Loading...
HomeMy WebLinkAbout20140260 Ver 1_401 Application_20140314�REATTVC I __.AND�CAPN NC DWCi,, 401 /Wetlands Unit 1650 Mail Service Center Raleigh, NC, 27699 -1650 Q���oer�p MAR 1 3 2014 Project Name: 75 Rebel Ridge Road - Stream Stabilization and Culvert Installation PIN #: 7697 - 32 - 8742 To whom it may concern, aayoOL(ob March 5, 2014 We are a small landscaping company located in Canton, NC. We are working on a landscaping project in Maggie Valley, NC. This project involves bank stabilization on a UT to Big Spring Branch, a culvert installation in addition to an existing culvert and stream side stabilization. The primary objective is to repair and prevent erosion concerns, followed by the property landscaping with native plants. The work will be performed as soon as permits are approved. Please find enclosed five Pre - Construction Notification (PCN) form and drawings. Let us know if you need any supplementary information. We look forward for your response and to perform a professional installation. Best regards, Enrique Ramirez � r�gG,e J�f ✓i1 i/� L Copies to: USACE Wilmington District - Asheville Regulatory Field Office N.C. Wildlife Resources Commission, Marion Project Coordination and Design: Isabelle Norboge isabelienorboge@gmail.com 828 707 3065 Creative L,anJscaping 75 Hunter's Ride Mo6iie 828) +00-1867 Canton, NC 2871 '/ ?'0'. \NAT�FgOG O 19i� -c Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 MAR 1 3 2014 A— - WATER OUALI IY Page 1 of 10 PCN Form — Version 1.4 January 2009 Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ❑X Section 404 Permit ❑ Section 10. Permit 1b. Specify Nationwide Permit (NWP) number: a ; 3 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑X Yes ❑ No 1 d. Type(s) of approval sought from the DWQ (check all that apply): 0 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ❑X No For the record only for Corps Permit: ❑ Yes ❑X No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ❑X No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ❑X No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑X No 2. Project Information 2a. Name of project: 75 Rebel Ridge Road - Stream Stabilization and Culvert Installation 2b. County: Haywood 2c. Nearest municipality / town: Ivy Hill Township - Maggie Valley 28751 2d. Subdivision name: Maggie Valley Country Club East 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: Sari Kearnes and Kenneth Burke 3b. Deed Book and Page No. Deed Book 850, Page 1198 Map Book (L -22) & (A 47 -B) 3c. Responsible Party (for LLC if applicable): 3d. Street address: 2900 Florida Blvd. Apt 122 3e. City, state, zip: Delray Beach, Florida 33483 3f. Telephone no.: 561 - 706 -7233 3g. Fax no.: n/a 3h. Email addres : @gmail.com MAR 1 3 2014 A— - WATER OUALI IY Page 1 of 10 PCN Form — Version 1.4 January 2009 LW 4. Applicant Information (if different from owner) 4a. Applicant is: ❑X Agent ❑ Other, specify: 4b. Name: t 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: S. Agent/Consultant Information (if applicable) 5a. Name: Enrique Ramirez 5b. Business name (if applicable): Creative Landscaping 5c. Street address.- 75.Hunters Ridge Road 5d. City, state, zip: Canton, NC 28716 5e. Telephone no.: 828 -400 -1867 5f. Fax no.: n/a 5g. Email address: isabellenorboge @gmail.com t Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 7697 - 32 - 8742 1 b. Site coordinates (in decimal degrees): Latitude: 35.530852 Longitude: - 83.055059 1 c. Property size: 1.044 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: UT to Big Spring Branch (1355' West of property) 2b. Water Quality Classification of nearest receiving water: "C 2c. River basin: Pigeon (06010106) 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Residential - Single Family house, 1304 sqf - built in 1978 - Located in "Maggie Valley Country Club East' subdivision. Land partially covered with common broadleaf deciduous hardwood trees The general land use in the vicinity of the property is developed residential and golf course 3b. List the total estimated acreage of all existing wetlands on the property: 0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 183 3d. Explain the purpose of the proposed project: Stabilize the streambed, banks, and buffer of the LIT. Installation of a culvert to allow better and more access to the landscaped areas of the yard. 3e. Describe the overall project in detail, including the type of equipment to be used: 120 feet of Stream stabilization with Geotextile fabric and stones, addition of a 20' culvert, French drains installation, use of native grass and plants. Bank reinforcement with small retaining walls, 12" - 16" tall.E ui ment: small trackhoe. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all rior' hases in the past? ❑ Yes 0 No ❑ Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency /Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes X❑ No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ❑X No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ❑X Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 Choose one Choose one Yes /No - W2 - Choose one Choose one Yes /No - W3 - Choose one Choose one Yes /No - W4 - Choose one Choose one Yes /No - W5 - Choose one Choose one Yes /No - W6 - Choose one Choose one Yes /No 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 P Culvert LIT PER Corps 2 20 S2 P Stabilization LIT PER Corps 2 123 S3 Choose one S4 Choose one S5 Choose one _ - S6 Choose one - 3h. Total stream and tributary impacts 143 3i. Comments: Culvert size: 24" X 20' placed in the stream bed connected to existing culvert. Bank stabilization material: Rocks and Boulders ( Local provenance) Geotextile fabric on some stream edges to prevent stream siltation. Erosion control with grass, native plants and mulch. Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 - Choose one Choose 02 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. Buffer Impact number — Permanent (P) or Temporary T 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet ) 6g. Zone 2 impact (square feet B1 - Yes /No B2 - Yes /No B3 - Yes /No B4 - Yes /No B5 - Yes /No B6 Yes /No 6h. Total Buffer Impacts: 6i. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Project design is based on Environmental and Ecological resources, bank stabilization is a necessity to minimize risk of erosion 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Installation of silt fences to exclude unintentional disturbance to stream. Bare soil is covered with straw to avoid erosion prior seeding and mulching. Boulders /rocks will be used to build retaining wall where necessary. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ❑X No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non - riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? Yes Q No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes X❑ No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 0 2b. Does this project require a Stormwater Management Plan? ❑ Yes ❑x No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Existing drainage and culvert originally in place 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? Haywood County ❑ Phase II ❑ NSW 3b. Which of the following locally - implemented stormwater management programs ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑Coastal counties ❑HQW 4a. Which of the following state - implemented stormwater management programs apply ❑ORW (check all that apply): ❑Session Law 2006 -246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal /state /local) funds or the ❑ Yes X❑ No use of public (federal /state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes Q No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after - the -fact permit application? El Yes Q No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑Yes ❑X No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. n/a - Wastewater generated. None Page 9 of 10 PCN Form —Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or Yes X No El ❑ habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ❑X No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. - 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? U.S. Fish and Wildlife Service Environmental Conservation - Endangered Species Act (ESA) - Habitat Conservation Plans (HCPs) - Federally threatened or endangered species in North Carolina. IPaC System. and Latest Corps updated Heritage database. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑X No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ❑X No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? North Carolina Department of Cultural Resources - The North Carolina State Historic Preservation Office. and Latest Corps updated Heritage database. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA- designated 100 -year floodplain? ❑ Yes ❑X No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? Haywood County soil and water conservation district - North Carolina Floodplain Mapping Information System (FMIS) and Latest Haywood County on- line FEMA Map in the vicinity of the property. Enrique Ramirez I f �--// 03 -05 -2014 Applicant/Agent's Printed Name Date plicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant is provided ) Page 10 of 10 AGENT AUTHORIZATION FORM PROPERTY LEGAL DESCRIPTION: LOT: Portion of Lot N31 and N36 DEED BOOK: 850, Page 1198 MAP BOOK: (L -22) & (A 47 -8) PIN Number: 7697 - 32 - 8742 STREET ADDRESS: 75 Rebel Ridge road - Maggie Valley, NC 28751 Subdivision: Maggie Valley Country Club East Property Owner: Mrs. Sari Kearnes Property Owner: Mr. Kenneth Burke The undersigned, registered property owners of the above noted property, do hereby authorize Mr. Enrique Ramirez, of Creative Landscaping 75 Hunters Ridge Road Canton, NC 28716 Phone: 828 - 400 -1867 to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Property Owners Address (different than property above): 2900 Florida Blvd. Apt 122 - Delray Beach, Florida 33483 Phone: 561 - 706 -7233 We hereby certify the above information subrflfted-In this appltcattunfis true-and accurate to the best of our knowledge. Authorized Signature: Sari Kearnes ' Authorized Signature: Kenneth Burke !J. 7 Date: �� /j 2014 d�- r 00 J cq J r Q- �9 Z J Cl i O H LA Ci i J O i N o� 0 % N O � � i %A ItO %A oac� rs �ti !t 4 J CS %A Q LA C) 0 O 41 N o z- o� 41 Lgs-r- oo* -sZS 9,jdoospw" ani;naao S 0 Z tA tA v _ O %,4� s�A -6 i' O � o O � � � vA LU o� 0 % N O � � i %A ItO %A oac� rs �ti !t 4 J CS %A Q LA C) 0 O 41 N o z- o� 41 Lgs-r- oo* -sZS 9,jdoospw" ani;naao J JJJJJJJJJJJJJ JJ JJ.JJJJJJJJJJJJ IJJJ J� LI y J `IJJJ IJJ IJJ VJ y t^ �'H►. r ' x p v 4 S ^.i V 2 m 00 O O / i cs / rJJJ, "d Ir O a T QL- o i � o � � N � J � � S � S � Jl iii 1JJi JJJ, JJJ_ 5 0 41 S s ci i LL 0 JJJ JJJJ IJJJJJ " JJJJJI �/1 IJJJJJ. ;�•� JJaI.JJ' IJJ ;IJ JJydU J J J - IJJOIJ � XJJiIJ� i JJ�IJ � I1JWJ� 2L JJJJ IIJJJ�� o 1JJJ L IIJJJ� CL IJJJ IJJJ IJJJ JJJ IJJJ .) Z %A 41 S. 3 ° `cs -Nd 4J > v {X� to U CS N N Qa SL 00� ci v U J JJJJJJJJJJJJJ JJ JJ.JJJJJJJJJJJJ IJJJ J� LI y J `IJJJ IJJ IJJ VJ y t^ �'H►. r ' x p v 4 S ^.i V 2 m 00 O O / i cs / rJJJ, "d Ir O a T QL- o i � o � � N � J � � S � S � Jl iii 1JJi JJJ, JJJ_ 5 0 41 S s ci i LL 0 JJJ JJJJ IJJJJJ " JJJJJI �/1 IJJJJJ. ;�•� JJaI.JJ' IJJ ;IJ JJydU J J J - IJJOIJ � XJJiIJ� i JJ�IJ � I1JWJ� 2L JJJJ IIJJJ�� o 1JJJ L IIJJJ� CL IJJJ IJJJ IJJJ JJJ IJJJ PIN 76c17-32.-g742 Vieivtity Map 75 Rebel Ridge Road - Stream Stabilization and Culvert tvtstaflatiov. GENERAL ]VOTES: 1 - ALL PROPERTY CORNERS NOT DESCRIBED ARE "COMPUTED POINTS". 2 - ERROR OF CLOSURE MEETS OR EXCEEDS 1: 10,000�. 3 - ACREAGE CALCULATED BY COORDINATE COMPUTATION METHOD. 4 - ~ ~ THIS SURVEY MEETS THE REQUIREMENTS OF A CLASS A SURVEY. Chord ~~ N �1`5� ` , . 3J E 2U82 ` ' 5 - PROPERTY SHOWN HEREON IS SUBJECT TO ALL APPLICABLE EASEMENTS Radius | AND RIGHT OF WAY OF RECORDS. Tangent = 10.33' ^\ , 6 - ALL ROADS SHOWN HEREON ARE PRIVATELY MAINTAINED UNLESS 0|HExv�SE NOTED.="= -215 TO '_PR__OWNERS _ -SDEED BOOK 722, PAGE AS N WELL AS PAYING THE COSTS THEREOF.~~~_ � fir. us 2117> 11- 19/23 PIN No. 7697-42-0853 23 7 - PROPERTY SURVEYED IS NOT IN A FLOOD HAZARD AREA. PLAT BOOK ... .. PACE 22 CANTON 8 - THERE IS NO RECOVERABLE HORIZONTAL CONTROL WITHIN 2000'. 1 Chord N 59* 06' 28" E 35.16' HENMRS1 C* COUNT) - NORTH IS DEED NORTH AS DESCRIBED IN DEED 1300K 8.50 PAGE 11', 8 N 65* 37' 15" E 7 0 9 Radius = 155,00' 10 - THE PROPERTY SHOWN HEREON IS SUBJECT TO THE RULES, REGULATIOfN­S, Arc Length = 24.88' 4�, 04, Tangent = 17.70' ORDINANCES AND/OR JURISDICTIONS OF LOCAL, STATE AND/OR FEDERAL. FOUND No.5 REBAR AGENCIES, IF ANY. THE REQUIREMENTS OF SAID RULES, REGULATIONS, ORDINANCES WITH SURVEY I.D. CAP WAYNESVILLE AND/OR THE LIMITS OF SAID JURISDICTIONS ARE NOT SHOWN HEREON, L':NLESS MARKED: HERRON STATED OTHERWISE. 0 11 -THIS SURVEY WAS PERFORMED WITHOUT THE BENEFIT OF A TITLE SEARC!7�', HAYWOOD COUNTY VICINITY MAP NOT TO SCAU EASEMENTS OR OTHER MATTERS AFFECTING THE USE OF THIS PROPERTY NOT SHOWN HEREON, MAY EXIST IN THE PUBLIC RECORDS OF THIS COUNTY. cut THIS SURVEY REFLECTS ONLY WHAT WAS OBSERVED ON THE GROUND, 7' AND DOES NOT DEPICT UNUSED EASEMENTS, UNDERGROUND UTILITIES, 0R LEGEND: (�=�7�/�R�A WDTH8UR�Yi��� OTHER SUBSURFACE INSTALLATIONS WHICH MAY EXIST. 12 - ALL PROPERTY CORNERS SHOWN HEREON, NEITHER FOUND OR �E[ ARE TO U� ' ^ \\ CONSIDERED O = FND. CORNER AS LABELED \\ = POINT NOT SET "~ -P--P-= POWER LINE DASHED LINES INDICATES BOUNDARY LINES NOT SURVEYED � PP = POWER POLE | AND WERE DRAWN FROM {NF0RMAT]0N ROCK WALL | \ �^, �� \ � FENCE LINE � FOUND IN REFERENCED DOCUMENTS '_ l` `|�� <��' '« ` ~p` A WATER VALVE LLU WATER METER _LFL I LL LLI DEED BOOK 722, PAGE 1213 LLLLV 7697-42-0853 ^r / / -L-LLL Lv LL FOUND pp X9 L LO-LLI #LLI L_ -T L 36260.37 Sq.Ft. 9 -LL GRAVEL LEL L '-'-*LGRAVELL_� 0.832 ACRES i LL LLLLLLLLLLLLLL' PIN. RL L� tLLLL-L - RITCHLAMSON - QP ROCK WALL _LL_Lj LLLL -4 DEED BOOK 451, PAGE 1467 (Typical) LLLL LL_ L PIN' No7697-42-0698 A PLAT BOOK"A", PAGE 47-8 r jLLLL LLLLLY[_L_ �_-t I I L_ LLL LLLLLLLLLL -LLLL LLLLLLLLLLLLL LLLLLLLLLLLILLLLLLI I I - ---[LLLLi �LLLLLLLLLLLL.2�A�L ----- �L�i�LLL ' ~� CULVERT [ L L L L L �LLLLL- �|[~LLLLLLLLLLLLLLL�kLLLLLLL \ �� � �- �� � .P T RAIL FENCE CONCRETE THIS SURVEY IS OF AN EXISTING PARCEL OF LAND AND DOES NOT P 94-2175' DRIVE CREATE A NEW STREET OR CHANGE AN EXISTING STREET. ' / PINCHED TOP PIPE l' CLIFFORD G-_�ECHSER CERT FY THT IS PLAT WAS DRAYN4 UWUER W20'Y , \___FOUND Nu3 RE8AR SUPERVISION FROM AN ACTUAL SURVEY MADE UNDER MY SUPERVISION: WITH SURVEY lD " ' ' CAP THAT THE BOUNDARIES NOT SURVEYED ARE CLEARLY INDICATED AS URAWN MARKED: HERRON FROM INFORMATION FOUND IN REFERENCED "DOCUMENTS; THAT THE RATIO OF PRECISION AS CALCULATED lS1, 10,000 THAT THE PLAT WAS CASPER PREPARED IN ACCORDANCE WITH O.S. 47-30 AS AMENDED. WITNESS WY DEEDE00K53� PAGE 760 / ....-~ .. �� PIN No7697-32-8506 � '` PLAT CA6DNET^C", SLOT 3103` ' pi��r LAN�-�/RVEYOR - -- --' _ - - REGIS, AO8N NUMBER L-3052 SEAL