Loading...
HomeMy WebLinkAbout20210554 Ver 1_20210554_B-5717_ Bridge 109 and 121_Buffer Cert_2-18-21_20220218 DocuSign Envelope ID:39255C55-7112-4E70-8C94-7FA962lC56BF STArE a, ROY COOPER Governor i O ELIZABETH S.BISER Secretary QUAM S.DANIEL SMITH NORTH CAROLINA Director Environmental Quality February 18, 2022 Guilford County NCDWR Project No. 20210554 NCDOT TIP Project B-5717 Reconstruction of Bridge 109 and 121 East Gate City Boulevard APPROVAL of Jordan Lake Water Supply Riparian Buffer Impacts with Additional Conditions for: NCDOT TIP Project B-5717 Reconstruction of Bridge 109 and 121 on East Gate City Boulevard South Buffalo Creek in the Cape Fear(CPF03); Index No. 16-11-14-2; Water Supply(WS-V, NSW) Dear Mr. Harris: You have our approval for the impacts listed below for the purpose described in your application dated January 28,2022, received by the Division of Water Resources. These impacts are covered by Jordan Lake Water Supply Watershed Riparian Buffer Protection Rules and the Conditions listed below. Please note that you should get any other federal,state or local permits before proceeding with your project,including those required by (but not limited to) Sediment and Erosion Control, Non-Discharge, and Water Supply Watershed regulations. The following impacts are hereby approved, provided that, all the conditions listed below, and all the conditions of the Jordan Lake Supply Watershed Riparian Buffer Rules are met. No other impacts are approved, including incidental impacts. (15A NCAC 02B .0267). Jordan Lake Water Supply Watershed Riparian Buffer Impacts minus =Zone 1 Zone 1 Buffer minus =Zone 2 Zone 2 Zone 1 Zone 2 Buffer Wetlands Buffers (not Mitigation Wetlands Buffers (not Site Impact Impact Mitigation in Zone 1 wetlands) Required in Zone 2 wetlands) (s q ft) (s q ft) Required (s q ft) (s q ft) (3:1 ratio) (s q ft) (s q ft) (1.5.1 ratio) Bridge 1 8450 8450 0 5605 5605 0 Roadway 0 0 0 287 287 0 TOTAL 8450 0 8450 0 5892 0 5892 0 *n/a=Total for Site is less than 1/3 acre and 300 linear feet of impact,no mitigation required Total Buffer Impact for Project: 14,342 square feet. The project shall be constructed in accordance with your application dated received on January 28, 2022. After reviewing your application, we have decided that these impacts are covered by General Water E Q�� North Carolina Department of Environmental Quality I Division of Water Resources _ 512 North Salisbury Street 1 1617 Mail Service Center I Raleigh,North Carolina 27699-1617 NORTH CAROLINA Department of Environmental Quail /`� 919.707.9000 DocuSign Envelope ID:39255C55-7112-4E70-8C94-7FA9621C56BF Quality Certification Number 4135. This certification corresponds to the General Permit 2022-00263 issued by the Corps of Engineers on February 17, 2022. This approval is also valid for the Jordan Lake Riparian Buffer Rules(15A NCAC 213.0267). In addition,you should acquire any other federal,state or local permits before you proceed with your project including(but not limited to)Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire with the accompanying 404 permit. Unless otherwise approved in this certification, placement of culverts and other structures in open waters and streams, shall be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches,to allow low flow passage of water and aquatic life. Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or streambeds or banks,adjacent to or upstream and down stream of the above structures.The applicant is required to provide evidence that the equilibrium is being maintained if requested in writing by the NCDWR. If this condition is unable to be met due to bedrock or other limiting features encountered during construction, please contact the NCDWR for guidance on how to proceed and to determine whether or not a permit modification will be required. [15A NCAC 02H.0506(b)(2)] This approval is for the purpose and design described in your application.The plans and specifications for this project are incorporated by reference as part of this Authorization Certificate. If you change your project, you must notify the Division and you may be required to submit a new application package. If the property is sold, the new owner must be given a copy of this Authorization Certificate and is responsible for complying with all conditions. 15A NCAC 02B .0611(b)(2). The permittee shall report any noncompliance with the conditions of this Authorization Certificate and/or any violation of state regulated riparian buffer rules (15A NCAC 02B .0267). If you are unable to comply with any of the conditions below, you must notify Ryan Conchilla with the Transportation Permitting Branch at Ryan.Conchilla@ncdenr.gov within 24 hours (or the next business day if a weekend or holiday) from the time the permittee becomes aware of the circumstances. Special Conditions: 1. South Buffalo Creek are class WS-V; NSW waters of the State. The NCDWR is very concerned with sediment and erosion impacts that could result from this project. The NCDWR recommends that highly protective sediment and erosion control BMPs be implemented to reduce the risk of nutrient runoff to South Buffalo Creek. Post-construction stormwater BMPs should, to the MEP, be selected and designed to reduce nutrients. Projects within the Jordan Lake watershed must implement NCDOT's GREEN Program. Additional Conditions: 1. All stormwater runoff shall be directed as sheetflow through stream buffers at non-erosive velocities, unless otherwise approved by this Certification. (15A NCAC 02B .0267) 2. All riparian buffers impacted by the placement of temporary fill or clearing activities shall be restored to the preconstruction contours and revegetated. Maintained buffers shall be permanently revegetated with non-woody species by the end of the growing season following completion of construction. For this condition, maintained buffer areas are defined as areas within the transportation corridor that will be subject to regular NCDOT maintenance activities DEQ1A North Carolina Department of Environmental Quality I Division of Water Resources _ 512 North Salisbury Street 1 1617 Mail Service Center I Raleigh,North Carolina 27699-1617 NORTH CAROLINA Department of lammamemai auaift /`� 919.707.9000 DocuSign Envelope ID:39255C55-7112-4E70-8C94-7FA9621C56BF including mowing.The area with non-maintained buffers shall be permanently revegetated with native woody species before the next growing season following completion of construction. (15A NCAC 02B .0267) 3. Pursuant to 15A NCAC 2B .0267,sediment and erosion control devices shall not be placed in Zone 1 of any Jordan Lake Water Supply Watershed Riparian Buffer without prior approval by NCDWR. At this time, NCDWR has approved no sediment and erosion control devices in Zone 1, outside of the approved project impacts, anywhere on this project. Moreover, sediment and erosion control devices shall be allowed in Zone 2 of the buffers provided that Zone 1 is not compromised, and that discharge is released as diffuse flow. This approval and its conditions are final and binding unless contested. [G.S. 143-215.5] This Authorization Certificate can be contested as provided in Chapter 150E of the North Carolina General Statutes by filing a Petition for a Contested Case Hearing (Petition) with the North Carolina Office of Administrative Hearings (OAH) within sixty (60) calendar days. Requirements for filing a Petition are set forth in Chapter 150E of the North Carolina General Statutes and Title 26 of the North Carolina Administrative Code. Additional information regarding requirements for filing a Petition and Petition forms may be accessed at http://www.ncoah.com/or by calling the OAH Clerk's Office at(919)431-3000. A party filing a Petition must serve a copy of the Petition on: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 If the party filing the Petition is not the permittee, then the party must also serve the recipient of the Certification in accordance with N.C.G.S 15013-23(a). This Authorization shall expire five (5)years from the date of this letter. This letter completes the review of the Division under the Jordan Lake Water Supply Watershed Riparian Buffer Protection Rules as described in 15A NCAC 02B. 0267. Please contact Ryan Conchilla at Ryan.Conchilla@ncdenr.gov if you have any questions or concerns. Sincerely, EDocuSigned by: K4y pMAVIG 9C9886312DCD474... S. Daniel Smith, Director Division of Water Resources Cc: David Bailey, US Army Corps of Engineers, Raleigh Field Office Jerry Parker, DOT Division 7 Environmental Officer DEQ1A North Carolina Department of Environmental Quality I Division of Water Resources _ 512 North Salisbury Street 1 1617 Mail Service Center I Raleigh,North Carolina 27699-1617 NORTH CAROLINA Department of eavimaaraatai aaait, /`� 919.707.9000