigation Bank D1DPHRI0LWLJDWLRQ%DQN E&UHGLWV3XUFKDVHG DWWDFKUHFHLSWDQGOHWWHU  7\SH 7\SH 7\SH 4XDQWLW\ 4XDQWLW\ 4XDQWLW\ F&RPPHQWV  4. Complete if Making a Payment to In-lieu Fee Program D$SSURYDOOHWWHUIURPLQOLHXIHHSURJUDPLVDWWDFKHG<HV E6WUHDPPLWLJDWLRQUHTXHVWHGOLQHDUIHHW F,IXVLQJVWUHDPPLWLJDWLRQVWUHDPWHPSHUDWXUH G%XIIHUPLWLJDWLRQUHTXHVWHG ':4RQO\ VTXDUHIHHW H5LSDULDQZHWODQGPLWLJDWLRQUHTXHVWHGDFUHV I1RQULSDULDQZHWODQGPLWLJDWLRQUHTXHVWHGDFUHV J&RDVWDO WLGDO ZHWODQGPLWLJDWLRQUHTXHVWHGDFUHV K&RPPHQWV 5. Complete if Using a Permittee Responsible Mitigation Plan D,IXVLQJDSHUPLWWHHUHVSRQVLEOHPLWLJDWLRQSODQSURYLGHDGHVFULSWLRQRIWKHSURSRVHGPLWLJDWLRQSODQ    Thedistancebetweenthesidewalkandtheexistingroadhasbeenminimizedasmuchaspracticable.Throughoutthemajorityof theproject,2:1 fill slopeswillbeutilizedtominimizejurisdictionalstream,wetland,andbufferimpacts. AllequipmentwillbekeptwithinthedesignatedProposedDrainageEasement (PDE)duringconstructionofthisproject.Jurisdictionalareaswillbe accessedonlyfromtheexistingroad. n/a n/a 0 Chooseone 0 0 -- n/a Chooseone Chooseone Chooseone -- -- -- 0 0  3DJHRI 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) – required by DWQ D:LOOWKHSURMHFWUHVXOWLQDQLPSDFWZLWKLQDSURWHFWHGULSDULDQEXIIHUWKDWUHTXLUHV EXIIHUPLWLJDWLRQ"<HV1R E,I\HVWKHQLGHQWLI\WKHVTXDUHIHHWRILPSDFWWRHDFK]RQHRIWKHULSDULDQEXIIHUWKDWUHTXLUHVPLWLJDWLRQ&DOFXODWHWKH DPRXQWRIPLWLJDWLRQUHTXLUHG =RQH F 5HDVRQIRULPSDFW G 7RWDOLPSDFW VTXDUHIHHW   0XOWLSOLHU H 5HTXLUHGPLWLJDWLRQ VTXDUHIHHW  =RQH  IRU&DWDZED  =RQH  ITotal buffer mitigation required: J,IEXIIHUPLWLJDWLRQLVUHTXLUHGGLVFXVVZKDWW\SHRIPLWLJDWLRQLVSURSRVHG HJSD\PHQWWRSULYDWHPLWLJDWLRQEDQN SHUPLWWHHUHVSRQVLEOHULSDULDQEXIIHUUHVWRUDWLRQSD\PHQWLQWRDQDSSURYHGLQOLHXIHHIXQG     K&RPPHQWV  --00 --00 0 n/a Allimpactsarelistedas"Allowable." 3DJHRI 3&1)RUP±9HUVLRQ4January 2009 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan D'RHVWKHSURMHFWLQFOXGHRULVLWDGMDFHQWWRSURWHFWHGULSDULDQEXIIHUVLGHQWLILHG ZLWKLQRQHRIWKH1&5LSDULDQ%XIIHU3URWHFWLRQ5XOHV"<HV1R E,I\HVWKHQLVDGLIIXVHIORZSODQLQFOXGHG",IQRH[SODLQZK\   <HV1R 2. Stormwater Management Plan D:KDWLVWKHRYHUDOOSHUFHQWLPSHUYLRXVQHVVRIWKLVSURMHFW" E'RHVWKLVSURMHFWUHTXLUHD6WRUPZDWHU0DQDJHPHQW3ODQ"<HV1R F,IWKLVSURMHFW'2(6127UHTXLUHD6WRUPZDWHU0DQDJHPHQW3ODQH[SODLQZK\   G,IWKLVSURMHFW'2(6UHTXLUHD6WRUPZDWHU0DQDJHPHQW3ODQWKHQSURYLGHDEULHIQDUUDWLYHGHVFULSWLRQRIWKHSODQ    H:KRZLOOEHUHVSRQVLEOHIRUWKHUHYLHZRIWKH6WRUPZDWHU0DQDJHPHQW3ODQ" 3. Certified Local Government Stormwater Review D,QZKLFKORFDOJRYHUQPHQW¶VMXULVGLFWLRQLVWKLVSURMHFW" E:KLFKRIWKHIROORZLQJORFDOO\LPSOHPHQWHGVWRUPZDWHUPDQDJHPHQWSURJUDPV DSSO\ FKHFNDOOWKDWDSSO\  3KDVH,, 16: 8603 :DWHU6XSSO\:DWHUVKHG 2WKHU F+DVWKHDSSURYHG6WRUPZDWHU0DQDJHPHQW3ODQZLWKSURRIRIDSSURYDOEHHQ DWWDFKHG"<HV1R 4. DWQ Stormwater Program Review D:KLFKRIWKHIROORZLQJVWDWHLPSOHPHQWHGVWRUPZDWHUPDQDJHPHQWSURJUDPVDSSO\ FKHFNDOOWKDWDSSO\  &RDVWDOFRXQWLHV +4: 25: 6HVVLRQ/DZ 2WKHU E+DVWKHDSSURYHG6WRUPZDWHU0DQDJHPHQW3ODQZLWKSURRIRIDSSURYDOEHHQ DWWDFKHG"<HV1R 5. DWQ 401 Unit Stormwater Review D'RHVWKH6WRUPZDWHU0DQDJHPHQW3ODQPHHWWKHDSSURSULDWHUHTXLUHPHQWV"<HV1R E+DYHDOORIWKH8QLWVXEPLWWDOUHTXLUHPHQWVEHHQPHW"<HV1R  20 -- Roadwayrunoffwillbecollectedincatchbasinsanddirectedawayfromwetlandareaswithintheprojectboundaries.Impervioussurfaceshavebeen kepttoaminimum.Thesidewalkistobeconstructedwithgrassedswalesbetweentheroadandthesidewalkthroughoutthemajorityoftheproject. 2:1fillslopeswereutilizedinordertominimizejurisdictionalstreamandwetlandimpacts.PleaseseetheattachedStormwaterManagementPlan. OrangeCounty NCDOT 3DJHRI 3&1)RUP±9HUVLRQ4January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) D'RHVWKHSURMHFWLQYROYHDQH[SHQGLWXUHRISXEOLF IHGHUDOVWDWHORFDO IXQGVRUWKH XVHRISXEOLF IHGHUDOVWDWH ODQG"<HV1R E,I\RXDQVZHUHG³\HV´WRWKHDERYHGRHVWKHSURMHFWUHTXLUHSUHSDUDWLRQRIDQ HQYLURQPHQWDOGRFXPHQWSXUVXDQWWRWKHUHTXLUHPHQWVRIWKH1DWLRQDORU6WDWH 1RUWK&DUROLQD (QYLURQPHQWDO3ROLF\$FW 1(3$6(3$ " <HV1R F,I\RXDQVZHUHG³\HV´WRWKHDERYHKDVWKHGRFXPHQWUHYLHZEHHQILQDOL]HGE\WKH 6WDWH&OHDULQJ+RXVH" ,IVRDWWDFKDFRS\RIWKH1(3$RU6(3$ILQDODSSURYDO OHWWHU  &RPPHQWV <HV1R 2. Violations (DWQ Requirement) D,VWKHVLWHLQYLRODWLRQRI':4:HWODQG5XOHV $1&$&+ ,VRODWHG :HWODQG5XOHV $1&$&+ ':46XUIDFH:DWHURU:HWODQG6WDQGDUGV RU5LSDULDQ%XIIHU5XOHV $1&$&% " <HV1R E,VWKLVDQDIWHUWKHIDFWSHUPLWDSSOLFDWLRQ"<HV1R F,I\RXDQVZHUHG³\HV´WRRQHRUERWKRIWKHDERYHTXHVWLRQVSURYLGHDQH[SODQDWLRQRIWKHYLRODWLRQ V     3. Cumulative Impacts (DWQ Requirement) D:LOOWKLVSURMHFW EDVHGRQSDVWDQGUHDVRQDEO\DQWLFLSDWHGIXWXUHLPSDFWV UHVXOWLQ DGGLWLRQDOGHYHORSPHQWZKLFKFRXOGLPSDFWQHDUE\GRZQVWUHDPZDWHUTXDOLW\"<HV1R E,I\RXDQVZHUHG³\HV´WRWKHDERYHVXEPLWDTXDOLWDWLYHRUTXDQWLWDWLYHFXPXODWLYHLPSDFWDQDO\VLVLQDFFRUGDQFHZLWKWKH PRVWUHFHQW':4SROLF\,I\RXDQVZHUHG³QR´SURYLGHDVKRUWQDUUDWLYHGHVFULSWLRQ    4. Sewage Disposal (DWQ Requirement) D&OHDUO\GHWDLOWKHXOWLPDWHWUHDWPHQWPHWKRGVDQGGLVSRVLWLRQ QRQGLVFKDUJHRUGLVFKDUJH RIZDVWHZDWHUJHQHUDWHGIURP WKHSURSRVHGSURMHFWRUDYDLODEOHFDSDFLW\RIWKHVXEMHFWIDFLOLW\    n/a Constructionoftheproposedsidewalkdoesnotmakepreviouslyinaccessibleareasaccessible,norisnotanticipatedtoencourageadditional developmentinthearea. Nowastewaterisanticipatedtobegeneratedbytheproposedproject. PleaseseeattacheddraftCategoricalExclusionActionClassificationForm. 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ® Yes ❑ No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes © No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. - 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? U.S. Fish and %MldW Service County Listings and NCNHP virtual workroom (online). Field surveys for listed species were conducted during the appropriate survey windows. No individuals were identified and this project will have No Effect on listed species. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NOAH Fisheries Essential Fish Habitat Mapper v2.0 (online) 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ YesX❑ No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? SHPO concurrence (dated February 12, 2013) with NEPA documentation. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ❑ Yes ❑X No 8b. If yes, explain how project meets FEMA requirements: n/a 8c. What source(s) did you use to make the floodplain determination? NCFloodmaps.com digital GIS data. APO+ cant 15: 'rows of CARRgoRo GEaar'E -56 /Z 3 DIRE-crOR of PUIBL'ItD,ec� Applicant/Agents Printed Name Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant isprovided.) Page 10 of 10 Ora nge C oun ty, N C Title: Prepared for: Notes:1. Bac kground image ry so urc e:Chapel Hill, NC (1 993)7-5 -minute top ographicquadrangle p rov id ed by theU.S. Ge ological Survey. PRO JECTLOCATION ROGERSROADSIDEWALK Project: FIGURE Drawn by: Date: Scale: Project No.: SGD JAN 2013 As shown 13-001 1 Legend Stud y are a Carrboro to wn limits (ins ets) County line s (inse ts ) ³ 1,000 0 1,000 2,000500Feet k k k P u r e f o y D r i v e E u b a n k s R o a d Meadow Run Court Homestead Road 1 CATEGORICAL EXCLUSION ACTION CLASSIFICATION FORM TIP Project No. U-4726DD State Project No. 36268.1.25 Federal Project No.STPDA-0702(22) A. Project Description: The purpose of this project is to construct five-foot wide concrete sidewalk along SR 1729 (Rogers Road) in the Town of Carrboro from SR 1777 (Homestead Road) to Meadow Run Court. The length of the project will be approximately one mile. The project will provide sidewalk connectivity to SR 1777 (Homestead Road) and Meadow Run Court; see attached Vicinity and Location Map. Traffic will be maintained on-site during the construction of the project. B. Purpose and Need: Provide alternate mode of transportation (pedestrian). The project will provide a pedestrian circulation network to improve mobility and expand access to downtown Carrboro, schools, parks, bus stops, businesses, residential areas, town buildings, and other facilities. This project is part of the Town’s Sidewalk Bond program originally approved in November 2003. C. Proposed Improvements: This project provides for the construction of a 5’ wide concrete sidewalk to be used as a pedestrian path. Circle one or more of the following Type II improvements which apply to the project: This project is a Type I activity (Construction of bicycle and pedestrian lanes, paths, and facilities). 1. Modernization of a highway by resurfacing, restoration, rehabilitation, reconstruction, adding shoulders, or adding auxiliary lanes (e.g., parking, weaving, turning, climbing). a. Restoring, Resurfacing, Rehabilitating, and Reconstructing pavement (3R and 4R improvements) b. Widening roadway and shoulders without adding through lanes c. Modernizing gore treatments d. Constructing lane improvements (merge, auxiliary, and turn lanes) e. Adding shoulder drains f. Replacing and rehabilitating culverts, inlets, and drainage pipes, including safety treatments g. Providing driveway pipes h. Performing minor bridge widening (less than one through lane) i. Slide Stabilization 2 j. Structural BMP’s for water quality improvement 2. Highway safety or traffic operations improvement projects including the installation of ramp metering control devices and lighting. a. Installing ramp metering devices b. Installing lights c. Adding or upgrading guardrail d. Installing safety barriers including Jersey type barriers and pier protection e. Installing or replacing impact attenuators f. Upgrading medians including adding or upgrading median barriers g. Improving intersections including relocation and/or realignment h. Making minor roadway realignment i. Channelizing traffic j. Performing clear zone safety improvements including removing hazards and flattening slopes k. Implementing traffic aid systems, signals, and motorist aid l. Installing bridge safety hardware including bridge rail retrofit 3. Bridge rehabilitation, reconstruction, or replacement or the construction of grade separation to replace existing at-grade railroad crossings. a. Rehabilitating, reconstructing, or replacing bridge approach slabs b. Rehabilitating or replacing bridge decks c. Rehabilitating bridges including painting (no red lead paint), scour repair, fender systems, and minor structural improvements d. Replacing a bridge (structure and/or fill) 4. Transportation corridor fringe parking facilities. 5. Construction of new truck weigh stations or rest areas. 6. Approvals for disposal of excess right-of-way or for joint or limited use of right-of-way, where the proposed use does not have significant adverse impacts. 7. Approvals for changes in access control. 8. Construction of new bus storage and maintenance facilities in areas used predominantly for industrial or transportation purposes where such construction is not inconsistent with existing zoning and located on or near a street with adequate capacity to handle anticipated bus and support vehicle traffic. 9. Rehabilitation or reconstruction of existing rail and bus buildings and ancillary facilities where only minor amounts of additional land are required and there is not a substantial increase in the number of users. 10. Construction of bus transfer facilities (an open area consisting of passenger shelters, boarding areas, kiosks and related street improvements) when located in a commercial area or other high activity center in which there is adequate street capacity for projected bus traffic. 3 11. Construction of rail storage and maintenance facilities in areas used predominantly for industrial or transportation purposes where such construction is not inconsistent with existing zoning and where there is no significant noise impact on the surrounding community. 12. Acquisition of land for hardship or protective purposes, advance land acquisition loans under section 3(b) of the UMT Act. Hardship and protective buying will be permitted only for a particular parcel or a limited number of parcels. These types of land acquisition qualify for a CE only where the acquisition will not limit the evaluation of alternatives, including shifts in alignment for planned construction projects, which may be required in the NEPA process. No project development on such land may proceed until the NEPA process has been completed. 13. Acquisition and construction of wetland, stream and endangered species mitigation sites. 14. Remedial activities involving the removal, treatment or monitoring of soil or groundwater contamination pursuant to state or federal remediation guidelines. D. Special Project Information: Estimated Costs: Engineering $ 67,000 Total Construction $ 469,000 Contingencies $ 37,000 Total $ 574,000 Other Agency Comments: The North Carolina Department of Cultural Resources, State Historic Preservation Office, stated in a letter dated February 12, 2013 that a review of the project was conducted and that they are aware of no historic resources which would be affected by the project. 4 Public Involvement: A Public Hearing is scheduled to be held on April 16, 2013. 5 E. Threshold Criteria The following evaluation of threshold criteria must be completed for Type II actions ECOLOGICAL YES NO (1) Will the project have a substantial impact on any unique or important natural resource? X (2) Does the project involve habitat where federally listed endangered or threatened species may occur? X (3) Will the project affect anadromous fish? X (4) If the project involves wetlands, is the amount of permanent and/or temporary wetland taking less than one-tenth (1/10) of an acre and have all practicable measures to avoid and minimize wetland takings been evaluated? X (5) Will the project require the use of U. S. Forest Service lands? X (6) Will the quality of adjacent water resources be adversely impacted by proposed construction activities? X (7) Does the project involve waters classified as Outstanding Water Resources (OWR) and/or High Quality Waters (HQW)? X (8) Will the project require fill in waters of the United States in any of the designated mountain trout counties? X (9) Does the project involve any known underground storage tanks (UST's) or hazardous materials sites? X PERMITS AND COORDINATION YES NO (10) If the project is located within a CAMA county, will the project significantly affect the coastal zone and/or any "Area of Environmental Concern" (AEC)? X (11) Does the project involve Coastal Barrier Resources Act resources? X (12) Will a U. S. Coast Guard permit be required? X (13) Will the project result in the modification of any existing regulatory floodway? X 6 (14) Will the project require any stream relocations or channel changes? X SOCIAL, ECONOMIC, AND CULTURAL RESOURCES YES NO (15) Will the project induce substantial impacts to planned growth or land use for the area? X (16) Will the project require the relocation of any family or business? X (17) Will the project have a disproportionately high and adverse human health and environmental effect on any minority or low-income population? X (18) If the project involves the acquisition of right of way, is the amount of right of way acquisition considered minor? X (19) Will the project involve any changes in access control? X (20) Will the project substantially alter the usefulness and/or land use of adjacent property? X (21) Will the project have an adverse effect on permanent local traffic patterns or community cohesiveness? X (22) Is the project included in an approved thoroughfare plan and/or Transportation Improvement Program (and is, therefore, in conformance with the Clean Air Act of 1990)? X (23) Is the project anticipated to cause an increase in traffic volumes? X (24) Will traffic be maintained during construction using existing roads, staged construction, or on-site detours? X (25) If the project is a bridge replacement project, will the bridge be replaced at its existing location (along the existing facility) and will all construction proposed in association with the bridge replacement project be contained on the existing facility? N/A (26) Is there substantial controversy on social, economic, or environmental grounds concerning the project? X (27) Is the project consistent with all Federal, State, and local laws relating to the environmental aspects of the project? X (28) Will the project have an "effect" on structures/properties eligible for or listed on the National Register of Historic Places? X 7 (29) Will the project affect any archaeological remains which are important to history or pre-history? X (30) Will the project require the use of Section 4(f) resources (public parks, recreation lands, wildlife and waterfowl refuges, historic sites, or historic bridges, as defined in Section 4(f) of the U. S. Department of Transportation Act of 1966)? X (31) Will the project result in any conversion of assisted public recreation sites or facilities to non-recreation uses, as defined by Section 6(f) of the Land and Water Conservation Act of 1965, as amended? X (32) Will the project involve construction in, across, or adjacent to a river designated as a component of or proposed for inclusion in the National System of Wild and Scenic Rivers? X F. Additional Documentation Required for Unfavorable Responses in Part E Response to Question 2: Suitable habitat for Michaux’s sumac occurs throughout the study area along the margins of Rogers Road within utility line corridors, along woodland edges, and within residential yards. A review of NCNHP records, updated January 2013, indicates no known Michaux’s sumac occurrences within 1.0 mile of the study area. Systematic surveys were performed in all areas of suitable habitat on May 29, 2013, and no Michaux’s sumac was identified within the study area.Biological Conclusion: No Effect. Suitable habitat for smooth coneflower occurs throughout the study area along the margins of Rogers Road within utility line corridors, along woodland edges, and within residential yards. A review of NCNHP records, updated January 2013, indicates no known smooth coneflower occurrences within 1.0 mile of the study area. Axiom biologists visited the UNC Botanical Garden on May 29, 2013 and found smooth coneflowers to be in bloom. Subsequently, systematic surveys were performed in all areas of suitable habitat within the study area on the same day, and no individuals of this species were identified. Biological Conclusion: No Effect. 8 G. CE Approval TIP Project No.U-4726DD State Project No.36268.1.25 Federal Project No.STPDA-0702(22) Project Description: The purpose of this project is to construct five-foot wide concrete sidewalk along SR 1729 (Rogers Road) in the Town of Carrboro from SR 1777 (Homestead Road) to Meadow Run Court. The length of the project will be approximately one mile. The project will provide sidewalk connectivity to SR 1777 (Homestead Road) and Meadow Run Court. Traffic will be maintained on-siteduring construction. Categorical Exclusion Action Classification: ___X__ TYPE I TYPE II(A) TYPE II(B) Approved: Date Assistant Manager Project Development & Environmental Analysis Branch Date Project Planning Unit Head Project Development & Environmental Analysis Branch Date Project Planning Engineer Project Development & Environmental Analysis Branch For Type II(B) projects only: Date John F. Sullivan, III, PE, Division Administrator Federal Highway Administration (V e r s i o n 1 . 2 ; R e l e a s e d S e p t e m b e r 2 0 1 1 ) U- 4 7 2 6 D D Co u n t y ( i e s ) : Or a n g e Page 1of 4 Pr o j e c t T y p e : D a t e : Ph o n e : Ph o n e : Em a i l : Em a i l : Co u n t y ( i e s ) : CA M A C o u n t y ? De s i g n / F u t u r e : Ex i s t i n g : Su r r o u n d i n g L a n d U s e : Ru r a l , R e s i d e n t i a l 57 0 0 L F 26 0 0 0. 0 0 Pr o j e c t B u i l t - U p o n A r e a ( a c . ) Pr o p o s e d P r o j e c t E x i s t i n g S i t e Pr o j e c t L e n g t h ( l i n . M i l e s o r f e e t ) : Bu f f e r R u l e s i n E f f e c t Pr o j e c t D e s c r i p t i o n No n e No No n e NC D W Q S u r f a c e W a t e r C l a s s i f i c a t i o n f o r P r i m a r y R e c e i v i n g W a t e r 30 3 ( d ) I m p a i r m e n t s : Ri v e r B a s i n ( s ) : Pr i m a r y R e c e i v i n g W a t e r : Wa t e r S u p p l y V ( W S - V ) Ot h e r S t r e a m C l a s s i f i c a t i o n : Su n g a t e D e s i g n G r o u p , P A Ci t y / T o w n : (9 1 9 ) 8 5 9 - 2 2 4 3 Hi g h w a y D i v i s i o n 7 Ad d r e s s : Ca r r b o r o (3 3 6 ) 4 8 7 - 0 0 7 5 Or a n g e ac. Ge n e r a l P r o j e c t N a r r a t i v e : Th i s p r o j e c t c o n s i s t s o f a p r o p o s e d 5 ' w i d e s i d e w a l k a l o n g R o g e r s R o a d ( S R 1 7 2 9 ) . T h e p r i m a r y r e c e i v i n g w a t e r f o r t h e p r o j e c t , UT B o l i n C r e e k , i s i n t h e J o r d a n L a k e wa t e r s h e d , t h e r e f o r e , m e a s u r e s h a v e b e e n t a k e n t o r e d u c e d i r e c t r u n o f f i n t o t h e b u f f e r s . R o a d w a y r u n o f f w i l l b e c o l l e c t e d i n c a tc h b a s i n s a n d d i r e c t e d a w a y f r o m w e t l a n d ar e a s w i t h i n t h e p r o j e c t b o u n d a r i e s . I m p e r v i o u s s u r f a c e s w e r e k e p t a t a m i n i m u m . T h e s i d e w a l k i s t o b e c o n s t r u c t e d w i t h g r a s s e d swales between the road and the sidewalk th r o u g h o u t t h e m a j o r i t y o f t h e p r o j e c t . 2 : 1 f i l l s l o p e s w e r e u t i l i z e d i n o r d e r t o m i n i m i z e j u r i s d i c t i o n a l s t r e a m a n d w e t l a n d i m pa c t s . Ty p i c a l C r o s s S e c t i o n D e s c r i p t i o n : Re f e r e n c e s 2600 0. 6 4 Av e r a g e D a i l y T r a f f i c ( v e h / h r / d a y ) : ac . No r t h C a r o l i n a D e p a r t m e n t o f T r a n s p o r t a t i o n Hi g h w a y S t o r m w a t e r P r o g r a m S T O R M W A T E R M A N A G E M E N T P L A N FO R L I N E A R R O A D W A Y P R O J E C T S Do n n i e H u f f i n e s Si d e w a l k Gr e e n s b o r o , N C 2 7 4 1 5 Ge n e r a l P r o j e c t I n f o r m a t i o n Ad d r e s s : 11/22/2013 91 5 J o n e s F r a n k l i n R o a d 15 8 4 Y a n c e y v i l l e S t r e e t Ra l e i g h , N C 2 7 6 0 6 Pr o j e c t / T I P N o . : NC D O T C o n t a c t : Pr o j e c t N o . : U- 4 7 2 6 D D Co n t r a c t o r / D e s i g n e r : dh u f f i n e s @ n c d o t . g o v Ca p e F e a r 16 - 4 1 - 1 - 1 5 - 1 - ( 0 . 5 ) bh a m i l t o n @ s u n g a t e d e s i g n . c o m 5' C o n c r e t e s i d e w a l k w i t h v a r y i n g 3 : 1 a n d 4 : 1 cu t / f i l l s l o p e s . A r e a i s n o t c u r r e n t l y b u i l t u p o n . Jo r d a n L a k e NC D W Q S t r e a m I n d e x N o . : Su p p l e m e n t a l : Nu t r i e n t S e n s i t i v e W a t e r s ( N S W ) Pr i m a r y : UT B o l i n C r e e k ( H o g a n L a k e ) WETLAND AND SURFACE WATER IMPACTS PERMIT SITE 1 SITE 2 SHEET 1 OF 9 PERMIT DRAWING NOT TO SCALE VICINITY MAP HOMESTEAD RD SR 1777 R .J R A IN SLL HT O R L R O CA R O FESSI ON 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C STANDARDS TOWN OF CARRBORO ______________________________ OCTOBER, 2011 STANDARDS AND DESIGN, SPECIFICATIONS, OWASA - MANUAL OF ______________________________ STANDARD SPECIFICATION NCDOT - JANUARY 2012 TEL (919) 859-2243 FAX (919) 859-6258 RALEIGH, NORTH CAROLINA 27606 915 JONES FRANKLIN ROAD SUNGATE DESIGN GROUP, P.A. ENG. FIRM LICENSE NO. C-890ROGERS RD SIDEWALK PROJECT 10 20 4020 10 20 4020 5 105 0 0 0 PROFILE (HORIZONTAL) PROJECT LENGTH STATE STATE PROJECT REFERENCE NO. N.C. DESIGN DATA Prepared in the Office of: SIGNATURE: P.E. SUNGATE DESIGN GROUP, P.A. PROJECT ENGINEERGRAPHIC SCALES PLANS PROFILE (VERTICAL) LOCATION: TYPE OF WORK: N/A PUBLIC WORKS TOWN OF CARRBORO 0 00 915 JONES FRANKLIN ROAD, RALEIGH, NC, 27606 C-890 NG INEE R I A O P R O C C P R I T G UN IS E S S NO AE O F NO TE IESDGN URO G P P. A. EI L N. G C. RA H, LA N G H ARO LIR T N O AN R L.A. FIRM LICENSE NO. C-91 IGS RGN OU D S U N G AET C-91 A INL R O CA A N DSCAPE E IHC R A T R E T C T O R R N S T E D E H L GI E P ,RU LA CORP. P .A . D r . P u r e fo y Rogers Rd. R o g er s R d. Tallyho Tr. S R 1 8 9 6 S R 1 7 2 9 SR 2213 S R 2 2 5 4 S R 1 7 2 9 C la y m o re R d S y lv a n W a y S R 1 8 4 2 S R 1 7 2 7 E u b a n k s S R 1 7 7 7 SR 1896 PUREFOY DR O L D N C 8 6 S R 1729 R O G E RS R D N C 8 6 I 40 R u s c h R d DRAINAGE, DRIVE APRONS GUTTER, CONCRETE SIDEWALK, STORM CONCRETE SIDEWALK, CONCRETE CURB AND H o m e s te a d R d M eado w Run Ct INDEX OF SHEETS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS Staffield Ln W itm ore C ir N Hawick Ct S Hawick Ct R d. SR 1 7 2 7 EU BANK S RD AND SR 1777, HOMESTEAD RD 1. SR 1729, ROGERS ROAD BETWEEN MEADOW RUN CT (NON-SYSTEM) NCDOT ENCROACHMENTS (NON-SYSTEM) AND SR 1777, HOMESTEAD RD SR 1729, ROGERS ROAD BETWEEN MEADOW RUN CT 2.5 STA 11+61.90 BEGIN PROJECT STA 68+62.88 END PROJECT 1 SHEET NO. TOTAL SHEETS DATE: OCTOBER 7, 2013 PSH C1.04 PSH C1.05 PSH C1.06 PSH C1.07 PSH C1.08 PSH C1.09 PSH C1.10 PSH C 1 .1 1 P S H C 1. 12 P S H C 1. 13 P S H C 1. 14 PSH C1.15 = +/-5700 LF PROJECT CARRBORO SIDEWALK TOTAL LENGTH OF TOWN OF SIGNATURE: P.E. PROJECT ENGINEER W. HENRY WELLS, JR, P.E. CHARLES A. MUSSER, JR, R.L.A. PROJECT LANDSCAPE ARCHITECT SIGNATURE: R.L.A. JOSHUA G. DALTON, PE, CPESC A IN HT O R L R O CA R O FESSI O N 26971 G E N REINE SEALP N A L NOTLAD .G A UH S OJDO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION 71 / FINAL EROSION CONTROL CLEARING AND GRUBBINGE1.04 - E1.15 SOIL STABILIZATION SUMMARYE1.03 EROSION CONTROL DETAILSE1.02 - E1.02D EROSION CONTROL NOTESE1.01 EROSION CONTROL TITLE SHEETE1.00 FIBER OPTIC CONDUIT / PULL BOX LOCATIONSC5.01 TRAFFIC CONTROL OVERALLC4.02 TRAFFIC CONTROL DETAILSC4.01 - C4.01B STAGING AREASC3.01 CROSS SECTIONS- C2.26C2.01 PLAN/ PROFILEC1.04 - C1.15 GENERAL NOTESC1.03 TYPICALSC1.02C UTILITIES CONFLICTS SCHEDULEC1.02B STORM DRAINAGE SCHEDULEC1.02A SURVEY CONTROLC1.02 CONVENTIONAL PLAN SHEET SYMBOLSC1.01A S o u th e rn R ail w a y High Sch. Hill Chapel SHEET 2 OF 9 PERMIT DRAWING M A T C H LI N E 2 5 + 0 0 M A T C H LI N E 3 0 + 0 0 25+00 26+00 27+00 28+00 29+00 30+00 490 500 510 520 490 500 510 520 M A T C H LI N E 2 5 + 0 0 10 20 40200 PLANS M A T C H LI N E 3 0 + 0 0 1/ 13 / 2 0 14 R O G E R S _ H y d _ p r m _ w e t _ p s h 0 7 j h a r v e y S U N G A T E D E S I G N G R O U P , P .A . 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 R O G E R S R O A D S I D E W A LK C A R R B O R O , N C C1.07 ROGERS13CDC107 P LA N / P R O F I LE EXTG CL ROAD EXTG CL ROAD AT FACE SIDEWALK EXTG GRADE AT FACE SIDEWALK EXTG GRADE EX 15" RCP DITCH EXTG ROADSIDE 15" RCP DITCH PROP ROADSIDE 15" RCP DITCH EXTG ROADSIDE 2GI-D 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI 15" RCP EX 48" CMP S S SURFACE WATER DENOTES IMPACTS IN SITE 1 TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY SIDEWALK 5’ STD DRIVEWAY RETAIN ADJUST ADJUST ADJUST ADJUST ADJUST ADJUST ADJUST SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD DRIVEWAY SIDEWALK 5’ STD CONCRETE ADJUST ADJUST RETAIN E OG S OIL UT WV WV WV WV WV WM WM UP UP SIGN 4 8 " C M P 15" RCP EOP EOPEOP EOP UT UT E OG E OG 2 6 + 0 0 2 7 + 0 0 2 8 + 0 0 2 9 + 0 0 HYD MON INV=500.89’INV=500.14’ WV WV PREVENTER BACKFLOW CTRL POINT HOR/VERT PT #13 HYD MON PIN 9870441657 D.B. 932, PG. 81 JAMES M. ALLEN PIN 9870453385 D.B. 171, PG. 475 LEAH ROGERS PIN 9870347529 D.B. 4088, PG. 331 BUDDHA LLC PIN 9870442208 D.B. 4435, PG. 507 BUDDHA LLC PIN 9870443288 D.B. 854, PG. 104 ALLONIOUS NICKENS ROWROWROWROW ROW ROW ROW ROW ROW ROW EIP EIP EIP ROGERS ROAD SR 1729 ENDWALL 15" RCP-III REMOVE RETAIN 15" RCP-III 1 5 " RC P -III 2GI-B 1 5 " R C P - I I I SEE DETAIL #1 SPEC LAT V DITCH EST 5 SY GFD EST 1 TON CL ’B’ RIP RAP EST 5 SY GFD EST 1 TON CL ’B’ RIP RAP EST 7 SY GFD EST 2 TON CL ’B’ RIP RAP W/ GASKET SLEEVE BAND AND EXTEND 48" CSP (-) 1.68% (-) 0.94% E L = 5 0 0 .5 0 P I = 3 0 + 0 0 E L = 5 0 0 .3 8 P I = 2 9 + 2 5 E L = 5 0 0 .8 5 E L = 5 0 1.2 7 P I = 2 9 + 0 0 L A T V D IT C H B E G S P E C P I= 2 9 + 7 5 (+) 0.48% FF F F F FCFF F F F F FFFFFFFFFF FFFFF F C C C C C C C C C C SHEET 3 OF 9 PERMIT DRAWING M A T C H LI N E 2 5 + 0 0 M A T C H LI N E 3 0 + 0 0 25+00 26+00 27+00 28+00 29+00 30+00 490 500 510 520 490 500 510 520 M A T C H LI N E 2 5 + 0 0 10 20 40200 PLANS M A T C H LI N E 3 0 + 0 0 1/ 13 / 2 0 14 R O G E R S _ H y d _ p r m _ w e t _ p s h 0 7 _ c o n j h a r v e y S U N G A T E D E S I G N G R O U P , P .A . 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 R O G E R S R O A D S I D E W A LK C A R R B O R O , N C C1.07 ROGERS13CDC107 P LA N / P R O F I LE EXTG CL ROAD EXTG CL ROAD AT FACE SIDEWALK EXTG GRADE AT FACE SIDEWALK EXTG GRADE EX 15" RCP DITCH EXTG ROADSIDE 15" RCP DITCH PROP ROADSIDE 15" RCP DITCH EXTG ROADSIDE 2GI-D 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI 15" RCP EX 48" CMP S S SURFACE WATER DENOTES IMPACTS IN SITE 1 TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY SIDEWALK 5’ STD DRIVEWAY RETAIN ADJUST ADJUST ADJUST ADJUST ADJUST ADJUST ADJUST SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD DRIVEWAY SIDEWALK 5’ STD CONCRETE ADJUST ADJUST RETAIN E OG S OIL UT WV WV WV WV WV WM WM UP UP SIGN 4 8 " C M P 15" RCP EOP EOPEOP EOP UT UT E OG E OG 2 6 + 0 0 2 7 + 0 0 2 8 + 0 0 2 9 + 0 0 HYD MON INV=500.89’INV=500.14’ WV WV PREVENTER BACKFLOW CTRL POINT HOR/VERT PT #13 HYD MON PIN 9870441657 D.B. 932, PG. 81 JAMES M. ALLEN PIN 9870453385 D.B. 171, PG. 475 LEAH ROGERS PIN 9870347529 D.B. 4088, PG. 331 BUDDHA LLC PIN 9870442208 D.B. 4435, PG. 507 BUDDHA LLC PIN 9870443288 D.B. 854, PG. 104 ALLONIOUS NICKENS ROWROWROWROW ROW ROW ROW ROW ROW ROW EIP EIP EIP ROGERS ROAD SR 1729 FF F F F FCFF F F F F FFFFFFFFFF FFFFF F C C C C C C C C C C 4 9 5 4 9 6 497 498 4 9 8 499 4 9 9 500 500 501 501 501 502502 502 502 502 5 0 3 503504 504 504 505 505 5 0 5 506 506 506 507 507 5 0 7 508 508 508 508 509 509 509 509 510 5 1 0 510 510 510 511 5 1 1 511512 5 1 2 513 ENDWALL 15" RCP-III REMOVE RETAIN 15" RCP-III 1 5 " RC P -III 2GI-B 1 5 " R C P - I I I SEE DETAIL #1 SPEC LAT V DITCH EST 5 SY GFD EST 1 TON CL ’B’ RIP RAP EST 5 SY GFD EST 1 TON CL ’B’ RIP RAP EST 7 SY GFD EST 2 TON CL ’B’ RIP RAP W/ GASKET SLEEVE BAND AND EXTEND 48" CSP (-) 1.68% (-) 0.94% E L = 5 0 0 .5 0 P I = 3 0 + 0 0 E L = 5 0 0 .3 8 P I = 2 9 + 2 5 E L = 5 0 0 .8 5 E L = 5 0 1.2 7 P I = 2 9 + 0 0 L A T V D IT C H B E G S P E C P I= 2 9 + 7 5 (+) 0.48% SHEET 4 OF 9 PERMIT DRAWING M A T C H LI N E 3 0 + 0 0 M A T C H LI N E 3 5 + 0 0 30+00 31+00 32+00 33+00 34+00 35+00 490 500 510 520 490 500 510 520 10 20 40200 PLANS M A T C H LI N E 3 0 + 0 0 M A T C H LI N E 3 5 + 0 0 $ $ $ $ $ $ S Y S T IM E $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ D G N $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ U S E R N A M E $ $ $ $ EX 15" RCP EX 15" RCP S U N G A T E D E S I G N G R O U P , P .A . 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S R O G E R S R O A D S I D E W A LK C A R R B O R O , N C SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 C1.08 ROGERS13CDC108 P LA N / P R O F I LE 15" RCP DITCH PROP ROADSIDE EXTG CL ROAD EXTG CL ROAD AT FACE SIDEWALK EXTG GROUND AT FACE SIDEWALK EXTG GROUND DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI WETLAND DENOTES FILL INFF CLEARING DENOTES MECHANIZED* * * * ** * ** * * SITE 1 IMPACTS IN SURFACE WATER DENOTES TEMPORARY SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD DRIVEWAY SIDEWALK 5’ STD DRIVEWAY RELOCATE RETAIN SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE E O G EOG 15" RCP EOP EOP EOPEOP 3 1+ 0 0 3 2 + 0 0 3 3 + 0 0 3 4 + 0 0 15" RCP SIGN SIGN WM UP E O G E O G R/W MON INV=493.68’ INV=515.38’ INV=515.69’ INV=502.30’ INV=502.87’ MAILBOX CTRL POINT HOR/VERT PT #12 CTRL POINT HOR/VERT PT #11 PIN 9870445166 D.B. 395, PG. 234 BETTIE D. ROGERS SAMUEL F. ROGERS PIN 9870437814 D.B. 166, PG. 2 LEAH ROGERS PIN 9870443288 D.B. 854, PG. 104 ALLONIOUS NICKENS ROWROWROWROW ROW ROW ROW ROW ROW ROW EIP EIP ROGERS ROAD SR 1729 PIN 9870438967 D.B. 2164, PG. 351 LOVE CHURCH INTERNATIONAL INC. FAITH TABERNACLE OASIS OF (+) 0.92% (+) 1.49% (+) 2.38% (+) 3.16% E L = 5 0 2 .2 9 E L = 5 0 1.10 E L = 5 0 0 .7 3 E L = 5 0 0 .5 0 E L = 5 0 0 .5 0 P I = 3 0 + 0 0 P I = 3 0 + 2 5 P I = 3 0 + 5 0 P I = 3 1+ 0 0 E L = 5 0 3 .0 8 P I = 3 1+ 2 5 L A T V D I T C H E N D S P E C ENDWALL REMOVE RETAIN SEE DETAIL #1 SPEC LAT V DITCH 15" RCP-III EST 5 SY GFD EST 1 TON CL ’B’ RIP RAP C C F CF F F F F F FFF FFFF FFFFFFFFFFF C C C C C C C C C SHEET 5 OF 9 PERMIT DRAWING M A T C H LI N E 3 0 + 0 0 M A T C H LI N E 3 5 + 0 0 30+00 31+00 32+00 33+00 34+00 35+00 490 500 510 520 490 500 510 520 10 20 40200 PLANS M A T C H LI N E 3 0 + 0 0 M A T C H LI N E 3 5 + 0 0 $ $ $ $ $ $ S Y S T IM E $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ D G N $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ U S E R N A M E $ $ $ $ EX 15" RCP EX 15" RCP S U N G A T E D E S I G N G R O U P , P .A . 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S R O G E R S R O A D S I D E W A LK C A R R B O R O , N C SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 C1.08 ROGERS13CDC108 P LA N / P R O F I LE 15" RCP DITCH PROP ROADSIDE EXTG CL ROAD EXTG CL ROAD AT FACE SIDEWALK EXTG GROUND AT FACE SIDEWALK EXTG GROUND DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI WETLAND DENOTES FILL INFF CLEARING DENOTES MECHANIZED* * * * ** * ** * * SITE 1 IMPACTS IN SURFACE WATER DENOTES TEMPORARY SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD DRIVEWAY SIDEWALK 5’ STD DRIVEWAY RELOCATE RETAIN SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE E O G EOG 15" RCP EOP EOP EOPEOP 3 1+ 0 0 3 2 + 0 0 3 3 + 0 0 3 4 + 0 0 15" RCP SIGN SIGN WM UP E O G E O G R/W MON INV=493.68’ INV=515.38’ INV=515.69’ INV=502.30’ INV=502.87’ MAILBOX CTRL POINT HOR/VERT PT #12 CTRL POINT HOR/VERT PT #11 PIN 9870445166 D.B. 395, PG. 234 BETTIE D. ROGERS SAMUEL F. ROGERS PIN 9870437814 D.B. 166, PG. 2 LEAH ROGERS PIN 9870443288 D.B. 854, PG. 104 ALLONIOUS NICKENS ROWROWROWROW ROW ROW ROW ROW ROW ROW EIP EIP ROGERS ROAD SR 1729 PIN 9870438967 D.B. 2164, PG. 351 LOVE CHURCH INTERNATIONAL INC. FAITH TABERNACLE OASIS OF C C F CF F F F F F FFF FFFF FFFFFFFFFFF C C C C C C C C C494495 496 4 9 7 497 498 498 499 499 500 500 501 501 5 0 2 5 0 2 502 503 5 0 3 504 5 0 4 5 0 4 5 0 5 5 0 5 5 0 6 506 507 507 508 508 509 5 0 9 510 510 511 511 512 5125 12 513 513 513 514 514 514 515 515 515 516 516 516 516 517 517 517 517 518 518 518 518 519 519 519 519 520 520520 5 2 0 520 5 2 1 5 2 1 521 5 2 2 (+) 0.92% (+) 1.49% (+) 2.38% (+) 3.16% E L = 5 0 2 .2 9 E L = 5 0 1.10 E L = 5 0 0 .7 3 E L = 5 0 0 .5 0 E L = 5 0 0 .5 0 P I = 3 0 + 0 0 P I = 3 0 + 2 5 P I = 3 0 + 5 0 P I = 3 1+ 0 0 E L = 5 0 3 .0 8 P I = 3 1+ 2 5 L A T V D I T C H E N D S P E C ENDWALL REMOVE RETAIN SEE DETAIL #1 SPEC LAT V DITCH 15" RCP-III EST 5 SY GFD EST 1 TON CL ’B’ RIP RAP SHEET 6 OF 9 PERMIT DRAWING M A TC H LIN E 6 5 + 0 0 65+00 66+00 67+00 68+00 460 470 480 490 500 460 470 480 490 500 M A T C H LI N E 6 5 + 0 0 10 20 40200 PLANS 69+00 $ $ $ $ $ $ S Y S T IM E $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ D G N $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ U S E R N A M E $ $ $ $ S U N G A T E D E S I G N G R O U P , P .A . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . R O G E R S R O A D S I D E W A LK SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 C1.15 ROGERS13CDC115 P LA N / P R O F I LE EXTG CL ROAD EXTG CL ROAD AT FACE SIDEWALK EXTG GRADE AT FACE SIDEWALK EXTG GRADE DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE(2) EX 54" CMP 15" RCP CB ENDWALL 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI OUTLET 15" RCP WETLAND DENOTES FILL INFF S S SURFACE WATER DENOTES IMPACTS IN CLEARING DENOTES MECHANIZED* * * * ** * ** * * SITE 2 TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY SIDEWALK 5’ STD CONCRETE CURB AND GUTTER 2’-6" CONCRETE SIDEWALK 5’ STD CONCRETE CONCRETE SIDEWALK TIE TO EXTG ADJUST ADJUST STRIP 1’-6" UTILITY STRIP 1’-6" UTILITY STRIP 1’-6" UTILITY RELOCATE AND GUTTER TRANSITION TO EXISTING CURB AS REQUIRED FOR SMALL AND GUTTERREMOVE EXTG CURB T C S E O P EOPEOP EOP 5 4 " C M P 5 4 " C M P 36" RCP SIGN TPED CABLE UP SSMH SSMH SDMH 6 6 + 0 0 6 7 + 0 0 6 8 + 0 0 FO BOX CTRL POINT HOR/VERT PT #3 CTRL POINT HOR/VERT PT #2 15" RCP PIN 9870516306 P.B. 55, PG. 87 D.B. 5256, PG. 185 ANDREA C. TANNER DAVID G. TANNER PIN 9870519288 P.B. 55, PG. 87 D.B. 946, PG. 181 DONNA H. HAMILTON MICHAEL ANTHONY HAMILTON PIN 9870508940 P.B. 55, PG. 87 D.B. 868, PG. 1492 HOMEOWNERS ASSOCIATION INC. HIGHLANDS PHASE V C E N T E R LI N E H O M E S T E A D R O A D S R 1 1 7 7 R O W R O W R OW ROW ROW ROW ROW ROW ROW ROGERS ROAD SR 1729 ENDWALL RETAIN RETAIN CB EST 5 SY GFD EST 1 TON CL ’B’ RIP RAP 15" RCP-III W/ SLEEVE GASKETS AND EXTEND 2@54" CSP BAND F F F F F F F F F F F F F F FF SHEET 7 OF 9 PERMIT DRAWING M A TC H LIN E 6 5 + 0 0 65+00 66+00 67+00 68+00 460 470 480 490 500 460 470 480 490 500 M A T C H LI N E 6 5 + 0 0 10 20 40200 PLANS 69+00 $ $ $ $ $ $ S Y S T IM E $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ D G N $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ U S E R N A M E $ $ $ $ S U N G A T E D E S I G N G R O U P , P .A . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . R O G E R S R O A D S I D E W A LK SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 C1.15 ROGERS13CDC115 P LA N / P R O F I LE EXTG CL ROAD EXTG CL ROAD AT FACE SIDEWALK EXTG GRADE AT FACE SIDEWALK EXTG GRADE DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE(2) EX 54" CMP 15" RCP CB ENDWALL 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI OUTLET 15" RCP WETLAND DENOTES FILL INFF S S SURFACE WATER DENOTES IMPACTS IN CLEARING DENOTES MECHANIZED* * * * ** * ** * * SITE 2 TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY SIDEWALK 5’ STD CONCRETE CURB AND GUTTER 2’-6" CONCRETE SIDEWALK 5’ STD CONCRETE CONCRETE SIDEWALK TIE TO EXTG ADJUST ADJUST STRIP 1’-6" UTILITY STRIP 1’-6" UTILITY STRIP 1’-6" UTILITY RELOCATE AND GUTTER TRANSITION TO EXISTING CURB AS REQUIRED FOR SMALL AND GUTTERREMOVE EXTG CURB T C S E O P EOPEOP EOP 5 4 " C M P 5 4 " C M P 36" RCP SIGN TPED CABLE UP SSMH SSMH SDMH 6 6 + 0 0 6 7 + 0 0 6 8 + 0 0 FO BOX CTRL POINT HOR/VERT PT #3 CTRL POINT HOR/VERT PT #2 15" RCP PIN 9870516306 P.B. 55, PG. 87 D.B. 5256, PG. 185 ANDREA C. TANNER DAVID G. TANNER PIN 9870519288 P.B. 55, PG. 87 D.B. 946, PG. 181 DONNA H. HAMILTON MICHAEL ANTHONY HAMILTON PIN 9870508940 P.B. 55, PG. 87 D.B. 868, PG. 1492 HOMEOWNERS ASSOCIATION INC. HIGHLANDS PHASE V C E N T E R LI N E H O M E S T E A D R O A D S R 1 1 7 7 R O W R O W R OW ROW ROW ROW ROW ROW ROW ROGERS ROAD SR 1729 F F F F F F F F F F F F F F FF 473 474 4 7 4 4 7 4 474 4 7 4 4 7 4 475 4 7 5 475 475 4 7 5 4 7 5 4 7 6 476 476 4 7 6 4 7 6 477 477477 4 7 7 477 477 477 4 7 7 478 478 478 478478 478 478 479 479479 479 479 4 7 9 479 4 8 0 480 480 480 480 480 4 8 0 4 8 0 4 8 1 481 481 481 481 4 8 1 4 8 1 4 8 1 4 8 1 482 482 482 4 8 2 483 4 8 3 ENDWALL RETAIN RETAIN CB EST 5 SY GFD EST 1 TON CL ’B’ RIP RAP 15" RCP-III W/ SLEEVE GASKETS AND EXTEND 2@54" CSP BAND FILL IN WETLAND CLEARING MECHANIZED SITE 2 SHEET 8 OF 9 PERMIT DRAWING 475 480 485 475 480 485 00 5 10 15 20 25 30 35 40 45 50 66+25.00 -EL- 485 480 475 485 480 475 485 480 47566+75.00 485 480 475 480 47567+00.00 485 480 475 485 480 47567+25.00 485 480 475 00 5 10 15 20 25 30 35 40 45 50 00 5 10 15 20 25 30 35 40 45 50 485 480 47568+00.00 485 480 475 480 475 67+75.00 480 475 470 480 475 47067+50.00 480 475 470 480 475 47067+34.59 480 475 470 00 5 10 15 20 25 30 35 40 45 50 -EL- 66+50.00 485 470 4 8 0 . 6 6 E X E O P 4 8 0 . 6 7 E X E O P 4 8 0 . 6 9 E X E O P 4 8 0 . 6 9 E X E O P 54" CMP 4 8 0 . 7 0 E X E O P 4 8 0 . 9 7 E X E O P 4 8 1 . 2 3 E X E O P 4 8 1 . 4 7 E X E O P 4 8 1 . 8 1 E X E O P E X T R E E L IN E R O W E X C L= 4 8 1 . 0 7 R O W E X E X T R E E L IN E C L= 4 8 1 . 2 4 R O W E X E X T R E E L IN E R O W E X C L= 4 8 1. 2 6 R O W E X C L= 4 8 1 . 5 4 R O W E X E X R I P R A P E X R I P R A P C L= 4 8 1 . 8 1 R O W E X E X H E D G E L IN E E X H E D G E L IN E C L= 4 8 2 . 12 R O W E X E X H E D G E L IN E C L= 4 8 2 . 4 3 R O W E X E X H E D G E L IN E EX TP T V E X P E D 1/ 13 / 2 0 14 R O G E R S _ H y d _ p r m _ w e t _ p s h _ x p l 2 5 j h a r v e y W L E X W L E X W L E X W L E X W L E X W L E X W L E X W L E X W L E X 1.50’ 1.50’ 1.50’ C L= 4 8 1. 2 5 1.50’ 1.50’ 1.50’ 1.50’ 1.50’ SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: S U N G A T E D E S I G N G R O U P , P .A . PROJECT# : F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L I N R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C R O G E R S R O A D S I D E W A LK C A R R B O R O , N C C R O S S S E C T I O N S 1083-12003 ROGERS13CDC225 CAM, WBH C2.25 DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU ISIT ION C L= 4 8 1. 2 2 1.50’ 485 480 47566+00.00 485 480 475 C L= 4 8 2 . 7 5 4 8 2 . 1 3 E X E O P W L E X R O W E X 1.50’ EX SSMH ADJUST 2@54" CSP STD 838.22 ENDWALL 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI 2: 1 479.66’ .02 2: 1 478.39’ .02 2: 1 477.96’ .01 2: 1 477.09’ .02 476.96’ 2: 1 .01 2: 1 475.00’ .007 2: 1 .003 474.94’ 2: 1 .003 E X W E T L A N D 2: 1 474.72’ .00 E X W E T L A N D .02 2: 1 474.76’ Ha n d Existing Existing Pe r m a n e n t T e m p . E x c a v a t i o n M e c h a n i z e d C l e a r i n g P e r m a n e n t T e m p . C h a n n e l C h a n n e l N a t u r a l Si t e S t a t i o n S t r u c t u r e F i l l I n F i l l I n i n C l e a r i n g i n S W S W I m p a c t s I m p a c t s S t r e a m No . ( F r o m / T o ) S i z e / T y p e W e t l a n d s W e t l a n d s W e t l a n d s i n W e t l a n d s W e t l a n d s i m p a c t s i m p a c t s P e r m a n e n t T e m p . D e s i g n ( a c ) ( a c ) ( a c ) ( a c ) ( a c ) ( a c ) ( a c ) ( f t ) ( f t ) ( f t ) 1 2 9 + 8 6 - 3 0 + 2 6 - L - R T 1 @ 4 8 " C S P < 0 . 0 1 < 0 . 0 1 < 0 . 0 1 < 0 . 0 1 8 . 8 1 2 . 6 2 6 7 + 3 5 - 6 8 + 4 6 - L - R T 2 @ 5 4 " C S P < 0 . 0 1 < 0 . 0 1 < 0 . 0 1 < 0 . 0 1 8 . 5 1 0 . 9 TO T A L S * : < 0 . 0 1 < 0 . 0 1 < 0 . 0 1 < 0 . 0 1 1 7 2 4 0 *R o u n d e d t o t a l s a r e s u m o f a c t u a l i m p a c t s NO T E S : AT N R e v i s e d 3 / 1 2 / 1 3 SH E E T 9OF 9 NC D E P A R T M E N T O F T R A N S P O R T A T I O N DIVISION OF HIGHWAYS 01-20-14 W E T L A N D P E R M I T I M P A C T S U M M A R Y WE T L A N D I M P A C T S S U R F A C E W A T E R I M P A C T S ORANGE COUNTY SIDEWALK ON SR 1729 (ROGERS RD) (V e r s i o n 1 . 2 ; R e l e a s e d S e p t e m b e r 2 0 1 1 ) U- 4 7 2 6 D D Co u n t y ( i e s ) : Or a n g e Page 1of 4 Pr o j e c t T y p e : D a t e : Ph o n e : Ph o n e : Em a i l : Em a i l : Co u n t y ( i e s ) : CA M A C o u n t y ? De s i g n / F u t u r e : Ex i s t i n g : Su r r o u n d i n g L a n d U s e : Ru r a l , R e s i d e n t i a l 57 0 0 L F 26 0 0 0. 0 0 Pr o j e c t B u i l t - U p o n A r e a ( a c . ) Pr o p o s e d P r o j e c t E x i s t i n g S i t e Pr o j e c t L e n g t h ( l i n . M i l e s o r f e e t ) : Bu f f e r R u l e s i n E f f e c t Pr o j e c t D e s c r i p t i o n No n e No No n e NC D W Q S u r f a c e W a t e r C l a s s i f i c a t i o n f o r P r i m a r y R e c e i v i n g W a t e r 30 3 ( d ) I m p a i r m e n t s : Ri v e r B a s i n ( s ) : Pr i m a r y R e c e i v i n g W a t e r : Wa t e r S u p p l y V ( W S - V ) Ot h e r S t r e a m C l a s s i f i c a t i o n : Su n g a t e D e s i g n G r o u p , P A Ci t y / T o w n : (9 1 9 ) 8 5 9 - 2 2 4 3 Hi g h w a y D i v i s i o n 7 Ad d r e s s : Ca r r b o r o (3 3 6 ) 4 8 7 - 0 0 7 5 Or a n g e ac. Ge n e r a l P r o j e c t N a r r a t i v e : Th i s p r o j e c t c o n s i s t s o f a p r o p o s e d 5 ' w i d e s i d e w a l k a l o n g R o g e r s R o a d ( S R 1 7 2 9 ) . T h e p r i m a r y r e c e i v i n g w a t e r f o r t h e p r o j e c t , UT B o l i n C r e e k , i s i n t h e J o r d a n L a k e wa t e r s h e d , t h e r e f o r e , m e a s u r e s h a v e b e e n t a k e n t o r e d u c e d i r e c t r u n o f f i n t o t h e b u f f e r s . R o a d w a y r u n o f f w i l l b e c o l l e c t e d i n c a tc h b a s i n s a n d d i r e c t e d a w a y f r o m w e t l a n d ar e a s w i t h i n t h e p r o j e c t b o u n d a r i e s . I m p e r v i o u s s u r f a c e s w e r e k e p t a t a m i n i m u m . T h e s i d e w a l k i s t o b e c o n s t r u c t e d w i t h g r a s s e d swales between the road and the sidewalk th r o u g h o u t t h e m a j o r i t y o f t h e p r o j e c t . 2 : 1 f i l l s l o p e s w e r e u t i l i z e d i n o r d e r t o m i n i m i z e j u r i s d i c t i o n a l s t r e a m a n d w e t l a n d i m pa c t s . Ty p i c a l C r o s s S e c t i o n D e s c r i p t i o n : Re f e r e n c e s 2600 0. 6 4 Av e r a g e D a i l y T r a f f i c ( v e h / h r / d a y ) : ac . No r t h C a r o l i n a D e p a r t m e n t o f T r a n s p o r t a t i o n Hi g h w a y S t o r m w a t e r P r o g r a m S T O R M W A T E R M A N A G E M E N T P L A N FO R L I N E A R R O A D W A Y P R O J E C T S Do n n i e H u f f i n e s Si d e w a l k Gr e e n s b o r o , N C 2 7 4 1 5 Ge n e r a l P r o j e c t I n f o r m a t i o n Ad d r e s s : 11/22/2013 91 5 J o n e s F r a n k l i n R o a d 15 8 4 Y a n c e y v i l l e S t r e e t Ra l e i g h , N C 2 7 6 0 6 Pr o j e c t / T I P N o . : NC D O T C o n t a c t : Pr o j e c t N o . : U- 4 7 2 6 D D Co n t r a c t o r / D e s i g n e r : dh u f f i n e s @ n c d o t . g o v Ca p e F e a r 16 - 4 1 - 1 - 1 5 - 1 - ( 0 . 5 ) bh a m i l t o n @ s u n g a t e d e s i g n . c o m 5' C o n c r e t e s i d e w a l k w i t h v a r y i n g 3 : 1 a n d 4 : 1 cu t / f i l l s l o p e s . A r e a i s n o t c u r r e n t l y b u i l t u p o n . Jo r d a n L a k e NC D W Q S t r e a m I n d e x N o . : Su p p l e m e n t a l : Nu t r i e n t S e n s i t i v e W a t e r s ( N S W ) Pr i m a r y : UT B o l i n C r e e k ( H o g a n L a k e ) SITE 1 SITE 2 BUFFER IMPACTS PERMIT SHEET 1 OF 9 BUFFER DRAWING NOT TO SCALE VICINITY MAP HOMESTEAD RD SR 1777 R .J R A IN SLL HT O R L R O CA R O FESSI ON 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C STANDARDS TOWN OF CARRBORO ______________________________ OCTOBER, 2011 STANDARDS AND DESIGN, SPECIFICATIONS, OWASA - MANUAL OF ______________________________ STANDARD SPECIFICATION NCDOT - JANUARY 2012 TEL (919) 859-2243 FAX (919) 859-6258 RALEIGH, NORTH CAROLINA 27606 915 JONES FRANKLIN ROAD SUNGATE DESIGN GROUP, P.A. ENG. FIRM LICENSE NO. C-890ROGERS RD SIDEWALK PROJECT 10 20 4020 10 20 4020 5 105 0 0 0 PROFILE (HORIZONTAL) PROJECT LENGTH STATE STATE PROJECT REFERENCE NO. N.C. DESIGN DATA Prepared in the Office of: SIGNATURE: P.E. SUNGATE DESIGN GROUP, P.A. PROJECT ENGINEERGRAPHIC SCALES PLANS PROFILE (VERTICAL) LOCATION: TYPE OF WORK: N/A PUBLIC WORKS TOWN OF CARRBORO 0 00 915 JONES FRANKLIN ROAD, RALEIGH, NC, 27606 C-890 NG INEE R I A O P R O C C P R I T G UN IS E S S NO AE O F NO TE IESDGN URO G P P. A. EI L N. G C. RA H, LA N G H ARO LIR T N O AN R L.A. FIRM LICENSE NO. C-91 IGS RGN OU D S U N G AET C-91 A INL R O CA A N DSCAPE E IHC R A T R E T C T O R R N S T E D E H L GI E P ,RU LA CORP. P .A . D r . P u r e fo y Rogers Rd. R o g er s R d. Tallyho Tr. S R 1 8 9 6 S R 1 7 2 9 SR 2213 S R 2 2 5 4 S R 1 7 2 9 C la y m o re R d S y lv a n W a y S R 1 8 4 2 S R 1 7 2 7 E u b a n k s S R 1 7 7 7 SR 1896 PUREFOY DR O L D N C 8 6 S R 1729 R O G E RS R D N C 8 6 I 40 R u s c h R d DRAINAGE, DRIVE APRONS GUTTER, CONCRETE SIDEWALK, STORM CONCRETE SIDEWALK, CONCRETE CURB AND H o m e s te a d R d M eado w Run Ct INDEX OF SHEETS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS Staffield Ln W itm ore C ir N Hawick Ct S Hawick Ct R d. SR 1 7 2 7 EU BANK S RD AND SR 1777, HOMESTEAD RD 1. SR 1729, ROGERS ROAD BETWEEN MEADOW RUN CT (NON-SYSTEM) NCDOT ENCROACHMENTS (NON-SYSTEM) AND SR 1777, HOMESTEAD RD SR 1729, ROGERS ROAD BETWEEN MEADOW RUN CT 2.5 STA 11+61.90 BEGIN PROJECT STA 68+62.88 END PROJECT 1 SHEET NO. TOTAL SHEETS DATE: OCTOBER 7, 2013 PSH C1.04 PSH C1.05 PSH C1.06 PSH C1.07 PSH C1.08 PSH C1.09 PSH C1.10 PSH C 1 .1 1 P S H C 1. 12 P S H C 1. 13 P S H C 1. 14 PSH C1.15 = +/-5700 LF PROJECT CARRBORO SIDEWALK TOTAL LENGTH OF TOWN OF SIGNATURE: P.E. PROJECT ENGINEER W. HENRY WELLS, JR, P.E. CHARLES A. MUSSER, JR, R.L.A. PROJECT LANDSCAPE ARCHITECT SIGNATURE: R.L.A. JOSHUA G. DALTON, PE, CPESC A IN HT O R L R O CA R O FESSI O N 26971 G E N REINE SEALP N A L NOTLAD .G A UH S OJDO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION 71 / FINAL EROSION CONTROL CLEARING AND GRUBBINGE1.04 - E1.15 SOIL STABILIZATION SUMMARYE1.03 EROSION CONTROL DETAILSE1.02 - E1.02D EROSION CONTROL NOTESE1.01 EROSION CONTROL TITLE SHEETE1.00 FIBER OPTIC CONDUIT / PULL BOX LOCATIONSC5.01 TRAFFIC CONTROL OVERALLC4.02 TRAFFIC CONTROL DETAILSC4.01 - C4.01B STAGING AREASC3.01 CROSS SECTIONS- C2.26C2.01 PLAN/ PROFILEC1.04 - C1.15 GENERAL NOTESC1.03 TYPICALSC1.02C UTILITIES CONFLICTS SCHEDULEC1.02B STORM DRAINAGE SCHEDULEC1.02A SURVEY CONTROLC1.02 CONVENTIONAL PLAN SHEET SYMBOLSC1.01A S o u th e rn R ail w a y High Sch. Hill Chapel SHEET 2 OF 9 BUFFER DRAWING M A T C H LI N E 2 5 + 0 0 M A T C H LI N E 3 0 + 0 0 25+00 26+00 27+00 28+00 29+00 30+00 490 500 510 520 490 500 510 520 M A T C H LI N E 2 5 + 0 0 10 20 40200 PLANS M A T C H LI N E 3 0 + 0 0 1/ 13 / 2 0 14 R O G E R S _ H y d _ p r m _ b u f _ p s h 0 7 j h a r v e y S U N G A T E D E S I G N G R O U P , P .A . 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 R O G E R S R O A D S I D E W A LK C A R R B O R O , N C C1.07 ROGERS13CDC107 P LA N / P R O F I LE EXTG CL ROAD EXTG CL ROAD AT FACE SIDEWALK EXTG GRADE AT FACE SIDEWALK EXTG GRADE EX 15" RCP DITCH EXTG ROADSIDE 15" RCP DITCH PROP ROADSIDE 15" RCP DITCH EXTG ROADSIDE 2GI-D 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI 15" RCP EX 48" CMP SITE 1 ALLOWABLE IMPACTS ZONE 1 ALLOWABLE IMPACTS ZONE 2 SIDEWALK 5’ STD DRIVEWAY RETAIN ADJUST ADJUST ADJUST ADJUST ADJUST ADJUST ADJUST SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD DRIVEWAY SIDEWALK 5’ STD CONCRETE ADJUST ADJUST RETAIN E OG S OIL UT WV WV WV WV WV WM WM UP UP SIGN 4 8 " C M P 15" RCP EOP EOPEOP EOP UT UT E OG E OG 2 6 + 0 0 2 7 + 0 0 2 8 + 0 0 2 9 + 0 0 HYD MON INV=500.89’INV=500.14’ WV WV PREVENTER BACKFLOW CTRL POINT HOR/VERT PT #13 HYD MON PIN 9870441657 D.B. 932, PG. 81 JAMES M. ALLEN PIN 9870453385 D.B. 171, PG. 475 LEAH ROGERS PIN 9870347529 D.B. 4088, PG. 331 BUDDHA LLC PIN 9870442208 D.B. 4435, PG. 507 BUDDHA LLC PIN 9870443288 D.B. 854, PG. 104 ALLONIOUS NICKENS ROWROWROWROW ROW ROW ROW ROW ROW ROW EIP EIP EIP ROGERS ROAD SR 1729 ENDWALL 15" RCP-III REMOVE RETAIN 15" RCP-III 1 5 " RC P -III 2GI-B 1 5 " R C P - I I I SEE DETAIL #1 SPEC LAT V DITCH EST 5 SY GFD EST 1 TON CL ’B’ RIP RAP EST 5 SY GFD EST 1 TON CL ’B’ RIP RAP EST 7 SY GFD EST 2 TON CL ’B’ RIP RAP W/ GASKET SLEEVE BAND AND EXTEND 48" CSP (-) 1.68% (-) 0.94% E L = 5 0 0 .5 0 P I = 3 0 + 0 0 E L = 5 0 0 .3 8 P I = 2 9 + 2 5 E L = 5 0 0 .8 5 E L = 5 0 1.2 7 P I = 2 9 + 0 0 L A T V D IT C H B E G S P E C P I= 2 9 + 7 5 (+) 0.48% FF F F F FCFF F F F F FFFFFFFFFF FFFFF F C C C C C C C C C C SHEET 3 OF 9 BUFFER DRAWING M A T C H LI N E 2 5 + 0 0 M A T C H LI N E 3 0 + 0 0 25+00 26+00 27+00 28+00 29+00 30+00 490 500 510 520 490 500 510 520 M A T C H LI N E 2 5 + 0 0 10 20 40200 PLANS M A T C H LI N E 3 0 + 0 0 1/ 13 / 2 0 14 R O G E R S _ H y d _ p r m _ b u f _ p s h 0 7 _ c o n j h a r v e y S U N G A T E D E S I G N G R O U P , P .A . 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 R O G E R S R O A D S I D E W A LK C A R R B O R O , N C C1.07 ROGERS13CDC107 P LA N / P R O F I LE EXTG CL ROAD EXTG CL ROAD AT FACE SIDEWALK EXTG GRADE AT FACE SIDEWALK EXTG GRADE EX 15" RCP DITCH EXTG ROADSIDE 15" RCP DITCH PROP ROADSIDE 15" RCP DITCH EXTG ROADSIDE 2GI-D 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI 15" RCP EX 48" CMP SITE 1 ALLOWABLE IMPACTS ZONE 1 ALLOWABLE IMPACTS ZONE 2 SIDEWALK 5’ STD DRIVEWAY RETAIN ADJUST ADJUST ADJUST ADJUST ADJUST ADJUST ADJUST SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD DRIVEWAY SIDEWALK 5’ STD CONCRETE ADJUST ADJUST RETAIN E OG S OIL UT WV WV WV WV WV WM WM UP UP SIGN 4 8 " C M P 15" RCP EOP EOPEOP EOP UT UT E OG E OG 2 6 + 0 0 2 7 + 0 0 2 8 + 0 0 2 9 + 0 0 HYD MON INV=500.89’INV=500.14’ WV WV PREVENTER BACKFLOW CTRL POINT HOR/VERT PT #13 HYD MON PIN 9870441657 D.B. 932, PG. 81 JAMES M. ALLEN PIN 9870453385 D.B. 171, PG. 475 LEAH ROGERS PIN 9870347529 D.B. 4088, PG. 331 BUDDHA LLC PIN 9870442208 D.B. 4435, PG. 507 BUDDHA LLC PIN 9870443288 D.B. 854, PG. 104 ALLONIOUS NICKENS ROWROWROWROW ROW ROW ROW ROW ROW ROW EIP EIP EIP ROGERS ROAD SR 1729 FF F F F FCFF F F F F FFFFFFFFFF FFFFF F C C C C C C C C C C 4 9 5 4 9 6 497 498 4 9 8 499 4 9 9 500 500 501 501 501 502502 502 502 502 5 0 3 503504 504 504 505 505 5 0 5 506 506 506 507 507 5 0 7 508 508 508 508 509 509 509 509 510 5 1 0 510 510 510 511 5 1 1 511512 5 1 2 513 ENDWALL 15" RCP-III REMOVE RETAIN 15" RCP-III 1 5 " RC P -III 2GI-B 1 5 " R C P - I I I SEE DETAIL #1 SPEC LAT V DITCH EST 5 SY GFD EST 1 TON CL ’B’ RIP RAP EST 5 SY GFD EST 1 TON CL ’B’ RIP RAP EST 7 SY GFD EST 2 TON CL ’B’ RIP RAP W/ GASKET SLEEVE BAND AND EXTEND 48" CSP (-) 1.68% (-) 0.94% E L = 5 0 0 .5 0 P I = 3 0 + 0 0 E L = 5 0 0 .3 8 P I = 2 9 + 2 5 E L = 5 0 0 .8 5 E L = 5 0 1.2 7 P I = 2 9 + 0 0 L A T V D IT C H B E G S P E C P I= 2 9 + 7 5 (+) 0.48% SHEET 4 OF 9 BUFFER DRAWING M A T C H LI N E 3 0 + 0 0 M A T C H LI N E 3 5 + 0 0 30+00 31+00 32+00 33+00 34+00 35+00 490 500 510 520 490 500 510 520 10 20 40200 PLANS M A T C H LI N E 3 0 + 0 0 M A T C H LI N E 3 5 + 0 0 1/ 13 / 2 0 14 R O G E R S _ H y d _ p r m _ b u f _ p s h 0 8 j h a r v e y EX 15" RCP EX 15" RCP S U N G A T E D E S I G N G R O U P , P .A . 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S R O G E R S R O A D S I D E W A LK C A R R B O R O , N C SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 C1.08 ROGERS13CDC108 P LA N / P R O F I LE 15" RCP DITCH PROP ROADSIDE EXTG CL ROAD EXTG CL ROAD AT FACE SIDEWALK EXTG GROUND AT FACE SIDEWALK EXTG GROUND DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI SITE 1 ALLOWABLE IMPACTS ZONE 1 ALLOWABLE IMPACTS ZONE 2 SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD DRIVEWAY SIDEWALK 5’ STD DRIVEWAY RELOCATE RETAIN SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE E O G EOG 15" RCP EOP EOP EOPEOP 3 1+ 0 0 3 2 + 0 0 3 3 + 0 0 3 4 + 0 0 15" RCP SIGN SIGN WM UP E O G E O G R/W MON INV=493.68’ INV=515.38’ INV=515.69’ INV=502.30’ INV=502.87’ MAILBOX CTRL POINT HOR/VERT PT #12 CTRL POINT HOR/VERT PT #11 PIN 9870445166 D.B. 395, PG. 234 BETTIE D. ROGERS SAMUEL F. ROGERS PIN 9870437814 D.B. 166, PG. 2 LEAH ROGERS PIN 9870443288 D.B. 854, PG. 104 ALLONIOUS NICKENS ROWROWROWROW ROW ROW ROW ROW ROW ROW EIP EIP ROGERS ROAD SR 1729 PIN 9870438967 D.B. 2164, PG. 351 LOVE CHURCH INTERNATIONAL INC. FAITH TABERNACLE OASIS OF (+) 0.92% (+) 1.49% (+) 2.38% (+) 3.16% E L = 5 0 2 .2 9 E L = 5 0 1.10 E L = 5 0 0 .7 3 E L = 5 0 0 .5 0 E L = 5 0 0 .5 0 P I = 3 0 + 0 0 P I = 3 0 + 2 5 P I = 3 0 + 5 0 P I = 3 1+ 0 0 E L = 5 0 3 .0 8 P I = 3 1+ 2 5 L A T V D I T C H E N D S P E C ENDWALL REMOVE RETAIN SEE DETAIL #1 SPEC LAT V DITCH 15" RCP-III EST 5 SY GFD EST 1 TON CL ’B’ RIP RAP C C F CF F F F F F FFF FFFF FFFFFFFFFFF C C C C C C C C C SHEET 5 OF 9 BUFFER DRAWING M A T C H LI N E 3 0 + 0 0 M A T C H LI N E 3 5 + 0 0 30+00 31+00 32+00 33+00 34+00 35+00 490 500 510 520 490 500 510 520 10 20 40200 PLANS M A T C H LI N E 3 0 + 0 0 M A T C H LI N E 3 5 + 0 0 1/ 13 / 2 0 14 R O G E R S _ H y d _ p r m _ b u f _ p s h 0 8 _ c o n j h a r v e y EX 15" RCP EX 15" RCP S U N G A T E D E S I G N G R O U P , P .A . 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S R O G E R S R O A D S I D E W A LK C A R R B O R O , N C SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 C1.08 ROGERS13CDC108 P LA N / P R O F I LE 15" RCP DITCH PROP ROADSIDE EXTG CL ROAD EXTG CL ROAD AT FACE SIDEWALK EXTG GROUND AT FACE SIDEWALK EXTG GROUND DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI SITE 1 ALLOWABLE IMPACTS ZONE 1 ALLOWABLE IMPACTS ZONE 2 SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD DRIVEWAY SIDEWALK 5’ STD DRIVEWAY RELOCATE RETAIN SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE E O G EOG 15" RCP EOP EOP EOPEOP 3 1+ 0 0 3 2 + 0 0 3 3 + 0 0 3 4 + 0 0 15" RCP SIGN SIGN WM UP E O G E O G R/W MON INV=493.68’ INV=515.38’ INV=515.69’ INV=502.30’ INV=502.87’ MAILBOX CTRL POINT HOR/VERT PT #12 CTRL POINT HOR/VERT PT #11 PIN 9870445166 D.B. 395, PG. 234 BETTIE D. ROGERS SAMUEL F. ROGERS PIN 9870437814 D.B. 166, PG. 2 LEAH ROGERS PIN 9870443288 D.B. 854, PG. 104 ALLONIOUS NICKENS ROWROWROWROW ROW ROW ROW ROW ROW ROW EIP EIP ROGERS ROAD SR 1729 PIN 9870438967 D.B. 2164, PG. 351 LOVE CHURCH INTERNATIONAL INC. FAITH TABERNACLE OASIS OF C C F CF F F F F F FFF FFFF FFFFFFFFFFF C C C C C C C C C494495 496 4 9 7 497 498 498 499 499 500 500 501 501 5 0 2 5 0 2 502 503 5 0 3 504 5 0 4 5 0 4 5 0 5 5 0 5 5 0 6 506 507 507 508 508 509 5 0 9 510 510 511 511 512 5125 12 513 513 513 514 514 514 515 515 515 516 516 516 516 517 517 517 517 518 518 518 518 519 519 519 519 520 520520 5 2 0 520 5 2 1 5 2 1 521 5 2 2 (+) 0.92% (+) 1.49% (+) 2.38% (+) 3.16% E L = 5 0 2 .2 9 E L = 5 0 1.10 E L = 5 0 0 .7 3 E L = 5 0 0 .5 0 E L = 5 0 0 .5 0 P I = 3 0 + 0 0 P I = 3 0 + 2 5 P I = 3 0 + 5 0 P I = 3 1+ 0 0 E L = 5 0 3 .0 8 P I = 3 1+ 2 5 L A T V D I T C H E N D S P E C ENDWALL REMOVE RETAIN SEE DETAIL #1 SPEC LAT V DITCH 15" RCP-III EST 5 SY GFD EST 1 TON CL ’B’ RIP RAP SHEET 6 OF 9 BUFFER DRAWING M A TC H LIN E 6 5 + 0 0 65+00 66+00 67+00 68+00 460 470 480 490 500 460 470 480 490 500 M A T C H LI N E 6 5 + 0 0 10 20 40200 PLANS 69+00 1/ 13 / 2 0 14 R O G E R S _ H y d _ p r m _ b u f _ p s h 1 5 j h a r v e y S U N G A T E D E S I G N G R O U P , P .A . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . R O G E R S R O A D S I D E W A LK SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 C1.15 ROGERS13CDC115 P LA N / P R O F I LE EXTG CL ROAD EXTG CL ROAD AT FACE SIDEWALK EXTG GRADE AT FACE SIDEWALK EXTG GRADE DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE(2) EX 54" CMP 15" RCP CB ENDWALL 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI OUTLET 15" RCP SITE 2 ALLOWABLE IMPACTS ZONE 1 ALLOWABLE IMPACTS ZONE 2 SIDEWALK 5’ STD CONCRETE CURB AND GUTTER 2’-6" CONCRETE SIDEWALK 5’ STD CONCRETE CONCRETE SIDEWALK TIE TO EXTG ADJUST ADJUST STRIP 1’-6" UTILITY STRIP 1’-6" UTILITY STRIP 1’-6" UTILITY RELOCATE AND GUTTER TRANSITION TO EXISTING CURB AS REQUIRED FOR SMALL AND GUTTERREMOVE EXTG CURB T C S E O P EOPEOP EOP 5 4 " C M P 5 4 " C M P 36" RCP SIGN TPED CABLE UP SSMH SSMH SDMH 6 6 + 0 0 6 7 + 0 0 6 8 + 0 0 FO BOX CTRL POINT HOR/VERT PT #3 CTRL POINT HOR/VERT PT #2 15" RCP PIN 9870516306 P.B. 55, PG. 87 D.B. 5256, PG. 185 ANDREA C. TANNER DAVID G. TANNER PIN 9870519288 P.B. 55, PG. 87 D.B. 946, PG. 181 DONNA H. HAMILTON MICHAEL ANTHONY HAMILTON PIN 9870508940 P.B. 55, PG. 87 D.B. 868, PG. 1492 HOMEOWNERS ASSOCIATION INC. HIGHLANDS PHASE V C E N T E R LI N E H O M E S T E A D R O A D S R 1 1 7 7 R O W R O W R OW ROW ROW ROW ROW ROW ROW ROGERS ROAD SR 1729 ENDWALL RETAIN RETAIN CB EST 5 SY GFD EST 1 TON CL ’B’ RIP RAP 15" RCP-III W/ SLEEVE GASKETS AND EXTEND 2@54" CSP BAND F F F F F F F F F F F F F F FF SHEET 7 OF 9 BUFFER DRAWING M A TC H LIN E 6 5 + 0 0 65+00 66+00 67+00 68+00 460 470 480 490 500 460 470 480 490 500 M A T C H LI N E 6 5 + 0 0 10 20 40200 PLANS 69+00 1/ 13 / 2 0 14 R O G E R S _ H y d _ p r m _ b u f _ p s h 1 5 _ c o n j h a r v e y S U N G A T E D E S I G N G R O U P , P .A . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . R O G E R S R O A D S I D E W A LK SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 C1.15 ROGERS13CDC115 P LA N / P R O F I LE EXTG CL ROAD EXTG CL ROAD AT FACE SIDEWALK EXTG GRADE AT FACE SIDEWALK EXTG GRADE DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE(2) EX 54" CMP 15" RCP CB ENDWALL 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI OUTLET 15" RCP SITE 2 ALLOWABLE IMPACTS ZONE 1 ALLOWABLE IMPACTS ZONE 2 SIDEWALK 5’ STD CONCRETE CURB AND GUTTER 2’-6" CONCRETE SIDEWALK 5’ STD CONCRETE CONCRETE SIDEWALK TIE TO EXTG ADJUST ADJUST STRIP 1’-6" UTILITY STRIP 1’-6" UTILITY STRIP 1’-6" UTILITY RELOCATE AND GUTTER TRANSITION TO EXISTING CURB AS REQUIRED FOR SMALL AND GUTTERREMOVE EXTG CURB T C S E O P EOPEOP EOP 5 4 " C M P 5 4 " C M P 36" RCP SIGN TPED CABLE UP SSMH SSMH SDMH 6 6 + 0 0 6 7 + 0 0 6 8 + 0 0 FO BOX CTRL POINT HOR/VERT PT #3 CTRL POINT HOR/VERT PT #2 15" RCP PIN 9870516306 P.B. 55, PG. 87 D.B. 5256, PG. 185 ANDREA C. TANNER DAVID G. TANNER PIN 9870519288 P.B. 55, PG. 87 D.B. 946, PG. 181 DONNA H. HAMILTON MICHAEL ANTHONY HAMILTON PIN 9870508940 P.B. 55, PG. 87 D.B. 868, PG. 1492 HOMEOWNERS ASSOCIATION INC. HIGHLANDS PHASE V C E N T E R LI N E H O M E S T E A D R O A D S R 1 1 7 7 R O W R O W R OW ROW ROW ROW ROW ROW ROW ROGERS ROAD SR 1729 F F F F F F F F F F F F F F FF 473 474 4 7 4 4 7 4 474 4 7 4 4 7 4 475 4 7 5 475 475 4 7 5 4 7 5 4 7 6 476 476 4 7 6 4 7 6 477 477477 4 7 7 477 477 477 4 7 7 478 478 478 478478 478 478 479 479479 479 479 4 7 9 479 4 8 0 480 480 480 480 480 4 8 0 4 8 0 4 8 1 481 481 481 481 4 8 1 4 8 1 4 8 1 4 8 1 482 482 482 4 8 2 483 4 8 3 ENDWALL RETAIN RETAIN CB EST 5 SY GFD EST 1 TON CL ’B’ RIP RAP 15" RCP-III W/ SLEEVE GASKETS AND EXTEND 2@54" CSP BAND RO A D CR O S S I N G B R I D G E PA R A L L E L IM P A C T ZO N E 1 (f t 2) ZO N E 2 (f t 2) TO T A L (f t 2) ZO N E 1 (f t 2) ZO N E 2 (f t 2) TO T A L (f t 2)ZONE 1 (ft2)ZONE 2 (ft2) 1 4 8 " C S P 2 9 + 3 6 - 3 0 + 6 1 - L - R T X 1 2 6 9 . 9 8 1 1 . 2 2 0 8 1 . 1 2 2 @ 5 4 " C S P 6 6 + 9 0 - 6 7 + 9 3 - L - R T X 9 7 7 . 0 5 6 6 . 8 1 5 4 3 . 8 TO T A L : 22 4 6 . 9 1 3 7 8 . 0 3 6 2 4 . 9 0 . 0 0 . 0 0 . 0 N. C . D E P T . O F T R A N S P O R T A T I O N DI V I S I O N O F H I G H W A Y S ORANGE COUNTY S H E E T 8 O F 9 SIDEWALK ON SR 1 7 2 9 ( R O G E R S R O A D ) 01-13-14 IM P A C T BU F F E R I M P A C T S S U M M A R Y TY P E SI T E N O . ST R U C T U R E S I Z E / TY P E ST A T I O N (F R O M / T O ) AL L O W A B L E M I T I G A B L E BUFFER REPLACEMENT Rev. May 2006 ZO N E 1 (f t 2) ZO N E 2 (f t 2) 1 2 9 + 3 6 - 3 0 + 6 1 - L - R T 3 4 4 . 0 7 2 6 6 + 9 0 - 6 7 + 9 3 - L - R T 1 7 9 . 8 4 TO T A L : 05 2 3 . 9 1 N. C . D E P T . O F T R A N S P O R T A T I O N DIVISION OF HIGHWAYS ORANGE COUNTY S H E E T 9 O F 9 SIDEWALK ON SR 1729 (ROGERS ROAD) 01-13-14 WE T L A N D S I N B U F F E R I M P A C T S S U M M A R Y W E T L A N D S I N BU F F E R S SI T E N O . ST A T I O N (F R O M / T O ) Rev. Jan 2009 (V e r s i o n 1 . 2 ; R e l e a s e d S e p t e m b e r 2 0 1 1 ) U- 4 7 2 6 D D Co u n t y ( i e s ) : Or a n g e Page 1of 4 Pr o j e c t T y p e : D a t e : Ph o n e : Ph o n e : Em a i l : Em a i l : Co u n t y ( i e s ) : CA M A C o u n t y ? De s i g n / F u t u r e : Ex i s t i n g : Su r r o u n d i n g L a n d U s e : Ru r a l , R e s i d e n t i a l 57 0 0 L F 26 0 0 0. 0 0 Pr o j e c t B u i l t - U p o n A r e a ( a c . ) Pr o p o s e d P r o j e c t E x i s t i n g S i t e Pr o j e c t L e n g t h ( l i n . M i l e s o r f e e t ) : Bu f f e r R u l e s i n E f f e c t Pr o j e c t D e s c r i p t i o n No n e No No n e NC D W Q S u r f a c e W a t e r C l a s s i f i c a t i o n f o r P r i m a r y R e c e i v i n g W a t e r 30 3 ( d ) I m p a i r m e n t s : Ri v e r B a s i n ( s ) : Pr i m a r y R e c e i v i n g W a t e r : Wa t e r S u p p l y V ( W S - V ) Ot h e r S t r e a m C l a s s i f i c a t i o n : Su n g a t e D e s i g n G r o u p , P A Ci t y / T o w n : (9 1 9 ) 8 5 9 - 2 2 4 3 Hi g h w a y D i v i s i o n 7 Ad d r e s s : Ca r r b o r o (3 3 6 ) 4 8 7 - 0 0 7 5 Or a n g e ac. Ge n e r a l P r o j e c t N a r r a t i v e : Th i s p r o j e c t c o n s i s t s o f a p r o p o s e d 5 ' w i d e s i d e w a l k a l o n g R o g e r s R o a d ( S R 1 7 2 9 ) . T h e p r i m a r y r e c e i v i n g w a t e r f o r t h e p r o j e c t , UT B o l i n C r e e k , i s i n t h e J o r d a n L a k e wa t e r s h e d , t h e r e f o r e , m e a s u r e s h a v e b e e n t a k e n t o r e d u c e d i r e c t r u n o f f i n t o t h e b u f f e r s . R o a d w a y r u n o f f w i l l b e c o l l e c t e d i n c a tc h b a s i n s a n d d i r e c t e d a w a y f r o m w e t l a n d ar e a s w i t h i n t h e p r o j e c t b o u n d a r i e s . I m p e r v i o u s s u r f a c e s w e r e k e p t a t a m i n i m u m . T h e s i d e w a l k i s t o b e c o n s t r u c t e d w i t h g r a s s e d swales between the road and the sidewalk th r o u g h o u t t h e m a j o r i t y o f t h e p r o j e c t . 2 : 1 f i l l s l o p e s w e r e u t i l i z e d i n o r d e r t o m i n i m i z e j u r i s d i c t i o n a l s t r e a m a n d w e t l a n d i m pa c t s . Ty p i c a l C r o s s S e c t i o n D e s c r i p t i o n : Re f e r e n c e s 2600 0. 6 4 Av e r a g e D a i l y T r a f f i c ( v e h / h r / d a y ) : ac . No r t h C a r o l i n a D e p a r t m e n t o f T r a n s p o r t a t i o n Hi g h w a y S t o r m w a t e r P r o g r a m S T O R M W A T E R M A N A G E M E N T P L A N FO R L I N E A R R O A D W A Y P R O J E C T S Do n n i e H u f f i n e s Si d e w a l k Gr e e n s b o r o , N C 2 7 4 1 5 Ge n e r a l P r o j e c t I n f o r m a t i o n Ad d r e s s : 11/22/2013 91 5 J o n e s F r a n k l i n R o a d 15 8 4 Y a n c e y v i l l e S t r e e t Ra l e i g h , N C 2 7 6 0 6 Pr o j e c t / T I P N o . : NC D O T C o n t a c t : Pr o j e c t N o . : U- 4 7 2 6 D D Co n t r a c t o r / D e s i g n e r : dh u f f i n e s @ n c d o t . g o v Ca p e F e a r 16 - 4 1 - 1 - 1 5 - 1 - ( 0 . 5 ) bh a m i l t o n @ s u n g a t e d e s i g n . c o m 5' C o n c r e t e s i d e w a l k w i t h v a r y i n g 3 : 1 a n d 4 : 1 cu t / f i l l s l o p e s . A r e a i s n o t c u r r e n t l y b u i l t u p o n . Jo r d a n L a k e NC D W Q S t r e a m I n d e x N o . : Su p p l e m e n t a l : Nu t r i e n t S e n s i t i v e W a t e r s ( N S W ) Pr i m a r y : UT B o l i n C r e e k ( H o g a n L a k e ) SITE 1 SITE 2 BUFFER IMPACTS PERMIT SHEET 1 OF 9 BUFFER DRAWING NOT TO SCALE VICINITY MAP HOMESTEAD RD SR 1777 R .J R A IN SLL HT O R L R O CA R O FESSI ON 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C STANDARDS TOWN OF CARRBORO ______________________________ OCTOBER, 2011 STANDARDS AND DESIGN, SPECIFICATIONS, OWASA - MANUAL OF ______________________________ STANDARD SPECIFICATION NCDOT - JANUARY 2012 TEL (919) 859-2243 FAX (919) 859-6258 RALEIGH, NORTH CAROLINA 27606 915 JONES FRANKLIN ROAD SUNGATE DESIGN GROUP, P.A. ENG. FIRM LICENSE NO. C-890ROGERS RD SIDEWALK PROJECT 10 20 4020 10 20 4020 5 105 0 0 0 PROFILE (HORIZONTAL) PROJECT LENGTH STATE STATE PROJECT REFERENCE NO. N.C. DESIGN DATA Prepared in the Office of: SIGNATURE: P.E. SUNGATE DESIGN GROUP, P.A. PROJECT ENGINEERGRAPHIC SCALES PLANS PROFILE (VERTICAL) LOCATION: TYPE OF WORK: N/A PUBLIC WORKS TOWN OF CARRBORO 0 00 915 JONES FRANKLIN ROAD, RALEIGH, NC, 27606 C-890 NG INEE R I A O P R O C C P R I T G UN IS E S S NO AE O F NO TE IESDGN URO G P P. A. EI L N. G C. RA H, LA N G H ARO LIR T N O AN R L.A. FIRM LICENSE NO. C-91 IGS RGN OU D S U N G AET C-91 A INL R O CA A N DSCAPE E IHC R A T R E T C T O R R N S T E D E H L GI E P ,RU LA CORP. P .A . D r . P u r e fo y Rogers Rd. R o g er s R d. Tallyho Tr. S R 1 8 9 6 S R 1 7 2 9 SR 2213 S R 2 2 5 4 S R 1 7 2 9 C la y m o re R d S y lv a n W a y S R 1 8 4 2 S R 1 7 2 7 E u b a n k s S R 1 7 7 7 SR 1896 PUREFOY DR O L D N C 8 6 S R 1729 R O G E RS R D N C 8 6 I 40 R u s c h R d DRAINAGE, DRIVE APRONS GUTTER, CONCRETE SIDEWALK, STORM CONCRETE SIDEWALK, CONCRETE CURB AND H o m e s te a d R d M eado w Run Ct INDEX OF SHEETS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS Staffield Ln W itm ore C ir N Hawick Ct S Hawick Ct R d. SR 1 7 2 7 EU BANK S RD AND SR 1777, HOMESTEAD RD 1. SR 1729, ROGERS ROAD BETWEEN MEADOW RUN CT (NON-SYSTEM) NCDOT ENCROACHMENTS (NON-SYSTEM) AND SR 1777, HOMESTEAD RD SR 1729, ROGERS ROAD BETWEEN MEADOW RUN CT 2.5 STA 11+61.90 BEGIN PROJECT STA 68+62.88 END PROJECT 1 SHEET NO. TOTAL SHEETS DATE: OCTOBER 7, 2013 PSH C1.04 PSH C1.05 PSH C1.06 PSH C1.07 PSH C1.08 PSH C1.09 PSH C1.10 PSH C 1 .1 1 P S H C 1. 12 P S H C 1. 13 P S H C 1. 14 PSH C1.15 = +/-5700 LF PROJECT CARRBORO SIDEWALK TOTAL LENGTH OF TOWN OF SIGNATURE: P.E. PROJECT ENGINEER W. HENRY WELLS, JR, P.E. CHARLES A. MUSSER, JR, R.L.A. PROJECT LANDSCAPE ARCHITECT SIGNATURE: R.L.A. JOSHUA G. DALTON, PE, CPESC A IN HT O R L R O CA R O FESSI O N 26971 G E N REINE SEALP N A L NOTLAD .G A UH S OJDO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION 71 / FINAL EROSION CONTROL CLEARING AND GRUBBINGE1.04 - E1.15 SOIL STABILIZATION SUMMARYE1.03 EROSION CONTROL DETAILSE1.02 - E1.02D EROSION CONTROL NOTESE1.01 EROSION CONTROL TITLE SHEETE1.00 FIBER OPTIC CONDUIT / PULL BOX LOCATIONSC5.01 TRAFFIC CONTROL OVERALLC4.02 TRAFFIC CONTROL DETAILSC4.01 - C4.01B STAGING AREASC3.01 CROSS SECTIONS- C2.26C2.01 PLAN/ PROFILEC1.04 - C1.15 GENERAL NOTESC1.03 TYPICALSC1.02C UTILITIES CONFLICTS SCHEDULEC1.02B STORM DRAINAGE SCHEDULEC1.02A SURVEY CONTROLC1.02 CONVENTIONAL PLAN SHEET SYMBOLSC1.01A S o u th e rn R ail w a y High Sch. Hill Chapel SHEET 2 OF 9 BUFFER DRAWING M A T C H LI N E 2 5 + 0 0 M A T C H LI N E 3 0 + 0 0 25+00 26+00 27+00 28+00 29+00 30+00 490 500 510 520 490 500 510 520 M A T C H LI N E 2 5 + 0 0 10 20 40200 PLANS M A T C H LI N E 3 0 + 0 0 1/ 13 / 2 0 14 R O G E R S _ H y d _ p r m _ b u f _ p s h 0 7 j h a r v e y S U N G A T E D E S I G N G R O U P , P .A . 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 R O G E R S R O A D S I D E W A LK C A R R B O R O , N C C1.07 ROGERS13CDC107 P LA N / P R O F I LE EXTG CL ROAD EXTG CL ROAD AT FACE SIDEWALK EXTG GRADE AT FACE SIDEWALK EXTG GRADE EX 15" RCP DITCH EXTG ROADSIDE 15" RCP DITCH PROP ROADSIDE 15" RCP DITCH EXTG ROADSIDE 2GI-D 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI 15" RCP EX 48" CMP SITE 1 ALLOWABLE IMPACTS ZONE 1 ALLOWABLE IMPACTS ZONE 2 SIDEWALK 5’ STD DRIVEWAY RETAIN ADJUST ADJUST ADJUST ADJUST ADJUST ADJUST ADJUST SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD DRIVEWAY SIDEWALK 5’ STD CONCRETE ADJUST ADJUST RETAIN E OG S OIL UT WV WV WV WV WV WM WM UP UP SIGN 4 8 " C M P 15" RCP EOP EOPEOP EOP UT UT E OG E OG 2 6 + 0 0 2 7 + 0 0 2 8 + 0 0 2 9 + 0 0 HYD MON INV=500.89’INV=500.14’ WV WV PREVENTER BACKFLOW CTRL POINT HOR/VERT PT #13 HYD MON PIN 9870441657 D.B. 932, PG. 81 JAMES M. ALLEN PIN 9870453385 D.B. 171, PG. 475 LEAH ROGERS PIN 9870347529 D.B. 4088, PG. 331 BUDDHA LLC PIN 9870442208 D.B. 4435, PG. 507 BUDDHA LLC PIN 9870443288 D.B. 854, PG. 104 ALLONIOUS NICKENS ROWROWROWROW ROW ROW ROW ROW ROW ROW EIP EIP EIP ROGERS ROAD SR 1729 ENDWALL 15" RCP-III REMOVE RETAIN 15" RCP-III 1 5 " RC P -III 2GI-B 1 5 " R C P - I I I SEE DETAIL #1 SPEC LAT V DITCH EST 5 SY GFD EST 1 TON CL ’B’ RIP RAP EST 5 SY GFD EST 1 TON CL ’B’ RIP RAP EST 7 SY GFD EST 2 TON CL ’B’ RIP RAP W/ GASKET SLEEVE BAND AND EXTEND 48" CSP (-) 1.68% (-) 0.94% E L = 5 0 0 .5 0 P I = 3 0 + 0 0 E L = 5 0 0 .3 8 P I = 2 9 + 2 5 E L = 5 0 0 .8 5 E L = 5 0 1.2 7 P I = 2 9 + 0 0 L A T V D IT C H B E G S P E C P I= 2 9 + 7 5 (+) 0.48% FF F F F FCFF F F F F FFFFFFFFFF FFFFF F C C C C C C C C C C SHEET 3 OF 9 BUFFER DRAWING M A T C H LI N E 2 5 + 0 0 M A T C H LI N E 3 0 + 0 0 25+00 26+00 27+00 28+00 29+00 30+00 490 500 510 520 490 500 510 520 M A T C H LI N E 2 5 + 0 0 10 20 40200 PLANS M A T C H LI N E 3 0 + 0 0 1/ 13 / 2 0 14 R O G E R S _ H y d _ p r m _ b u f _ p s h 0 7 _ c o n j h a r v e y S U N G A T E D E S I G N G R O U P , P .A . 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 R O G E R S R O A D S I D E W A LK C A R R B O R O , N C C1.07 ROGERS13CDC107 P LA N / P R O F I LE EXTG CL ROAD EXTG CL ROAD AT FACE SIDEWALK EXTG GRADE AT FACE SIDEWALK EXTG GRADE EX 15" RCP DITCH EXTG ROADSIDE 15" RCP DITCH PROP ROADSIDE 15" RCP DITCH EXTG ROADSIDE 2GI-D 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI 15" RCP EX 48" CMP SITE 1 ALLOWABLE IMPACTS ZONE 1 ALLOWABLE IMPACTS ZONE 2 SIDEWALK 5’ STD DRIVEWAY RETAIN ADJUST ADJUST ADJUST ADJUST ADJUST ADJUST ADJUST SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD DRIVEWAY SIDEWALK 5’ STD CONCRETE ADJUST ADJUST RETAIN E OG S OIL UT WV WV WV WV WV WM WM UP UP SIGN 4 8 " C M P 15" RCP EOP EOPEOP EOP UT UT E OG E OG 2 6 + 0 0 2 7 + 0 0 2 8 + 0 0 2 9 + 0 0 HYD MON INV=500.89’INV=500.14’ WV WV PREVENTER BACKFLOW CTRL POINT HOR/VERT PT #13 HYD MON PIN 9870441657 D.B. 932, PG. 81 JAMES M. ALLEN PIN 9870453385 D.B. 171, PG. 475 LEAH ROGERS PIN 9870347529 D.B. 4088, PG. 331 BUDDHA LLC PIN 9870442208 D.B. 4435, PG. 507 BUDDHA LLC PIN 9870443288 D.B. 854, PG. 104 ALLONIOUS NICKENS ROWROWROWROW ROW ROW ROW ROW ROW ROW EIP EIP EIP ROGERS ROAD SR 1729 FF F F F FCFF F F F F FFFFFFFFFF FFFFF F C C C C C C C C C C 4 9 5 4 9 6 497 498 4 9 8 499 4 9 9 500 500 501 501 501 502502 502 502 502 5 0 3 503504 504 504 505 505 5 0 5 506 506 506 507 507 5 0 7 508 508 508 508 509 509 509 509 510 5 1 0 510 510 510 511 5 1 1 511512 5 1 2 513 ENDWALL 15" RCP-III REMOVE RETAIN 15" RCP-III 1 5 " RC P -III 2GI-B 1 5 " R C P - I I I SEE DETAIL #1 SPEC LAT V DITCH EST 5 SY GFD EST 1 TON CL ’B’ RIP RAP EST 5 SY GFD EST 1 TON CL ’B’ RIP RAP EST 7 SY GFD EST 2 TON CL ’B’ RIP RAP W/ GASKET SLEEVE BAND AND EXTEND 48" CSP (-) 1.68% (-) 0.94% E L = 5 0 0 .5 0 P I = 3 0 + 0 0 E L = 5 0 0 .3 8 P I = 2 9 + 2 5 E L = 5 0 0 .8 5 E L = 5 0 1.2 7 P I = 2 9 + 0 0 L A T V D IT C H B E G S P E C P I= 2 9 + 7 5 (+) 0.48% SHEET 4 OF 9 BUFFER DRAWING M A T C H LI N E 3 0 + 0 0 M A T C H LI N E 3 5 + 0 0 30+00 31+00 32+00 33+00 34+00 35+00 490 500 510 520 490 500 510 520 10 20 40200 PLANS M A T C H LI N E 3 0 + 0 0 M A T C H LI N E 3 5 + 0 0 1/ 13 / 2 0 14 R O G E R S _ H y d _ p r m _ b u f _ p s h 0 8 j h a r v e y EX 15" RCP EX 15" RCP S U N G A T E D E S I G N G R O U P , P .A . 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S R O G E R S R O A D S I D E W A LK C A R R B O R O , N C SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 C1.08 ROGERS13CDC108 P LA N / P R O F I LE 15" RCP DITCH PROP ROADSIDE EXTG CL ROAD EXTG CL ROAD AT FACE SIDEWALK EXTG GROUND AT FACE SIDEWALK EXTG GROUND DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI SITE 1 ALLOWABLE IMPACTS ZONE 1 ALLOWABLE IMPACTS ZONE 2 SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD DRIVEWAY SIDEWALK 5’ STD DRIVEWAY RELOCATE RETAIN SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE E O G EOG 15" RCP EOP EOP EOPEOP 3 1+ 0 0 3 2 + 0 0 3 3 + 0 0 3 4 + 0 0 15" RCP SIGN SIGN WM UP E O G E O G R/W MON INV=493.68’ INV=515.38’ INV=515.69’ INV=502.30’ INV=502.87’ MAILBOX CTRL POINT HOR/VERT PT #12 CTRL POINT HOR/VERT PT #11 PIN 9870445166 D.B. 395, PG. 234 BETTIE D. ROGERS SAMUEL F. ROGERS PIN 9870437814 D.B. 166, PG. 2 LEAH ROGERS PIN 9870443288 D.B. 854, PG. 104 ALLONIOUS NICKENS ROWROWROWROW ROW ROW ROW ROW ROW ROW EIP EIP ROGERS ROAD SR 1729 PIN 9870438967 D.B. 2164, PG. 351 LOVE CHURCH INTERNATIONAL INC. FAITH TABERNACLE OASIS OF (+) 0.92% (+) 1.49% (+) 2.38% (+) 3.16% E L = 5 0 2 .2 9 E L = 5 0 1.10 E L = 5 0 0 .7 3 E L = 5 0 0 .5 0 E L = 5 0 0 .5 0 P I = 3 0 + 0 0 P I = 3 0 + 2 5 P I = 3 0 + 5 0 P I = 3 1+ 0 0 E L = 5 0 3 .0 8 P I = 3 1+ 2 5 L A T V D I T C H E N D S P E C ENDWALL REMOVE RETAIN SEE DETAIL #1 SPEC LAT V DITCH 15" RCP-III EST 5 SY GFD EST 1 TON CL ’B’ RIP RAP C C F CF F F F F F FFF FFFF FFFFFFFFFFF C C C C C C C C C SHEET 5 OF 9 BUFFER DRAWING M A T C H LI N E 3 0 + 0 0 M A T C H LI N E 3 5 + 0 0 30+00 31+00 32+00 33+00 34+00 35+00 490 500 510 520 490 500 510 520 10 20 40200 PLANS M A T C H LI N E 3 0 + 0 0 M A T C H LI N E 3 5 + 0 0 1/ 13 / 2 0 14 R O G E R S _ H y d _ p r m _ b u f _ p s h 0 8 _ c o n j h a r v e y EX 15" RCP EX 15" RCP S U N G A T E D E S I G N G R O U P , P .A . 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S R O G E R S R O A D S I D E W A LK C A R R B O R O , N C SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 C1.08 ROGERS13CDC108 P LA N / P R O F I LE 15" RCP DITCH PROP ROADSIDE EXTG CL ROAD EXTG CL ROAD AT FACE SIDEWALK EXTG GROUND AT FACE SIDEWALK EXTG GROUND DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI SITE 1 ALLOWABLE IMPACTS ZONE 1 ALLOWABLE IMPACTS ZONE 2 SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD DRIVEWAY SIDEWALK 5’ STD DRIVEWAY RELOCATE RETAIN SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE E O G EOG 15" RCP EOP EOP EOPEOP 3 1+ 0 0 3 2 + 0 0 3 3 + 0 0 3 4 + 0 0 15" RCP SIGN SIGN WM UP E O G E O G R/W MON INV=493.68’ INV=515.38’ INV=515.69’ INV=502.30’ INV=502.87’ MAILBOX CTRL POINT HOR/VERT PT #12 CTRL POINT HOR/VERT PT #11 PIN 9870445166 D.B. 395, PG. 234 BETTIE D. ROGERS SAMUEL F. ROGERS PIN 9870437814 D.B. 166, PG. 2 LEAH ROGERS PIN 9870443288 D.B. 854, PG. 104 ALLONIOUS NICKENS ROWROWROWROW ROW ROW ROW ROW ROW ROW EIP EIP ROGERS ROAD SR 1729 PIN 9870438967 D.B. 2164, PG. 351 LOVE CHURCH INTERNATIONAL INC. FAITH TABERNACLE OASIS OF C C F CF F F F F F FFF FFFF FFFFFFFFFFF C C C C C C C C C494495 496 4 9 7 497 498 498 499 499 500 500 501 501 5 0 2 5 0 2 502 503 5 0 3 504 5 0 4 5 0 4 5 0 5 5 0 5 5 0 6 506 507 507 508 508 509 5 0 9 510 510 511 511 512 5125 12 513 513 513 514 514 514 515 515 515 516 516 516 516 517 517 517 517 518 518 518 518 519 519 519 519 520 520520 5 2 0 520 5 2 1 5 2 1 521 5 2 2 (+) 0.92% (+) 1.49% (+) 2.38% (+) 3.16% E L = 5 0 2 .2 9 E L = 5 0 1.10 E L = 5 0 0 .7 3 E L = 5 0 0 .5 0 E L = 5 0 0 .5 0 P I = 3 0 + 0 0 P I = 3 0 + 2 5 P I = 3 0 + 5 0 P I = 3 1+ 0 0 E L = 5 0 3 .0 8 P I = 3 1+ 2 5 L A T V D I T C H E N D S P E C ENDWALL REMOVE RETAIN SEE DETAIL #1 SPEC LAT V DITCH 15" RCP-III EST 5 SY GFD EST 1 TON CL ’B’ RIP RAP SHEET 6 OF 9 BUFFER DRAWING M A TC H LIN E 6 5 + 0 0 65+00 66+00 67+00 68+00 460 470 480 490 500 460 470 480 490 500 M A T C H LI N E 6 5 + 0 0 10 20 40200 PLANS 69+00 1/ 13 / 2 0 14 R O G E R S _ H y d _ p r m _ b u f _ p s h 1 5 j h a r v e y S U N G A T E D E S I G N G R O U P , P .A . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . R O G E R S R O A D S I D E W A LK SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 C1.15 ROGERS13CDC115 P LA N / P R O F I LE EXTG CL ROAD EXTG CL ROAD AT FACE SIDEWALK EXTG GRADE AT FACE SIDEWALK EXTG GRADE DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE(2) EX 54" CMP 15" RCP CB ENDWALL 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI OUTLET 15" RCP SITE 2 ALLOWABLE IMPACTS ZONE 1 ALLOWABLE IMPACTS ZONE 2 SIDEWALK 5’ STD CONCRETE CURB AND GUTTER 2’-6" CONCRETE SIDEWALK 5’ STD CONCRETE CONCRETE SIDEWALK TIE TO EXTG ADJUST ADJUST STRIP 1’-6" UTILITY STRIP 1’-6" UTILITY STRIP 1’-6" UTILITY RELOCATE AND GUTTER TRANSITION TO EXISTING CURB AS REQUIRED FOR SMALL AND GUTTERREMOVE EXTG CURB T C S E O P EOPEOP EOP 5 4 " C M P 5 4 " C M P 36" RCP SIGN TPED CABLE UP SSMH SSMH SDMH 6 6 + 0 0 6 7 + 0 0 6 8 + 0 0 FO BOX CTRL POINT HOR/VERT PT #3 CTRL POINT HOR/VERT PT #2 15" RCP PIN 9870516306 P.B. 55, PG. 87 D.B. 5256, PG. 185 ANDREA C. TANNER DAVID G. TANNER PIN 9870519288 P.B. 55, PG. 87 D.B. 946, PG. 181 DONNA H. HAMILTON MICHAEL ANTHONY HAMILTON PIN 9870508940 P.B. 55, PG. 87 D.B. 868, PG. 1492 HOMEOWNERS ASSOCIATION INC. HIGHLANDS PHASE V C E N T E R LI N E H O M E S T E A D R O A D S R 1 1 7 7 R O W R O W R OW ROW ROW ROW ROW ROW ROW ROGERS ROAD SR 1729 ENDWALL RETAIN RETAIN CB EST 5 SY GFD EST 1 TON CL ’B’ RIP RAP 15" RCP-III W/ SLEEVE GASKETS AND EXTEND 2@54" CSP BAND F F F F F F F F F F F F F F FF SHEET 7 OF 9 BUFFER DRAWING M A TC H LIN E 6 5 + 0 0 65+00 66+00 67+00 68+00 460 470 480 490 500 460 470 480 490 500 M A T C H LI N E 6 5 + 0 0 10 20 40200 PLANS 69+00 1/ 13 / 2 0 14 R O G E R S _ H y d _ p r m _ b u f _ p s h 1 5 _ c o n j h a r v e y S U N G A T E D E S I G N G R O U P , P .A . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . R O G E R S R O A D S I D E W A LK SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 C1.15 ROGERS13CDC115 P LA N / P R O F I LE EXTG CL ROAD EXTG CL ROAD AT FACE SIDEWALK EXTG GRADE AT FACE SIDEWALK EXTG GRADE DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE(2) EX 54" CMP 15" RCP CB ENDWALL 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI OUTLET 15" RCP SITE 2 ALLOWABLE IMPACTS ZONE 1 ALLOWABLE IMPACTS ZONE 2 SIDEWALK 5’ STD CONCRETE CURB AND GUTTER 2’-6" CONCRETE SIDEWALK 5’ STD CONCRETE CONCRETE SIDEWALK TIE TO EXTG ADJUST ADJUST STRIP 1’-6" UTILITY STRIP 1’-6" UTILITY STRIP 1’-6" UTILITY RELOCATE AND GUTTER TRANSITION TO EXISTING CURB AS REQUIRED FOR SMALL AND GUTTERREMOVE EXTG CURB T C S E O P EOPEOP EOP 5 4 " C M P 5 4 " C M P 36" RCP SIGN TPED CABLE UP SSMH SSMH SDMH 6 6 + 0 0 6 7 + 0 0 6 8 + 0 0 FO BOX CTRL POINT HOR/VERT PT #3 CTRL POINT HOR/VERT PT #2 15" RCP PIN 9870516306 P.B. 55, PG. 87 D.B. 5256, PG. 185 ANDREA C. TANNER DAVID G. TANNER PIN 9870519288 P.B. 55, PG. 87 D.B. 946, PG. 181 DONNA H. HAMILTON MICHAEL ANTHONY HAMILTON PIN 9870508940 P.B. 55, PG. 87 D.B. 868, PG. 1492 HOMEOWNERS ASSOCIATION INC. HIGHLANDS PHASE V C E N T E R LI N E H O M E S T E A D R O A D S R 1 1 7 7 R O W R O W R OW ROW ROW ROW ROW ROW ROW ROGERS ROAD SR 1729 F F F F F F F F F F F F F F FF 473 474 4 7 4 4 7 4 474 4 7 4 4 7 4 475 4 7 5 475 475 4 7 5 4 7 5 4 7 6 476 476 4 7 6 4 7 6 477 477477 4 7 7 477 477 477 4 7 7 478 478 478 478478 478 478 479 479479 479 479 4 7 9 479 4 8 0 480 480 480 480 480 4 8 0 4 8 0 4 8 1 481 481 481 481 4 8 1 4 8 1 4 8 1 4 8 1 482 482 482 4 8 2 483 4 8 3 ENDWALL RETAIN RETAIN CB EST 5 SY GFD EST 1 TON CL ’B’ RIP RAP 15" RCP-III W/ SLEEVE GASKETS AND EXTEND 2@54" CSP BAND RO A D CR O S S I N G B R I D G E PA R A L L E L IM P A C T ZO N E 1 (f t 2) ZO N E 2 (f t 2) TO T A L (f t 2) ZO N E 1 (f t 2) ZO N E 2 (f t 2) TO T A L (f t 2)ZONE 1 (ft2)ZONE 2 (ft2) 1 4 8 " C S P 2 9 + 3 6 - 3 0 + 6 1 - L - R T X 1 2 6 9 . 9 8 1 1 . 2 2 0 8 1 . 1 2 2 @ 5 4 " C S P 6 6 + 9 0 - 6 7 + 9 3 - L - R T X 9 7 7 . 0 5 6 6 . 8 1 5 4 3 . 8 TO T A L : 22 4 6 . 9 1 3 7 8 . 0 3 6 2 4 . 9 0 . 0 0 . 0 0 . 0 N. C . D E P T . O F T R A N S P O R T A T I O N DI V I S I O N O F H I G H W A Y S ORANGE COUNTY S H E E T 8 O F 9 SIDEWALK ON SR 1 7 2 9 ( R O G E R S R O A D ) 01-13-14 IM P A C T BU F F E R I M P A C T S S U M M A R Y TY P E SI T E N O . ST R U C T U R E S I Z E / TY P E ST A T I O N (F R O M / T O ) AL L O W A B L E M I T I G A B L E BUFFER REPLACEMENT Rev. May 2006 ZO N E 1 (f t 2) ZO N E 2 (f t 2) 1 2 9 + 3 6 - 3 0 + 6 1 - L - R T 3 4 4 . 0 7 2 6 6 + 9 0 - 6 7 + 9 3 - L - R T 1 7 9 . 8 4 TO T A L : 05 2 3 . 9 1 N. C . D E P T . O F T R A N S P O R T A T I O N DIVISION OF HIGHWAYS ORANGE COUNTY S H E E T 9 O F 9 SIDEWALK ON SR 1729 (ROGERS ROAD) 01-13-14 WE T L A N D S I N B U F F E R I M P A C T S S U M M A R Y W E T L A N D S I N BU F F E R S SI T E N O . ST A T I O N (F R O M / T O ) Rev. Jan 2009 NOT TO SCALE VICINITY MAP HOMESTEAD RD SR 1777 R .J R A IN SLL HT O R L R O CA R O FESSI ON 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C STANDARDS TOWN OF CARRBORO ______________________________ OCTOBER, 2011 STANDARDS AND DESIGN, SPECIFICATIONS, OWASA - MANUAL OF ______________________________ STANDARD SPECIFICATION NCDOT - JANUARY 2012 TEL (919) 859-2243 FAX (919) 859-6258 RALEIGH, NORTH CAROLINA 27606 915 JONES FRANKLIN ROAD SUNGATE DESIGN GROUP, P.A. ENG. FIRM LICENSE NO. C-890ROGERS RD SIDEWALK PROJECT 10 20 4020 10 20 4020 5 105 0 0 0 PROFILE (HORIZONTAL) PROJECT LENGTH STATE STATE PROJECT REFERENCE NO. N.C. DESIGN DATA Prepared in the Office of: SIGNATURE: P.E. SUNGATE DESIGN GROUP, P.A. PROJECT ENGINEERGRAPHIC SCALES PLANS PROFILE (VERTICAL) LOCATION: TYPE OF WORK: N/A PUBLIC WORKS TOWN OF CARRBORO 0 00 915 JONES FRANKLIN ROAD, RALEIGH, NC, 27606 C-890 NG INEE R I A O P R O C C P R I T G UN IS E S S NO AE O F NO TE IESDGN URO G P P. A. EI L N. G C. RA H, LA N G H ARO LIR T N O AN R L.A. FIRM LICENSE NO. C-91 IGS RGN OU D S U N G AET C-91 A INL R O CA A N DSCAPE E IHC R A T R E T C T O R R N S T E D E H L GI E P ,RU LA CORP. P .A . D r . P u r e fo y Rogers Rd. R o g er s R d. Tallyho Tr. S R 1 8 9 6 S R 1 7 2 9 SR 2213 S R 2 2 5 4 S R 1 7 2 9 C la y m o re R d S y lv a n W a y S R 1 8 4 2 S R 1 7 2 7 E u b a n k s S R 1 7 7 7 SR 1896 PUREFOY DR O L D N C 8 6 S R 1729 R O G E RS R D N C 8 6 I 40 R u s c h R d DRAINAGE, DRIVE APRONS GUTTER, CONCRETE SIDEWALK, STORM CONCRETE SIDEWALK, CONCRETE CURB AND H o m e s te a d R d M eado w Run Ct INDEX OF SHEETS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS Staffield Ln W itm ore C ir N Hawick Ct S Hawick Ct R d. SR 1 7 2 7 EU BANK S RD NCDOT ENCROACHMENTS AND SR 1777, HOMESTEAD RD 1. SR 1729, ROGERS ROAD BETWEEN MEADOW RUN CT (NON-SYSTEM) (NON-SYSTEM) AND SR 1777, HOMESTEAD RD SR 1729, ROGERS ROAD BETWEEN MEADOW RUN CT 2.5 STA 11+61.90 BEGIN PROJECT STA 68+62.88 END PROJECT 1 SHEET NO. TOTAL SHEETS DATE: OCTOBER 7, 2013 PSH C1.04 PSH C1.05 PSH C1.06 PSH C1.07 PSH C1.08 PSH C1.09 PSH C1.10 PSH C 1 .1 1 P S H C 1. 12 P S H C 1. 13 P S H C 1. 14 PSH C1.15 = +/-5700 LF PROJECT CARRBORO SIDEWALK TOTAL LENGTH OF TOWN OF SIGNATURE: P.E. PROJECT ENGINEER W. HENRY WELLS, JR, P.E. CHARLES A. MUSSER, JR, R.L.A. PROJECT LANDSCAPE ARCHITECT SIGNATURE: R.L.A. JOSHUA G. DALTON, PE, CPESC A IN HT O R L R O CA R O FESSI O N 26971 G E N REINE SEALP N A L NOTLAD .G A UH S OJDO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION 71 / FINAL EROSION CONTROL CLEARING AND GRUBBINGE1.04 - E1.15 SOIL STABILIZATION SUMMARYE1.03 EROSION CONTROL DETAILSE1.02 - E1.02D EROSION CONTROL NOTESE1.01 EROSION CONTROL TITLE SHEETE1.00 FIBER OPTIC CONDUIT / PULL BOX LOCATIONSC5.01 TRAFFIC CONTROL OVERALLC4.02 TRAFFIC CONTROL DETAILSC4.01 - C4.01B STAGING AREASC3.01 CROSS SECTIONS- C2.26C2.01 PLAN/ PROFILEC1.04 - C1.15 GENERAL NOTESC1.03 TYPICALSC1.02C UTILITIES CONFLICTS SCHEDULEC1.02B STORM DRAINAGE SCHEDULEC1.02A SURVEY CONTROLC1.02 CONVENTIONAL PLAN SHEET SYMBOLSC1.01A S o u th e rn R ail w a y High Sch. Hill Chapel Existing Edge of Pavement Existing Curb Proposed Slope Stakes Cut Proposed Slope Stakes Fill Existing Metal Guardrail Existing Cable Guiderail Proposed Guardrail Equality Symbol Pavement Removal Baseline Control Point RIGHT OF WAY: Existing Right of Way Marker Existing Right of Way Line h Existing Control of Access Proposed Control of Access Proposed Right of Way Line C F Existing Easement Line Proposed Temporary Construction Easement Proposed Temporary Drainage Easement Proposed Permanent Drainage Easement Proposed Permanent Utility Easement HYDROLOGY: Stream or Body of Water Hydro, Pool or Reservoir Flow Arrow Disappearing Stream Spring ; z v W K Proposed Lateral, Tail, Head Ditch False Sump Proposed Cable Guiderail MAJOR: Bridge, Tunnel or Box Culvert Bridge Wing Wall, Head Wall and End Wall MINOR: Head and End Wall Pipe Culvert Footbridge Paved Ditch Gutter UTILITIES: ROADS AND RELATED FEATURES: Existing Power Pole Proposed Power Pole P U/G Power Cable Hand Hole Power Manhole Power Line Tower Power Transformer Existing Joint Use Pole Proposed Joint Use Pole Existing Telephone Pole Proposed Telephone Pole Telephone Manhole Telephone Booth Telephone Pedestal U/G Telephone Cable Hand Hole R } T p Q l e ] / b H-Frame Pole O O POWER: TELEPHONE: Telephone Cell Tower Recorded U/G Power Line Recorded U/G Telephone Cable Designated U/G Telephone Cable (S.U.E.*) Recorded U/G Telephone Conduit Designated U/G Telephone Conduit (S.U.E.*) Recorded U/G Fiber Optics Cable WATER: Water Manhole Water Meter Water Valve Water Hydrant Recorded U/G Water Line 4 I H a TV: TV Satellite Dish TV Pedestal TV Tower U/G TV Cable Hand Hole Recorded U/G TV Cable Recorded U/G Fiber Optic Cable Designated U/G Fiber Optic Cable (S.U.E.*) r | I ] GAS: Gas Valve Gas Meter Recorded U/G Gas Line n c SANITARY SEWER: Sanitary Sewer Manhole Sanitary Sewer Cleanout U/G Sanitary Sewer Line Recorded SS Forced Main Line Designated SS Forced Main Line (S.U.E.*) d o A/G Water Above Ground Gas Line A/G Gas Above Ground Water Line Above Ground Sanitary Sewer A/G Sanitary Sewer MISCELLANEOUS: Utility Pole O F S 3 Utility Pole with Base Utility Located Object Utility Traffic Signal Box Utility Unknown U/G Line ? CONC CONC WW v v Drainage Box: Catch Basin, DI or JB Storm Sewer Storm Sewer Manhole m U/G Tank; Water, Gas, Oil A/G Tank; Water, Gas, Oil BOUNDARIES AND PROPERTY: State Line County Line Township Line City Line Reservation Line Property Line Existing Iron Pin Property Corner Property Monument Existing Fence Line Proposed Woven Wire Fence Proposed Chain Link Fence Proposed Barbed Wire Fence g F 123 Existing Wetland Boundary Proposed Wetland Boundary Existing Endangered Animal Boundary Existing Endangered Plant Boundary BUILDINGS AND OTHER CULTURE: Area Outline Gas Pump Vent or U/G Tank Cap Church School Dam Sign Small Mine Well V M WW S x Foundation S Building y y VEGETATION: Single Tree X Y Vineyard Single Shrub Hedge Woods Line Orchard Vineyard RAILROADS: Standard Gauge RR Signal Milepost Switch RR Abandoned RR Dismantled S FLOW Designated U/G Power Line (S.U.E.*) Designated U/G Fiber Optics Cable (S.U.E.*) Designated U/G Water Line (S.U.E.*) Designated U/G TV Cable (S.U.E.*) Designated U/G Gas Line (S.U.E.*) U/G Test Hole (S.U.E.*) *S.U.E. = Subsurface Utility Engineering WLB EIP B ECM CONC HW CB CSX TRANSPORTATION MILEPOST 35 SWITCH Cemetery EXISTING STRUCTURES: Parcel / Sequence Number E AATUR End of Information E.O.I. Note: Not to Scale Abandoned According to Utility Records WLB EAB EPB R W R W R W C A E TDE PDE PUE S P P T T TC TC T FO T FO W W TV TV TV FO TV FO G G SS FSS FSS ?UTL Jurisdictional Stream JS Buffer Zone 1 Buffer Zone 2 BZ 1 BZ 2 Wetland Proposed Permanent Easement with Iron Pin and Cap Marker Proposed Temporary Utility Easement TUE Iron Pin and Cap Marker Proposed Right of Way Line with DUEProposed Permanent Drainage / Utility Easement AUEProposed Aerial Utility Easement CRProposed Curb Ramp STATE OF NORTH CAROLINA DIVISION OF HIGHWAYS Underground Storage Tank, Approx. Loc. Geoenvironmental Boring UST Known Soil Contamination: Area or Site Potential Soil Contamination: Area or Site Concrete or Granite R/W Marker Proposed Right of Way Line with C A Concrete C/A Marker Proposed Control of Access Line with 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . R O G E R S R O A D S I D E W A LK SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 C A R R B O R O , N C C1.0110 / 8 / 2 0 13 R O G E R S 1 3 C D C 1 0 1 j h a r v e y C O N V E N T I O N A L P LA N S H E E T S Y M B O LS S U N G A T E D E S I G N G R O U P , P .A . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L I N A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S I N COMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON 10-7-13 ROGERS13CDC101 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI S U N G A T E D E S I G N G R O U P , P .A . 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T ION DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 1 0 2 ( s u r v ) j h a r v e y 150 300 6003000 PLANS R O G E R S R O A D S I D E W A LK C A R R B O R O , N C DATUM DESCRIPTION THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY NCGS FOR MONUMENT "#17" WITH NAD 83/NSRS 2011 STATE PLANE GRID COORDINATES OF NORTHING: 805957.33(ft) EASTING: 1973508.75(ft) ELEVATION: 514.95’(ft) THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT THE N.C. LAMBERT GRID BEARING AND LOCALIZED HORIZONTAL GROUND DISTANCE FROM "#17" TO -L- STATION IS ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES VERTICAL DATUM USED IS NAVD 88 (GROUND TO GRID) IS: 0.999928860 19 18 1 E u b a n k s S R 1 7 2 7 Rogers Rd. SR 1 7 2 9 Meado w Run Ct S R 1 8 9 6 P u r e fo y S R 1 8 4 2 R u s c h R d Tallyho S R 2 2 1 3Tr. R o g er s R d. S R 1 7 2 9 C la y m o re R d S R 2 2 5 4 H o m e s te a d R d S R 1 7 7 7 DESCRIPTIONNORTHING EASTING ELEVATION POINT C1.02 ROGERS13CDC102 DESIGN AND ENGINEERING SERVICES ON MARCH 7, 2013. SURVEY CONTROL DATA PROVIDED BY SUMMIT 2 NCGS HOR & VERT525.51972052805876.719 NCGS HOR & VERT510194327780617718 IP/ CAP481.311976239801116.162 IP/ CAP NCGS HOR & VERT502.91975541800253.51 S U R V E Y C O N T R O L R d. 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E S U N G A T E D E S I G N G R O U P , P .A . 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 R O G E R S R O A D S I D E W A LK C A R R B O R O , N C S T O R M D R A I N A G E S C H E D U LE ROGERS13CDC102A C1.02A10 / 8 / 2 0 13 R O G E R S 1 3 C D C 1 0 2 A ( d r n - s c h ) j h a r v e y 10-3-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E RE IN F . C O N C . F LA R E D E N D S E C T IO N S N O . & S IZ E C O R R . S TE E L F LA R E D E N D S E C T IO N S N O . & S IZ E C O RR. S T E E L E LB O W S N O . & S IZ E P IP E RE M O V A L LIN . F T . C O N C . C O LLA R S C L. " B " C . Y. S T D 8 4 0 . 7 2 R E IN F . C O N C . E LB O W S N O . & S IZ E SIZE REMARKS CLASS III R.C. PIPE (UNLESS NOTED OTHERWISE)STATION S T R U C T U R E N O . F R O M TO 54"60"66"72"78"84"54"60"66"72" . 10 9 . 1 3 8 . 16 8 . 13 8 . 16 8 . 13 8 . 16 8 . 13 8 . 13 8 . 16 8 . 16 8 60"66"72" 12 12 121010 10 STRUCTURAL PLATE PIPE LO C A TIO N ( LT, RT , O R C L) OR GAUGE THICKNESS GATED ELON- SHOP W ITH R . C . - C . Y. W IT H C . S . - C . Y. M A S O N A R Y D R A IN A G E S T R U C T U R E S C U B IC YA R D S ENDWALLS REINFORCED LIST OF PIPES, ENDWALLS, ETC. (FOR PIPES 54" & OVER) TYPE OF GRATE FE GC . B . S TD . 8 4 0 . 0 1 O R S T D . 8 4 0 . 0 2 STANDARD 840.03 AND HOOD FRAME, GRATES ABBREVIATIONS IN V E RT E LE V A T IO N IN V E RT E LE V A T IO N T O P E LE V A TIO N S LO P E C RITIC A L C.B. N.D.I. D.I. J.B. M.H. CATCH BASIN NARROW DROP INLET DROP INLET JUNCTION BOX MANHOLE TRAFFIC BEARING DROP INLETT.B.D.I. T.B.J.B.TRAFFIC BEARING JUNCTION BOX G.D.I.GRATED DROP INLET G.D.I. (N.S.) (NARROW SLOT) GRATED DROP INLET C A T C H B A S IN D R O P IN LE T S E C T IO N TRA N S IT IO N A L C O N C RE T E C.S. PIPE 67+35 -L-RT 472.33 16 7.3 BAND AND EXTEND 2@54" CSP W SLEEVE GASKET J . B . S TD . 8 4 0 . 3 1 O R 8 4 0 . 3 2 SIZE A B Q U A N TITIE S F O R D R A IN A G E S TR U C T U R E S ENDWALLS STATION S T R U C T U R E N O . R . C . P . C . S . P . . 10 9 . 0 7 9 . 10 9 P E R E A C H ( 0 ’ T H RU 5 . 0 ’) 5 . 0 ’ TH R U 10 . 0 ’ 10 . 0 ’ A N D A B O V E * TO TA L L. F . F O R P A Y Q U A N T IT Y S H A LL B E C O L. ’A ’ + ( 1 . 3 X C O L. ’ B ’ ) F R O M T O TYPE OF GRATE FE GC . B . S T D . 8 4 0 . 0 1 O R S T D . 8 4 0 . 0 2 ABBREVIATIONS LO C A TIO N ( LT, RT , O R C L) 4 / 0 4 / 0 6 REMARKS COMPUTED BY: CHECKED BY:DATE: DATE: 12"15"18"24"30"36"42"48"12"36"42"48" LIST OF PIPES, ENDWALLS, ETC. (FOR PIPES 48" & UNDER) DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA STANDARD 840.03 AND HOOD FRAME, GRATES CU. YDS. OR GAUGE THICKNESS *FT. LIN. T O P E LE V A TIO N IN V E R T E LE V A TIO N IN V E R T E LE V A T IO N S LO P E C R ITIC A L OTHERWISE) NOTED (UNLESS STD. 838.80 OR STD. 838.11 STD. 838.01, C.B. N.D.I. D.I. J.B. M.H. CATCH BASIN NARROW DROP INLET DROP INLET JUNCTION BOX MANHOLE TRAFFIC BEARING DROP INLETT.B.D.I. T.B.J.B.TRAFFIC BEARING JUNCTION BOX G.D.I.GRATED DROP INLET G.D.I. (N.S.) (NARROW SLOT) GRATED DROP INLET 48"42"36"30"24"18"15" D RO P I N LE T C A T C H B A S IN S E C TIO N TR A N S ITIO N A L C O N C R E TE (RCP, CSP, CAAP, HDPE, or PVC) DRAINAGE PIPE C O R R . S TE E L E LB O W S N O . & S IZ E C O N C . C O LLA R S C L. " B " C . Y. S T D 8 4 0 . 7 2 C O N C . & B R IC K P IP E P LU G , C . Y . S TD . 8 4 0 . 7 1 P IP E R E M O V A L LIN . F T. D O N O T U S E RC P D O N O T U S E C S P D O N O T U S E C A A P D O N O T U S E H D P E C.S. PIPE 15"18"24" . 0 6 4 . 0 6 4 . 0 6 4 . 0 6 4 (CLASS III) R.C. PIPE 12"18"24"30"36"42"48"15" * * " R . C . P IP E (C LA S S V ) * * " R. C . P IP E C U LV E R TS , C O N T R A C T O R D E S IG N P IP E * * " R. C . P IP E C U LV E R TS , C O N T R A C T O R D E S IG N P IP E 15 " S ID E D RA IN P IP E 18 " S ID E D RA IN P IP E (CLASS IV) R.C. PIPE SUB-REGIONAL & REGIONAL NOTE: Invert Elevations are for Bid Purposes only and shall not be used for project construction stakeout. See "Standard Specifications For Roads and Structures, Section 300-5". 11+90 -L-RT 1 517.0 514.3 1 G . D . I. T Y P E " B " S TD . 8 4 0 . 18 O R 8 4 0 . 2 7 G . D . I. T Y P E " D " S TD . 8 4 0 . 1 9 O R 8 4 0 . 2 8 C . B . S TD . 8 4 0 . 0 2 J B W IT H M A N H O LE S TD . 8 4 0 . 3 1 O R 8 4 0 . 3 2 1 514.33 513.9 24 11+75 -L-RT 2 3 514.2 513.9 16 RT 3 517.8 513.7 1 1 1 17+00 -L-RT 4 526.4528.3 1 1 RT 4 5 526.4 525.2 36 18+08 -L-RT 6 525.8 523.5 1 1 RT 6 7 523.5 523.0 16 20+88 -L-RT 8 523.0 520.0 1 1 RT 8 9 520.0 519.7 20 28+59 -L-RT 10 500.9 499.011 72 29+75 -L-RT 12 500.4 493.9 RT 12 493.913A 493.7 20 1 2.5 1 29+88 -L-RT 13 493.9 BAND AND EXTEND 48" CSP WITH SLEEVE GASKET RT OUT13 493.7 12 6.0 31+64 -L-RT 14 15 502.9 501.2 56 38+20 -L-RT 16 17 532.4 531.3 12 38+49 -L-RT 17 533.1 531.3 1 1 51+89 -L-RT 18 19 518.0 12 1252+39 -L-RT 20 21 516.3 62+50 -L-RT 2422 488.3 485.2 80 62+98 -L-RT 23 24 486.5 485.2 63+52 -L-RT 25 483.7 483.7 2 RT 25 26 483.7 483.2 8 48 63+47 -L-RT 27 28 488.5 484.0 32 68+38 -L-RT 29 480.1 477.1 11 RT 29 30 476.5477.1 24 SHEET TOTALS 12 264 60 48 80 6.0 7 2.5 1 1 5 1 1 2 517.6 516.0 29 3029 478.5 472.33 472.23 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 1 0 2 B ( u t i l ) j h a r v e y S U N G A T E D E S I G N G R O U P , P .A . 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 R O G E R S R O A D S I D E W A LK C A R R B O R O , N C ROGERS13CDC102B C1.02B U T I LI T I E S C O N F LI C T S 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : CAM, WBH 1083-12003 R O G E R S R O A D S I D E W A LK C A R R B O R O , N C F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 S U N G A T E D E S I G N G R O U P , P .A . I N COMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S 1’1’ 5’ C1.02C ROGERS13CDC102C T Y P I C A LS (+).08 (+).08 (+).02 3:1 3:1 1’1’ 5’ (+).08 (+).08 (+).02 3:1 2:1 (-).08 2: 1 4"4" TYPICAL SECTION NO. 1 TYPICAL SECTION NO. 2 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 1 0 2 C ( t y p ) j h a r v e y 5’ 1’ (-).08 4" (+).02 1’-6" 2’-6" GUTTER (+).08 2: 1 STA 63+50 - STA 68+62.88 3:1 3: 14 : 1 (-).08 6’ 4’ 3’ 1’ (+).08 (+).02 5’ 4" 1’ (-).08 E X E P 4 : 1 3:1 3’ (+).08 1’ 5’ (+).02 2: 1 TYPICAL SECTION NO. 9 TYPICAL SECTION NO. 10 4" (-).02 VARIES 6" 4.0’ 6" STA 23+25 - STA 24+75 TYPICAL SECTION NO. 12 E X S H L D P T STA 59+00 - STA 62+25 STA 53+50 - STA 54+00 STA 40+75 - STA 41+75 STA 37+50 - STA 38+00 BINDER 5" ASPHALT SURFACE 2" ASPHALT BASE 4" ASPHALT (-).08 3: 1 STA 54+50 - STA 58+75 STA 42+00 - STA 52+75 STA 38+50 - STA 40+50 STA 31+75 STA 28+75 - STA 29+00 STA 22+25 - STA 22+75 STA 20+50 - STA 21+25 STA 16+75 - STA 17+75 STA 29+00 - STA 31+25 STA 19+00 - STA 19+75 STA 18+00 STA 32+00 - STA 37+50 STA 26+00 - STA 28+50 STA 25+25 - STA 25+75 STA 21+75 - STA 22+00 STA 20+25 STA 12+25 - STA 16+50 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : CAM, WBH 1083-12003 R O G E R S R O A D S I D E W A LK C A R R B O R O , N C F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 S U N G A T E D E S I G N G R O U P , P .A . C1.03 I N COMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 1 0 3 ( n o t e s ) j h a r v e y G E N E R A L N O T E S ROGERS13CDC103 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI M A TC H LIN E 15 + 0 0 10+00 11+00 12+00 13+00 14+00 15+00 500 510 520 530 540 500 510 520 530 540 M A T C H LI N E 1 5 + 0 0 10 20 40200 PLANS 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 1 0 4 _ p f l j h a r v e y S U N G A T E D E S I G N G R O U P , P .A . 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 R O G E R S R O A D S I D E W A LK C A R R B O R O , N C C1.04 ROGERS13CDC104 P LA N / P R O F I LE EXTG CL ROAD EXTG CL ROAD AT SIDEWALK FACE EXTG GRADE AT SIDEWALK FACE EXTG GRADE EX 24" RCP DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE DITCH PROP ROADSIDE 18" RCP 18" RCP 2GI JB W/ MH 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI C E N T E R L I N E M E A D O W R U N C T RELOCATE ADJUST RELOCATE SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE WCR RETAIN P O T S t a . 10 + 0 0 .0 0 P I S t a . 11+ 2 4 .6 3 P C S t a . 13 + 9 9 . 4 7 EOP EOP EOP EOP SIGN SIGN SIGN SIGN SIGN 11+ 0 0 12 + 0 0 14 + 0 0 13 + 0 0 WV WV WV WVWM UT UTWM EOP 24" RCP UT PI Sta 14+73.25 D L = 147.25’ T = 73.78’ R = 920.82’ INV=511.76’ INV=513.73’PREVENTER BACKFLOW CTRL POINT HOR/VERT PT #17 CCC CCCCCFFFF F F F F F FFFFFFFFFFF F C 509 510 511 511 512 512 512 513 513 513 513 514 514 514 515 515 5 15 516 5 1 6 5 16 5 16 517 517 517 518 518 518 5 1 9 5 1 9 519 520 520 5 2 1 521 5 2 2 522 5 2 3 523 52 4 524 525 525 5 2 6 526 5 2 7 527 5 2 8 528 528 5 2 9 529 529 5 3 0 530 5 3 0 531 P I = 12 + 0 0 E L = 5 17 .5 0 E L = 5 17 .0 7 P I = 11+ 9 0 L A T V D I T C H B E G S P E C E L = 5 19 .13 P I = 12 + 2 5 L A T V D I T C H E N D S P E C (+) 4.30% (+) 6.52% PIN 9870352822 P.B. 55, PG. 38 D.B. 4189, PG. 590 KIMBERLY M. GIBSON-FORREST HOWARD J. FORRET PIN 9870355605 P.B. 55, PG. 38 D.B. 1528, PG. 322 VIRGINIA BETHEA JOHN BETHEA M E A D O W R U N C T PIN 9870357613 D.B. 166, PG. 346 ADDIE STREET JOHN STREET ROW R O W R O W ROW ROW ROW ROW ROWROW ROW EIP EIP EIP ROGERS ROAD SR 1729 PIN 9870353308 D.B. 856, PG. 396 HOMEOWNERS ASSOC. INC MEADOW RUN 2GI 18" RCP-III 1 8 " R C P - I I I 3 2 1 RETAIN JB w/MH SEE DETAIL #1 SPEC LAT V DITCH ( Not to Scale) SPECIAL LATERAL ’V’ DITCH D d 3: 1 FROM STA. 11+90 TO STA. 12+25 -L- RT Max. d=1.5 Ft. Min. D=1.5 Ft. DETAIL 1 Type of Liner= PSRM Ground Natural Flatter4:1 or Slope Fill DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF M A T C H LI N E 1 5 + 0 0 M A TC H LIN E 2 0 + 0 0 15+00 16+00 17+00 18+00 19+00 20+00 510 520 530 540 550 510 520 530 540 550 M A T C H LI N E 1 5 + 0 0 M A T C H LI N E 2 0 + 0 0 10 20 40200 PLANS 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 1 0 5 _ p f l j h a r v e y 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 R O G E R S R O A D S I D E W A LK C A R R B O R O , N C C1.05 ROGERS13CDC105 S U N G A T E D E S I G N G R O U P , P .A . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S P LA N / P R O F I LE EXTG CL ROAD EXTG CL ROAD AT FACE SIDEWALK EXTG GRADE AT FACE SIDEWALK EXTG GRADE DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE EX 12" RCP DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE EX 12" RCP DITCH PROP ROADSIDE DITCH PROP ROADSIDE PROP DITCH RIGHT 2GI-D 15" RCP 15" RCP 2GI-D 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI EX 15" RCP 522523523 523 5 2 3 524 5 2 4 524 524 524 5 2 4 5 2 4 524 525 52 5 525 525 525 526 526 526 527527 5 2 7 528 528 528 5 2 8 529 529 529 529 530 530 530 530 530 5 3 0 531 5 3 1 531 531 531 5 3 1 531 531 532 532 5 3 2 532 ADJUST RELOCATE REMOVE RELOCATE REMOVE REMOVE ADJUST RETAIN SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD DRIVEWAY SIDEWALK 5’ STD DRIVEWAY SIDEWALK 5’ STD DRIVEWAY SIDEWALK 5’ STD DRIVEWAY RELOCATE RETAIN SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE RELOCATE RELOCATE P C C S t a. 1 5 + 4 6. 7 1 P T S ta . 18 + 2 7 .8 2 1 6 + 0 0 17 + 0 0 18 + 0 0 EOP EOP EOP EOP EO G E O G MANHOLE WATER WM WELL FH W E O G E OG UP WV UT UP 15 " R C P 12 " RC P 12 " R C P E O G E O G E OG S OIL S OIL WM WM 19 + 0 0 HYD MON PI Sta 14+73.25 D L = 147.25’ T = 73.78’ R = 920.82’ PI Sta 16+90.76 D L = 281.11’ T = 144.05’ R = 522.03’ WM INV=523.47’ INV=524.74’ INV=524.03’ INV=523.69’ MAILBOX (2) MAILBOXES MAILBOX INV=522.11’ WV WV CTRL POINT HOR/VERT PT #16 CTRL POINT HOR/VERT PT #15 E l = 5 2 4 .7 1 E L = 5 2 5 .18 P I = 17 + 3 5 L A T V D I T C H B E G S P E C (- ) 3 .00% E L = 5 2 3 .6 0 P I= 18 + 0 0 L A T V D I T C H E N D S P E C (-) 2.22% (+) 0.48% E L = 5 2 5 .9 5 P I = 18 + 0 7 L A T V D I T C H B E G S P E C P I = 17 + 5 0 E L = 5 2 6 .8 0 P I = 18 + 7 5 L A T V D I T C H E N D S P E C E L = 5 2 2 .11 P I = 19 + 9 5 L A T V D I T C H E N D S P E C P I = 19 + 2 5 E L = 5 2 4 .18 P I = 19 + 5 0 E L = 5 2 3 .9 6 (-) 1.12%(-) 0.88%(-) 0.76% E L = 5 2 4 .4 6 P I = 19 + 0 0 L A T V D I T C H B E G S P E C P I = 19 + 7 5 E L = 5 2 3 .7 7 PIN 9870357613 D.B. 166, PG. 346 ADDIE STREET JOHN STREET PIN 9870356499 D.B. 182, PG. 334 ADDIE STREET JOHN A. STREET PIN 9870356289 D.B. 460, PG. 378 GEORGE L. THOMPSON PIN 9870357203 D.B. 5442, PG. 467 ASSOCIATION TRUSTEE US BANK NATIONAL P IN 9 8 7 0 3 5 7 2 0 3 D .B . 5 4 4 2 , P G . 4 6 7 A S S O C IA T IO N T R U S T E E U S B A N K N A T IO N A L ROW ROW ROW ROWROW ROW ROW ROW ROW ROW ROW ROW ROW EIP EIP EIP EIP EIP EIP PIN 9870356398 LAUREN MAXWELL ROGERS ROAD SR 1729 6 7 15 " RC P- III 2GI-D 15" R C P- III RETAIN REMOVE 15" R C P-III 4 5 SEE DETAIL #1 SPEC LAT V DITCH 2GI-D SEE DETAIL #1 SPEC LAT V DITCH REMOVE SEE DETAIL #1 SPEC LAT V DITCH EST 7 SY GFD EST 2 TON CL ’B’ RIP RAP EST 7 SY GFD EST 2 TON CL ’B’ RIP RAP ( Not to Scale) SPECIAL LATERAL ’V’ DITCH D d 3: 1 FROM STA. 18+95 TO STA. 19+94 -L- RT FROM STA. 18+07 TO STA. 18+75 -L- RT FROM STA. 17+35 TO STA. 18+00 -L- RT Max. d=1.5 Ft. Min. D=1.5 Ft. DETAIL 1 Type of Liner= PSRM Ground Natural Flatter4:1 or Slope Fill DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF F F C F F F F F F F FF F F C C F C C C CC F F FFF FF F F F F F F FF C C M ATC H LIN E 2 0 + 0 0 M A T C H LI N E 2 5 + 0 0 20+00 21+00 22+00 23+00 24+00 25+00 500 510 520 530 540 500 510 520 530 540 M A T C H LI N E 2 5 + 0 0 10 20 40200 PLANS M A T C H LI N E 2 0 + 0 0 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 1 0 6 _ p f l j h a r v e y S U N G A T E D E S I G N G R O U P , P .A . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 C1.06 ROGERS13CDC106 R O G E R S R O A D S I D E W A LK C A R R B O R O , N C 10-7-13 P LA N / P R O F I LE EXTG CL ROAD EXTG CL ROAD AT FACE SIDEWALK EXTG GROUND AT FACE SIDEWALK EXTG GROUND EX 12" RCP EX 12" RCP EX 12" RCP DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE 15" RCP 15" RCP 15" RCP R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI 2GI-D EX 15" RCP SIDEWALK 5’ STD DRIVEWAY RELOCATE RETAIN SIDEWALK 5’ STD CONCRETE RELOCATE RETAIN RETAIN SIDEWALK 5’ STD DRIVEWAY SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD DRIVEWAY REMOVE RETAIN ADJUST ADJUST SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD DRIVEWAY SIDEWALK 5’ STD DRIVEWAY ADJUST RETAIN P C S ta . 2 0 + 5 6 .3 6 P C C S ta . 2 1+ 8 2 .3 8 P C C S t a . 2 3 + 2 6 . 7 8 P T S t a . 2 4 + 7 1. 5 7 12 " R C P 12 " R C P EOG 15 " R C P 12" RCP 12" RCP E O P E O P EOP EOP UT WM WM UT UP WV WV WM SSMH F E NC E E O G E OG E O G E O G S OIL S OIL EOG E OG E O G S O I L 2 1+ 0 0 2 2 + 0 0 2 3 + 0 0 2 4 + 0 0 UPUT UT R = 1,072.91’ T = 63.08’ L = 126.02’ D PI Sta 21+19.44 PI Sta 22+55.06 D L = 144.40’ T = 72.68’ R = 512.73’ PI Sta 23+99.29 D L = 144.79’ T = 72.51’ R = 1,063.40’ INV=521.62’ COLUMN INV=520.27’ INV=521.07’ INV=521.63’ INV=521.84’ INV=520.13’ INV=519.51’ MAILBOX CTRL POINT HOR/VERT PT #14 FF FF FFF F F F F F F F F F F F FFF F F F F F F F FF F F F F F F F 513 514 514 515 5 1 5 516 5 1 6 517 517 518 5 1 8 519 5 1 9 5 2 0 520 5 2 0 521521 521 5 2 1 521 522 522 5 2 2522 522 522 5 2 2 523 523523 523 5 2 3523 5 2 3 5 2 3 5 2 3 524524 5 2 4 524 5 2 5 (- ) 3 .86% E L = 5 19 .5 1 P I = 2 3 + 0 3 L A T V D I T C H B E G S P E C E L = 5 12 .4 5 P I= 2 4 + 8 6 L A T V D I T C H E N D S P E C PIN 9870358102 D.B. 5076, PG. 586 JAMES E. STEWART JACQUELINE STEWART PIN 9870346986 D.B. 5459, PG. 333 ZOILA RIVAS I PIN 9870348970 D.B. 3943, PG. 246 ALICIA JIMENEZ HERMELINDA PEREZ JIMENEZ PIN 9870349879 P.B. 96, PG. 177 D.B. 3649, PG. 383 KIMBERLY CANOVA MICHAEL J. CANOVA PIN 9870349696 D.B. 185, PG. 147 JAMES M. ALLEN P IN 9 8 7 0 3 5 7 2 0 3 D .B . 5 4 4 2 , P G . 4 6 7 A S S O C IA T IO N T R U S T E E U S B A N K N A T IO N A L ROW ROW ROW ROW R OW R OW R OW R OW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROWEIP EIP EIP EIP EIP EIP EIP EIP ROGERS ROAD SR 1729 PIN 9870358102 D.B. 5076, PG. 586 JAMES E. STEWART JACQUELINE STEWART 8 9 15 " RC P- III 15" RCP-III REMOVE 15" R C P-III RETAIN RETAIN RETAIN 15" RCP-III 15" R C P-III 2GI-D ( Not to Scale) SPECIAL LATERAL ’V’ DITCH D d 3: 1 FROM STA. 23+03 TO STA. 24+86 -L- RT Max. d=1.5 Ft. Min. D=1.5 Ft. DETAIL 1 Type of Liner= PSRM Ground Natural Flatter4:1 or Slope Fill SEE DETAIL #1 SPEC LAT V DITCH EST 5 SY GFD EST 1 TON CL ’B’ RIP RAP EST 7 SY GFD EST 2 TON CL ’B’ RIP RAP DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF M A T C H LI N E 2 5 + 0 0 M A T C H LI N E 3 0 + 0 0 25+00 26+00 27+00 28+00 29+00 30+00 490 500 510 520 490 500 510 520 M A T C H LI N E 2 5 + 0 0 10 20 40200 PLANS M A T C H LI N E 3 0 + 0 0 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 1 0 7 _ p f l j h a r v e y S U N G A T E D E S I G N G R O U P , P .A . 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 R O G E R S R O A D S I D E W A LK C A R R B O R O , N C C1.07 ROGERS13CDC107 P LA N / P R O F I LE EXTG CL ROAD EXTG CL ROAD AT FACE SIDEWALK EXTG GRADE AT FACE SIDEWALK EXTG GRADE EX 15" RCP DITCH EXTG ROADSIDE 15" RCP DITCH PROP ROADSIDE 15" RCP DITCH EXTG ROADSIDE 2GI-D 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI 15" RCP EX 48" CMP SIDEWALK 5’ STD DRIVEWAY RETAIN ADJUST ADJUST ADJUST ADJUST ADJUST ADJUST ADJUST SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD DRIVEWAY SIDEWALK 5’ STD CONCRETE ADJUST ADJUST RETAIN E OG S OIL UT WV WV WV WV WV WM WM UP UP SIGN 4 8 " C M P 15" RCP EOP EOPEOP EOP UT UT E OG E OG 2 6 + 0 0 2 7 + 0 0 2 8 + 0 0 2 9 + 0 0 HYD MON INV=500.89’INV=500.14’ WV WV PREVENTER BACKFLOW INV=493.68’ INV=493.74’ CTRL POINT HOR/VERT PT #13 HYD MON PIN 9870441657 D.B. 932, PG. 81 JAMES M. ALLEN PIN 9870453385 D.B. 171, PG. 475 LEAH ROGERS PIN 9870347529 D.B. 4088, PG. 331 BUDDHA LLC PIN 9870442208 D.B. 4435, PG. 507 BUDDHA LLC PIN 9870443288 D.B. 854, PG. 104 ALLONIOUS NICKENS ROWROWROWROW ROW ROW ROW ROW ROW ROW EIP EIP EIP ROGERS ROAD SR 1729 FF F F F FCFF F F F F FFFFFFFFFF FFFFF F C C C C C C C C C C 4 9 5 4 9 6 497 498 4 9 8 499 4 9 9 500 500 501 501 501 502502 502 502 502 5 0 3 503504 504 504 505 505 5 0 5 506 506 506 507 507 5 0 7 508 508 508 508 509 509 509 509 510 5 1 0 510 510 510 511 5 1 1 511512 5 1 2 513 10 11 12 ENDWALL 15" RCP-III REMOVE RETAIN 1313A 15" RCP-III ( Not to Scale) SPECIAL LATERAL ’V’ DITCH D d 3: 1 FROM STA. 29+00 TO STA. 31+25 -L- RT Max. d=1.5 Ft. Min. D=1.5 Ft. DETAIL 1 Type of Liner= PSRM Ground Natural Flatter4:1 or Slope Fill 1 5 " RC P -III 2GI-B 1 5 " R C P - I I I SEE DETAIL #1 SPEC LAT V DITCH EST 5 SY GFD EST 1 TON CL ’B’ RIP RAP EST 5 SY GFD EST 1 TON CL ’B’ RIP RAP EST 7 SY GFD EST 2 TON CL ’B’ RIP RAP W/ GASKET SLEEVE BAND AND EXTEND 48" CSP (-) 1.68% (-) 0.94% E L = 5 0 0 .5 0 P I = 3 0 + 0 0 E L = 5 0 0 .3 8 P I = 2 9 + 2 5 E L = 5 0 0 .8 5 E L = 5 0 1.2 7 P I = 2 9 + 0 0 L A T V D IT C H B E G S P E C P I= 2 9 + 7 5 (+) 0.48% DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF M A T C H LI N E 3 0 + 0 0 M A T C H LI N E 3 5 + 0 0 30+00 31+00 32+00 33+00 34+00 35+00 490 500 510 520 490 500 510 520 10 20 40200 PLANS M A T C H LI N E 3 0 + 0 0 M A T C H LI N E 3 5 + 0 0 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 1 0 8 _ p f l j h a r v e y EX 15" RCP EX 15" RCP S U N G A T E D E S I G N G R O U P , P .A . 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S R O G E R S R O A D S I D E W A LK C A R R B O R O , N C SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 C1.08 ROGERS13CDC108 P LA N / P R O F I LE 15" RCP DITCH PROP ROADSIDE EXTG CL ROAD EXTG CL ROAD AT FACE SIDEWALK EXTG GROUND AT FACE SIDEWALK EXTG GROUND DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD DRIVEWAY SIDEWALK 5’ STD DRIVEWAY RELOCATE RETAIN SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE E O G EOG 15" RCP EOP EOP EOPEOP 3 1+ 0 0 3 2 + 0 0 3 3 + 0 0 3 4 + 0 0 15" RCP SIGN SIGN WM UP E O G E O G R/W MON INV=493.68’ INV=515.38’ INV=515.69’ INV=502.30’ INV=502.87’ MAILBOX CTRL POINT HOR/VERT PT #12 CTRL POINT HOR/VERT PT #11 PIN 9870445166 D.B. 395, PG. 234 BETTIE D. ROGERS SAMUEL F. ROGERS PIN 9870437814 D.B. 166, PG. 2 LEAH ROGERS PIN 9870443288 D.B. 854, PG. 104 ALLONIOUS NICKENS ROWROWROWROW ROW ROW ROW ROW ROW ROW EIP EIP ROGERS ROAD SR 1729 PIN 9870438967 D.B. 2164, PG. 351 LOVE CHURCH INTERNATIONAL INC. FAITH TABERNACLE OASIS OF C C F CF F F F F F FFF FFFF FFFFFFFFFFF C C C C C C C C C494495 496 4 9 7 497 498 498 499 499 500 500 501 501 5 0 2 5 0 2 502 503 5 0 3 504 5 0 4 5 0 4 5 0 5 5 0 5 5 0 6 506 507 507 508 508 509 5 0 9 510 510 511 511 512 5125 12 513 513 513 514 514 514 515 515 515 516 516 516 516 517 517 517 517 518 518 518 518 519 519 519 519 520 520520 5 2 0 520 5 2 1 5 2 1 521 5 2 2 (+) 0.92% (+) 1.49% (+) 2.38% (+) 3.16% E L = 5 0 2 .2 9 E L = 5 0 1.10 E L = 5 0 0 .7 3 E L = 5 0 0 .5 0 E L = 5 0 0 .5 0 P I = 3 0 + 0 0 P I = 3 0 + 2 5 P I = 3 0 + 5 0 P I = 3 1+ 0 0 E L = 5 0 3 .0 8 P I = 3 1+ 2 5 L A T V D I T C H E N D S P E C 15 14 ENDWALL REMOVE RETAIN ( Not to Scale) SPECIAL LATERAL ’V’ DITCH D d 3: 1 FROM STA. 29+00 TO STA. 31+25 -L- RT Max. d=1.5 Ft. Min. D=1.5 Ft. DETAIL 1 Type of Liner= PSRM Ground Natural Flatter4:1 or Slope Fill SEE DETAIL #1 SPEC LAT V DITCH 15" RCP-III EST 5 SY GFD EST 1 TON CL ’B’ RIP RAP DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF M A T C H LI N E 3 5 + 0 0 M A T C H LIN E 4 0 + 0 0 35+00 36+00 37+00 38+00 39+00 40+00 510 520 530 540 550 510 520 530 540 550 10 20 40200 PLANS M A T C H LI N E 4 0 + 0 0 M A T C H LI N E 3 5 + 0 0 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 1 0 9 _ p f l j h a r v e y 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 R O G E R S R O A D S I D E W A LK C A R R B O R O , N C C1.09 ROGERS13CDC109 S U N G A T E D E S I G N G R O U P , P .A . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S P LA N / P R O F I LE EXTG CL ROAD EXTG CL ROAD AT FACE SIDEWALK EXTG GRADE AT FACE SIDEWALK EXTG GRADE EX 15" RCP EX 15" RCP EX 12" RCP DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE DITCH PROP ROADSIDE 2GI-D 15" RCP 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE ADJUST ADJUST ADJUST ADJUST RETAIN RELOCATE RETAIN RETAINSIDEWALK 5’ STD DRIVEWAY SIDEWALK 5’ STD DRIVEWAY SIDEWALK 5’ STD DRIVEWAY SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETERETAIN ADJUST RELOCATE RETAIN ADJUST RELOCATE RETAIN RETAIN RETAIN RELOCATE RETAIN ADJUST RETAIN ADJUST P C S t a . 3 9 + 4 8 .7 6 3 6 + 0 0 3 7 + 0 0 3 8 + 0 0 3 9 + 0 0 EOP EOP EOP EOP EOP GATE SIGN SIGN WV WV WV WV WV WM WM WMGV WM GATE 12" RCP 15" RCP 15" RCP UP UP UP UT EOGE O G E OGE O G E O C E OC E O G E O G PI Sta 41+07.26 D L = 316.51’ T = 158.51’ R = 2,298.19’ INV=525.30’ INV=526.48’SIGN INV=529.70’INV=531.20’ INV=535.51’ INV=536.02’ GUYWIRE GUYWIRE GUYWIRE CTRL POINT HOR/VERT PT #10 HYD MON HYD MON ROWROW ROWROWROW ROWROWROWROWROW ROW ROW R O W R O W EIP EIP EIP S R 1 8 9 6 P U R E F O Y D R IV E ROGERS ROAD SR 1729 PIN 9870438967 D.B. 2164, PG. 351 LOVE CHURCH INTERNATIONAL INC. FAITH TABERNACLE OASIS OF PIN 9870438967 D.B. 2164, PG. 351 LOVE CHURCH INTERNATIONAL INC. FAITH TABERNACLE OASIS OF PIN 9870439728 P.B. 53, PG. 178 D.B. 2356, PG. 205 LOVE CHURCH INTERNATIONAL INC. FAITH TABERNACLE OASIS OF PIN 9870530645 P.B. 53, PG. 178 D.B. 2164, PG. 347 LOVE CHURCH INTERNATIONAL INC. FAITH TABERNACLE OASIS OF P I N 9 8 7 0 5 3 0 6 4 5 P . B . 5 3 , P G . 1 7 8 D . B . 2 1 6 4 , P G . 3 4 7 L O V E C H U R C H I N T E R N A T I O N A L I N C . F A I T H T A B E R N A C L E O A S I S O F C C C CC C CCCC C CCCCC FF FFF F F FFFFFFFFFFFFF C C C C F C C C C 520 5 2 1 521 5 2 2 522 5 2 3 523 523 524 524 524 525 525 5 2 6 526 5 2 7 527 527 5 2 8 528 528 529 529 5 2 9 53 0 530 530 531 531 531 532 532 532 533 5 3 3 534 5 3 4 534 535 535 535 536 536 5 3 6 537 537 537 538 538538 538 539 539 540 540 17 15 " RC P- III 2GI-D RETAIN RETAIN RETAIN 16 DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF M A T C H L I N E 4 0 + 0 0 M A TC H LIN E 4 5 + 0 0 40+00 41+00 42+00 43+00 44+00 45+00 520 530 540 550 560 520 530 540 550 560 10 20 40200 PLANS M A T C H LI N E 4 0 + 0 0 M A T C H LI N E 4 5 + 0 0 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 1 1 0 _ p f l j h a r v e y S U N G A T E D E S I G N G R O U P , P .A . 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 R O G E R S R O A D S I D E W A LK C A R R B O R O , N C C1.10 ROGERS13CDC110 P LA N / P R O F I LE EXST CL ROAD EXST CL ROAD AT FACE SIDEWALK EXTG GRADE AT FACE SIDEWALK EXTG GRADE DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE EX 15" RCP EX 15" CMP EX 15" RCP EX 15" RCP R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI 10-7-13 SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD DRIVEWAY SIDEWALK 5’ STD DRIVEWAY RELOCATE RETAIN REMOVE REMOVE RELOCATE RELOCATE SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE REMOVE REMOVE RETAIN RETAIN REMOVERETAIN SIDEWALK 5’ STD DRIVEWAY RELOCATE RETAIN RETAIN RETAIN RETAIN RETAIN SIDEWALK 5’ STD CONCRETE RELOCATE P C S t a . 4 4 + 19 .0 4 4 1+ 0 0 4 2 + 0 0 4 3 + 0 0 4 4 + 0 0 EOP EOP EOP EOP EOP EOP EOP 15" RCP 15" CMP 15" RCP 15" RCP WM WM WM WM WV WVWV SIGN UP UP UP UP UP UP UP UP UP EOGE O G E O G E OG E O G E OG E O G EOG EOG E OG FENCE R = 2,298.19’ T = 158.51’ L = 316.51’ D PI Sta 41+07.26 P T S t a . 4 2 + 6 5 .2 7 PI Sta 44+79.07 D L = 119.99’ T = 60.03’ R = 1,571.23’ INV=537.86’INV=537.80’ INV=541.58’ INV=541.84’ INV=540.94’ INV=541.63’ INV=546.15’INV=546.56’ CTRL POINT HOR/VERT PT #9 HYD MON PIN 9870531675 D.B. 2385, PG. 57 OF CHAPEL HILL INC. ABUNDANT LIFE CENTER PIN 9870532405 D.B. 5501, PG. 279 PROPERTIES LLC BMS INVESTMENT PIN 9870533332 D.B. 3586, PG. 1 DE MARY J. DE LIMA JORGE L. DE LIMA Z I E G E R L A N E R O W ROW ROW ROWROWROW ROW R O W R O W ROW ROW ROW ROW ROW ROW ROW EIP EIP EIP EIP EIP EIP ROGERS ROAD SR 1729 PIN 9870539867 D.B. 2609, PG. 2141 ORANGE COUNTY INC. HABITAT FOR HUMANIITY R U S C H R D S R 1 8 4 2 R U S C H R D S R 1 8 4 2 P I N 9 8 7 0 5 3 0 6 4 5 P . B. 5 3 , P G. 1 7 8 D. B. 2 1 6 4 , P G. 3 4 7 L O V E C H U R C H I N T E R N A T I O N A L I N C. F A I T H T A B E R N A C L E O A S I S O F FFFFF FFC CFCCCFFF CC FCC FF FFFFFF FFFFFFFFF F FFFFFF C C C C 538 538 539 539 539 540 540 540 540 540 541 541 541 541 541 5 4 1 541 542 542 542 542 5 4 2 543 5 4 3 543 5 4 4 544 544 544 5 4 5 545 545 546 546 5 4 6 546 547 547 547 547 548 5 4 8 548 548 549 549 5 4 9 5 4 9 549 5 4 9 550 550 5 5 0 550 551 RETAIN RETAIN RETAIN RETAIN DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF M A T C H L I N E 4 5 + 0 0 M A TC H LIN E 5 0 + 0 0 45+00 46+00 47+00 48+00 49+00 50+00 520 530 540 550 560 520 530 540 550 560 10 20 40200 PLANS M A T C H LI N E 4 5 + 0 0 M A T C H LI N E 5 0 + 0 0 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 1 1 1 _ p f l j h a r v e y S U N G A T E D E S I G N G R O U P , P .A . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . R O G E R S R O A D S I D E W A LK C A R R B O R O , N C SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 C1.11 ROGERS13CDC111 P LA N / P R O F I LE EXTG CL ROAD AT FACE SIDEWALK EXTG GRADE AT FACE SIDEWALK EXTG GRADE EXTG CL ROAD DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI RELOCATE RELOCATE RETAIN ADJUST RETAIN RETAIN RELOCATE SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE RELOCATE RELOCATE P C C S t a . 4 5 + 3 9 . 0 3 P C C S t a . 4 6 + 4 2 . 5 7 P T S ta . 4 8 + 7 7 .4 1 4 6 + 0 0 4 7 + 0 0 4 8 + 0 0 4 9 + 0 0 C FENCE UP UP SIGN WV FH WV CABLE EOP EOP EOP EOP PI Sta 45+90.89 D L = 103.54’ T = 51.86’ R = 719.09’ R = 1,184.38’ T = 117.81’ L = 234.84’ D PI Sta 47+60.37 PI Sta 44+79.07 D L = 119.99’ T = 60.03’ R = 1,571.23’ GUYWIRE GUYWIRE GUYWIRE STRAIN POLE CTRL POINT HOR/VERT PT #8 PIN 9870527705 P.B. 78, PG. 110 D.B. 3915, PG. 118 HOMEOWNERS ASSOCIATION HIGHLANDS NORTH PIN 9870533332 D.B. 3586, PG. 1 DE MARY J. DE LIMA JORGE L. DE LIMA ROW ROW ROW ROW ROW ROW ROW ROW ROW R O W EIP EIP EIP R U S C H R D S R 1 8 4 2 R U S C H R D S R 1 8 4 2 ROGERS ROAD SR 1729 C C C F F CC C C C CCCC C CC C C C FF F F F F F F F F F FFFFF F FF F F F FF 5 2 8 529 5 2 9 530 5 3 0 531 5 3 1 532 532 533 5 3 3 534 5 3 4 535 5 3 5 536 536 537 537 538 5 3 8 539 5 3 9 5 4 0 540 541 5 4 1 542 542 5 4 2 543 5 4 3 5 4 3 544 5 4 4 544 5 4 4 545 545 5 4 5 546 5 46 546 5 4 7 5 4 7 547 548 548 5 4 8 549 549 549 549 549 549 549 550550 550 550 5 5 0 550 551 551 551 5 5 2 DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF M A T C H LI N E 5 0 + 0 0 M A T C H LI N E 5 5 + 0 0 50+00 51+00 52+00 53+00 54+00 55+00 500 510 520 530 540 500 510 520 530 540 M A T C H LI N E 5 0 + 0 0 M A T C H LI N E 5 5 + 0 0 10 20 40200 PLANS 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 1 1 2 _ p f l j h a r v e y S U N G A T E D E S I G N G R O U P , P .A . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . R O G E R S R O A D S I D E W A LK REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : CAM, WBH 1083-12003 C A R R B O R O , N C SHEET NO. REVISIONS: C C1.12 ROGERS13CDC112 P LA N / P R O F I LE EXTG CL ROAD EXTG CL ROAD AT FACE SIDEWALK EXTG GRADE AT FACE SIDEWALK EXTG GRADE EX 24" RCP DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE 18" RCP 15" RCP 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI C E N T E R L I N E T A L L YH O T R A I L SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE ADJUST RETAIN RETAIN RETAINRETAIN RETAIN RETAIN RETAIN RELOCATE RETAIN ADJUST WCR WCR RETAIN T EOP EOP EOP E OP EOP EOP EOP EOP 5 1+ 0 0 5 2 + 0 0 5 3 + 0 0 5 4 + 0 0 SIGN SIGN SIGN SSMH SSMH WV WV WVWV 24" RCP UP TELE FH FENCE FENCEUP INV=517.31’ INV=516.29’ CTRL POINT HOR/VERT PT #7 CTRL POINT HOR/VERT PT #6 PIN 9870527450 P.B. 61, PG. 126 D.B. 3675, PG. 192 HONG HE LIN WANG PIN 9870527215 P.B. 61, PG. 126 D.B. 5385, PG. 475 MICHELLE E. TARTALIO DAVID M. BEFUMO E Z E K IE L P E P P E R S T R A IL PIN 9870527705 P.B. 78, PG. 110 D.B. 3915, PG. 118 HOMEOWNERS ASSOCIATION HIGHLANDS NORTH PIN 9870527185 P.B. 61, PG. 126 D.B. 3980, PG. 37 GWEN D. GAGE JAMES R. GAGE ROWROW ROW R O WR O W ROW ROW ROW ROW ROW ROW R O W R O W EIP S R 2 2 1 3 T A L L Y H O T R A IL PIN 9870528994 D.B. 1720, PG. 367 ORANGE COUNTY INC. HABITAT FOR HUMANIITY ROGERS ROAD SR 1729 FF CC C FF FC C FFCC F F FFF F FFFFF FF FF FFFFFFF C C C C C C C 508 509 509 5 0 9 510 5 10 510 511 5 11 5 1 1 512 5 1 2 512 512 513 5 13 513 513 514 5 14 5 14 514 515 515 5 1 5 515 515 516 516 5 1 6 5 16 5 1 6 517 517 5 17 517 517 518 518 518 518 518 518 5 19 519 519 519 519 519 519 520 5 2 0 520 520 520 521 5 2 1 521 522 5 2 2 5 2 2 523 523 523 524 5 2 4 524 525 5 2 5 5 2 5 526 5 2 6 526 527 5 2 7 527 528 528 528 529 529 RETAIN 18 " RC P- III 15 " RC P -III 18 19 21 20 DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF M A T C H LI N E 5 5 + 0 0 M A T C H LI N E 6 0 + 0 0 55+00 56+00 57+00 58+00 59+00 60+00 480 490 500 510 520 480 490 500 510 520 M A T C H LI N E 5 5 + 0 0 M A T C H LI N E 6 0 + 0 0 10 20 40200 PLANS 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 1 1 3 _ p f l j h a r v e y S U N G A T E D E S I G N G R O U P , P .A . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 C1.13 ROGERS13CDC113 R O G E R S R O A D S I D E W A LK C A R R B O R O , N C P LA N / P R O F I LE EXTG CL ROAD EXTG CL ROAD AT FACE SIDEWALK EXTG GRADE AT FACE SIDEWALK EXTG GRADE DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE RETAIN RETAIN RETAIN RETAINRETAIN P I S t a . 5 5 + 9 0 .0 2 P I S t a . 5 8 + 8 5 .14 5 6 + 0 0 5 7 + 0 0 5 8 + 0 0 5 9 + 0 0 EOP EOP EOP EOP FENCE FENCE FENCE UP UPUP CTRL POINT HOR/VERT PT #5 PIN 9870527185 P.B. 61, PG. 126 D.B. 3980, PG. 37 GWEN D. GAGE JAMES R. GAGE PIN 9870527071 P.B. 61, PG. 126 D.B. 2671, PG. 286 MARY M. MATEER JEFFERY R. MATEER PIN 9870518941 P.B. 55, PG. 88 D.B. 1088, PG. 342 ANNE B. JUSTICE SCOTT E. JUSTICE PIN 9870527185 P.B. 61, PG. 126 D.B. 3980, PG. 37 GWEN D. GAGE JAMES R. GAGE ROW ROW ROWROWROW ROW EIP ROGERS ROAD SR 1729 FFFFFFFFFFFFFFFF FFFFFF FFFFFFF F FF C C C C C 496 496 496 497 497 497 498 498 498 498 499 499 499 499 499 500 500 500 500 500 500 501 5 0 1 501 501 501 501 502 502 5 0 2 502 502 502 502 503 503 503 503 503 503 503 504 5 0 4 504 5 0 4 504 504 505 505 5 0 5 505 505 505 506 506 5 0 6 5 0 6 507 507 507 508 508 508 509 510 511 512 E L = 4 9 8 .4 8 P I = 5 8 + 5 0 3 ’ B A S E D I T C H B E G S T D P I = 5 8 + 7 5 E L = 4 9 8 .2 6 (-) 0.89% (-) 2.62% (-) 2.32% P I = 5 9 + 7 5 E L = 4 9 5 .6 4 2:12: 1 D ( Not to Scale) STANDARD BASE DITCH B d FROM STA. 63+75 TO STA. 64+75 -L- RT FROM STA. 58+50 TO STA. 62+50 -L- RT DETAIL 2 B=3 Ft. Max. d=1.0 Ft. Min. D=1.5 Ft. *When B is < 6.0’ Type of Liner= PSRM Ground Natural Ground Natural SEE DETAIL #2 W/ PRSM 3’ BASE DITCH DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF M A T C H LI N E 6 0 + 0 0 M A T C H LI N E 6 5 + 0 0 60+00 61+00 62+00 63+00 64+00 65+00 470 480 490 500 510 470 480 490 500 510 M A T C H LI N E 6 0 + 0 0 M A T C H LI N E 6 5 + 0 0 10 20 40200 PLANS 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 1 1 4 _ p f l j h a r v e y S U N G A T E D E S I G N G R O U P , P .A . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . R O G E R S R O A D S I D E W A LK SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 C1.14 ROGERS13CDC114 P LA N / P R O F I LE EXTG CL ROAD EXTG CL ROAD AT FACE SIDEWALK EXTG GRADE AT FACE SIDEWALK EXTG GRADE (2) 24" RCP DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE DESIGN BOX SPECIAL 18" RCP 15" RCP (2) 24" RCP 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI W/ SLEEVE GASKETS BAND AND EXTEND (2) 24" RCP C E N T E R L I N E C L A YM O R E R D SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE ADJUST RETAIN RETAIN RETAIN RELOCATE WCR WCR SIDEWALK 5’ STD CONCRETE STRIP 1’-6" UTILITY STRIP 1’-6" UTILITY CURB AND GUTTER 2’-6" CONCRETE CURB AND GUTTER END 2’-6" CONCRETE R=33.5’ BACK OF CURB CROSSWALK STOP BAR P C S t a . 6 4 + 8 8 .18 EOP EOP EOP E O P E O P EOP EOP UP UP SAT SIGN SIGN SIGN 6 1+ 0 0 6 2 + 0 0 6 3 + 0 0 6 4 + 0 0 WV WVWV WV SIGN INV=484.99’INV=483.70’ INV=483.50’ INV=485.43’24" RCP 24" RCP CTRL POINT HOR/VERT PT #4 PIN 9870518850 P.B. 55, PG. 88 D.B. 3779, PG. 476 CHRISTEN E. HOLLY JOHN D. HOLLY PIN 9870519636 P.B. 55, PG. 88 D.B. 4194, PG. 242 DEBORAH B. ADLER MICHAEL BENTLEY ADLER PIN 9870519466 P.B. 55, PG. 87 D.B. 5144, PG. 206 JUBINA BREGU ERMAL BREGU PIN 9870518941 P.B. 55, PG. 88 D.B. 1088, PG. 342 ANNE B. JUSTICE SCOTT E. JUSTICE ROW ROW R O W ROW ROW R O WR O W R O W ROW ROW ROWROWROWROW ROW EIP EIP EIP ROGERS ROAD SR 1729 ( O R A N G E C T Y ) S Y L V A N W A Y S R 2 2 5 3 C L A Y M O R E R O A D FF FFFFFF F FCCC C C C C C C C 482 482 483 483 483 4 8 3 484 484 484 484 484 484 485 485 485 485 4 8 5 486 4 8 6 486 486 486 4 8 6 4 8 7 487 487 4 8 7 487 488 488 4 8 8 488 4 8 8 488 4 8 9 489 4 8 9 489 4 8 9 489 489 490 490 490 4 9 0 490 4 9 0 490 490 491 491 491 491 4 9 1 491 4 9 1 492 492 492 492 4 9 2 492 4 9 2 493 493 493 493 493 493 493 494 494 494 494 494 494 494 495 495 495 495 495 495 4 9 5 496 496 496 496 496 4 9 6 497 497 497 497 4 97 497 498 498 498 4 9 8 498 498498 499 499 4 9 9 499 500 500 5 0 0501 501 5 0 1 502 502 502 (-) 2.32% (-) 2.82% (-) 3.04% E L = 4 8 8 .3 3 P I = 6 2 + 5 0 3 ’ B A S E D I T C H E N D S T D E L = 4 9 3 .3 2 P I = 6 0 + 7 5 P I = 6 2 + 2 5 E L = 4 8 9 .0 9 E L = 4 8 3 .2 4 P I = 6 3 + 7 5 3 ’ B A S E D I T C H B E G S T D (-) 1.16% (-) 1.52% (-) 2.76% E L = 4 8 2 .19 P I = 6 4 + 5 0 E L = 4 8 2 .9 5 P I = 6 4 + 0 0 E L = 4 8 1.5 0 P I = 6 4 + 7 5 3 ’ B A S E D I T C H E N D S T D 22 24 23 RETAIN RETAIN18" RCP-III 15" RCP-III 24" RCP-III 24" RCP-III 26 25 EXTEND COLLAR AND G RAD E TO DRA IN 28 27 EST 30 SY GFD EST 14 TONS CL ’1’ RIP RAP 2:12: 1 D ( Not to Scale) STANDARD BASE DITCH B d FROM STA. 63+75 TO STA. 64+75 -L- RT FROM STA. 58+50 TO STA. 62+50 -L- RT DETAIL 2 B=3 Ft. Max. d=1.0 Ft. Min. D=1.5 Ft. *When B is < 6.0’ Type of Liner= PSRM Ground Natural Ground Natural SEE DETAIL #2 W/ PSRM 3’ BASE DITCHSEE DETAIL #2 W/ PSRM 3’ BASE DITCH SEE DETAIL #2 W/ PSRM 3’ BASE DITCH (2 ) 2 4 " R C P -III DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF M A TC H LIN E 6 5 + 0 0 65+00 66+00 67+00 68+00 460 470 480 490 500 460 470 480 490 500 M A T C H LI N E 6 5 + 0 0 10 20 40200 PLANS 69+00 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 1 1 5 _ p f l j h a r v e y S U N G A T E D E S I G N G R O U P , P .A . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . R O G E R S R O A D S I D E W A LK SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 C1.15 ROGERS13CDC115 P LA N / P R O F I LE EXTG CL ROAD EXTG CL ROAD AT FACE SIDEWALK EXTG GRADE AT FACE SIDEWALK EXTG GRADE DITCH EXTG ROADSIDE DITCH EXTG ROADSIDE(2) EX 54" CMP 15" RCP CB ENDWALL 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI OUTLET 15" RCP SIDEWALK 5’ STD CONCRETE CURB AND GUTTER 2’-6" CONCRETE SIDEWALK 5’ STD CONCRETE CONCRETE SIDEWALK TIE TO EXTG ADJUST ADJUST STRIP 1’-6" UTILITY STRIP 1’-6" UTILITY STRIP 1’-6" UTILITY RELOCATE AND GUTTER TRANSITION TO EXISTING CURB AS REQUIRED FOR SMALL AND GUTTERREMOVE EXTG CURB P T S t a . 6 8 + 14 . 8 0 P O T S t a . 6 8 + 6 8 . 5 8 T C S E O P EOPEOP EOP 5 4 " C M P 5 4 " C M P 36" RCP SIGN TPED CABLE UP SSMH SSMH SDMH 6 6 + 0 0 6 7 + 0 0 6 8 + 0 0 PI Sta 66+52.51 D L = 326.62’ T = 164.32’ R = 1,200.11’ INV=472.70’INV=473.47’ INV=472.39’ INV=472.33’ FO BOX CTRL POINT HOR/VERT PT #3 CTRL POINT HOR/VERT PT #2 15" RCP PIN 9870516306 P.B. 55, PG. 87 D.B. 5256, PG. 185 ANDREA C. TANNER DAVID G. TANNER PIN 9870519288 P.B. 55, PG. 87 D.B. 946, PG. 181 DONNA H. HAMILTON MICHAEL ANTHONY HAMILTON PIN 9870508940 P.B. 55, PG. 87 D.B. 868, PG. 1492 HOMEOWNERS ASSOCIATION INC. HIGHLANDS PHASE V C E N T E R LI N E H O M E S T E A D R O A D S R 1 1 7 7 R O W R O W R OW ROW ROW ROW ROW ROW ROW ROGERS ROAD SR 1729 F F F F F F F F F F F F F F FF 473 474 4 7 4 4 7 4 474 4 7 4 4 7 4 475 4 7 5 475 475 4 7 5 4 7 5 4 7 6 476 476 4 7 6 4 7 6 477 477477 4 7 7 477 477 477 4 7 7 478 478 478 478478 478 478 479 479479 479 479 4 7 9 479 4 8 0 480 480 480 480 480 4 8 0 4 8 0 4 8 1 481 481 481 481 4 8 1 4 8 1 4 8 1 4 8 1 482 482 482 4 8 2 4 8 2 483 4 8 3 ENDWALL RETAIN RETAIN 29 30 CB EST 5 SY GFD EST 1 TON CL ’B’ RIP RAP 15" RCP-III 31 32 W/ SLEEVE GASKETS AND EXTEND 2@54" CSP BAND DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF C SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: S U N G A T E D E S I G N G R O U P , P .A . PROJECT# : F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L I N R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C 510 515 520 510 515 520 00 5 10 15 20 25 30 35 40 45 50 11+00.00 -EL- 520 515 510 11+25.00 520 515 510 520 515 510 11+50.00 520 515 510 520 515 510 11+61.90 520 515 510 520 515 510 11+75.00 520 515 510 00 5 10 15 20 25 30 35 40 45 50 525 520 515 13+00.00 525 520 515 00 5 10 15 20 25 30 35 40 45 50 525 520 515 12+75.00 525 520 515 525 520 515 12+50.00 525 520 515 520 515 510 12+25.00 520 515 510 520 515 510 12+00.00 520 515 510 00 5 10 15 20 25 30 35 40 45 50 -EL- R O G E R S R O A D S I D E W A LK C A R R B O R O , N C C R O S S S E C T I O N S 1083-12003 ROGERS13CDC201 CAM, WBH C2.01 5 2 3 . 0 4 E X E O P R O W E X 5 2 2 . 0 1 E X E O P R O W E X 5 2 1 . 4 8 E X E O P R O W E X 5 2 0 . 2 4 E X E O P R O W E X 5 1 8 . 9 2 E X E O P R O W E X 5 1 7 . 6 7 E X E O P R O W E X 5 1 6 . 7 9 E X E O P 5 1 5 . 7 1 E X E O P EX 24" RCP EX 24" RCP EX 24" RCP EX 24" RCP ( 2 ) W V E X ( 2 ) W V E X C L= 5 17 . 7 0 C L= 5 1 8 . 7 5 C L= 5 1 9 . 9 7 C L= 5 2 1. 1 7 C L= 5 2 1. 8 7 C L= 5 2 3 . 0 2 EX SIGN EX TP EX SIGN 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 2 0 1 _ s e c j h a r v e y DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU ISIT ION 18" RCP 18" RCP JB W/ MH 2GI 18" RCP 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI 517.07’ 3:1 3: 1 4 : 1 3:1 4 : 1 517.07’ 519.13’ 3:1 520.08’ 520.39’ 3:1 521.24’ 522.00’3:1 520.88’ 523.14’3:1 521.76’ 515 520 525 515 520 525 00 5 10 15 20 25 30 35 40 45 50 13+25.00 -EL- 530 525 520 13+50.00 530 525 520 530 525 520 13+75.00 530 525 520 530 525 520 14+00.00 530 525 520 530 525 520 14+25.00 530 525 520 00 5 10 15 20 25 30 35 40 45 50 535 530 525 15+50.00 535 530 525 00 5 10 15 20 25 30 35 40 45 50 535 530 525 15+25.00 535 530 525 535 530 525 15+00.00 535 530 525 535 530 525 14+75.00 535 530 525 535 530 525 14+50.00 535 530 525 00 5 10 15 20 25 30 35 40 45 50 -EL- 5 3 0 . 8 8 E X E O P R O W E X 5 3 0 . 5 0 E X E O P R O W E X 5 3 0 . 0 0 E X E O P R O W E X 5 2 9 . 3 9 E X E O P R O W E X 5 2 8 . 6 4 E X E O P R O W E X 5 2 7 . 9 3 E X E O P R O W E X 5 2 7 . 0 1 E X E O P R O W E X 5 2 6 . 1 0 E X E O P R O W E X 5 2 5 . 1 0 E X E O P R O W E X 5 2 4 . 0 7 E X E O P R O W E X C L= 5 2 4 . 9 2 C L= 5 2 5 . 0 3 C L= 5 2 6 . 2 4 C L= 5 2 7 . 3 7 C L= 5 2 9 . 12 C L= 5 2 9 . 7 1 C L= 5 3 0 . 3 8 C L= 5 3 1. 18 C L= 5 3 1. 8 9 M A N H O L E E X W A T E R C L= 5 2 9 . 5 1 W M E X EX TP 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 2 0 2 _ s e c j h a r v e y SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: S U N G A T E D E S I G N G R O U P , P .A . PROJECT# : F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L I N R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C R O G E R S R O A D S I D E W A LK C A R R B O R O , N C C R O S S S E C T I O N S 1083-12003 ROGERS13CDC202 CAM, WBH C2.02 DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU ISIT ION 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI 524.39’ 3:1 3:1 522.70’ 523.66’ 3:1 3:1 525.51’ 524.62’ 3:1 3:1 526.61’ 525.63’ 3:1 3:1 528.03’ 526.74’ 3:1 3:1 529.69’ 527.50’ 3:1 3:1 530.77’ 528.23’ 3:1 3:1 531.26’ 529.10’ 3:1 3:1 531.79’ 532.41’3:1 3:1 529.58’ 530.17’ 3:1 3:1 532.71’ 525 530 535 525 530 535 00 5 10 15 20 25 30 35 40 45 50 15+75.00 -EL- 535 530 525 15+87.87 535 530 525 535 530 525 16+00.00 535 530 525 535 530 525 16+25.00 535 530 525 535 530 525 16+50.00 535 530 525 00 5 10 15 20 25 30 35 40 45 50 535 530 525 17+50.00 535 530 525 00 5 10 15 20 25 30 35 40 45 50 535 530 525 17+25.00 535 530 525 535 530 525 17+15.52 535 530 525 535 530 525 17+00.00 535 530 525 535 530 525 16+75.00 535 530 525 00 5 10 15 20 25 30 35 40 45 50 -EL- 5 2 8 . 5 0 E X E O P R O W E X 5 2 9 . 0 3 E X E O P E X E O G R O W E X E X E O G 5 2 9 . 2 0 E X E O P R O W E X 5 2 9 . 4 8 E X E O P R O W E X 5 2 9 . 9 6 E X E O P R O W E X 5 3 0 . 4 2 E X E O P R O W E X 5 3 0 . 8 1 E X E O P R O W E X EX WELL HOUSE 5 3 1 . 1 4 E X E O P E X E O G R O W E X 5 3 1 . 1 8 E X E O P R O W E X 5 3 1 . 1 8 E X E O P E X E O G R O W E X C L= 5 3 2 . 0 6 C L= 5 3 1. 6 3 5 3 1 . 1 8 E X E O P W M E X C L= 5 3 1 . 4 1 W V E X F H E X C L= 5 3 0 . 8 1 C L= 5 3 0 . 10 C L= 5 2 8 . 5 9 C L= 5 2 8 . 2 8 EX GRAVEL DRIVE EX GRAVEL DRIVE C L= 5 2 8 . 4 7 C L= 5 2 7 . 8 4 C L= 5 3 1 . 5 9 EX TP SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: S U N G A T E D E S I G N G R O U P , P .A . PROJECT# : F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L I N R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C R O G E R S R O A D S I D E W A LK C A R R B O R O , N C C R O S S S E C T I O N S 1083-12003 ROGERS13CDC203 CAM, WBH C2.03 DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU ISIT ION 10-7-13 15" RCP 2GI-D 15" RCP R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 2 0 3 _ s e c j h a r v e y 531.12’ 3:1 532.19’ 530.98’ 3:1 531.76’ 530.58’ 3:1 531.54’ 530.13’ 3:1 530.94’ 529.47’ 3:1 530.08’ 528.45’ 2:1 528.38’ 527.91’ 3:1 2:1 527.66’ 527.02’ 3:1 2:1 526.70’ 524.71’ 520 525 530 520 525 530 00 5 10 15 20 25 30 35 40 45 50 17+75.00 -EL- 530 525 520 18+00.00 530 525 520 530 525 520 18+25.00 530 525 520 530 525 520 18+50.00 530 525 520 530 525 520 18+75.00 530 525 520 00 5 10 15 20 25 30 35 40 45 50 530 525 520 19+75.00 530 525 520 00 5 10 15 20 25 30 35 40 45 50 530 525 520 19+50.00 530 525 520 530 525 520 530 525 520 525 520 19+00.00 530 525 520 530 525 520 18+85.84 530 525 520 00 5 10 15 20 25 30 35 40 45 50 -EL- 530 19+25.00 5 2 5 . 2 5 E X E O P R O W E X 5 2 5 . 4 3 E X E O P R O W E X 5 2 5 . 6 6 E X E O P R O W E X 5 2 5 . 9 4 E X E O P R O W E X 5 2 6 . 1 1 E X E O P R O W E X 5 2 6 . 2 7 E X E O P R O W E X 5 2 6 . 6 3 E X E O P R O W E X 5 2 7 . 0 7 E X E O P R O W E X 5 2 7 . 5 4 E X E O P R O W E X 5 2 8 . 0 2 E X E O P R O W E X C L= 5 2 7 . 3 5 C L= 5 2 6 . 8 5 E X T R E E L IN E STA 18+08 EX 15" RCP C L= 5 2 6 . 5 3 E X T R E E L IN E C L= 5 2 6 . 3 3 E X T R E E L IN E C L= 5 2 6 . 4 1 EX 12" RCP C L= 5 2 6 . 3 5 EX 12" RCP EX GRAVEL/SOIL DRIVE C L= 5 2 5 . 5 7 E X T R E E L IN E C L= 5 2 5 . 0 4 E X T R E E L IN E C L= 5 2 4 . 8 2 C L= 5 2 5 . 2 9 W M E X W M E X 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 2 0 4 _ s e c j h a r v e y SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: S U N G A T E D E S I G N G R O U P , P .A . PROJECT# : F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L I N R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C R O G E R S R O A D S I D E W A LK C A R R B O R O , N C C R O S S S E C T I O N S 1083-12003 ROGERS13CDC204 CAM, WBH C2.04 DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU ISIT ION 10-7-13 15" RCP2GI-D 15" RCP R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI 3:1 526.45’ 2: 1 525.24’ 524.21’ 3:1 2: 1 524.47’ 526.06’ 4: 1 523.60’ 526.04’ 2: 1 524.06’ 526.16’ 2: 1 524.20’ 2: 1 524.22’ 3:1 3: 1 524.09’524.46’ 4 : 1 523.68’ 525.29’ 524.18’ 3:1 3: 1 4 : 1 3:1 523.96’ 525.04’ 3: 1 523.24’ 4 : 1 523.77’ 3:1 524.82’ 3: 1 523.05’ 4 : 1 520 525 530 520 525 530 00 5 10 15 20 25 30 35 40 45 50 20+00.00 -EL- 530 525 52020+05.03 530 525 520 530 525 52020+25.00 530 525 520 530 525 52020+50.00 530 525 520 530 525 52020+75.00 530 525 520 00 5 10 15 20 25 30 35 40 45 50 530 525 520 21+75.00 5303 525 520 00 5 10 15 20 25 30 35 40 45 50 530 525 520 21+50.00 530 525 520 530 525 520 21+44.95 530 525 520 530 525 520 21+25.00 530 525 520 530 525 520 21+00.00 530 525 520 00 5 10 15 20 25 30 35 40 45 50 -EL- 5 2 3 . 9 0 E X E O P R O W E X 5 2 4 . 1 1 E X E O P R O W E X E X E O G 5 2 4 . 1 5 E X E O P R O W E X 5 2 4 . 3 4 E X E O P R O W E X 5 2 4 . 3 7 E X E O P R O W E X 5 2 4 . 5 1 E X E O P R O W E X 5 2 4 . 7 1 E X E O P R O W E X 5 2 4 . 9 0 E X E O P R O W E X E X E O G 5 2 5 . 0 4 E X E O P R O W E X 5 2 5 . 0 7 E X E O P R O W E X C L= 5 2 4 . 5 1 EX 12" RCP EX GRAVEL DRIVE EX 12" RCP C L= 5 2 4 . 4 2 EX GRAVEL DRIVE C L= 5 2 4 . 5 3 W M E X C L= 5 2 4 . 4 6 C L= 5 2 4 . 7 1 STA 20+85 EX 15" RCP C L= 5 2 4 . 5 8 C L= 5 2 4 . 3 0 EX GRAVEL DRIVE EX 12" RCP C L= 5 2 4 . 3 0 EX GRAVEL DRIVE EX 12" RCP W M E X C L= 5 2 4 . 6 1 EX TP E X F E N C E E X F E N C E EX TP 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 2 0 5 _ s e c j h a r v e y SHEET NO. REVISIONS: REVIEWED BY: DRAWN BY: DATE: DRAWING NAME: S U N G A T E D E S I G N G R O U P , P .A . PROJECT# : F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L I N R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C R O G E R S R O A D S I D E W A LK C A R R B O R O , N C C R O S S S E C T I O N S 1083-12003 ROGERS13CDC205 CAM, WBH C2.05 DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU ISIT ION 10-7-13 15" RCP 2GI-D 15" RCP 15" RCP 15" RCP USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E JRH C L= 5 2 3 . 9 9 523.38’ 3:1 521.42’ 3: 1 3:1 523.08’ 2: 1 520.87’ 523.01’ 3:1 2: 1 520.48’ 3:1 522.97’ 521.08’ 2: 1 3:1 523.03’ 2: 1 521.66’ 522.83’ 3:1 3: 1 522.83’ 520 525 530 520 525 530 00 5 10 15 20 25 30 35 40 45 50 22+00.00 -EL- 530 525 520 22+15.60 530 525 520 530 525 52022+25.00 530 525 520 530 525 52022+50.00 530 525 520 530 525 52022+75.00 530 525 520 00 5 10 15 20 25 30 35 40 45 50 525 520 51523+75.00 525 520 515 00 5 10 15 20 25 30 35 40 45 50 525 520 51523+50.00 525 520 515 525 520 51523+25.00 525 520 515 530 525 52023+00.00 530 525 520 530 525 52022+94.47 530 525 520 00 5 10 15 20 25 30 35 40 45 50 -EL- 5 1 8 . 7 8 E X E O P R O W E X 5 1 9 . 6 1 E X E O P R O W E X 5 2 0 . 4 4 E X E O P R O W E X SS MH 5 2 1 . 2 4 E X E O P R O W E X 5 2 1 . 4 2 E X E O P R O W E X 5 2 1 . 9 9 E X E O P R O W E X 5 2 2 . 7 1 E X E O P R O W E X 5 2 2 . 7 1 E X E O P R O W E X E X E O G 5 2 3 . 4 2 E X E O P R O W E X 5 2 3 . 6 2 E X E O P R O W E X C L= 5 2 2 . 3 0 C L= 5 2 3 . 3 7 W V E X EX GRAVEL DRIVE C L= 5 2 1. 8 1 EX 12" RCP EX GRAVEL DRIVE EX GRAVEL DRIVE C L= 5 2 1. 3 1 C L= 5 2 1. 2 3 EX 12" RCP C L= 5 19 . 4 1 C L= 5 1 7 . 7 9 C L= 5 2 3 . 6 7 C L= 5 2 3 . 1 7 C L= 5 18 . 5 3 EX TP W V E X W M E X 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 2 0 6 _ s e c j h a r v e y SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: S U N G A T E D E S I G N G R O U P , P .A . PROJECT# : F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L I N R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C R O G E R S R O A D S I D E W A LK C A R R B O R O , N C C R O S S S E C T I O N S 1083-12003 ROGERS13CDC206 CAM, WBH C2.06 DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU ISIT ION 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI 3: 1 522.90’ 3:1 523.04’ 522.99’ 2: 13:1 522.85’ 3:1 521.90’522.04’ 2: 1 3:1 520.88’ 521.46’ 2: 1 3:1 518.49’ 4 :1 3:1 517.53’ 4 :1 516.73’ 3:14 :1 515 520 525 515 520 525 00 5 10 15 20 25 30 35 40 45 50 24+00.00 -EL- 520 515 510 520 515 510 520 515 51024+50.00 520 515 510 515 51024+75.00 520 515 510 520 515 51025+00.00 520 515 510 00 5 10 15 20 25 30 35 40 45 50 515 510 50526+25.00 515 510 505 00 5 10 15 20 25 30 35 40 45 50 515 510 50526+00.00 515 510 505 515 510 25+75.00 515 510 505 520 515 51025+50.00 520 515 510 520 515 51025+25.00 520 515 510 00 5 10 15 20 25 30 35 40 45 50 -EL- 24+25.00 520 505 5 1 0 . 2 2 E X E O P R O W E X 5 1 1 . 0 1 E X E O P R O W E X 5 1 1 . 7 6 E X E O P R O W E X 5 1 2 . 5 7 E X E O P R O W E X 5 1 3 . 3 8 E X E O P R O W E X 5 1 4 . 1 9 E X E O P R O W E X 5 1 5 . 0 6 E X E O P R O W E X 5 1 6 . 0 3 E X E O P R O W E X 5 1 7 . 0 0 E X E O P R O W E X 5 1 7 . 8 9 E X E O P R O W E X C L= 5 1 6 . 5 1 C L= 5 15 . 5 2 C L= 5 1 4 . 6 0 C L= 5 1 3 . 6 6 C L= 5 1 4 . 5 9 C L= 5 1 2 . 2 3 C L= 5 11 . 6 6 C L= 5 1 0 . 9 9 C L= 5 1 0 . 0 6 C L= 5 0 9 . 4 3 EX TP W V E X EX TP 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 2 0 7 _ s e c j h a r v e y SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: S U N G A T E D E S I G N G R O U P , P .A . PROJECT# : F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L I N R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C R O G E R S R O A D S I D E W A LK C A R R B O R O , N C C R O S S S E C T I O N S 1083-12003 ROGERS13CDC207 CAM, WBH C2.07 DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU ISIT ION 10-7-13 15" RCP R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI 515.78’ 3:14 :1 3:1 514.93’ 4 :1 3:1 513.86’ 4 :1 3:1 512.88’ 4 :1 3:1 511.54’ 510.78’ 3:1 3: 1 511.23’ 3:1 509.96’ 510.45’ 3: 1 3:1 509.22’ 510.64’ 3:1 3:1 508.59’ 510.56’3:1 505 510 515 505 510 515 00 5 10 15 20 25 30 35 40 45 50 26+50.00 -EL- 515 510 505 515 510 505 515 540 50527+00.00 515 510 505 510 50527+25.00 515 510 505 510 505 50027+50.00 510 505 500 00 5 10 15 20 25 30 35 40 45 50 505 500 49528+70.08 505 500 495 00 5 10 15 20 25 30 35 40 45 50 510 505 50028+50.00 510 505 500 510 505 28+25.00 510 505 500 510 505 50028+00.00 510 505 500 510 505 50027+75.00 510 505 500 00 5 10 15 20 25 30 35 40 45 50 -EL- 26+75.00 515 500 5 0 3 . 3 3 E X E O P R O W E X E X E O G 5 0 3 . 8 2 E X E O P R O W E X E X E O G 5 0 4 . 4 4 E X E O P R O W E X 5 0 5 . 1 4 E X E O P R O W E X 5 0 5 . 8 4 E X E O P R O W E X 5 0 6 . 5 5 E X E O P R O W E X 5 0 7 . 2 5 E X E O P R O W E X 5 0 7 . 9 8 E X E O P R O W E X 5 0 8 . 7 3 E X E O P R O W E X 5 0 9 . 4 4 E X E O P R O W E X C L= 5 0 8 . 9 1 C L= 5 0 8 . 5 8 C L= 5 0 7 . 9 7 C L= 5 0 7 . 2 2 C L= 5 0 6 . 3 9 C L= 5 0 5 . 5 8 C L= 5 0 4 . 7 8 C L= 5 0 3 . 9 3 C L= 5 0 2 . 8 9 C L= 5 0 3 . 2 5 EX 15" RCP EX GRAVEL DRIVE EX TP W V E X 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 2 0 8 _ s e c j h a r v e y SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: S U N G A T E D E S I G N G R O U P , P .A . PROJECT# : F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L I N R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C R O G E R S R O A D S I D E W A LK C A R R B O R O , N C C R O S S S E C T I O N S 1083-12003 ROGERS13CDC208 CAM, WBH C2.08 DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU ISIT ION 10-7-13 15" RCP 15" RCP R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI 510.54’3:1 3:1 508.00’ 3:1 510.42’ 3:1 507.42’ 3:1 506.71’ 510.00’3:1 3:1 505.95’ 509.50’3:1 508.77’ 3:1 3:1 505.19’ 3:1 504.45’ 507.98’ 3:1 3:1 506.48’3:1 503.72’ 3:1 503.23’ 3:1 505.82’ 3:1 504.83’ 3:1 501.86’ 495 500 505 495 500 505 00 5 10 15 20 25 30 35 40 45 50 28+75.00 -EL- 505 500 495 505 500 495 505 500 49529+25.00 505 500 495 500 49529+50.00 505 500 495 505 500 49529+75.00 505 500 495 00 5 10 15 20 25 30 35 40 45 50 505 500 49530+75.00 505 500 495 00 5 10 15 20 25 30 35 40 45 50 505 500 49530+50.00 505 500 495 500 495 30+25.00 500 495 490 500 495 49030+00.00 500 495 490 500 495 49029+88.87 500 495 490 00 5 10 15 20 25 30 35 40 45 50 -EL- 29+00.00 505 490 5 0 3 . 1 6 E X E O P R O W E X 5 0 2 . 5 8 E X E O P R O W E X 5 0 2 . 2 1 E X E O P R O W E X W E T L A N D E X W E T L A N D E X 5 0 1 . 9 8 E X E O P R O W E X S T R E A M E X 5 0 1 . 8 9 E X E O P R O W E X 48" CMP 5 0 1 . 9 6 E X E O P R O W E X 5 0 2 . 0 9 E X E O P R O W E X 5 0 2 . 3 3 E X E O P R O W E X 5 0 2 . 7 5 E X E O P R O W E X 5 0 3 . 2 0 E X E O P R O W E X E X E O G C L= 5 0 3 . 4 8 EX GRAVEL DRIVE EX 15" RCP C L= 5 0 1 . 5 4 C L= 5 0 2 . 4 0 C L= 5 0 1 . 9 8 C L= 5 0 1 . 7 4 C L= 5 0 1 . 6 1 C L= 5 0 1 . 6 3 C L= 5 0 1 . 8 6 C L= 5 0 2 . 2 3 C L= 5 0 2 . 8 2 W V E X W V E X W V E X W V E X EX SIGN EX TP W M E X W M E X 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 2 0 9 _ s e c j h a r v e y 838.01 CONC ENDWALL SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: S U N G A T E D E S I G N G R O U P , P .A . PROJECT# : F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L I N R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C R O G E R S R O A D S I D E W A LK C A R R B O R O , N C C R O S S S E C T I O N S 1083-12003 ROGERS13CDC209 CAM, WBH C2.09 DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU ISIT ION 15" RCP 15" RCP 15" RCP 15" RCP 48" CSP 10-7-13 STA 29+75 2GI-B R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI 501.05’ 2: 1 500.98’ 2: 1 501.27’ 4 :1 3:1 499.22’ 2: 1 500.85’ 4 :1 3:1 497.53’ 2: 1500.61’ 4 :1 3:1 2: 1 497.01’ 500.48’ 4 :1 3:1 2: 1500.41’ 4 :1 3:1 E X W E T L A N D 494.98’ 2: 1500.50’ 4 :1 3:1 E X W E T L A N D 494.92’ 2: 1500.73’ 4 :1 3:1 496.21’ 2: 1501.10’ 4 :1 3:1 497.88’ 2: 1501.68’ 4 :1 3:1 495 500 505 495 500 505 00 5 10 15 20 25 30 35 40 45 50 31+00.00 -EL- 505 500 495 505 500 495 510 505 500 31+50.00 510 505 500 505 500 31+75.00 510 505 500 510 505 50032+00.00 510 505 500 00 5 10 15 20 25 30 35 40 45 50 520 515 51033+25.00 520 515 510 00 5 10 15 20 25 30 35 40 45 50 515 510 50533+00.00 515 510 505 515 510 32+75.00 515 510 505 515 510 50532+50.00 515 510 505 515 510 50532+25.00 515 510 505 00 5 10 15 20 25 30 35 40 45 50 -EL- 31+25.00 510 505 5 1 2 . 8 2 E X E O P R O W E X 5 1 1 . 7 0 E X E O P R O W E X 5 1 0 . 5 5 E X E O P R O W E X 5 0 9 . 4 5 E X E O P R O W E X 5 0 8 . 3 6 E X E O P R O W E X 5 0 7 . 3 0 E X E O P R O W E X 5 0 6 . 3 1 E X E O P E O G E X R O W E X 5 0 5 . 4 1 E X E O P R O W E X 5 0 4 . 5 6 E X E O P R O W E X 5 0 3 . 7 7 E X E O P R O W E X C L= 5 0 4 . 2 1 C L= 5 0 5 . 4 7 EX GRAVEL DRIVE EX 15" RCP C L= 5 0 5 . 9 1 C L= 5 0 6 . 6 7 C L= 5 0 8 . 2 8 C L= 5 0 9 . 6 5 C L= 5 10 . 7 8 C L= 5 11 . 8 8 C L= 5 1 3 . 1 2 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 2 1 0 _ s e c j h a r v e y 5 0 3 . 4 2 SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: S U N G A T E D E S I G N G R O U P , P .A . PROJECT# : F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L I N R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C R O G E R S R O A D S I D E W A LK C A R R B O R O , N C C R O S S S E C T I O N S 1083-12003 ROGERS13CDC210 CAM, WBH C2.10 DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU ISIT ION 15" RCP 15" RCP 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI 500.20’ 2: 1 502.29’ 4 :1 3:1 503.53’ 2: 1 503.08’ 4 :1 3:1 3:1 505.00’ 505.30’ 2: 1 3:1 506.17’ 507.03’ 3:1 3:1 507.49’ 508.59’ 3:1 508.67’ 3:1 509.92’ 3:1 3:1 509.83’ 3:1 511.49’ 510.99’ 3:1 3:1 513.10’ 511.86’ 3:1 3:1 514.06’ 510 515 520 510 515 520 00 5 10 15 20 25 30 35 40 45 50 33+50.00 -EL- 520 515 510 520 515 510 520 515 51034+00.00 520 515 510 515 51034+25.00 520 515 510 520 515 510 34+40.19 520 515 510 00 5 10 15 20 25 30 35 40 45 50 525 520 51535+50.00 525 520 515 00 5 10 15 20 25 30 35 40 45 50 525 520 51535+25.00 525 520 515 525 520 35+00.00 525 520 515 525 520 51534+75.00 525 520 515 525 520 51534+50.00 525 520 515 00 5 10 15 20 25 30 35 40 45 50 -EL- 33+75.00 520 515 5 2 2 . 1 1 E X E O P R O W E X 5 2 1 . 1 6 E X E O P R O W E X 5 2 0 . 1 9 E X E O P R O W E X 5 1 9 . 2 1 E X E O P R O W E X 5 1 8 . 2 1 E X E O P R O W E X 5 1 7 . 8 2 E X E O P R O W E X 5 1 7 . 2 0 E X E O P R O W E X 5 1 6 . 1 4 E X E O P R O W E X 5 1 5 . 0 7 E X E O P R O W E X 5 1 3 . 9 6 E X E O P R O W E X C L= 5 1 4 . 3 8 C L= 5 1 5 . 8 3 C L= 5 1 6 . 9 6 C L= 5 1 7 . 3 1 C L= 5 1 8 . 6 1 EX 15" RCP E X E O G E X E O G C L= 5 1 8 . 6 8 E X E O G E X E O G EX GRAVEL DRIVE EX GRAVEL DRIVE EX GRAVEL DRIVE C L= 5 19 . 9 0 C L= 5 2 0 . 6 8 C L= 5 2 1. 5 4 EX 15" RCP C L= 5 1 8 . 9 9 EX TP W M E X EX SIGN 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 2 1 1 _ s e c j h a r v e y SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: S U N G A T E D E S I G N G R O U P , P .A . PROJECT# : F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L I N R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C R O G E R S R O A D S I D E W A LK C A R R B O R O , N C C R O S S S E C T I O N S 1083-12003 ROGERS13CDC211 CAM, WBH C2.11 DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU ISIT ION 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI 3:1 512.79’ 3:1 515.07’ 514.56’ 3:1 3:1 516.10’ 515.63’ 3:1 3:1 517.25’ 516.09’ 3:1 3:1 518.67’ 518.34’ 3:1 518.81’ 3:1 518.19’ 521.07’3:1 521.35’ 3:1 519.25’ 3:1 519.92’ 3:1 3:1 521.96’ 520.69’ 3:1 3:1 522.75’ 515 520 525 515 520 525 00 5 10 15 20 25 30 35 40 45 50 35+75.00 -EL- 530 525 520 530 525 520 530 525 52036+25.00 530 525 520 525 52036+50.00 530 525 520 530 525 52036+75.00 530 525 520 00 5 10 15 20 25 30 35 40 45 50 535 530 52538+00.00 535 530 525 00 5 10 15 20 25 30 35 40 45 50 535 530 52537+75.00 535 530 525 535 530 37+50.00 535 530 525 535 530 52537+25.00 535 530 525 535 530 52537+00.00 535 530 525 00 5 10 15 20 25 30 35 40 45 50 -EL- 36+00.00 530 525 5 3 2 . 0 9 E X E O P R O W E X 5 3 1 . 0 8 E X E O P R O W E X 5 3 0 . 0 5 E X E O P R O W E X 5 2 9 . 0 0 E X E O P R O W E X 5 2 8 . 0 0 E X E O P R O W E X E X C H A I N G A T E 5 2 7 . 0 4 E X E O P R O W E X 5 2 6 . 0 5 E X E O P R O W E X 5 2 5 . 0 5 E X E O P R O W E X 5 2 4 . 0 1 E X E O P R O W E X 5 2 3 . 0 5 E X E O P R O W E X C L= 5 2 2 . 6 7 C L= 5 2 3 . 6 6 C L= 5 2 4 . 3 9 C L= 5 2 4 . 9 9 C L= 5 2 6 . 4 8 C L= 5 2 8 . 5 1 EX GRAVEL DRIVE EX 12" RCP C L= 5 2 8 . 4 7 C L= 5 2 9 . 3 2 C L= 5 3 0 . 15 C L= 5 3 1. 2 4 EX SIGN W V E X ( 2 ) W V E X W V E X W V E X W M E X EX TP W M E X W M E X EX SIGN E X E O G E X E O G G V E X W M E X 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 2 1 2 _ s e c j h a r v e y SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: S U N G A T E D E S I G N G R O U P , P .A . PROJECT# : F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L I N R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C R O G E R S R O A D S I D E W A LK C A R R B O R O , N C C R O S S S E C T I O N S 1083-12003 ROGERS13CDC212 CAM, WBH C2.12 DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU ISIT ION 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI 521.77’ 3:1 523.45’3:1 522.79’ 3:1 524.19’ 3:1 524.95’ 3:1 3:1 523.28’ 3:1 523.97’ 525.87’3:1 3:1 525.44’ 3:1 526.93’ 529.18’ 3:1 3:1 527.46’ 3:1 528.48’ 3:1 530.21’ 3:1 529.45’ 2:1 531.30 3:1 530.17’ 532.52’2:1 530 535 540 530 535 540 00 5 10 15 20 25 30 35 40 45 50 38+25.00 -EL- 540 535 530 540 535 530 540 535 53038+50.00 540 535 530 535 53038+75.00 540 535 530 540 535 53039+00.00 540 535 530 00 5 10 15 20 25 30 35 40 45 50 545 540 53540+00.00 545 540 535 00 5 10 15 20 25 30 35 40 45 50 545 540 53539+75.00 5545 540 535 545 540 39+50.00 545 540 535 545 540 53539+43.27 545 540 535 540 535 53039+25.00 540 535 530 00 5 10 15 20 25 30 35 40 45 50 -EL- 38+33.39 540 535 5 3 8 . 9 1 E X E O P R O W E X 5 3 8 . 2 1 E X E O P R O W E X 5 3 7 . 5 0 E X E O P E O G E X R O W E X 5 3 7 . 1 1 E X E O P R O W E X 5 3 6 . 7 0 E X E O P R O W E X 5 3 5 . 8 7 E X E O P R O W E X 5 3 5 . 0 0 E X E O P R O W E X 5 3 4 . 0 8 E X E O P R O W E X 5 3 3 . 4 4 E X E O P C O N C E X R O W E X 5 3 3 . 1 1 E X E O P C O N C E X R O W E X C L= 5 3 3 . 8 4 C L= 5 3 4 . 0 0 C L= 5 3 4 . 6 3 C L= 5 3 5 . 5 7 C L= 5 3 5 . 6 6 C L= 5 3 6 . 8 7 C L= 5 3 7 . 8 7 EX 15" RCP EX 15" RCP EX 15" RCP C L= 5 3 7 . 7 1 C L= 5 3 8 . 4 5 C L= 5 3 9 . 9 2 E X C H A I N G A T E E X C H A I N G A T E EX TP W M E X W V E X W M E X EX TP EX TP EX TP 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 2 1 3 _ s e c j h a r v e y SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: S U N G A T E D E S I G N G R O U P , P .A . PROJECT# : F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L I N R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C R O G E R S R O A D S I D E W A LK C A R R B O R O , N C C R O S S S E C T I O N S 1083-12003 ROGERS13CDC213 CAM, WBH C2.13 DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU ISIT ION 15" RCP 10-7-13 2GI-D R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI 3:1 535.03’2:1TOP=533.12 3:1 534.09’ 3:1 535.70’ 3:1 534.64’ 3:1 535.88’ 535.57’ 3:1 3:1 538.68’ 539.00’3:1 3:1 536.32’ 537.15’ 3:1 3:1 539.43’ 540.39’3:1 3:1 537.78’ 535 540 545 535 540 545 00 5 10 15 20 25 30 35 40 45 50 40+25.00 -EL- 545 540 535 545 540 535 545 540 53540+50.00 545 540 535 540 53540+75.00 545 540 535 545 540 535 41+00.00 545 540 535 00 5 10 15 20 25 30 35 40 45 50 550 545 540 41+81.69 550 545 540 00 5 10 15 20 25 30 35 40 45 50 550 545 540 41+75.00 550 545 540 545 540 41+61.89 545 540 535 545 540 535 41+50.00 545 540 535 545 540 535 41+25.00 545 540 535 00 5 10 15 20 25 30 35 40 45 50 -EL- 40+35.05 545 535 5 4 3 . 3 8 E X E O P R O W E X 5 4 3 . 2 2 E X E O P R O W E X 5 4 2 . 9 0 E X E O P R O W E X 5 4 2 . 6 1 E X E O P R O W E X 5 4 2 . 0 7 E X E O P R O W E X 5 4 1 . 5 0 E X E O P R O W E X 5 4 0 . 8 9 E X E O P R O W E X 5 4 0 . 2 7 E X E O P E O G E X R O W E X 5 3 9 . 8 8 E X E O P R O W E X 5 3 9 . 5 9 E X E O P R O W E X E X E O G C L= 5 3 9 . 8 4 C L= 5 3 9 . 8 4 C L= 5 3 9 . 8 9 C L= 5 4 0 . 6 7 EX 15" RCP EX 15" RCP C L= 5 4 0 . 8 0 C L= 5 4 2 . 18 C L= 5 4 2 . 5 6 E X E O G C L= 5 4 2 . 8 6 E X E O G EX 15" CMP EX 15" CMP EX 15" RCP EX 15" RCP C L= 5 4 3 . 11 C L= 5 4 3 . 5 1 W M E X EX TP 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 2 1 4 _ s e c j h a r v e y SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: S U N G A T E D E S I G N G R O U P , P .A . PROJECT# : F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L I N R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C R O G E R S R O A D S I D E W A LK C A R R B O R O , N C C R O S S S E C T I O N S 1083-12003 ROGERS13CDC214 CAM, WBH C2.14 DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU ISIT ION 10-7-13 EX GRAVEL DRIVE EX GRAVEL DRIVE EX GRAVEL DRIVE R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI 539.04’ 3:1 539.97’ 3:1 538.75’ 540.61’ 3:1 540.11’ 3:1 540.64’ 3:1 540.53’ 540.77’ 2: 1 541.93’3:1 540.75’ 3:1 542.36’ 542.69’ 543.23’ 543.49’ 540 545 550 540 545 550 00 5 10 15 20 25 30 35 40 45 50 42+00.00 -EL- 550 545 540 550 545 540 550 545 54042+50.00 550 545 540 545 54042+75.00 550 545 540 550 545 54043+00.00 550 545 540 00 5 10 15 20 25 30 35 40 45 50 555 550 54544+00.00 555 550 545 00 5 10 15 20 25 30 35 40 45 50 555 550 54543+86.98 555 550 545 555 550 43+75.00 555 550 545 550 545 54043+50.00 550 545 540 550 545 54043+25.00 550 545 540 00 5 10 15 20 25 30 35 40 45 50 -EL- 42+25.00 550 545 5 4 8 . 3 1 E X E O P R O W E X E X F E N C E R O W E X 5 4 8 . 0 5 E X E O P R O W E X 5 4 7 . 8 2 E X E O P E O G E X E O G E X R O W E X 5 4 7 . 4 0 E X E O P R O W E X 5 4 6 . 8 5 E X E O P R O W E X 5 4 6 . 3 0 E X E O P 5 4 5 . 7 2 E X E O P R O W E X 5 4 5 . 1 4 E X E O P R O W E X 5 4 4 . 4 9 E X E O P R O W E X 5 4 3 . 8 3 E X E O P R O W E X C L= 5 4 3 . 6 3 C L= 5 4 3 . 8 1 C L= 5 4 4 . 5 1 C L= 5 4 5 . 2 6 C L= 5 4 7 . 0 0 C L= 5 4 7 . 8 2 C L= 5 4 8 . 6 6 C L= 5 4 8 . 4 3 E X E O G C L= 5 4 8 . 3 0 EX 15" RCP W M E X EX TP EX TP EX SIGN W M E X 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 2 1 5 _ s e c j h a r v e y SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: S U N G A T E D E S I G N G R O U P , P .A . PROJECT# : F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L I N R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C R O G E R S R O A D S I D E W A LK C A R R B O R O , N C C R O S S S E C T I O N S 1083-12003 ROGERS13CDC215 CAM, WBH C2.15 DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU ISIT ION 10-7-13 EX GRAVEL DRIVE R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI C L= 5 4 6 . 13 3: 1 543.55’3:1 542.43’ 544.03’ 3:1 3:1 542.84’ 543.51’ 3:1 3:1 544.83’ 3:1 545.63’ 544.20’ 3:1 545.89’ 3:1 544.94’ 3: 1 3:1 545.79’ 547.13’ 3:1 546.33’ 3:1 548.14’ 546.69’ 3:1 548.79’ 548.43’3:1 547.35’ 545 550 555 545 550 555 00 5 10 15 20 25 30 35 40 45 50 44+25.00 -EL- 555 550 545 555 550 545 555 550 54544+75.00 555 550 545 550 54545+00.00 555 550 545 555 550 54545+25.00 555 550 545 00 5 10 15 20 25 30 35 40 45 50 555 550 54546+50.00 555 550 545 00 5 10 15 20 25 30 35 40 45 50 555 550 54546+25.00 555 550 545 555 550 46+00.00 555 550 545 555 550 54545+75.00 555 550 545 555 550 54545+50.00 555 550 545 00 5 10 15 20 25 30 35 40 45 50 -EL- 44+50.00 555 545 5 4 7 . 2 8 E X E O P R O W E X E X F E N C E 5 4 8 . 0 1 E X E O P R O W E X 5 4 8 . 6 1 E X E O P R O W E X 5 4 9 . 1 2 E X E O P R O W E X 5 4 9 . 2 9 E X E O P R O W E X 5 4 9 . 3 8 E X E O P R O W E X E X F E N C E 5 4 9 . 3 5 E X E O P R O W E X E X F E N C E 5 4 9 . 1 8 E X E O P R O W E X E X F E N C E 5 4 8 . 9 1 E X E O P R O W E X 5 4 8 . 6 3 E X E O P R O W E X C L= 5 4 8 . 7 5 C L= 5 4 9 . 3 2 C L= 5 5 0 . 0 5 C L= 5 5 0 . 6 2 C L= 5 5 0 . 4 5 C L= 5 5 0 . 2 3 C L= 5 5 0 . 2 7 C L= 5 4 9 . 5 2 C L= 5 4 8 . 4 3 C L= 5 4 7 . 3 9 W V E X W V E X EX TP W V E X F H E X EX SIGN EX TP W V E X W V M O N E X 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 2 1 6 _ s e c j h a r v e y SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: S U N G A T E D E S I G N G R O U P , P .A . PROJECT# : F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L I N R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C R O G E R S R O A D S I D E W A LK C A R R B O R O , N C C R O S S S E C T I O N S 1083-12003 ROGERS13CDC216 CAM, WBH C2.16 DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU ISIT ION 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI 548.88’3:1 547.68’ 3:1 548.28’ 549.45’ 548.95’ 3:1 550.18’ 548.61’ 3:1 550.75’ 548.80’ 3:1 3:1 551.53’ 551.98’3:1 3:1 548.92’ 548.68’ 3:1 3:1 551.85’ 551.23’ 3:1 548.20’ 3:1 547.64’ 3:1 550.51’3:1 546.60’ 3:1 549.38’3:1 540 545 550 540 545 550 00 5 10 15 20 25 30 35 40 45 50 46+75.00 -EL- 550 545 540 550 545 540 550 545 54047+25.00 550 545 540 545 54047+50.00 550 545 540 550 545 54047+75.00 550 545 540 00 5 10 15 20 25 30 35 40 45 50 540 535 53049+00.00 540 535 530 00 5 10 15 20 25 30 35 40 45 50 540 535 53048+75.00 540 535 530 545 540 48+50.00 545 540 535 545 540 53548+25.00 545 540 535 545 540 53548+00.00 545 540 535 00 5 10 15 20 25 30 35 40 45 50 -EL- 47+00.00 550 535 5 3 5 . 8 5 E X E O P R O W E X 5 3 7 . 2 5 E X E O P R O W E X 5 3 8 . 5 5 E X E O P R O W E X 5 3 9 . 8 5 E X E O P R O W E X 5 4 1 . 0 8 E X E O P R O W E X 5 4 2 . 2 9 E X E O P R O W E X 5 4 3 . 4 2 E X E O P R O W E X 5 4 4 . 5 3 E X E O P R O W E X 5 4 5 . 5 2 E X E O P R O W E X 5 4 6 . 4 6 E X E O P R O W E X C L= 5 4 6 . 4 9 C L= 5 4 5 . 2 3 C L= 5 4 4 . 2 0 C L= 5 4 3 . 14 C L= 5 4 2 . 1 9 C L= 5 4 1 . 3 4 C L= 5 4 0 . 1 8 C L= 5 3 8 . 9 4 C L= 5 3 7 . 5 5 C L= 5 3 6 . 0 9 EX TP G U Y W I R E E X G U Y W I R E E X E X G U Y W I R E C A B L E E X 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 2 1 7 _ s e c j h a r v e y SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: S U N G A T E D E S I G N G R O U P , P .A . PROJECT# : F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L I N R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C R O G E R S R O A D S I D E W A LK C A R R B O R O , N C C R O S S S E C T I O N S 1083-12003 ROGERS13CDC217 CAM, WBH C2.17 DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU ISIT ION 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI 545.36’ 3:1 548.17’3:1 547.78’ 3:1 544.32’ 3:1 543.28’ 3:1 3:1 546.63’ 3:1 542.13’ 545.65’ 3:1 3:1 540.91’ 3:1 544.92’ 541.46’3:1 540.02’ 3:1 538.48’ 3:1 541.98’ 3:1 537.04’ 3:1 540.65’ 535.45’ 3:1 3:1 538.12’ 536.04’3:1 533.92’ 530 535 540 530 535 540 00 5 10 15 20 25 30 35 40 45 50 49+25.00 -EL- 535 530 525 535 530 525 535 530 52549+75.00 535 530 525 530 52550+00.00 535 530 525 535 530 52550+25.00 535 530 525 00 5 10 15 20 25 30 35 40 45 50 525 520 515 51+50.00 525 520 515 00 5 10 15 20 25 30 35 40 45 50 530 525 520 51+25.00 530 525 520 530 525 51+00.00 530 525 520 530 525 52050+75.00 530 525 520 530 525 52050+50.00 530 525 520 00 5 10 15 20 25 30 35 40 45 50 -EL- 49+50.00 535 520 5 2 2 . 6 5 E X E O P R O W E X 5 2 3 . 8 3 E X E O P R O W E X 5 2 5 . 0 5 E X E O P R O W E X 5 2 6 . 2 7 E X E O P R O W E X 5 2 7 . 5 0 E X E O P R O W E X 5 2 8 . 7 4 E X E O P R O W E X 5 3 0 . 2 6 E X E O P R O W E X 5 3 1 . 8 0 E X E O P R O W E X 5 3 3 . 1 2 E X E O P R O W E X 5 3 4 . 4 5 E X E O P R O W E X C L= 5 3 4 . 5 9 C L= 5 3 2 . 8 4 C L= 5 3 0 . 7 8 C L= 5 2 9 . 3 4 C L= 5 2 8 . 1 9 C L= 5 2 7 . 0 0 C L= 5 2 5 . 7 1 C L= 5 2 4 . 5 5 C L= 5 2 3 . 2 3 C L= 5 2 2 . 5 7 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 2 1 8 _ s e c j h a r v e y SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: S U N G A T E D E S I G N G R O U P , P .A . PROJECT# : F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L I N R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C R O G E R S R O A D S I D E W A LK C A R R B O R O , N C C R O S S S E C T I O N S 1083-12003 ROGERS13CDC218 CAM, WBH C2.18 DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU ISIT ION 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI 3:1 532.27’ 534.59’ 533.13’ 3:1 3:1 530.54’ 528.71’ 3:1 3:1 531.61’ 3:1 530.16’ 527.32’ 3:1 3:1 526.14’ 3:1 528.75’ 527.62’ 3:1 3:1 524.97’ 526.47’3:1 3:1 523.80’ 522.74’ 3:1 3:1 524.87’ 3:1 521.79’ 523.36’ 3:1 520.37’ 3: 1 522.49’ 515 520 525 515 520 525 00 5 10 15 20 25 30 35 40 45 50 51+75.00 -EL- 525 520 515 525 520 515 525 520 51552+25.00 525 520 515 520 51552+28.66 525 520 515 525 520 51552+50.00 525 520 515 00 5 10 15 20 25 30 35 40 45 50 520 515 51053+75.00 520 515 510 00 5 10 15 20 25 30 35 40 45 50 520 515 51053+50.00 520 515 510 520 515 53+25.00 520 515 510 520 515 51053+00.00 520 515 510 520 515 51052+75.00 520 515 510 00 5 10 15 20 25 30 35 40 45 50 -EL- 52+00.00 525 510 5 1 3 . 6 0 E X E O P R O W E X E X F E N C E 5 1 4 . 5 4 E X E O P R O W E X E X F E N C E 5 1 5 . 4 8 E X E O P R O W E X E X F E N C E 5 1 6 . 3 9 E X E O P R O W E X E X F E N C E 5 1 7 . 3 2 E X E O P R O W E X E X F E N C E 5 1 8 . 1 6 E X E O P R O W E X 5 1 8 . 8 8 E X E O P 5 1 9 . 0 6 E X E O P TALLYHO TRAIL 5 2 1 . 4 7 E X E O P R O W E X C L= 5 2 0 . 9 8 EX 24" RCP C L= 5 1 9 . 9 8 5 2 0 . 1 9 E X E O T EX 24" RCP EX 24" RCP 5 1 9 . 4 3 E X E O T C L= 5 19 . 0 1 5 1 9 . 3 4 E X E O T C L= 5 18 . 9 2 5 1 8 . 3 0 E X E O T C L= 5 1 7 . 9 9 C L= 5 1 7 . 4 0 C L= 5 16 . 7 6 C L= 5 1 5 . 9 8 C L= 5 15 . 1 3 C L= 5 1 3 . 7 0 EX TPEX SIGN T P E D E X W V E X W V E X W V E X W V E X E X F H 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 2 1 9 _ s e c j h a r v e y SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: S U N G A T E D E S I G N G R O U P , P .A . PROJECT# : F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L I N R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C R O G E R S R O A D S I D E W A LK C A R R B O R O , N C C R O S S S E C T I O N S 1083-12003 ROGERS13CDC219 CAM, WBH C2.19 DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU ISIT ION TALLYHO TRAIL TALLYHO TRAIL 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI 518.75’ 3:1 521.78’3:1 518.79’ 518.36’ 3: 1 516.75’ 3:1 518.12’ 515.88’ 3:1 3:1 517.90’ 515.06’ 3:1 519.20’2:1 518.38’2:1 514.13’ 3:1 518.51’ 2:1 513.14’ 3:1 511.96’ 3:1 517.60’ 2:1 505 510 515 505 510 515 00 5 10 15 20 25 30 35 40 45 50 54+00.00 -EL- 515 510 505 515 510 505 515 510 50554+50.00 515 510 505 510 50554+75.00 515 510 505 515 510 50555+00.00 515 510 505 00 5 10 15 20 25 30 35 40 45 50 510 505 50056+25.00 510 505 500 00 5 10 15 20 25 30 35 40 45 50 510 505 50056+00.00 510 505 500 510 505 55+75.00 510 505 500 515 510 50555+50.00 515 510 505 515 510 50555+25.00 515 510 505 00 5 10 15 20 25 30 35 40 45 50 -EL- 54+25.00 515 500 5 0 5 . 8 3 E X E O P R O W E X E X F E N C E 5 0 6 . 5 5 E X E O P R O W E X E X F E N C E 5 0 7 . 2 6 E X E O P R O W E X E X F E N C E 5 0 7 . 9 5 E X E O P R O W E X E X F E N C E 5 0 8 . 6 7 E X E O P R O W E X E X F E N C E 5 0 9 . 4 3 E X E O P R O W E X E X F E N C E 5 1 0 . 2 0 E X E O P R O W E X E X F E N C E 5 1 0 . 9 8 E X E O P R O W E X E X F E N C E 5 1 1 . 7 5 E X E O P R O W E X E X F E N C E 5 1 2 . 6 8 E X E O P R O W E X E X F E N C E C L= 5 1 2 . 1 1 C L= 5 1 1. 0 0 C L= 5 1 0 . 3 2 C L= 5 0 9 . 6 1 C L= 5 0 8 . 9 2 C L= 5 0 8 . 7 2 C L= 5 0 7 . 3 4 C L= 5 0 6 . 4 5 C L= 5 0 5 . 8 5 C L= 5 0 5 . 2 9 EX TP EX TP EX TPEX TP 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 2 2 0 _ s e c j h a r v e y SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: S U N G A T E D E S I G N G R O U P , P .A . PROJECT# : F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L I N R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C R O G E R S R O A D S I D E W A LK C A R R B O R O , N C C R O S S S E C T I O N S 1083-12003 ROGERS13CDC220 CAM, WBH C2.20 DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU ISIT ION EX SSMH ADJUST 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI 510.72’ 3:1 2:1 516.87’ 3:1 509.55’ 508.61’ 3:1 510.75’ 3:1 509.74’3:1 508.43’ 3:1 508.16’ 508.89’ 507.25’ 3:1 508.85’ 507.47’3:1 506.67’ 506.58’3:1 505.83’ 505.98’3:1 505.04’ 505.42’3:1 504.37’ 500 505 510 500 505 510 00 5 10 15 20 25 30 35 40 45 50 56+50.00 -EL- 510 505 500 510 505 500 510 505 50057+00.00 510 505 500 505 50057+25.00 510 505 500 505 500 49557+50.00 505 500 495 00 5 10 15 20 25 30 35 40 45 50 505 500 49558+75.00 505 500 495 00 5 10 15 20 25 30 35 40 45 50 505 500 49558+50.00 505 500 495 505 500 58+25.00 505 500 495 505 500 49558+00.00 505 500 495 505 500 49557+75.00 505 500 495 00 5 10 15 20 25 30 35 40 45 50 -EL- 56+75.00 510 495 4 9 9 . 7 4 E X E O P R O W E X 5 0 0 . 3 6 E X E O P R O W E X 5 0 0 . 9 7 E X E O P R O W E X E X F E N C E E X F E N C E 5 0 1 . 5 7 E X E O P E X F E N C E R O W E X E X F E N C E 5 0 2 . 1 5 E X E O P R O W E X E X F E N C E 5 0 2 . 7 2 E X E O P R O W E X E X F E N C E 5 0 3 . 3 0 E X E O P R O W E X E X F E N C E 5 0 3 . 8 9 E X E O P R O W E X E X F E N C E 5 0 4 . 5 1 E X E O P R O W E X E X F E N C E 5 0 5 . 1 3 E X E O P R O W E X E X F E N C E C L= 5 0 4 . 6 9 C L= 5 0 4 . 2 1 C L= 5 0 4 . 19 C L= 5 0 4 . 0 0 C L= 5 0 3 . 1 2 C L= 5 0 2 . 1 8 C L= 5 0 1 . 3 6 C L= 5 0 0 . 7 6 C L= 5 0 0 . 2 8 C L= 4 9 9 . 3 9 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 2 2 1 _ s e c j h a r v e y SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: S U N G A T E D E S I G N G R O U P , P .A . PROJECT# : F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L I N R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C R O G E R S R O A D S I D E W A LK C A R R B O R O , N C C R O S S S E C T I O N S 1083-12003 ROGERS13CDC221 CAM, WBH C2.21 DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU ISIT ION 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI 504.82’3:1 503.80’ 3:1 503.39’ 504.34’ 3:1 503.03’ 504.32’ 3:1 502.05’ 504.12’ 503.25’3:1 501.38’ 500.55’ 3:1 502.31’ 499.74’ 3:1 501.49’ 500.89’3:1 499.30’ 500.89’3:1 499.30’ 3:1 4 :1 498.26’ 495 500 505 495 500 505 00 5 10 15 20 25 30 35 40 45 50 59+00.00 -EL- 505 500 495 505 500 495 505 500 49559+50.00 505 500 495 495 49059+75.00 500 495 490 500 495 49060+00.00 500 495 490 00 5 10 15 20 25 30 35 40 45 50 500 495 490 61+25.00 500 495 490 00 5 10 15 20 25 30 35 40 45 50 500 495 490 61+00.00 500 495 490 500 495 60+75.00 500 495 490 500 495 49060+50.00 500 495 490 500 495 49060+25.00 500 495 490 00 5 10 15 20 25 30 35 40 45 50 -EL- 59+25.00 500 490 4 9 3 . 3 7 E X E O P R O W E X 4 9 4 . 1 1 E X E O P R O W E X 4 9 4 . 8 0 E X E O P R O W E X 4 9 5 . 3 9 E X E O P R O W E X 4 9 5 . 9 7 E X E O P R O W E X 4 9 6 . 5 4 E X E O P R O W E X 4 9 7 . 1 2 E X E O P R O W E X 4 9 7 . 7 5 E X E O P R O W E X 4 9 8 . 3 8 E X E O P R O W E X 4 9 9 . 0 6 E X E O P R O W E X C L= 4 9 8 . 0 3 C L= 4 9 7 . 4 0 C L= 4 9 6 . 7 7 C L= 4 9 6 . 1 9 C L= 4 9 5 . 6 2 C L= 4 9 5 . 0 4 C L= 4 9 4 . 4 5 C L= 4 9 3 . 7 6 C L= 4 9 3 . 0 8 EX TP EX TP 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 2 2 2 _ s e c j h a r v e y C L= 4 9 8 . 7 1 SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: S U N G A T E D E S I G N G R O U P , P .A . PROJECT# : F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L I N R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C R O G E R S R O A D S I D E W A LK C A R R B O R O , N C C R O S S S E C T I O N S 1083-12003 ROGERS13CDC222 CAM, WBH C3.22 DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU ISIT ION 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI 4 :1 497.58’ 501.06’ 3:1 2:1 4 :1 496.90’ 3:1 2:1 503.96’ 4 :1 496.27’ 3:1 2:1 502.05’ 4 :1 495.64’ 3:1 2:1 501.61’ 4 :1 495.06’ 3:1 2:1 500.55’ 2:1 3:1 494.49’ 4 :1 497.59’ 4 :1 493.91’ 3:1 2:1 496.69’ 493.32’ 4 :1 3:1 2:1 496.58’ 4 :1 492.63’ 3:1 2:1 497.90’ 2:1 3:1 491.89’ 4 :1 500.00’ 490 495 500 490 495 500 00 5 10 15 20 25 30 35 40 45 50 61+50.00 -EL- 495 490 485 495 490 485 495 490 48562+00.00 495 490 485 490 48562+25.00 495 490 485 495 490 48562+50.00 495 490 485 00 5 10 15 20 25 30 35 40 45 50 00 5 10 15 20 25 30 35 40 45 50 495 490 485 63+40.54 495 490 485 495 490 63+25.00 495 490 485 495 490 48563+00.00 495 490 485 495 490 48562+75.00 495 490 485 00 5 10 15 20 25 30 35 40 45 50 -EL- 61+75.00 495 485 4 8 7 . 3 7 E X E O P 4 8 9 . 0 8 E X E O P 4 8 9 . 0 8 E X E O P 4 9 0 . 5 7 E X E O P 4 9 1 . 2 5 E X E O P 4 9 1 . 9 3 E X E O P 4 9 2 . 6 4 E X E O P R O W E X C L= 4 9 2 . 2 9 E X T R E E L IN E R O W E X E X T R E E L IN E C L= 4 9 1. 5 8 R O W E X E X T R E E L IN E C L= 4 9 0 . 9 0 E X T R E E L IN E R O W E X C L= 4 9 0 . 2 2 R O W E X E X T R E E L IN E C L= 4 8 9 . 8 0 R O W E X E X T R E E L IN E EX 24" RCP EX SIGN W V E X EX 24" RCP EX 24" RCP W V E X W V ( 2 ) E X EX SIGN EX 24" RCP EX 24" RCP EX 24" RCP 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 2 2 3 _ s e c j h a r v e y C L= 4 9 1. 3 3 SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: S U N G A T E D E S I G N G R O U P , P .A . PROJECT# : F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L I N R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C R O G E R S R O A D S I D E W A LK C A R R B O R O , N C C R O S S S E C T I O N S 1083-12003 ROGERS13CDC223 CAM, WBH C2.23 DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU ISIT ION 495 490 485 62+88.81 495 485 490 2@24" RCP C L= 4 8 8 . 9 5 2@24" RCP 2@24" RCP 18" RCP 485.25 10-7-13 BOX W/ MH SPECIAL DESIGN CLAYMORE RD R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI 491.16’ 4 :1 3:1 2:1 496.89’ 4 :1 3:1 2:1 492.19’ 490.45 489.77’ 4 :1 3:1 2:1 495.11’ 489.09’ 4 :1 3:1 2:1 498.53’ 488.33’ 493.45’ -.08 3:1 489.47’ 2:1 4 :13:1 488.60’488.76’ 4 :1 480 485 490 480 485 490 00 5 10 15 20 25 30 35 40 45 50 63+75.00 -EL- 490 485 480 490 485 480 490 485 48064+25.00 490 485 480 485 48064+50.00 490 485 480 490 485 48064+75.00 490 485 480 00 5 10 15 20 25 30 35 40 45 50 00 5 10 15 20 25 30 35 40 45 50 485 480 47565+75.00 485 480 475 485 480 65+50.00 485 480 475 485 480 47565+25.00 485 480 475 490 485 48065+00.00 490 485 480 00 5 10 15 20 25 30 35 40 45 50 -EL- 64+00.00 490 475 4 8 4 . 1 5 E X E O P 4 8 2 . 4 5 E X E O P 4 8 2 . 8 3 E X E O P 4 8 3 . 2 3 E X E O P 4 8 3 . 6 7 E X E O P 4 8 4 . 7 7 E X E O P 4 8 5 . 3 7 E X E O P 4 8 5 . 9 6 E X E O P 4 8 6 . 4 9 E X E O P C L= 4 8 6 . 9 4 C L= 4 8 6 . 4 0 C L= 4 8 5 . 9 1 C L= 4 8 5 . 3 3 C L= 4 8 4 . 7 5 C L= 4 8 4 . 2 8 C L= 4 8 3 . 8 5 C L= 4 8 3 . 4 5 C L= 4 8 3 . 0 6 EX SIGN EX TP 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 2 2 4 _ s e c j h a r v e y SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: S U N G A T E D E S I G N G R O U P , P .A . PROJECT# : F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L I N R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C R O G E R S R O A D S I D E W A LK C A R R B O R O , N C C R O S S S E C T I O N S 1083-12003 ROGERS13CDC224 CAM, WBH C2.24 DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU ISIT ION 2@24" RCP R O W E X E X T R E E L IN E R O W E X E X T R E E L IN E R O W E X E X T R E E L IN E E X T R E E L IN ER O W E X E X T R E E L IN E R O W E X R O W E X R O W E X R O W E X R O W E X 1.50’ 1.50’ 1.50’ 1.50’ 1.50’ 1.50’ 1.50’ 15" RCP 1.50’ 1.50’ 490 485 48063+50.00 490 485 480 4 8 7 . 0 1 E X E O P EX 24" RCP EX 24" RCP INV IN=488.50 15" RCP EXTG 2@24" RCP COLLAR AND EXTEND 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI .02 2: 1 2: 1 492.26’ 483.24’ 2:1.02 2: 1 490.09’ 482.95’ 2:1 .02 2: 1 489.64’ 482.57’ 2:1.003 2: 1 489.47’ 482.19’ 2:1.007 2: 1 482.95’2:1 481.50’ .01 2: 1 481.36’ .01 480.85’ 2: 1 .02 2: 1 480.46’ .02 2: 1 480.01’ .05 475 480 485 475 480 485 00 5 10 15 20 25 30 35 40 45 50 66+25.00 -EL- 485 480 475 485 480 475 485 480 47566+75.00 485 480 475 480 47567+00.00 485 480 475 485 480 47567+25.00 485 480 475 00 5 10 15 20 25 30 35 40 45 50 00 5 10 15 20 25 30 35 40 45 50 485 480 47568+00.00 485 480 475 480 475 67+75.00 480 475 470 480 475 47067+50.00 480 475 470 480 475 47067+34.59 480 475 470 00 5 10 15 20 25 30 35 40 45 50 -EL- 66+50.00 485 470 4 8 0 . 6 6 E X E O P 4 8 0 . 6 7 E X E O P 4 8 0 . 6 9 E X E O P 4 8 0 . 6 9 E X E O P 54" CMP 4 8 0 . 7 0 E X E O P 4 8 0 . 9 7 E X E O P 4 8 1 . 2 3 E X E O P 4 8 1 . 4 7 E X E O P 4 8 1 . 8 1 E X E O P E X T R E E L IN E R O W E X C L= 4 8 1 . 0 7 R O W E X E X T R E E L IN E C L= 4 8 1 . 2 4 R O W E X E X T R E E L IN E R O W E X C L= 4 8 1. 2 6 R O W E X C L= 4 8 1 . 5 4 R O W E X E X R I P R A P E X R I P R A P C L= 4 8 1 . 8 1 R O W E X E X H E D G E L IN E E X H E D G E L IN E C L= 4 8 2 . 12 R O W E X E X H E D G E L IN E C L= 4 8 2 . 4 3 R O W E X E X H E D G E L IN E EX TP T V E X P E D 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 2 2 5 _ s e c j h a r v e y 1.50’ 1.50’ 1.50’ C L= 4 8 1. 2 5 1.50’ 1.50’ 1.50’ 1.50’ 1.50’ SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: S U N G A T E D E S I G N G R O U P , P .A . PROJECT# : F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L I N R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C R O G E R S R O A D S I D E W A LK C A R R B O R O , N C C R O S S S E C T I O N S 1083-12003 ROGERS13CDC225 CAM, WBH C2.25 DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU ISIT ION C L= 4 8 1. 2 2 1.50’ 485 480 47566+00.00 485 480 475 C L= 4 8 2 . 7 5 4 8 2 . 1 3 E X E O P R O W E X 1.50’ EX SSMH ADJUST 2@54" CSP STD 838.22 ENDWALL 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI 2: 1 479.66’ .02 2: 1 478.39’ .02 2: 1 477.96’ .01 2: 1 477.09’ .02 476.96’ 2: 1 .01 2: 1 475.00’ .007 2: 1 .003 474.94’ 2: 1 .003 E X W E T L A N D 2: 1 474.72’ .00 E X W E T L A N D .02 2: 1 474.76’ 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 2 2 6 _ s e c j h a r v e y SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L I N R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C C A R R B O R O , N C C R O S S S E C T I O N S 1083-12003 ROGERS13CDC226 CAM, WBH C2.26 DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU ISIT ION 485 480 47568+62.88 485 480 475 00 5 10 15 20 25 30 35 40 45 50 485 480 47568+50.00 485 480 475 00 5 10 15 20 25 30 35 40 45 50 -EL- 4 8 1 . 1 1 E X E O P 4 8 1 . 5 9 E X S D W K 4 8 0 . 7 4 E X E O P C L= 4 8 1. 2 0 EX SIGN 1.50’ S U N G A T E D E S I G N G R O U P , P .A . R O G E R S R O A D S I D E W A LK 485 480 47568+25.00 485 480 4 8 0 . 6 4 E X E O P R O W E X C L= 4 8 1. 0 6 475 B O X E X F O T E L E E X P E D 1.50’ 15" RCP 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI E X W E T L A N D .02 2: 1 .02 2: 1 746.22’ S U N G A T E D E S I G N G R O U P , P .A . 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N COMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT ION P R E L I MI N A R Y P L A N S SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 3 0 1 ( s t a g i n g ) j h a r v e y R O G E R S R O A D S I D E W A LK C A R R B O R O , N C SR 1896 Purefoy SR 1842 RogersRd.S R 1729 Rusch Rd STAGING AREA 50 100 2001000 PLANS S T A G I N G A R E A C3.01 10 20 40200 PLANS ROGERS13CDC301 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI STAGING AREA TO EUBANKS RD T O H O M E S T E A D R D EOP EOP 15" RCP UPEOGEOG EOP EOP EOP 15" RCP 15" C MP 15" R CP UP UP EOG E O G E OG EOG EOG EOG GUYWIRE GUYWIREGUYWIRE RO W RO W RO W R O W RO W RO W RO W EIP EIP EIP 536 5 3 7 537 5 3 8 5 3 8 538 5 3 9 539 5 3 9 5 3 9539 5 4 0 5 4 0 540 5 4 0 5 4 0 5 4 0 540 541 5 4 1 5 4 1 541 5 4 1 541 541 542 5 4 3 543 543 544544 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : CAM, WBH 1083-12003 R O G E R S R O A D S I D E W A LK C A R R B O R O , N C F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 S U N G A T E D E S I G N G R O U P , P .A . C4.01 I N COMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S T R A F F I C C O N T R O L D E T A I LS ROGERS13CDC401 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 4 0 1 ( t r a f d e t ) j h a r v e y 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : CAM, WBH 1083-12003 R O G E R S R O A D S I D E W A LK C A R R B O R O , N C F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 S U N G A T E D E S I G N G R O U P , P .A . C4.01A ROGERS13CDC401A I N COMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S T R A F F I C C O N T R O L D E T A I LS 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 4 0 1 ( t r a f d e t ) j h a r v e y 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : CAM, WBH 1083-12003 R O G E R S R O A D S I D E W A LK C A R R B O R O , N C F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 S U N G A T E D E S I G N G R O U P , P .A . C4.01B I N COMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S T R A F F I C C O N T R O L D E T A I LS ROGERS13CDC401B 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 4 0 1 ( t r a f d e t ) j h a r v e y 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E S U N G A T E D E S I G N G R O U P , P .A . 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T ION DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 4 0 2 ( t r a f o v r l ) j h a r v e y 150 300 6003000 PLANS R O G E R S R O A D S I D E W A LK C A R R B O R O , N C Eubanks SR 1727 Rogers Rd. S R 1 7 2 9 M e a d o w R u n C t SR 1896Purefoy SR 1842Rusch Rd Tallyho SR 2213 Tr. R o g e r s R d . S R 1 7 2 9 Claymore Rd SR 2254 Homestead Rd SR 1777 C4.02 ROGERS13CDC402 Rd. T R A F F I C C O N T R O L O V E R A LL 6-PEDESTRIAN AND WORKER SAFETY." "NC-MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR WORK ZONE (MUTCD) CHAPTER SHALL COMPLY WITH THE REQUIREMENTS AND RECOMMENDATIONS OF THE 2009 EDITION OF THE BARRIERS (NO BARRIER WALLS) BETWEEN THE WORK ZONE AND ADJACENT OPEN SIDEWALKS. WORK IN THE WORK ZONE PHASE. PROVIDE ORANGE SAFETY FENCING, DRUMS OR OTHER SIMILAR ONE SIDE OF THE ROAD OR OTHER, AS APPROPRIATE FOR THE CONSTRUCTION ACTIVITY UNDERWAY BARRICADES AND EXISTING OR TEMPORARY CURB CUT RAMPS AND DETOUR PEDESTRIANS TO LOCATIONS OF ANY SIDEWALK CLOSURES. AT ROAD CLOSURE BARRICADES PROVIDE SIDEWALK CONTRACTOR WILL PROTECT AND SAFELY DETOUR PEDESTRIANS AROUND THE WORK ZONE TIME IN EACH PHASE OF CONSTRUCTION FOR THE MINIMUM TIME PRACTICABLE. THE REPLACEMENTS AND REPAIRS WILL BE LIMITED TO ONE SIDE OF THE ROADWAY AT ANY THE SIDEWALK, OR WHERE SIDEWALK REPLACEMENT OR REPAIR IS SPECIFIED. SIDEWALK PERIODS AND IN LOCATIONS WHERE CONSTRUCTION WORK IS IN CLOSE PROXIMITY TO AND WHEELCHAIR ACCESS DURING ALL PHASES OF CONSTRUCTION, EXCEPT DURING SIDEWALKS SHALL REMAIN OPEN AND UNOBSTRUCTED TO PEDESTRIAN MOVEMENT AS NECESSARY FOR UTILITY INSTALLATIONS. ROAD CLOSURES STD 1101.03 (2 OF 9, OR 8 OF 9) STD. 1101.02 (1 OF 9) AND TEMPORARY -PROVIDE TEMPORARY LANE CLOSURES CONTROL NOTES. -REFER TO TRAFFIC & PEDESTRIAN ON ROGERS RD, TALLYHO TRL, CLAYMORE RD, HOMESTEAD RD AND TOWN SIDE STREETS. PROVIDE STANDARD TRAFFIC AND PEDESTRIAN WARNING SIGNS ON ALL PROJECT APPROACHES PROJECT BEGIN PROJECT END 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI S U N G A T E D E S I G N G R O U P , P .A . 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T ION DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 10 / 8 / 2 0 13 R O G E R S 1 3 C D C 5 0 1 ( I T ) j h a r v e y 150 300 6003000 PLANS R O G E R S R O A D S I D E W A LK C A R R B O R O , N C E u b a n k s S R 1 7 2 7 Rogers Rd. S R 1 7 2 9 Meado w Run Ct S R 1 8 9 6 P u r e fo y S R 1 8 4 2 R u s c h R d Tallyho S R 2 2 1 3Tr. R o g er s R d. S R 1 7 2 9 C la y m o re R d S R 2 2 5 4 H o m e s te a d R d S R 1 7 7 7 C5.01 ROGERS13CDC501 R d.PROJECT BEGIN PROJECT END 10-7-13 R .J R A IN SLL HT O R L R O CA R O FESSI O N 9334 G E N REINE WY N E HW. SEALP N A L E USM RESJR . A. C HAR L SE 401 A INL R O CA ANDSCAPE E IHC R A T R E TC T O R R N S T E DE H L GI F I B E R O P T I C C O N D U I T / P U LL B O X LO C A T I O N S A B C B B A A A A A A C C C C C NOT TO SCALE VICINITY MAP HOMESTEAD RD SR 1777 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C STANDARDS TOWN OF CARRBORO ______________________________ OCTOBER, 2011 STANDARDS AND DESIGN, SPECIFICATIONS, OWASA - MANUAL OF ______________________________ STANDARD SPECIFICATION NCDOT - JANUARY 2012 = +/-5700 LF TOTAL LENGTH OF TOWN OF CARRBORO SIDEWALK BOND PROJECT PROJECT LENGTHDESIGN DATA Prepared in the Office of: SUNGATE DESIGN GROUP, P.A. LOCATION: TYPE OF WORK: 915 JONES FRANKLIN ROAD, RALEIGH, NC, 27606 D r . P u r e fo y Rogers Rd. R o g er s R d. Tallyho Tr. S R 1 8 9 6 S R 1 7 2 9 S R 2 2 1 3 S R 2 2 5 4 S R 1 7 2 9 C la y m o re R d S y lv a n W a y S R 1 8 4 2 S R 1 7 2 7 E u b a n k s S R 1 7 7 7 SR 1896 PUREFOY DR O L D N C 8 6 S R 1729 R O G E RS R D N C 8 6 I 40 R u s c h R d DRAINAGE, DRIVE APRONS GUTTER, CONCRETE SIDEWALK, STORM CONCRETE SIDEWALK, CONCRETE CURB AND H o m e s te a d R d Meado w Run Ct INDEX OF SHEETS Staffield Ln W itm ore C ir N Hawick Ct S Hawick Ct R d. SR 1 7 2 7 EU BANK S RD NCDOT ENCROACHMENTS AND SR 1777, HOMESTEAD RD 1. SR 1729, ROGERS ROAD BETWEEN MEADOW RUN CT (NON-SYSTEM) (NON-SYSTEM) AND SR 1777, HOMESTEAD RD SR 1729, ROGERS ROAD BETWEEN MEADOW RUN CT STA 11+61.90 BEGIN PROJECT STA 68+62.88 END PROJECT GRAPHIC SCALE STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET PUBLIC WORKS TOWN OF CARRBORO 10 / 8 / 2 0 13 R O G E R S 1 3 C D E 1 0 0 j h a r v e y ROGERS RD SIDEWALK PROJECT EROSION AND SEDIMENT CONTROL MEASURES CONSTRUCTION. GRUBBING PHASE OF FOR CLEARING AND EROSION CONTROL PLANS THIS PROJECT CONTAINS Temporary Silt Ditch Temporary Silt Fence Silt Basin Type B Stilling Basin TDTemporary Diversion Temporary Rock Silt Check Type-B Temporary Rock Silt Check Type-A Temporary Rock Sediment Dam Type-A Temporary Rock Sediment Dam Type-B Type A Type B Type C A B C Temporary Silt Fence TSD Std. #Description Symbol Temporary Berms and Slope Drains Rock Inlet Sediment Trap: 1630.03 1630.05 1605.01 1622.01 1633.01 1634.01 1634.02 1635.01 1635.02 1630.04 1632.01 1632.02 1632.03 Rock Pipe Inlet Sediment Trap Type-A Rock Pipe Inlet Sediment Trap Type-B Temporary Rock Sediment Dam Type A Temporary Rock Sediment Dam Type B Temporary Silt Fence Roadway Standard Drawings The following roadway english standards as appear in "Roadway Standard Drawings"- Roadway Design revison thereto are applicable to this project and by reference hereby are considered a part of these plans. Rock Pipe Inlet Sediment Trap Type A EC-1 1606.01 Special Sediment Control Fence 1634.01 1634.02 1635.01 1605.01 1630.01 Temporary Berms and Slope Drains 1606.01 1622.01 Special Sediment Control Fence Riser Basin R O G E R S R D S I D E W A L K 1635.02 Rock Pipe Inlet Sediment Trap Type B 1604.01 Railroad Erosion Control Detail 1607.01 Gravel Construction Entrance Skimmer Basin for Special Considerations. Refer To E. C. Special Provisions ON THIS PROJECT SENSITIVE AREA(S) EXIST ENVIRONMENTALLY STANDARDS. SENSITIVE WATERSHED BEEN DESIGNED TO THIS PROJECT HAS Tiered Skimmer Basin Infiltration Basin Special Stilling Basin1630.06 Temporary Rock Silt Check Type-A with Matting and Polyacrylamide (PAM) Wattle/Coir Fiber Wattle Wattle/Coir Fiber Wattle with Polyacrylamide (PAM) 1630.02 1633.02 2012 STANDARD SPECIFICATIONS NATURAL RESOURCES DIVISION OF WATER QUALITY. ISSUED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NCG-010000 GENERAL CONSTRUCTION PERMIT EFFECTIVE AUGUST 3, 2011 WITH THE REGULATIONS SET FORTH BY THE THESE EROSION AND SEDIMENT CONTROL PLANS COMPLY Unit - N. C. Department of Transportation - Raleigh, N. C., dated January 2012 and the latest 1630.05 Temporary Diversion 1630.04 Stilling Basin 1630.03 Temporary Silt Ditch 1630.02 Silt Basin Type B 1630.06 Special Stilling Basin 1631.01 Matting Installation 1632.02 1632.01 Rock Inlet Sediment Trap Type B Rock Inlet Sediment Trap Type A 1632.03 Rock Inlet Sediment Trap Type C 1633.01 1633.02 Temporary Rock Silt Check Type B Temporary Rock Silt Check Type A 1640.01 Coir Fiber Baffle 1645.01 Temporary Stream Crossing EW CFW ROGERS RD PSH E1.04 PSH E1.05 PSH E1.06 PSH E1.07 PSH E1.08 PSH E1.09 PSH E1.10 PSH E 1 .1 1 P S H E 1. 12 P S H E 1. 13 P S H E 1. 14 PSH E1.15 DATE: OCTOBER 7, 2013 EROSION CONTROL PLAN FOR PROPOSED SIGNATURE: P.E. PROJECT ENGINEER INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS JOSHUA G. DALTON, PE, CPESC A IN HT O R L R O CA R O FESSI O N 26971 G E N REINE SEALP N A L NOTLAD .G A UH S OJDO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION CLEARING AND GRUBBING/ FINAL EROSION CONTROLE1.04 - E1.15 SOIL STABLIZATION SUMMARYE1.03 DETAILSE1.02 - E1.02D EROSION CONTROL NOTESE1.01 0 PLANS 2010 40 S o u th e rn R ail w a y High Sch. Hill Chapel 10 / 8 / 2 0 13 R O G E R S 1 3 C D E 1 0 1 _ n o t e s j h a r v e y 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : CAM, WBH 1083-12003 R O G E R S R O A D S I D E W A LK C A R R B O R O , N C F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 S U N G A T E D E S I G N G R O U P , P .A . I N COMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S ENGINEER. NEED TO BE INSTALLED AS DIRECTED BY THE ADDITIONAL EROSION CONTROL DEVICES MAY REQUIRE PRIOR APPROVAL BY ENGINEER. NOTES: ANY DEVIATION FROM OPTIONS GIVEN WILL E1.01 ROGERS13CDE101 E R O S I O N C O N T R O L N O T E S AREA = 4.1 ACRES TOTAL DISTURBED 10-7-13 A IN HT O R L R O CA R O FESSI O N 26971 G E N REINE SEALP N A L NOTLAD .G A UH S OJ 10 / 8 / 2 0 13 R O G E R S 1 3 C D E 1 0 2 _ d e t j h a r v e y 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : CAM, WBH 1083-12003 R O G E R S R O A D S I D E W A LK C A R R B O R O , N C F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 S U N G A T E D E S I G N G R O U P , P .A . I N COMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S E R O S I O N C O N T R O L D E T A I LS E1.02 10-7-13 A IN HT O R L R O CA R O FESSI O N 26971 G E N REINE SEALP N A L NOTLAD .G A UH S OJ ROGERS13CDE102 AA 5’-0" 1’-0" 1’-6" 4’-8" 6" 1’-2" STONE CONTROL SEDIMENT STONE STRUCTURAL WATER FILTERED 12" SECTION A-A 1’-6" 1632.02 1632.02 1 1 1 1 R O C K I N L E T S E D I ME N T T R A P T Y P E ‘ B ’R O C K I N L E T S E D I ME N T T R A P T Y P E ‘ B ’ R A L E I G H , N . C . D I V I S I O N O F H I G H WA Y S D E P T . O F T R A N S P O R T A T I O N N O R T H C A R O L I N A S T A T E O F R A L E I G H , N . C . D I V I S I O N O F H I G H WA Y S D E P T . O F T R A N S P O R T A T I O N N O R T H C A R O L I N A S T A T E O F SHEET OF SHEET OF E N G L I S H S T A N D A R D D R A WI N G F O R E N G L I S H S T A N D A R D D R A WI N G F O R DIVERSION POINT. THE SHOULDER OR ANY MINIMUM OF ONE FOOT BELOW CONSTRUCT TOP OF BERM A THE ENGINEER. OTHERWISE SPECIFIED BY MINIMUM ACCEPTABLE UNLESS DIMENSIONS SHOWN ARE FOR SEDIMENT CONTROL. USE NO. 5 OR NO. 57 STONE STRUCTURAL STONE. USE CLASS ’A’ STONE FOR NOTE: 7 - 0 6 7 - 0 6 10 / 8 / 2 0 13 R O G E R S 1 3 C D E 1 0 2 A _ d e t j h a r v e y 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : CAM, WBH 1083-12003 R O G E R S R O A D S I D E W A LK C A R R B O R O , N C F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 S U N G A T E D E S I G N G R O U P , P .A . I N COMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S E R O S I O N C O N T R O L D E T A I LS FLOW A A *T = 12" MIN., 18" MAX. H WIDTH *T PLAN SECTION A-A SECTION B-B B B 2/3 CHANNEL STRUCTURAL STONE SEDIMENT CONTROL STONE 2’ MIN 2’ MIN L=3xH 12" 1633.01 1633.01 1 1 1 1 T E MP O R A R Y R O C K S I L T C H E C K T Y P E ‘ A ’T E MP O R A R Y R O C K S I L T C H E C K T Y P E ‘ A ’ R A L E I G H , N . C . D I V I S I O N O F H I G H WA Y S D E P T . O F T R A N S P O R T A T I O N N O R T H C A R O L I N A S T A T E O F R A L E I G H , N . C . D I V I S I O N O F H I G H WA Y S D E P T . O F T R A N S P O R T A T I O N N O R T H C A R O L I N A S T A T E O F SHEET OF SHEET OF E N G L I S H S T A N D A R D D R A WI N G F O R E N G L I S H S T A N D A R D D R A WI N G F O R CONTROL STONE. USE NO. 5 OR NO. 57 STONE FOR SEDIMENT FOR STRUCTURAL STONE. USE CLASS ’B’ EROSION CONTROL STONE NOTE FILTER FABRIC COMPACTED FILL WIRE NOTES OF 6 LINE WIRES WITH 12" STAY SPACING. DIRECTED BY THE ENGINEER. FILTER FABRIC 8" 4" WIRE INTO TRENCH EXTENSION OF FABRIC AND 8’ MAX. WITH WIRE (6’ MAX. WITHOUT WIRE) T E MP O R A R Y S I L T F E N C ET E MP O R A R Y S I L T F E N C E 1 1 1 1 SHALL BE 12 GAUGE MIN. MIDDLE AND VERTICAL WIRES SHALL BE 10 GAUGE MIN. TOP AND BOTTOM STRAND R A L E I G H , N . C . D I V I S I O N O F H I G H WA Y S D E P T . O F T R A N S P O R T A T I O N N O R T H C A R O L I N A S T A T E O F R A L E I G H , N . C . D I V I S I O N O F H I G H WA Y S D E P T . O F T R A N S P O R T A T I O N N O R T H C A R O L I N A S T A T E O F SHEET OF SHEET OF E N G L I S H S T A N D A R D D R A WI N G F O R E N G L I S H S T A N D A R D D R A WI N G F O R 1605.01 1605.01 STEEL POST - 2’-0" DEPTH USE WIRE A MINIMUM OF 32" IN WIDTH AND WITH A MINIMUM USE FILTER FABRIC A MINIMUM OF 36" IN WIDTH AND FASTEN ADEQUATELY TO THE WIRE AS PROVIDE 5’-0" STEEL POST OF THE SELF-FASTENER ANGLE STEEL TYPE. E1.02A ROGERS13CDE102A 10-7-13 A IN HT O R L R O CA R O FESSI O N 26971 G E N REINE SEALP N A L NOTLAD .G A UH S OJ 10 / 8 / 2 0 13 R O G E R S 1 3 C D E 1 0 2 B _ d e t j h a r v e y 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : CAM, WBH 1083-12003 R O G E R S R O A D S I D E W A LK C A R R B O R O , N C F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 S U N G A T E D E S I G N G R O U P , P .A . I N COMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S E R O S I O N C O N T R O L D E T A I LS E1.02B ROGERS13CDE102B 10-7-13 A IN HT O R L R O CA R O FESSI O N 26971 G E N REINE SEALP N A L NOTLAD .G A UH S OJ MATTING INSTALLATION DETAIL NOTES: THIS DETAIL APPLIES TO STRAW, EXCELSIOR, AND PERMANENT SOIL REINFORCEMENT MAT (PSRM) INSTALLATION. STAPLES SHALL BE NO. 11 GAUGE STEEL WIRE FORMED INTO A "U" SHAPE WITH A MINIMUM THROAT WIDTH OF 1 INCH AND NOT LESS THAN 6 INCHES IN LENGTH. MATTING IN DITCHES MATTING ON SLOPES BACKFILL MATTING SHALL BE PLACED IN TRENCH AND BACKFILLED 18" (MIN.) 6" MIN STAPLES ON 1’ CENTERS IN TRENCH EXISTING GROUND 6" (MIN.) S L O P E STAPLES ON 1’ CENTERS IN TRENCH NOT TO SCALE A B A B A 4" 4" 10" 10" 10" DIAGRAM B DIAGRAM A 10" 6" 30’ C 4" 4" 30’ C STAPLE CHECK 10" 4" 4" Staple Check Staple Staple Check Pattern DIAGRAM c 1 1 / 2 ’ 6’ 3’ 3’ Staple 10 / 8 / 2 0 13 R O G E R S 1 3 C D E 1 0 2 C _ d e t j h a r v e y 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : CAM, WBH 1083-12003 R O G E R S R O A D S I D E W A LK C A R R B O R O , N C F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 S U N G A T E D E S I G N G R O U P , P .A . I N COMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S E R O S I O N C O N T R O L D E T A I LS E1.02C ROGERS13CDE102C 10-7-13 A IN HT O R L R O CA R O FESSI O N 26971 G E N REINE SEALP N A L NOTLAD .G A UH S OJ 1606.01 1606.01 1 1 1 1 S P E C I A L S E D I ME N T C O N T R O L F E N C E S P E C I A L S E D I ME N T C O N T R O L F E N C E SEDIMENT CONTROL STONE SEDIMENT CONTROL STONE WATER FLOW STEEL POST - 2 ft DEPTH 2:1 *DIMENSION VARIABLE R A L E I G H , N . C . D I V I S I O N O F H I G H WA Y S D E P T . O F T R A N S P O R T A T I O N N O R T H C A R O L I N A S T A T E O F R A L E I G H , N . C . D I V I S I O N O F H I G H WA Y S D E P T . O F T R A N S P O R T A T I O N N O R T H C A R O L I N A S T A T E O F SHEET OF SHEET OF E N G L I S H S T A N D A R D D R A WI N G F O R E N G L I S H S T A N D A R D D R A WI N G F O R 2 ft 3 ft WIRE MESH 1 ft min WIRE MESH 1 ft min 2 ft WIRE MESH D D D D D SPACE POST A MAXIMUM OF 3 FT. POST 2 FT. DEEP MINIMUM. INSTALL 5 FT. SELF FASTENER ANGLE STEEL WITH 1/4 INCH MESH OPENINGS. USE HARDWARE CLOTH 24 GAUGE WIRE MESH CONTROL STONE. USE NO. 5 OR NO. 57 STONE FOR SEDIMENT GENERAL NOTES: ELEVATION VIEW NATURAL GROUND NATURAL GROUND FLOW 1’ MIN. 1’ MIN. CROSS SECTION CROSS SECTION TRAPEZOIDAL DITCH VEE DITCH 12" MIN. SILT BASIN OPTIONAL TYPE "B"4’-6" EDGE OF PAVEMENT ISOMETRIC VIEW PAVEMENT SHLD. DITCH CHECK TEMP. STONE SLOPE BACK SLOPEDITCH TRAP SEDIMENT 12" STRUCTURAL STONE BASE OF DITCH CONTROL STONE 12" THICK SEDIMENT 1633.02 1633.02 1 1 1 1 T E MP O R A R Y R O C K S I L T C H E C K T Y P E ‘ B ’T E MP O R A R Y R O C K S I L T C H E C K T Y P E ‘ B ’ R A L E I G H , N . C . D I V I S I O N O F H I G H WA Y S D E P T . O F T R A N S P O R T A T I O N N O R T H C A R O L I N A S T A T E O F R A L E I G H , N . C . D I V I S I O N O F H I G H WA Y S D E P T . O F T R A N S P O R T A T I O N N O R T H C A R O L I N A S T A T E O F SHEET OF SHEET OF E N G L I S H S T A N D A R D D R A WI N G F O R E N G L I S H S T A N D A R D D R A WI N G F O R AS DIRECTED BY THE ENGINEER. CONTROL. PLACE SEDIMENT CONTROL STONE USE NO. 5 OR NO. 57 STONE FOR SEDIMENT GRADE LESS THAN 3%. ONE (1) ACRE DRAINAGE AREA AND A DITCH CLASS "A" STONE FOR SITES HAVING LESS THAN THE ENGINEER MAY DIRECT THE OPTION OF STRUCTURAL STONE. USE CLASS ’B’ EROSION CONTROL STONE FOR NOTES: 7 - 0 6 7 - 0 6 10 / 8 / 2 0 13 R O G E R S 1 3 C D E 1 0 2 D _ d e t j h a r v e y 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : CAM, WBH 1083-12003 R O G E R S R O A D S I D E W A LK C A R R B O R O , N C F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 S U N G A T E D E S I G N G R O U P , P .A . I N COMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S E R O S I O N C O N T R O L D E T A I LS E1.02D ROGERS13CDE102D 10-7-13 A IN HT O R L R O CA R O FESSI O N 26971 G E N REINE SEALP N A L NOTLAD .G A UH S OJ WIRE MESH AA SECTION A-A YY SECTION Y-Y MULTI-DIRECTIONAL FLOW SINGLE-DIRECTIONAL FLOW 2’ 2’ 2’ 6" 1’-6" " WIRE MESH " WIRE MESH CONTROL STONE SEDIMENT WATER FILTERED 12" 2’ 2’ 6" 1’-6" CONTROL STONE SEDIMENT WATER FILTERED FLOW FLOW * MAXIMUM POST SPACING 4 FT. ** SEE NOTE FOR POST DESCRIPTION DIMENSION VARIABLE AVERAGE BOX DIMENSION VARIABLE AVERAGE BOX 1632.03 1632.03 1 1 1 1 R O C K I N L E T S E D I ME N T T R A P T Y P E ‘ C ’R O C K I N L E T S E D I ME N T T R A P T Y P E ‘ C ’ R A L E I G H , N . C . D I V I S I O N O F H I G H WA Y S D E P T . O F T R A N S P O R T A T I O N N O R T H C A R O L I N A S T A T E O F R A L E I G H , N . C . D I V I S I O N O F H I G H WA Y S D E P T . O F T R A N S P O R T A T I O N N O R T H C A R O L I N A S T A T E O F SHEET OF SHEET OF E N G L I S H S T A N D A R D D R A WI N G F O R E N G L I S H S T A N D A R D D R A WI N G F O R " WIRE MESH OF 4’. SPACE POST A MAXIMUM ANGLE STEEL TYPE. OF THE SELF-FASTENER 1.5’ DEEP MINIMUM, AND USE 5’ STEEL POST, INSTALLED SEDIMENT CONTROL STONE. INSTALL WIRE MESH UNDER DIVERSION POINT. THE SHOULDER OR ANY A MINIMUM OF ONE FOOT BELOW PLACE TOP OF WIRE MESH 1/4 INCH MESH OPENINGS. MESH HARDWARE CLOTH WITH USE 24 GAUGE MINIMUM WIRE FOR SEDIMENT CONTROL STONE. USE NO. 5 OR NO. 57 STONE NOTE 10 / 8 / 2 0 13 R O G E R S 1 3 C D E 1 0 3 j h a r v e y 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . C SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : CAM, WBH 1083-12003 R O G E R S R O A D S I D E W A LK C A R R B O R O , N C F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 S U N G A T E D E S I G N G R O U P , P .A . I N COMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S 10-7-13 DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA SOIL STABILIZATION SUMMARY SHEET SIDESTATION TO STATION FROM LINESHEET NO. CONST ESTIMATE (SY)STATION TO SIDESTATION FROM LINE SHEET NO. CONST ESTIMATE (SY) MATTING FOR EROSION CONTROL PERMANENT SOIL REINFORCEMENT MAT 4 -L-11+90 12+25 RT 45 -L-17+35 18+00 RT 20 -L-18+07 18+75 RT 85 5 5 5 -L-18+95 19+94 RT 6 -L-23+03 24+86 RT 220 7 -L-29+00 29+83 RT 100 8 -L-29+83 31+25 RT 175 125 S O I L S T A B I LI Z A T I O N S U M M A R Y S H E E T ROGERS13CDE103 E1.03 A IN HT O R L R O CA R O FESSI O N 26971 G E N REINE SEALP N A L NOTLAD .G A UH S OJ SUBTOTAL ADDITIONAL PSRM TO BE INSTALLED TOTAL 1315 0 1315 13 -L-58+50 60+00 RT 165 14 -L-60+00 62+50 RT 270 14 -L-63+75 64+75 RT 110 4 -L-12+25 15+00 RT 335 -L-15+00 15+75 RT5 95 5 -L-16+00 18+07 RT 220 6 -L-20+11 20+86 RT 80 6 -L-21+50 22+10 RT 105 6 -L-22+20 23+88 RT 205 7 -L-25+10 28+63 RT 370 8 -L-31+60 34+35 RT 335 -L-34+508 35+00 RT 65 9 -L-35+00 36+91 RT 230 9 -L-37+05 38+25 RT 130 9 -L-38+43 39+38 RT 100 9 -L-39+49 40+00 RT 55 10 -L-40+00 40+28 RT 30 10 -L-40+41 43+78 RT 410 10 -L-43+95 45+00 RT 130 11 -L-45+00 50+00 RT 605 12 -L-50+00 52+00 RT 245 12 -L-52+26 55+00 RT 330 13 -L-55+00 58+50 RT 425 SUBTOTAL TOTAL 4500 ADDITIONAL MATTING TO BE INSTALLED 11650 16150 M A TC H LIN E 15 + 0 0 10 20 40200 PLANS 10 / 8 / 2 0 13 R O G E R S 1 3 C D E 1 0 4 j h a r v e y M A TC H LIN E 15 + 0 0 CLEARING AND GRUBBING FINAL GRADE S U N G A T E D E S I G N G R O U P , P .A . 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 R O G E R S R O A D S I D E W A LK C A R R B O R O , N C E1.04 E R O S I O N C O N T R O L ROGERS13CDE104 10-7-13 A IN HT O R L R O CA R O FESSI O N 26971 G E N REINE SEALP N A L NOTLAD .G A UH S OJ PROPOSED DITCH LINE. EROSION CONTROL IN THE INSTALL PSRM FOR Sta. 12+25 to Sta. 15+00 in Ditch as Work Allows. Place Matting for Erosion Control D D EOP EOP SIGN SIGN SIGN SIGN 11+ 0 0 12 + 0 0 14 + 0 0 13 + 0 0 WV WV WV WVWM UT UTWM EOP 24" RCP PREVENTER BACKFLOW CTRL POINT HOR/VERT PT #17 CCC CCCCCFFFF F F F F F FFFFFFFFFFF F C 512 513 513 514 514515 5 15 5 1 6 5 16 5 16 517 517 518 518 518 5 1 9 5 1 9 519 520 520 5 2 1 521 5 2 2 522 5 2 3 523 52 4 524 525 525 5 2 6 526 5 2 7 527 5 2 8 528 528 5 2 9 529 529 5 3 0 530 5 3 0 531 PIN 9870355605 P.B. 55, PG. 38 D.B. 1528, PG. 322 VIRGINIA BETHEA JOHN BETHEA M E A D O W R U N C T PIN 9870357613 D.B. 166, PG. 346 ADDIE STREET JOHN STREET R O W R O W ROW ROW ROW ROW ROWROW ROW EIP EIP EIP ROGERS ROAD SR 1729 PIN 9870353308 D.B. 856, PG. 396 HOMEOWNERS ASSOC. INC MEADOW RUN DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF BDISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF RELOCATE ADJUST RELOCATE SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE WCR RETAIN EOP EOP SIGN SIGN SIGN SIGN 11+ 0 0 12 + 0 0 14 + 0 0 13 + 0 0 WV WV WV WVWM UT UTWM EOP 24" RCP PREVENTER BACKFLOW CTRL POINT HOR/VERT PT #17 PIN 9870355605 P.B. 55, PG. 38 D.B. 1528, PG. 322 VIRGINIA BETHEA JOHN BETHEA M E A D O W R U N C T PIN 9870357613 D.B. 166, PG. 346 ADDIE STREET JOHN STREET R O W R O W ROW ROW ROW ROW ROWROW ROW EIP EIP EIP ROGERS ROAD SR 1729 PIN 9870353308 D.B. 856, PG. 396 HOMEOWNERS ASSOC. INC MEADOW RUN CCC CCCCCFFFF F F F F F FFFFFFFFFFF F C 512 513 513 514 514515 5 15 5 1 6 5 16 5 16 517 517 518 518 518 5 1 9 5 1 9 519 520 520 5 2 1 521 5 2 2 522 5 2 3 523 52 4 524 525 525 5 2 6 526 5 2 7 527 5 2 8 528 528 5 2 9 529 529 5 3 0 530 5 3 0 531 2GI 18" RCP-III 1 8 " R C P - I I I 3 2 1 RETAIN JB w/MH SEE DETAIL #1 SPEC LAT V DITCH ( Not to Scale) SPECIAL LATERAL ’V’ DITCH D d 3: 1 FROM STA. 11+90 TO STA. 12+25 -L- RT Max. d=1.5 Ft. Min. D=1.5 Ft. DETAIL 1 Type of Liner= PSRM Ground Natural Flatter4:1 or Slope Fill M A T C H LI N E 1 5 + 0 0 M A TC H LIN E 2 0 + 0 0 10 20 40200 PLANS 10 / 8 / 2 0 1 3 R O G E R S 1 3 C D E 1 0 5 j h a r v e y M A T C H LI N E 1 5 + 0 0 M A TC H LIN E 2 0 + 0 0 CLEARING AND GRUBBING FINAL GRADE 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 R O G E R S R O A D S I D E W A LK C A R R B O R O , N C E1.05 E R O S I O N C O N T R O L ROGERS13CDE105 S U N G A T E D E S I G N G R O U P , P .A . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N O T U SE F OR R / W A CQU I SI T I ON DO N O T U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S 10-7-13 A IN HT O R L R O CA R O FESSI O N 26971 G E N REINE SEALP N A L NOTLAD .G A UH S OJ PROPOSED DITCH LINE. EROSION CONTROL IN THE INSTALL PSRM FOR D D PROPOSED DITCH LINE. EROSION CONTROL IN THE INSTALL PSRM FOR D Sta. 15+00 to Sta. 15+75 in Ditch as Work Allows. Place Matting for Erosion Control D Sta. 16+00 to Sta. 18+07 in Ditch as Work Allows. Place Matting for Erosion Control D D 522523523 523 52 3 524 524 524 524 524 5 2 4 5 2 4 524 525 52 5 525 525 525 526 526 526 527527 5 2 7 528 528 528 5 2 8 529 529 529 5 2 9 530 530 530 530 530 5 3 0 531 5 3 1 531 531 531 5 3 1 531 531 532 532 5 3 2 532 1 6 + 0 0 17 + 0 0 18 + 0 0 EOP EOP EOP EOP EO G E OG MANHOLE WATER WM WELL FH W E O G E OG UP WV UT UP 15 " R C P 12 " RC P 12 " RC P E O G E O G E OG S OIL S OIL WM WM 19 + 0 0 HYD MON WM MAILBOX (2) MAILBOXES MAILBOX WV WV CTRL POINT HOR/VERT PT #16 CTRL POINT HOR/VERT PT #15 PIN 9870357613 D.B. 166, PG. 346 ADDIE STREET JOHN STREET PIN 9870356499 D.B. 182, PG. 334 ADDIE STREET JOHN A. STREET PIN 9870356289 D.B. 460, PG. 378 GEORGE L. THOMPSON PIN 9870357203 D.B. 5442, PG. 467 ASSOCIATION TRUSTEE US BANK NATIONAL P IN 9 8 7 0 3 5 7 2 0 3 D .B . 5 4 4 2 , P G . 4 6 7 A S S O C IA T IO N T R U S TE E U S B A N K N A T IO N A L ROW ROW ROW ROWROW ROW ROW ROW ROW ROW ROW ROW ROW EIP EIP EIP EIP EIP EIP PIN 9870356398 LAUREN MAXWELL ROGERS ROAD SR 1729 DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF F F C F F F F F F F FF F F C C F C C C CC F F FFF FF F F F F F F FF C C 522523523 523 5 23 524 524 524 524 524 5 2 4 524 524 525 525 525 525 525 526 526 526 527527 5 2 7 528 528 528 5 2 8 529 529 529 529 530 530 530 530 530 5 3 0 531 5 3 1 531 531 531 5 3 1 531 531 532 532 5 3 2 532 ADJUST RELOCATE REMOVE RELOCATE REMOVE REMOVE ADJUST RETAIN SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD DRIVEWAY SIDEWALK 5’ STD DRIVEWAY SIDEWALK 5’ STD DRIVEWAY SIDEWALK 5’ STD DRIVEWAY RELOCATE RETAIN SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE RELOCATE RELOCATE 1 6 + 0 0 17 + 0 0 18 + 0 0 EOP EOP EOP EOP EO G E OG MANHOLE WATER WM WELL FH W E O G E OG UP WV UT UP 15 " R C P 12 " RC P 12 " RC P E O G E O G E OG S OIL S OIL WM WM 19 + 0 0 HYD MON WM MAILBOX (2) MAILBOXES MAILBOX WV WV CTRL POINT HOR/VERT PT #16 CTRL POINT HOR/VERT PT #15 PIN 9870357613 D.B. 166, PG. 346 ADDIE STREET JOHN STREET PIN 9870356499 D.B. 182, PG. 334 ADDIE STREET JOHN A. STREET PIN 9870356289 D.B. 460, PG. 378 GEORGE L. THOMPSON PIN 9870357203 D.B. 5442, PG. 467 ASSOCIATION TRUSTEE US BANK NATIONAL P IN 9 8 7 0 3 5 7 2 0 3 D .B . 5 4 4 2 , P G . 4 6 7 A S S O C IA T IO N T R U S TE E U S B A N K N A T IO N A L ROW ROW ROW ROWROW ROW ROW ROW ROW ROW ROW ROW EIP EIP EIP EIP EIP EIP PIN 9870356398 LAUREN MAXWELL ROGERS ROAD SR 1729 B B DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF 6 7 15 " RC P- II I 2GI-D 15 " RC P-III RETAIN REMOVE 15" R C P-III 4 5 SEE DETAIL #1 SPEC LAT V DITCH 2GI-D SEE DETAIL #1 SPEC LAT V DITCH REMOVE SEE DETAIL #1 SPEC LAT V DITCH EST 7 SY GFD EST 2 TON CL ’B’ RIP RAP EST 7 SY GFD EST 2 TON CL ’B’ RIP RAP ( Not to Scale) SPECIAL LATERAL ’V’ DITCH D d 3: 1 FROM STA. 18+95 TO STA. 19+94 -L- RT FROM STA. 18+07 TO STA. 18+75 -L- RT FROM STA. 17+35 TO STA. 18+00 -L- RT Max. d=1.5 Ft. Min. D=1.5 Ft. DETAIL 1 Type of Liner= PSRM Ground Natural Flatter4:1 or Slope Fill F F C F F F F F F F FF F F C C F C C C CC F F FFF FF F F F F F F FF C C M ATC H LIN E 2 0 + 0 0 M A T C H LI N E 2 5 + 0 0 10 20 40200 PLANS 10 / 7 / 2 0 13 R O G E R S 1 3 C D E 1 0 6 j h a r v e y M ATC H LIN E 2 0 + 0 0 M A T C H L I N E 2 5 + 0 0 CLEARING AND GRUBBING FINAL GRADE S U N G A T E D E S I G N G R O U P , P .A . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 E1.06 E R O S I O N C O N T R O L ROGERS13CDE106 R O G E R S R O A D S I D E W A LK C A R R B O R O , N C 10-7-13 A IN HT O R L R O CA R O FESSI O N 26971 G E N REINE SEALP N A L NOTLAD .G A UH S OJ PROPOSED DITCH LINE. EROSION CONTROL IN THE INSTALL PSRM FOR D D Sta. 20+11 to Sta. 20+86 in Ditch as Work Allows. Place Matting for Erosion Control Sta. 21+50 to Sta. 22+10 in Ditch as Work Allows. Place Matting for Erosion Control D Sta. 22+20 to Sta. 23+88 in Ditch as Work Allows. Place Matting for Erosion Control D 12 " R C P 12 " R C P EOG 15 " R C P 12" RCP 12" RCP E O P E O P EOP EOP UT WM WM UT UP WV WV WM SSMH F E NC E E O G E OG E O G E O G S OIL S OIL EOG E OG E O G S O I L 2 1+ 0 0 2 2 + 0 0 2 3 + 0 0 2 4 + 0 0 UPUT UT INV=521.62’ COLUMN INV=520.27’ INV=521.07’ INV=521.63’ INV=521.84’ INV=520.13’ INV=519.51’ MAILBOX CTRL POINT HOR/VERT PT #14 FF FF FFF F F F F F F F F F F F FFF F F F F F F F FF F F F F F F F 513 514 514 515 5 1 5 516 5 1 6 517 517 518 5 1 8 519 5 1 9 5 2 0 520 5 2 0 521521 521 5 2 1 521 522 522 5 2 2522 522 522 5 2 2 523 523523 523 5 2 3523 5 2 3 5 2 3 5 2 3 524524 5 2 4 524 5 2 5 PIN 9870358102 D.B. 5076, PG. 586 JAMES E. STEWART JACQUELINE STEWART PIN 9870346986 D.B. 5459, PG. 333 ZOILA RIVAS I PIN 9870348970 D.B. 3943, PG. 246 ALICIA JIMENEZ HERMELINDA PEREZ JIMENEZ PIN 9870349879 P.B. 96, PG. 177 D.B. 3649, PG. 383 KIMBERLY CANOVA MICHAEL J. CANOVA PIN 9870349696 D.B. 185, PG. 147 JAMES M. ALLEN P IN 9 8 7 0 3 5 7 2 0 3 D .B . 5 4 4 2 , P G . 4 6 7 A S S O C IA T IO N T R U S T E E U S B A N K N A T IO N A L ROW ROW ROW ROW R OW R OW R OW R OW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROWEIP EIP EIP EIP EIP EIP EIP EIP ROGERS ROAD SR 1729 PIN 9870358102 D.B. 5076, PG. 586 JAMES E. STEWART JACQUELINE STEWART DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF SIDEWALK 5’ STD DRIVEWAY RELOCATE RETAIN SIDEWALK 5’ STD CONCRETE RELOCATE RETAIN RETAIN SIDEWALK 5’ STD DRIVEWAY SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD DRIVEWAY REMOVE RETAIN ADJUST ADJUST SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD DRIVEWAY SIDEWALK 5’ STD DRIVEWAY ADJUST RETAIN 12 " R C P 12 " R C P EOG 15 " R C P 12" RCP 12" RCP E O P E O P EOP EOP UT WM WM UT UP WV WV WM SSMH F E NC E E O G E OG E O G E O G S OIL S OIL EOG E OG E O G S O I L 2 1+ 0 0 2 2 + 0 0 2 3 + 0 0 2 4 + 0 0 UPUT UT INV=521.62’ COLUMN INV=520.27’ INV=521.07’ INV=521.63’ INV=521.84’ INV=520.13’ INV=519.51’ MAILBOX CTRL POINT HOR/VERT PT #14 FF FF FFF F F F F F F F F F F F FFF F F F F F F F FF F F F F F F F 513 514 514 515 5 1 5 516 5 1 6 517 517 518 5 1 8 519 5 1 9 5 2 0 520 5 2 0 521521 521 5 2 1 521 522 522 5 2 2522 522 522 5 2 2 523 523523 523 5 2 3523 5 2 3 5 2 3 5 2 3 524524 5 2 4 524 52 5 PIN 9870358102 D.B. 5076, PG. 586 JAMES E. STEWART JACQUELINE STEWART PIN 9870346986 D.B. 5459, PG. 333 ZOILA RIVAS I PIN 9870348970 D.B. 3943, PG. 246 ALICIA JIMENEZ HERMELINDA PEREZ JIMENEZ PIN 9870349879 P.B. 96, PG. 177 D.B. 3649, PG. 383 KIMBERLY CANOVA MICHAEL J. CANOVA PIN 9870349696 D.B. 185, PG. 147 JAMES M. ALLEN P IN 9 8 7 0 3 5 7 2 0 3 D .B . 5 4 4 2 , P G . 4 6 7 A S S O C IA T IO N T R U S T E E U S B A N K N A T IO N A L ROW ROW ROW ROW R OW R OW R OW R OW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROWEIP EIP EIP EIP EIP EIP EIP EIP ROGERS ROAD SR 1729 PIN 9870358102 D.B. 5076, PG. 586 JAMES E. STEWART JACQUELINE STEWART B DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF 8 9 15 " RC P- III 15" RCP-III REMOVE 15" R C P-III RETAIN RETAIN RETAIN 15" RCP-III 15" R C P-III 2GI-D ( Not to Scale) SPECIAL LATERAL ’V’ DITCH D d 3: 1 FROM STA. 23+03 TO STA. 24+86 -L- RT Max. d=1.5 Ft. Min. D=1.5 Ft. DETAIL 1 Type of Liner= PSRM Ground Natural Flatter4:1 or Slope Fill SEE DETAIL #1 SPEC LAT V DITCH EST 5 SY GFD EST 1 TON CL ’B’ RIP RAP EST 7 SY GFD EST 2 TON CL ’B’ RIP RAP M A T C H LI N E 2 5 + 0 0 M A T C H LI N E 3 0 + 0 0 10 20 40200 PLANS 10 / 7 / 2 0 13 R O G E R S 1 3 C D E 1 0 7 j h a r v e y M A T C H LI N E 2 5 + 0 0 M A T C H LI N E 3 0 + 0 0 CLEARING AND GRUBBING FINAL GRADE S U N G A T E D E S I G N G R O U P , P .A . 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 R O G E R S R O A D S I D E W A LK C A R R B O R O , N C E1.07 E R O S I O N C O N T R O L ROGERS13CDE107 10-7-13 A IN HT O R L R O CA R O FESSI O N 26971 G E N REINE SEALP N A L NOTLAD .G A UH S OJ SEE PROJECT SPECIAL PROVISIONS ENVIRONMENTALLY SENSITIVE AREA PROPOSED DITCH LINE. EROSION CONTROL IN THE INSTALL MATTING FOR D D Sta. 25+10 to Sta. 28+63 in Ditch as Work Allows. Place Matting for Erosion Control D D E OG S OIL UT WV WV WV WV WV WM WM UP UP SIGN 4 8 " C M P 15" RCP EOP EOPEOP EOP UT UT E OG E OG 2 6 + 0 0 2 7 + 0 0 2 8 + 0 0 2 9 + 0 0 HYD MON WV WV PREVENTER BACKFLOW CTRL POINT HOR/VERT PT #13 HYD MON PIN 9870441657 D.B. 932, PG. 81 JAMES M. ALLEN PIN 9870453385 D.B. 171, PG. 475 LEAH ROGERS PIN 9870347529 D.B. 4088, PG. 331 BUDDHA LLC PIN 9870442208 D.B. 4435, PG. 507 BUDDHA LLC PIN 9870443288 D.B. 854, PG. 104 ALLONIOUS NICKENS ROWROWROWROW ROW ROW ROW ROW ROW ROW EIP EIP EIP ROGERS ROAD SR 1729 FF F F F FCFF F F F F FFFFFFFFFF FFFFF F C C C C C C C C C C 4 9 5 4 9 6 497 498 4 9 8 499 4 9 9 500 500 501 501 501 502502 502 502 502 5 0 3 503504 504 504 505 505 5 0 5 506 506 506 507 507 5 0 7 508 508 508 508 509 509 509 509 510 5 1 0 510 510 510 511 5 1 1 511512 5 1 2 513 DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF SIDEWALK 5’ STD DRIVEWAY RETAIN ADJUST ADJUST ADJUST ADJUST ADJUST ADJUST ADJUST SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD DRIVEWAY SIDEWALK 5’ STD CONCRETE ADJUST ADJUST RETAIN E OG SOIL UT WV WV WV WV WV WM WM UP UP SIGN 4 8 " C M P 15" RCP EOP EOPEOP EOP UT UT E OG E OG 2 6 + 0 0 2 7 + 0 0 2 8 + 0 0 2 9 + 0 0 HYD MON WV WV PREVENTER BACKFLOW CTRL POINT HOR/VERT PT #13 HYD MON PIN 9870441657 D.B. 932, PG. 81 JAMES M. ALLEN PIN 9870453385 D.B. 171, PG. 475 LEAH ROGERS PIN 9870347529 D.B. 4088, PG. 331 BUDDHA LLC PIN 9870442208 D.B. 4435, PG. 507 BUDDHA LLC PIN 9870443288 D.B. 854, PG. 104 ALLONIOUS NICKENS ROWROWROWROW ROW ROW ROW ROW ROW ROW EIP EIP EIP ROGERS ROAD SR 1729 FF F F F FCFF F F F F FFFFFFFFFF FFFFF F C C C C C C C C C C 4 9 5 4 9 6 497 498 4 9 8 499 4 9 9 500 500 501 501 501 502502 502 502 502 5 0 3 503504 504 504 505 505 5 0 5 506 506 506 507 507 5 0 7 508 508 508 508 509 509 509 509 510 5 1 0 510 510 510 511 5 1 1 511512 5 1 2 513 10 11 12 ENDWALL 15" RCP-III REMOVE RETAIN 1313A 15" RCP-III ( Not to Scale) SPECIAL LATERAL ’V’ DITCH D d 3: 1 FROM STA. 29+00 TO STA. 31+25 -L- RT Max. d=1.5 Ft. Min. D=1.5 Ft. DETAIL 1 Type of Liner= PSRM Ground Natural Flatter4:1 or Slope Fill 1 5 " RC P -III 2GI-B 1 5 " R C P - I I I SEE DETAIL #1 SPEC LAT V DITCH EST 5 SY GFD EST 1 TON CL ’B’ RIP RAP EST 5 SY GFD EST 1 TON CL ’B’ RIP RAP EST 7 SY GFD EST 2 TON CL ’B’ RIP RAP W/ GASKET SLEEVE BAND AND EXTEND 48" CSP B DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF M A T C H LI N E 3 0 + 0 0 M A T C H LI N E 3 5 + 0 0 10 20 40200 PLANS 10 / 8 / 2 0 1 3 R O G E R S 1 3 C D E 1 0 8 j h a r v e y M A T C H LI N E 3 0 + 0 0 M A T C H LI N E 3 5 + 0 0 CLEARING AND GRUBBING FINAL GRADE S U N G A T E D E S I G N G R O U P , P .A . 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N O T U SE F OR R / W A CQU I SI T I ON DO N O T U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S R O G E R S R O A D S I D E W A LK C A R R B O R O , N C E R O S I O N C O N T R O L SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 E1.08 ROGERS13CDE108 10-7-13 A IN HT O R L R O CA R O FESSI O N 26971 G E N REINE SEALP N A L NOTLAD .G A UH S OJ SEE PROJECT SPECIAL PROVISIONS ENVIRONMENTALLY SENSITIVE AREA PROPOSED DITCH LINE. EROSION CONTROL IN THE INSTALL PSRM FOR D Sta. 31+60 to Sta. 34+35 in Ditch as Work Allows. Place Matting for Erosion Control D D Sta. 34+50 to Sta. 35+00 in Ditch as Work Allows. Place Matting for Erosion Control D E OG EOG 15" RCP EOP EOP EOPEOP 3 1 + 0 0 3 2 + 0 0 3 3 + 0 0 3 4 + 0 0 15" RCP SIGN SIGN WM UP E O G E O G R/W MON INV=493.68’ MAILBOX CTRL POINT HOR/VERT PT #12 CTRL POINT HOR/VERT PT #11 PIN 9870445166 D.B. 395, PG. 234 BETTIE D. ROGERS SAMUEL F. ROGERS PIN 9870437814 D.B. 166, PG. 2 LEAH ROGERS PIN 9870443288 D.B. 854, PG. 104 ALLONIOUS NICKENS ROWROWROWROW ROW ROW ROW ROW ROW ROW EIP EIP ROGERS ROAD SR 1729 PIN 98 7 0 4 38 9 67 D.B. 2164, PG. 35 1 LO VE CH URCH INTERN ATIO NAL INC. FAITH TABERN ACLE O ASIS OF C C F CF F F F F F FFF FFFF FFFFFFFFFFF C C C C C C C C C49 4 495 496 4 9 7 497 498 498 499 499 500 500 501 501 502 502 50 2 503 503 504 5 0 4 50 4 5 0 5 5 0 5 506 506 507 507 508 508 509 5 0 9 510 510 511 511 512 5125 1 2 513 513 513 514 514 514 515 515 515 516 516 516 516 517 517 517 517 518 518 518 518 519 519 519 519 520 520 520 520 520 5 2 1 5 2 1 521 5 2 2 DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD DRIVEWAY SIDEWALK 5’ STD DRIVEWAY RELOCATE RETAIN SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE E OG EOG 15" RCP EOP EOP EOPEOP 3 1 + 0 0 3 2 + 0 0 3 3 + 0 0 3 4 + 0 0 15" RCP SIGN SIGN WM UP E O G E OG R/W MON INV=493.68’ MAILBOX CTRL POINT HOR/VERT PT #12 CTRL POINT HOR/VERT PT #11 PIN 9870445166 D.B. 395, PG. 234 BETTIE D. ROGERS SAMUEL F. ROGERS PIN 9870437814 D.B. 166, PG. 2 LEAH ROGERS PIN 9870443288 D.B. 854, PG. 104 ALLONIOUS NICKENS ROWROWROWROW ROW ROW ROW ROW ROW ROW EIP EIP ROGERS ROAD SR 1729 PIN 98 7 043 8 9 6 7 D.B. 2164, PG. 351 LO VE CH URCH INTERNATIONAL INC. FAITH TABERN ACLE O ASIS OF C C F CF F F F F F FFF FFFF FFFFFFFFFFF C C C C C C C C C49 4 495 496 49 7 497 49 8 498 499 499 500 500 501 501 502 502 50 2 503 5 03 504 5 0 4 50 4 5 0 5 5 0 5 506 506 507 507 508 508 509 5 0 9 510 510 511 511 512 5125 1 2 513 513 513 514 514 514 515 515 515 516 516 516 516 517 517 517 51 7 518 518 518 518 519 519 519 519 520 520 520 520 520 5 2 1 5 2 1 521 5 2 2 DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF 15 14 ENDWALL REMOVE RETAIN ( Not to Scale) SPECIAL LATERAL ’V’ DITCH D d 3: 1 FROM STA. 29+00 TO STA. 31+25 -L- RT Max. d=1.5 Ft. Min. D=1.5 Ft. DETAIL 1 Type of Liner= PSRM Ground Natural Flatter4:1 or Slope Fill SEE DETAIL #1 SPEC LAT V DITCH 15" RCP-III EST 5 SY GFD EST 1 TON CL ’B’ RIP RAP M A T C H LI N E 3 5 + 0 0 M A T C H LIN E 4 0 + 0 0 10 20 40200 PLANS 10 / 7 / 2 0 13 R O G E R S 1 3 C D E 1 0 9 j h a r v e y M A T C H LI N E 3 5 + 0 0 M A T C H LIN E 4 0 + 0 0 CLEARING AND GRUBBING FINAL GRADE 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 R O G E R S R O A D S I D E W A LK C A R R B O R O , N C E1.09 E R O S I O N C O N T R O L ROGERS13CDE109 S U N G A T E D E S I G N G R O U P , P .A . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S 10-7-13 A IN HT O R L R O CA R O FESSI O N 26971 G E N REINE SEALP N A L NOTLAD .G A UH S OJ Sta. 35+00 to Sta. 36+91 in Ditch as Work Allows. Place Matting for Erosion Control D D Sta. 37+05 to Sta. 38+25 in Ditch as Work Allows. Place Matting for Erosion Control D Sta. 38+43 to Sta. 39+38 in Ditch as Work Allows. Place Matting for Erosion Control D Sta. 39+49 to Sta. 40+00 in Ditch as Work Allows. Place Matting for Erosion Control D 3 6 + 0 0 3 7 + 0 0 3 8 + 0 0 3 9 + 0 0 EOP EOP EOP EOP EOP GATE SIGN SIGN WV WV WV WV WV WM WM WMGV WM GATE 12" RCP 15" RCP 15" RCP UP UP UP UT EOGE O G E OGE O G E O C E OC E O G E O GSIGN GUYWIRE GUYWIRE GUYWIRE CTRL POINT HOR/VERT PT #10 HYD MON HYD MON ROWROW ROWROWROW ROWROWROWROWROW ROW ROW R O W R O W EIP EIP EIP S R 1 8 9 6 P U R E F O Y D R IV E ROGERS ROAD SR 1729 PIN 9870438967 D.B. 2164, PG. 351 LOVE CHURCH INTERNATIONAL INC. FAITH TABERNACLE OASIS OF PIN 9870438967 D.B. 2164, PG. 351 LOVE CHURCH INTERNATIONAL INC. FAITH TABERNACLE OASIS OF PIN 9870439728 P.B. 53, PG. 178 D.B. 2356, PG. 205 LOVE CHURCH INTERNATIONAL INC. FAITH TABERNACLE OASIS OF PIN 9870530645 P.B. 53, PG. 178 D.B. 2164, PG. 347 LOVE CHURCH INTERNATIONAL INC. FAITH TABERNACLE OASIS OF P I N 9 8 7 0 5 3 0 6 4 5 P . B . 5 3 , P G . 1 7 8 D . B . 2 1 6 4 , P G . 3 4 7 L O V E C H U R C H I N T E R N A T I O N A L I N C . F A I T H T A B E R N A C L E O A S I S O F C C C CC C CCCC C CCCCC FF FFF F F FFFFFFFFFFFFF C C C C F C C C C 520 5 2 1 521 5 2 2 522 5 2 3 523 523 524 524 524 525 525 5 2 6 526 5 2 7 527 527 5 2 8 528 528 529 529 5 2 9 53 0 530 530 531 531 531 532 532 532 533 5 3 3 534 5 3 4 534 535 535 535 536 536 5 3 6 537 537 537 538 538538 538 539 539 540 540 DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE ADJUST ADJUST ADJUST ADJUST RETAIN RELOCATE RETAIN RETAINSIDEWALK 5’ STD DRIVEWAY SIDEWALK 5’ STD DRIVEWAY SIDEWALK 5’ STD DRIVEWAY SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETERETAIN ADJUST RELOCATE RETAIN ADJUST RELOCATE RETAIN RETAIN RETAIN RELOCATE RETAIN ADJUST RETAIN ADJUST 3 6 + 0 0 3 7 + 0 0 3 8 + 0 0 3 9 + 0 0 EOP EOP EOP EOP EOP GATE SIGN SIGN WV WV WV WV WV WM WM WMGV WM GATE 12" RCP 15" RCP 15" RCP UP UP UP UT EOGE O G E O GE O G E O C E OC E O G E O GSIGN GUYWIRE GUYWIRE GUYWIRE CTRL POINT HOR/VERT PT #10 HYD MON HYD MON ROWROW ROWROWROW ROWROWROWROWROW ROW ROW R O W R O W EIP EIP EIP S R 1 8 9 6 P U R E F O Y D R IV E ROGERS ROAD SR 1729 PIN 9870438967 D.B. 2164, PG. 351 LOVE CHURCH INTERNATIONAL INC. FAITH TABERNACLE OASIS OF PIN 9870438967 D.B. 2164, PG. 351 LOVE CHURCH INTERNATIONAL INC. FAITH TABERNACLE OASIS OF PIN 9870439728 P.B. 53, PG. 178 D.B. 2356, PG. 205 LOVE CHURCH INTERNATIONAL INC. FAITH TABERNACLE OASIS OF PIN 9870530645 P.B. 53, PG. 178 D.B. 2164, PG. 347 LOVE CHURCH INTERNATIONAL INC. FAITH TABERNACLE OASIS OF P I N 9 8 7 0 5 3 0 6 4 5 P . B . 5 3 , P G . 1 7 8 D . B . 2 1 6 4 , P G . 3 4 7 L O V E C H U R C H I N T E R N A T I O N A L I N C . F A I T H T A B E R N A C L E O A S I S O F C C C CC C CCCC C CCCCC FF FFF F F FFFFFFFFFFFFF C C C C F C C C C 5 2 0 5 2 1 521 5 2 2 522 5 2 3 523 523 524 524 524 525 525 5 2 6 526 5 2 7 527 527 5 2 8 528 528 529 529 5 2 9 5 30 530 530 531 531 531 532 532 532 533 5 3 3 534 5 3 4 534 535 535 535 536 536 5 3 6 537 537 537 538 538538 538 539 539 540 540 B DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF 17 15 " RC P- III 2GI-D RETAIN RETAIN RETAIN 16 M A T C H L I N E 4 0 + 0 0 M A TC H LIN E 4 5 + 0 0 10 20 40200 PLANS 10 / 7 / 2 0 13 R O G E R S 1 3 C D E 1 1 0 j h a r v e y M A T C H L I N E 4 0 + 0 0 M A TC H LIN E 4 5 + 0 0 CLEARING AND GRUBBING FINAL GRADE S U N G A T E D E S I G N G R O U P , P .A . 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 R O G E R S R O A D S I D E W A LK C A R R B O R O , N C E1.10 E R O S I O N C O N T R O L ROGERS13CDE110 10-7-13 A IN HT O R L R O CA R O FESSI O N 26971 G E N REINE SEALP N A L NOTLAD .G A UH S OJ Sta. 40+00 to Sta. 40+28 in Ditch as Work Allows. Place Matting for Erosion Control D Sta. 40+41 to Sta. 43+78 in Ditch as Work Allows. Place Matting for Erosion Control D D Sta. 43+95 to Sta. 45+00 in Ditch as Work Allows. Place Matting for Erosion Control D 4 1+ 0 0 4 2 + 0 0 4 3 + 0 0 4 4 + 0 0 EOP EOP EOP EOP EOP EOP EOP 15" RCP 15" CMP 15" RCP 15" RCP WM WM WM WM WV WVWV SIGN UP UP UP UP UP UP UP UP UP EOGE O G E O G E OG E O G E OG E O G EOG EOG E OG FENCE CTRL POINT HOR/VERT PT #9 HYD MON PIN 9870531675 D.B. 2385, PG. 57 OF CHAPEL HILL INC. ABUNDANT LIFE CENTER PIN 9870532405 D.B. 5501, PG. 279 PROPERTIES LLC BMS INVESTMENT PIN 9870533332 D.B. 3586, PG. 1 DE MARY J. DE LIMA JORGE L. DE LIMA Z I E G E R L A N E R O W ROW ROW ROWROWROW ROW R O W R O W ROW ROW ROW ROW ROW ROW ROW EIP EIP EIP EIP EIP EIP ROGERS ROAD SR 1729 PIN 9870539867 D.B. 2609, PG. 2141 ORANGE COUNTY INC. HABITAT FOR HUMANIITY R U S C H R D S R 1 8 4 2 R U S C H R D S R 1 8 4 2 P I N 9 8 7 0 5 3 0 6 4 5 P . B. 5 3 , P G. 1 7 8 D. B. 2 1 6 4 , P G. 3 4 7 L O V E C H U R C H I N T E R N A T I O N A L I N C. F A I T H T A B E R N A C L E O A S I S O F FFFFF FFC CFCCCFFF CC FCC FF FFFFFF FFFFFFFFF F FFFFFF C C C C 538 538 539 539 539 540 540 540 540 540 541 541 541 541 541 5 4 1 541 542 542 542 542 5 4 2 543 5 4 3 543 5 4 4 544 544 544 5 4 5 545 545 546 546 5 4 6 546 547 547 547 547 548 5 4 8 548 548 549 549 5 4 9 5 4 9 549 5 4 9 550 550 5 5 0 550 551 DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD DRIVEWAY SIDEWALK 5’ STD DRIVEWAY RELOCATE RETAIN REMOVE REMOVE RELOCATE RELOCATE SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE REMOVE REMOVE RETAIN RETAIN REMOVERETAIN SIDEWALK 5’ STD DRIVEWAY RELOCATE RETAIN RETAIN RETAIN RETAIN RETAIN SIDEWALK 5’ STD CONCRETE RELOCATE 4 1+ 0 0 4 2 + 0 0 4 3 + 0 0 4 4 + 0 0 EOP EOP EOP EOP EOP EOP EOP 15" RCP 15" CMP 15" RCP 15" RCP WM WM WM WM WV WVWV SIGN UP UP UP UP UP UP UP UP UP EOGE O G E O G E OG E O G E OG E O G EOG EOG E O G FENCE CTRL POINT HOR/VERT PT #9 HYD MON PIN 9870531675 D.B. 2385, PG. 57 OF CHAPEL HILL INC. ABUNDANT LIFE CENTER PIN 9870532405 D.B. 5501, PG. 279 PROPERTIES LLC BMS INVESTMENT PIN 9870533332 D.B. 3586, PG. 1 DE MARY J. DE LIMA JORGE L. DE LIMA Z I E G E R L A N E R O W ROW ROW ROWROWROW ROW R O W R O W ROW ROW ROW ROW ROW ROW ROW EIP EIP EIP EIP EIP EIP ROGERS ROAD SR 1729 PIN 9870539867 D.B. 2609, PG. 2141 ORANGE COUNTY INC. HABITAT FOR HUMANIITY R U S C H R D S R 1 8 4 2 R U S C H R D S R 1 8 4 2 P I N 9 8 7 0 5 3 0 6 4 5 P . B. 5 3 , P G. 1 7 8 D. B . 2 1 6 4 , P G. 3 4 7 L O V E C H U R C H I N T E R N A T I O N A L I N C. F A I T H T A B E R N A C L E O A S I S O F FFFFF FFC CFCCCFFF CC FCC FF FFFFFF FFFFFFFFF F FFFFFF C C C C 538 538 539 539 539 540 540 540 540 540 541 541 541 541 541 5 4 1 541 542 542 542 542 5 4 2 543 5 4 3 543 5 4 4 544 544 544 5 4 5 545 545 546 546 5 4 6 546 547 547 547 547 548 5 4 8 548 548 549 549 5 4 9 5 4 9 549 5 4 9 550 550 5 5 0 550 551 RETAIN RETAIN RETAIN RETAIN DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF M A T C H L I N E 4 5 + 0 0 M A TC H LIN E 5 0 + 0 0 10 20 40200 PLANS 10 / 8 / 2 0 1 3 R O G E R S 1 3 C D E 1 1 1 j h a r v e y M A T C H L I N E 4 5 + 0 0 M A TC H LIN E 5 0 + 0 0 CLEARING AND GRUBBING FINAL GRADE S U N G A T E D E S I G N G R O U P , P .A . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N O T U SE F OR R / W A CQU I SI T I ON DO N O T U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . R O G E R S R O A D S I D E W A LK C A R R B O R O , N C E R O S I O N C O N T R O L SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 E1.11 ROGERS13CDE111 10-7-13 A IN HT O R L R O CA R O FESSI O N 26971 G E N REINE SEALP N A L NOTLAD .G A UH S OJ Sta. 45+00 to Sta. 50+00 in Ditch as Work Allows. Place Matting for Erosion Control D D 4 6 + 0 0 4 7 + 0 0 4 8 + 0 0 4 9 + 0 0 C FENCE UP UP SIGN WV FH WV CABLE EOP EOP EOP EOP GUYWIRE GUYWIRE GUYWIRE STRAIN POLE CTRL POINT HOR/VERT PT #8 PIN 9870527705 P.B. 78, PG. 110 D.B. 3915, PG. 118 HOMEOWNERS ASSOCIATION HIGHLANDS NORTH PIN 9870533332 D.B. 3586, PG. 1 DE MARY J. DE LIMA JORGE L. DE LIMA ROW ROW ROW ROW ROW ROW ROW ROW ROW R O W EIP EIP EIP R U S C H R D S R 1 8 4 2 R U S C H R D S R 1 8 4 2 ROGERS ROAD SR 1729 C C C F F CC C C C CCCC C CC C C C FF F F F F F F F F F FFFFF F FF F F F FF 5 2 8 529 529 530 530 531 53 1 532 53 2 533 5 3 3 534 5 3 4 535 5 3 5 536 5 3 6 537 537 538 5 3 8 539 5 3 9 5 4 0 54 0 541 54 1 542 542 542 543 5 43 5 4 3 544 5 44 544 5 4 4 545 545 5 4 5 546 5 46 546 5 47 547 547 548 548 5 4 8 549 549 549 549 549 549 549 550550 550 550 5 5 0 550 551 551 551 5 5 2 DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF RELOCATE RELOCATE RETAIN ADJUST RETAIN RETAIN RELOCATE SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE RELOCATE RELOCATE 4 6 + 0 0 4 7 + 0 0 4 8 + 0 0 4 9 + 0 0 C FENCE UP UP SIGN WV FH WV CABLE EOP EOP EOP EOP GUYWIRE GUYWIRE GUYWIRE STRAIN POLE CTRL POINT HOR/VERT PT #8 PIN 9870527705 P.B. 78, PG. 110 D.B. 3915, PG. 118 HOMEOWNERS ASSOCIATION HIGHLANDS NORTH PIN 9870533332 D.B. 3586, PG. 1 DE MARY J. DE LIMA JORGE L. DE LIMA ROW ROW ROW ROW ROW ROW ROW ROW ROW R O W EIP EIP EIP R U S C H R D S R 1 8 4 2 R U S C H R D S R 1 8 4 2 ROGERS ROAD SR 1729 C C C F F CC C C C CCCC C CC C C C FF F F F F F F F F F FFFFF F FF F F F FF 528 529 529 530 5 3 0 531 53 1 532 532 533 5 3 3 534 5 3 4 535 5 3 5 536 5 3 6 537 537 538 5 3 8 539 5 3 9 5 4 0 5 4 0 541 541 542 542 542 543 543 5 4 3 544 544 544 5 4 4 545 545 5 4 5 546 546 546 5 47 547 547 548 548 5 4 8 549 549 549 549 549 549 549 550550 550 550 5 5 0 550 551 551 551 5 5 2 DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF M A T C H LI N E 5 0 + 0 0 M A T C H LI N E 5 5 + 0 0 10 20 40200 PLANS 10 / 7 / 2 0 13 R O G E R S 1 3 C D E 1 1 2 j h a r v e y M A T C H LI N E 5 0 + 0 0 M A T C H LI N E 5 5 + 0 0 CLEARING AND GRUBBING FINAL GRADE S U N G A T E D E S I G N G R O U P , P .A . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . R O G E R S R O A D S I D E W A LK E R O S I O N C O N T R O L REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : CAM, WBH 1083-12003 C A R R B O R O , N C SHEET NO. REVISIONS: C E1.12 ROGERS13CDE112 10-7-13 A IN HT O R L R O CA R O FESSI O N 26971 G E N REINE SEALP N A L NOTLAD .G A UH S OJ A IN HT O R L R O CA R O FESSI O N 26971 G E N REINE SEALP N A L NOTLAD .G A UH S OJ Sta. 50+00 to Sta. 52+00 in Ditch as Work Allows. Place Matting for Erosion Control D Sta. 52+26 to Sta. 55+00 in Ditch as Work Allows. Place Matting for Erosion Control D D T EOP EOP EOP E OP EOP EOP EOP EOP 5 1+ 0 0 5 2 + 0 0 5 3 + 0 0 5 4 + 0 0 SIGN SIGN SIGN SSMH SSMH WV WV WVWV 24" RCP UP TELE FH FENCE FENCEUP INV=517.31’ INV=516.29’ CTRL POINT HOR/VERT PT #7 CTRL POINT HOR/VERT PT #6 PIN 9870527450 P.B. 61, PG. 126 D.B. 3675, PG. 192 HONG HE LIN WANG PIN 9870527215 P.B. 61, PG. 126 D.B. 5385, PG. 475 MICHELLE E. TARTALIO DAVID M. BEFUMO E Z E K IE L P E P P E R S T R A IL PIN 9870527705 P.B. 78, PG. 110 D.B. 3915, PG. 118 HOMEOWNERS ASSOCIATION HIGHLANDS NORTH PIN 9870527185 P.B. 61, PG. 126 D.B. 3980, PG. 37 GWEN D. GAGE JAMES R. GAGE ROWROW ROW R O WR O W ROW ROW ROW ROW ROW ROW R O W R O W EIP S R 2 2 1 3 T A L L Y H O T R A IL PIN 9870528994 D.B. 1720, PG. 367 ORANGE COUNTY INC. HABITAT FOR HUMANIITY ROGERS ROAD SR 1729 508 509 509 5 0 9 510 5 10 510 511 5 11 5 1 1 512 5 1 2 512 512 513 5 13 513 513 514 5 14 5 14 514 515 515 5 1 5 515 515 516 516 5 1 6 5 16 5 1 6 517 517 5 17 517 517 518 518 518 518 518 518 5 19 519 519 519 519 519 519 520 5 2 0 520 520 520 521 5 2 1 521 522 5 2 2 5 2 2 523 523 523 524 5 2 4 524 525 5 2 5 5 2 5 526 5 2 6 526 527 5 2 7 527 528 528 528 529 529DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE ADJUST RETAIN RETAIN RETAINRETAIN RETAIN RETAIN RETAIN RELOCATE RETAIN ADJUST WCR WCR RETAIN T EOP EOP EOP E OP EOP EOP EOP EOP 5 1+ 0 0 5 2 + 0 0 5 3 + 0 0 5 4 + 0 0 SIGN SIGN SIGN SSMH SSMH WV WV WVWV 24" RCP UP TELE FH FENCE FENCEUP INV=517.31’ INV=516.29’ CTRL POINT HOR/VERT PT #7 CTRL POINT HOR/VERT PT #6 PIN 9870527450 P.B. 61, PG. 126 D.B. 3675, PG. 192 HONG HE LIN WANG PIN 9870527215 P.B. 61, PG. 126 D.B. 5385, PG. 475 MICHELLE E. TARTALIO DAVID M. BEFUMO E Z E K IE L P E P P E R S T R A I L PIN 9870527705 P.B. 78, PG. 110 D.B. 3915, PG. 118 HOMEOWNERS ASSOCIATION HIGHLANDS NORTH PIN 9870527185 P.B. 61, PG. 126 D.B. 3980, PG. 37 GWEN D. GAGE JAMES R. GAGE ROWROW ROW R O WR OW ROW ROW ROW ROW ROW ROW R O W R O W EIP S R 2 2 1 3 T A L L Y H O T R A IL PIN 9870528994 D.B. 1720, PG. 367 ORANGE COUNTY INC. HABITAT FOR HUMANIITY ROGERS ROAD SR 1729 FF CC C FF FC C FFCC F F FFF F FFFFF FF FF FFFFFFF C C C C C C C FF CC C FF FC C FFCC F F FFF F FFFFF FF FF FFFFFFF C C C C C C C 508 509 509 5 0 9 510 5 10 510 511 5 11 5 1 1 512 5 1 2 512 512 513 5 13 513 513 514 5 14 5 14 514 515 515 5 1 5 515 515 516 516 5 1 6 5 16 5 1 6 517 517 5 17 517 517 518 518 518 518 518 518 5 19 519 519 519 519 519 519 520 5 2 0 520 520 520 521 5 2 1 521 522 5 2 2 5 2 2 523 523 523 524 5 2 4 524 525 5 2 5 5 2 5 526 5 2 6 526 527 5 2 7 527 528 528 528 529 529 RETAIN 18 " RC P- III 15 " RC P -III 18 19 21 20 DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF M A T C H LI N E 5 5 + 0 0 M A T C H LI N E 6 0 + 0 0 10 20 40200 PLANS 10 / 7 / 2 0 13 R O G E R S 1 3 C D E 1 1 3 j h a r v e y M A T C H LI N E 6 0 + 0 0 M A T C H LI N E 5 5 + 0 0 CLEARING AND GRUBBING FINAL GRADE S U N G A T E D E S I G N G R O U P , P .A . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 E1.13 E R O S I O N C O N T R O L ROGERS13CDE113 R O G E R S R O A D S I D E W A LK C A R R B O R O , N C 10-7-13 A IN HT O R L R O CA R O FESSI O N 26971 G E N REINE SEALP N A L NOTLAD .G A UH S OJ Sta. 55+00 to Sta. 58+50 in Ditch as Work Allows. Place Matting for Erosion Control D D 5 6 + 0 0 5 7 + 0 0 5 8 + 0 0 5 9 + 0 0 EOP EOP EOP EOP FENCE FENCE FENCE UP UPUP CTRL POINT HOR/VERT PT #5 PIN 9870527185 P.B. 61, PG. 126 D.B. 3980, PG. 37 GWEN D. GAGE JAMES R. GAGE PIN 9870527071 P.B. 61, PG. 126 D.B. 2671, PG. 286 MARY M. MATEER JEFFERY R. MATEER PIN 9870518941 P.B. 55, PG. 88 D.B. 1088, PG. 342 ANNE B. JUSTICE SCOTT E. JUSTICE PIN 9870527185 P.B. 61, PG. 126 D.B. 3980, PG. 37 GWEN D. GAGE JAMES R. GAGE ROW ROW ROWROWROW ROW EIP ROGERS ROAD SR 1729 FFFFFFFFFFFFFFFF FFFFFF FFFFFFF F FF C C C C C 496 496 496 497 497 497 498 498 498 498 499 499 499 499 499 500 500 500 500 500 500 501 5 0 1 501 501 501 501 502 502 5 0 2 502 502 502 502 503 503 503 503 503 503 503 504 5 0 4 504 5 0 4 504 504 505 505 5 0 5 505 505 505 506 506 5 0 6 5 0 6 507 507 507 508 508 508 509 510 511 512 DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE RETAIN RETAIN RETAIN RETAINRETAIN 5 6 + 0 0 5 7 + 0 0 5 8 + 0 0 5 9 + 0 0 EOP EOP EOP EOP FENCE FENCE FENCE UP UPUP CTRL POINT HOR/VERT PT #5 PIN 9870527185 P.B. 61, PG. 126 D.B. 3980, PG. 37 GWEN D. GAGE JAMES R. GAGE PIN 9870527071 P.B. 61, PG. 126 D.B. 2671, PG. 286 MARY M. MATEER JEFFERY R. MATEER PIN 9870518941 P.B. 55, PG. 88 D.B. 1088, PG. 342 ANNE B. JUSTICE SCOTT E. JUSTICE PIN 9870527185 P.B. 61, PG. 126 D.B. 3980, PG. 37 GWEN D. GAGE JAMES R. GAGE ROW ROW ROWROWROW ROW EIP ROGERS ROAD SR 1729 FFFFFFFFFFFFFFFF FFFFFF FFFFFFF F FF C C C C C 496 496 496 497 497 497 498 498 498 498 499 499 499 499 499 500 500 500 500 500 500 501 5 0 1 501 501 501 501 502 502 5 0 2 502 502 502 502 503 503 503 503 503 503 503 504 5 0 4 504 5 0 4 504 504 505 505 5 0 5 505 505 505 506 506 5 0 6 5 0 6 507 507 507 508 508 508 509 510 511 512 DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF 2:12: 1 D ( Not to Scale) STANDARD BASE DITCH B d FROM STA. 63+75 TO STA. 64+75 -L- RT FROM STA. 58+50 TO STA. 62+50 -L- RT DETAIL 2 B=3 Ft. Max. d=1.0 Ft. Min. D=1.5 Ft. *When B is < 6.0’ Type of Liner= PSRM Ground Natural Ground Natural SEE DETAIL #2 W/ PRSM 3’ BASE DITCH M A T C H LI N E 6 0 + 0 0 M A T C H LI N E 6 5 + 0 0 10 20 40200 PLANS 10 / 7 / 2 0 13 R O G E R S 1 3 C D E 1 1 4 j h a r v e y M A T C H LI N E 6 5 + 0 0 M A T C H LI N E 6 0 + 0 0 CLEARING AND GRUBBING FINAL GRADE S U N G A T E D E S I G N G R O U P , P .A . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . R O G E R S R O A D S I D E W A LK E R O S I O N C O N T R O L SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 E1.14 ROGERS13CDE114 A IN HT O R L R O CA R O FESSI O N 26971 G E N REINE SEALP N A L NOTLAD .G A UH S OJ 10-7-13 EOP EOP EOP E O P E O P EOP EOP UP UP SAT SIGN SIGN SIGN 6 1+ 0 0 6 2 + 0 0 6 3 + 0 0 6 4 + 0 0 WV WVWV WV SIGN INV=484.99’INV=483.70’ INV=483.50’ INV=485.43’24" RCP 24" RCP CTRL POINT HOR/VERT PT #4 PIN 9870518850 P.B. 55, PG. 88 D.B. 3779, PG. 476 CHRISTEN E. HOLLY JOHN D. HOLLY PIN 9870519636 P.B. 55, PG. 88 D.B. 4194, PG. 242 DEBORAH B. ADLER MICHAEL BENTLEY ADLER PIN 9870519466 P.B. 55, PG. 87 D.B. 5144, PG. 206 JUBINA BREGU ERMAL BREGU PIN 9870518941 P.B. 55, PG. 88 D.B. 1088, PG. 342 ANNE B. JUSTICE SCOTT E. JUSTICE ROW ROW R O W ROW ROW R O WR O W R O W ROW ROW ROWROWROWROW ROW EIP EIP EIP ROGERS ROAD SR 1729 ( O R A N G E C T Y ) S Y L V A N W A Y S R 2 2 5 3 C L A Y M O R E R O A D 482 482 483 483 483 4 8 3 484 484 484 484 484 484 485 485 485 485 4 8 5 486 4 8 6 486 486 486 4 8 6 4 8 7 487 487 4 8 7 487 488 488 4 8 8 488 4 8 8 488 4 8 9 489 4 8 9 489 4 8 9 489 489 490 490 490 4 9 0 490 4 9 0 490 490 491 491 491 491 4 9 1 491 4 9 1 492 492 492 492 4 9 2 492 4 9 2 493 493 493 493 493 493 493 494 494 494 494 494 494 494 495 495 495 495 495 495 4 9 5 496 496 496 496 496 4 9 6 497 497 497 497 4 97 497 498 498 498 4 9 8 498 498498 499 499 4 9 9 499 500 500 5 0 0501 501 5 0 1 502 502 502 DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF EOP EOP EOP E O P E O P EOP EOP UP UP SAT SIGN SIGN SIGN 6 1+ 0 0 6 2 + 0 0 6 3 + 0 0 6 4 + 0 0 WV WVWV WV SIGN INV=484.99’INV=483.70’ INV=483.50’ INV=485.43’24" RCP 24" RCP CTRL POINT HOR/VERT PT #4 PIN 9870518850 P.B. 55, PG. 88 D.B. 3779, PG. 476 CHRISTEN E. HOLLY JOHN D. HOLLY PIN 9870519636 P.B. 55, PG. 88 D.B. 4194, PG. 242 DEBORAH B. ADLER MICHAEL BENTLEY ADLER PIN 9870519466 P.B. 55, PG. 87 D.B. 5144, PG. 206 JUBINA BREGU ERMAL BREGU PIN 9870518941 P.B. 55, PG. 88 D.B. 1088, PG. 342 ANNE B. JUSTICE SCOTT E. JUSTICE ROW ROW R O W ROW ROW R O WR O W R O W ROW ROW ROWROWROWROW ROW EIP EIP EIP ROGERS ROAD SR 1729 ( O R A N G E C T Y ) S Y L V A N W A Y S R 2 2 5 3 C L A Y M O R E R O A D FF FFFFFF F FCCC C C C C C C C 482 482 483 483 483 4 8 3 484 484 484 484 484 484 485 485 485 485 4 8 5 486 4 8 6 486 486 486 4 8 6 4 8 7 487 487 4 8 7 487 488 488 4 8 8 488 4 8 8 488 4 8 9 489 4 8 9 489 4 8 9 489 489 490 490 490 4 9 0 490 4 9 0 490 490 491 491 491 491 4 9 1 491 4 9 1 492 492 492 492 4 9 2 492 4 9 2 493 493 493 493 493 493 493 494 494 494 494 494 494 494 495 495 495 495 495 495 4 9 5 496 496 496 496 496 4 9 6 497 497 497 497 4 97 497 498 498 498 4 9 8 498 498498 499 499 4 9 9 499 500 500 5 0 0501 501 5 0 1 502 502 502 SIDEWALK 5’ STD CONCRETE SIDEWALK 5’ STD CONCRETE ADJUST RETAIN RETAIN RETAIN RELOCATE WCR WCR SIDEWALK 5’ STD CONCRETE STRIP 1’-6" UTILITY STRIP 1’-6" UTILITY CURB AND GUTTER 2’-6" CONCRETE CURB AND GUTTER END 2’-6" CONCRETE R=33.5’ BACK OF CURB CROSSWALK STOP BAR DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF 22 24 23 RETAIN RETAIN18" RCP-III 15" RCP-III 24" RCP-III 24" RCP-III 26 25 EXTEND COLLAR AND G RAD E TO D RA IN 28 27 EST 30 SY GFD EST 14 TONS CL ’1’ RIP RAP 2:12: 1 D ( Not to Scale) STANDARD BASE DITCH B d FROM STA. 63+75 TO STA. 64+75 -L- RT FROM STA. 58+50 TO STA. 62+50 -L- RT DETAIL 2 B=3 Ft. Max. d=1.0 Ft. Min. D=1.5 Ft. *When B is < 6.0’ Type of Liner= PSRM Ground Natural Ground Natural SEE DETAIL #2 W/ PSRM 3’ BASE DITCHSEE DETAIL #2 W/ PSRM 3’ BASE DITCH SEE DETAIL #2 W/ PSRM 3’ BASE DITCH (2 ) 2 4 " R C P -III FF FFFFFF F FCCC C C C C C C C M A TC H LIN E 6 5 + 0 0 10 20 40200 PLANS 10 / 7 / 2 0 13 R O G E R S 1 3 C D E 1 1 5 j h a r v e y M A TC H LIN E 6 5 + 0 0 CLEARING AND GRUBBING FINAL GRADE S U N G A T E D E S I G N G R O U P , P .A . F A X ( 9 1 9 ) 8 5 9 - 6 2 5 8 T E L ( 9 1 9 ) 8 5 9 - 2 2 4 3 R A L E IG H , N O R T H C A R O L IN A 2 7 6 0 6 9 1 5 J O N E S F R A N K L IN R O A D E N G F IR M L IC E N S E N O . C - 8 9 0 I N C OMP L E T E P L A N S DO N OT U SE F OR R / W A CQU I SI T I ON DO N OT U SE F OR CON ST R U CT I ON P R E L I MI N A R Y P L A N S 2 0 1 3 S U N G A T E D E S I G N G R O U P , P . A . T H I S D R A W I N G A N D A L L R E P R O D U C T I O N S O F I T A R E T H E S O L E P R O P E R T Y O F S D G . R E P R O D U C T I O N O R O T H E R U S E S O F T H I S D R A W I N G W I T H O U T W R I T T E N C O N S E N T O F S D G I S N O T P E R M I T T E D . R O G E R S R O A D S I D E W A LK E R O S I O N C O N T R O L SHEET NO. REVISIONS: REVIEWED BY: JRH DRAWN BY: DATE: DRAWING NAME: PROJECT# : C CAM, WBH 1083-12003 E1.15 ROGERS13CDE115 10-7-13 A IN HT O R L R O CA R O FESSI O N 26971 G E N REINE SEALP N A L NOTLAD .G A UH S OJ SEE PROJECT SPECIAL PROVISIONS ENVIRONMENTALLY SENSITIVE AREA T C S E O P EOPEOP EOP 5 4 " C M P 5 4 " C M P 36" RCP SIGN TPED CABLE UP SSMH SSMH SDMH 6 6 + 0 0 6 7 + 0 0 6 8 + 0 0 FO BOX CTRL POINT HOR/VERT PT #3 CTRL POINT HOR/VERT PT #2 15" RCP PIN 9870516306 P.B. 55, PG. 87 D.B. 5256, PG. 185 ANDREA C. TANNER DAVID G. TANNER PIN 9870519288 P.B. 55, PG. 87 D.B. 946, PG. 181 DONNA H. HAMILTON MICHAEL ANTHONY HAMILTON PIN 9870508940 P.B. 55, PG. 87 D.B. 868, PG. 1492 HOMEOWNERS ASSOCIATION INC. HIGHLANDS PHASE V C E N T E R LI N E H O M E S T E A D R O A D S R 1 1 7 7 R O W R O W R OW ROW ROW ROW ROW ROW ROW ROGERS ROAD SR 1729 473 474 4 7 4 4 7 4 474 4 7 4 4 7 4 475 4 7 5 475 475 4 7 5 4 7 5 4 7 6 476 476 4 7 6 4 7 6 477 477477 4 7 7 477 477 477 4 7 7 478 478 478 478478 478 478 479 479479 479 479 4 7 9 479 4 8 0 480 480 480 480 480 4 8 0 4 8 0 4 8 1 481 481 481 481 4 8 1 4 8 1 4 8 1 4 8 1 482 482 482 4 8 2 4 8 2 483 4 8 3 DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF T C S E O P EOPEOP EOP 5 4 " C M P 5 4 " C M P 36" RCP SIGN TPED CABLE UP SSMH SSMH SDMH 6 6 + 0 0 6 7 + 0 0 6 8 + 0 0 FO BOX CTRL POINT HOR/VERT PT #3 CTRL POINT HOR/VERT PT #2 15" RCP PIN 9870516306 P.B. 55, PG. 87 D.B. 5256, PG. 185 ANDREA C. TANNER DAVID G. TANNER PIN 9870519288 P.B. 55, PG. 87 D.B. 946, PG. 181 DONNA H. HAMILTON MICHAEL ANTHONY HAMILTON PIN 9870508940 P.B. 55, PG. 87 D.B. 868, PG. 1492 HOMEOWNERS ASSOCIATION INC. HIGHLANDS PHASE V C E N T E R LI N E H O M E S T E A D R O A D S R 1 1 7 7 R O W R O W R OW ROW ROW ROW ROW ROW ROW ROGERS ROAD SR 1729 F F F F F F F F F F F F F F FF 473 474 4 7 4 4 7 4 474 4 7 4 4 7 4 475 4 7 5 475 475 4 7 5 4 7 5 4 7 6 476 476 4 7 6 4 7 6 477 477477 4 7 7 477 477 477 4 7 7 478 478 478 478478 478 478 479 479479 479 479 4 7 9 479 4 8 0 480 480 480 480 480 4 8 0 4 8 0 4 8 1 481 481 481 481 4 8 1 4 8 1 4 8 1 4 8 1 482 482 482 4 8 2 4 8 2 483 4 8 3 SIDEWALK 5’ STD CONCRETE CURB AND GUTTER 2’-6" CONCRETE SIDEWALK 5’ STD CONCRETE CONCRETE SIDEWALK TIE TO EXTG ADJUST ADJUST STRIP 1’-6" UTILITY STRIP 1’-6" UTILITY STRIP 1’-6" UTILITY RELOCATE AND GUTTER TRANSITION TO EXISTING CURB AS REQUIRED FOR SMALL AND GUTTERREMOVE EXTG CURB DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF C ENDWALL RETAIN RETAIN 29 30 CB EST 5 SY GFD EST 1 TON CL ’B’ RIP RAP 15" RCP-III 31 32 W/ SLEEVE GASKETS AND EXTEND 2@54" CSP BAND F F F F F F F F F F F F F F FF