HomeMy WebLinkAbout20140270 Ver 1_Application_20140319+�� ��.�.,r ,.
J,° .',` ,,,,
.
� ; .. �.,,,
`� - � �
r� :�6 / �i► ... 4�,
k r �` '�"'�(�, . r
'^ . �'� —,;�':r;' •
r� � • ,;
4 '�� �,`�`,� � +,
`P ,e,�
� .
4
�4� i:. �x
•
a@�.....q.
STATE fJF N(JRT�I � ARt�LINA
DEPARTMENT (JF TRA.NSP(JRTATION
PAT McCRORY P. O. Box 25201, Raleigh, N� 27611-52t�2 TONY TATA
GC)VERNOR PH(JNE: 919-733-2520 SE�RETAIZY
March I9, 2014
Mr. Andy Williams
tT. S. Ar�ny Corps af Engineers
Raleigh Regulatc�ry Field +�f�ce
3 3 31 �Ieritage Trade Drive, Suite 105
Wake F'ar�st, N� 2758i
Subject: Nationwide Fermlt #13
SR 1348, Kings Creek Road
Alle�hany County, North Carc�lzna
Project Number: 11C.003Q13.1 (No 'WR Permit Required)
Dear Mr. Williams:
Qn February 25, 2Q 14, we submitted an �mergency notificatian of a failed roadway shoulcle�r along the
subj ect route. At that time I informed you that I had instructe� our maintenar�ce forces to �roceed with
the slope repair since the failure was already at the white lin� and drazning directl� inta a siream. Ti'l1S 15
the after-the-fact permit applica.tian that we discussed to address the issue.
The NC Department of Transportation installed 5U line�r feet of ri�rap on this slope which was tc�ed ir�to
the edge af an unnamed tributary to the South Fork New River (Class: B; C.�R.W). The s�ream actually
does not show up an topo maps in this area. The construction zone was dewat�red with a pump around
operation as usual during this type af operation. Dewatering was appraximately 2(} linear fee� beyo�d
the permanent impact total. Ti115 �J�'O� �Gt is exempt for cultural resource review. I have a�ta�ched �
Preconstruction Notif cation Form, a marked topc�graphy map and photagraphs for your review.
By copy of this electronic letter, it is requested thai M�-s. Marla Chambers V�1t�1 til� I�T��il ��.�'0�111�
Wildlife Resources Commission comment directly to you eoncerning the 404 Nat�c�nvvide Permzt
application with a copy sent to meo
If further i�farmation is requlred, please let me l�now.
Enclasures
�
Sincerely,
��
Heath Slaughter
I)ivision Envlronmental CJf�c�r
P. O. BOX 250, N. WILKESBCJRO, NC 2$659
PHa�F (336) 667-9111 FAx (336) 66'7-4549
Mr. Andy �lilliams
SR 1308 slape failure, Alleghany
Page 2
March 1 �, 2014
cc: Marla Chambers, N�WRC
Amy Chapman, Division of Water Quality (2 copies}
Mike Pettyj ohn, PE, :Division Engineer
Brandon Whitaker, PE, District Engin�er
Todd Spurlin, County Maxntenan�e Engineer
Heath Slaugh�er, Division Environmental �f�cer
Chase Threll�eld, Roadside En�ironmental Fie1d C�perations Technician
�
°� �`� ���' Ufifice Use Only:
������ ��
� � >& :�-- Carps actian l a no.
, =�
� � � � � � ,p � �� � ,� DWQ proje�t no.
� � ��� ' �" b s,.
����,��'� �`� �'�� � Farm Versiar► 1.3 Dec 1 fl 2008
Pre-Construction Noti�ica�tion (Pt�l\1 �'orm
)
A. A Iicant Infarmation
1. Processing
1a. Type�s) af approval sought fram the
(� Section 4Q4 �ermit ❑ Section 10 Permit
Corps:
1 b. Specify Nationwide Permit (NWP) number: 13 or General Permit (�P) number:
1 c. Has the N1NP or GP number been verified by the Corps? [� Yes � Na
1 d. Type(s) af approval sought from the [�WQ (check �II that apply):
0 401 Water Quality Certificatic�n -- F�egular � Non-4O4 Jurisdictional �eneral Permit
[� 401 Water Quality Certificati�n — Express ❑ Ripari�n Buffer Authoriza#ion
1 e. Is this notificatian solely far the record For the record only for DWQ 441 For the record only for Corps Permit:
because written approval is nat requir�d? Certification:
� Yes ❑ No ❑ Yes � No
1 f. Is payment inta a mitigation bank or ir�-iieu fee program propc�sed far mitigation � Yes � No
o f i m p a c t s? i f s o, a t t a c h t h e a c c e p t a r� c e l e t t e r f r o m m i t i g a t i a r � b a n k o r i n- li eu
fee program.
1 g. Is the project located in any of NC's tv�venty coastal counti�s. if yes, answer 1 h � Yes � hlo
belaw.
1 h. Is the project locafied within a NC DGIV1 Area of Environmental Concern (AEC)? ❑ Yes � Nc�
2. Praject Information
2a. Name of project: SR � 308, Kings �reek Road, B�nk StabiliZation
2b. County: Alleghany
2c. Nearest municipality i tawn: Pin�y Creek
2d. Subdivision name:
2e. NCDCJT only, T.I.P. or state ���.403013.1
project no:
3. Owner Information
3a. Name{s) on Recorded Deed: NCDOT
3b. Deed Book and Page No.
3c. Responsible Party �for LLC if
�pplic�ble):
3d. Street address: 801 Statesvifle Road
3e. City, state, Zip: North Wilkesboro, NC 28659
3f. Telephone no.: 33�-903-9202
3g. Fax no.: 336-667-4549
3h. Email address: hslaughterC�ncdot.gov
Page 1 c�f 10
PCN F�rm -- Version 1.3 December 1Q, 20a8 Versior�
�
4. Appiicant Infarmation (if different from owner}
4a. Applicant is: ❑ Agent ❑ Other, specify:
4b. �lame:
4c. Business name
(if applicable):
4d. �treet address:
4e. City, state, zip:
4f. Telephon� no.:
4g. Fax no.:
4h. Email address:
5. AgenfiJCc�nsuitant Infiormation (if applicable)
5a. Name:
5b. Business name
(if applicable}:
5c. Street address:
5d. City, state, zip:
5e. Telephone no.:
5f. Fax no.:
5g. Email address:
Page 2 of 1 �
F'CN F�arm -- Versian 1.3 December �0, 2��8 Versian
�
B. Project tnfcarmation and Prior Praject History
1. Property Identification
1 a. Property identification no. (tax PIN or parcel ID):
1 bo �ite caordinates in decimal de rees : L�titude: 36.54055 Longitude: - 81.3'1 �4�
t g )
(DD.DDDDDD) (-aD.DDDDQD)
1 c. Property siZe: 0. � acres
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to �}T to SFNR
proposed project:
2b. Water Quaiity Classification of nearest receiving water: B; CJRW
�c. River basin: New
3. Project Description
3a. Describe the existing canditians on the site and the general I�nd use in the vicinity of the project �t the time of this
applicafiion:
F�aved ro�d with grassed shoulders in a rural setting along a state raad.
3b. List the fiotal estimated acreage of a!I existing we�lands on the property:
0 acres
3c. List the total estimated linear feet ofi all existing streams (intermittent and perennial) on the property:
stream parallels roa+d
3d. Explain the purpose of the propos�d project:
Stabilize shoulder
3e. Describe the overall projecfi in detail, including the type of equipmen� to be used:
�ee attached cover letter.
4. Jurisdictianal Determinations
4a. Have jurisdictional wetland or stream determinatians by the
Corps or State been requested or abtained for this property /
project (including all prior phases) in the past? ❑�'es � No ❑ UnknQwn
Comments:
4b. If the Corps made the jurisdictional determination, what type Preliminar Final
of determinatian was made? � � �
4c. If yes, wha delineated the jurisdictional �reas? Agency/Consultant Company:
Name (if known): t�th�r:
4d. If yes, list the dates of the Corps jurisdictional determinations or �tate determin�tions and atta�h documen�ation.
5. Project History
5a. Have permits or certifications been requested or obtained far 0 Yes � No 0 Unknown
this project (including all prior phases} in the pa�t?
5b. If yes, explain in c�etail accarding to "help file" instructions.
6. Future Project Plans
�a. Is this a phased project? � Yes � No
6b. If yes, explain.
Page 3 �f 14
PCN Form -- Version 1.3 December 10, 2008 Versinn
C. Propased Impacts Inventory
1. Impacts Summary '
1 a. Which sections were completed below far your project (check all that apply):
0 Wetlands � Streams - tributaries ❑ Buffers
❑ C�pen Waters [� Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed an the site, then complete this question for each wetland area imp�ctede
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number -- Type of impact Type of wetland Far�sted (Corps - 404, 10 Area of imp�ct
Permanent {P) or (if known) DWQ -- non-4�4, other) (acres)
Tem orar T
❑ Yes ❑ Gorps
W1 [� P❑ T No DW
L� ❑ C�
� Yes ❑ Carps
W2 [�P❑T No DW
� ❑ C�
❑ Yes [] Corps
W3 C] P❑ T No DW
❑ � �
❑ Yes ❑ Carps
W4 ❑ P ❑ T �o DW
❑ � Q
[� Yes � Corps
W5 ❑ P � T No DW
0 ❑ Q
❑ Yes ❑ Corps
W6 [� P❑ T No DW
❑ ❑ �
2g, Total wetland impacts
2h. �omments:
3. Stream Impacts
If there are perenniai or intermittent stream impacts (including terr�porary impacts) propased on the site, then c�mpfete fihis
questian for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type af impact Stream name Perennial Type c�f jurisdictian Average Imp�ct
number - (PER) or (Corps - 4U4, 1� stream length
Permanent (P) or interrnittent DWQ — non-404, width (linear
TemporarY iT) (I�IT)? other) �feet) feet)
Riprap & � PER � Gorps
�� � P�� Dewaterin UT to SFNR INT DWQ 2 7U
� ❑ �
❑ P�R ❑ Corps
S2 [] P❑ T I NT DWQ
0 ❑
0 PER ❑ Corps
S3 ❑ P 0 T I NT CJWQ
❑ ❑
� PER ❑ Corps
S4 ❑ P❑ T I NT DWQ
❑ ❑
� PER ❑ Corps
S5 ❑ P❑ T I NT DWQ
0 D
❑ PER ❑ Corps
S6 � P � T I NT QWQ
0 0
3h. Total stream and tributary impaets ?p
3i. Comments: 50 linear feet of riprap, 20 feet dewatering
Page 4 of 1 �
PGN Farm — Version 1.3 December 1�? 20�8 Version
,
4. +CJpen Water Impacts
if there are proposed impacts to lakes, pands, estuaries, tributaries, sounds, the Atlantic C�cean, c�r any other open water �fi
the U.S. then individually list ali open water impacts below.
4a. 4b. 4c. 4d. 4e.
Open water Name of waterbody
impac� number -- (if applicable} Type of impact WaterbodY type Are� of imp�ct (�cres}
Permanent (P) or
Tem ora T
U1 ❑P[�T
t�2 ❑P❑T
03 ❑P❑T
t�4 [� P j� T
4f. Total apen water impacts
4g. Comments:
5. Pond or Lake Construction
If ond ar lake constructic�n ra ased, then com iete the chart below.
5a. 5b. 5c. 5d. 5e.
Wetland Impacts (acres) Stream Impacts (feet) Upl�nd
Pond ID Proposed use or purpose {acres)
number of pond
Flooded Filled Exc�vated Flooded Filled Excavated Flac�ded
P1
P2
5f. Tatal
5g. Gc�mments: N/A
5h. Is a dam high hazard permit required?
❑ Yes � No If yes, permit ID na:
5i. Expected pond surface area (acres):
5j. Si�e of pond watershed (acres}:
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project wiil impact a protected riparian buffer, then complete the chart below. If yes, then individu�lly list �II buffer imp�c��
below. If an im acts re uire miti ation, then ou MUST fill out S�ction D af this farm.
6a.
[] Neuse ❑ Tar-Pamlico ❑ Other:
Project is in which protected basin? ❑ Catawba Q Randleman
6b. �c. 6d. 6e. 6f. 6g,
Buffer impact
number -- Reason Buffer Zone 1 imp�ct Zone 2 impact
Permanent (P} or for Stream name mitig�tion (square feet} (square feet)
Tem ora T im act re uired?
L� Y�s
�� ❑ P�T �o
�
� �'es
B2 ❑ P [� T No
❑
❑ Yes
B3 ❑ P ❑ T ��
❑
6h. Tatal buf�'er impacts
6i. Gomments:
Pag� 5 of 14
P�N Farm -- Version 1.3 December �10, �OU8 Version
.,
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1 a. Specifically describe measures taken to avoid or minimize the proposed imp�cts in designing project.
Armoring length is the minimum needed to stabilize the road.
1 b. Specifically describe measures taken ta avoid ar minimize the prapased impacts through canstructian techniques.
Ail apprapriate BMPs were used during construction
2. Compensatory Mitigation for Impacts to Waters of the U.�. or Waters of the State
2a. Does the project require Compensatory Mitigation for � Yes � No
impacts to Waters af the U.S. or Waters of the State?
2b. If yes, mitigation is required by (check all that apply): ❑ CiWQ ❑ Corps
[] Mitigation bank
2c. ff yes, which mitigation option will be used for this pa ment to in-lieu fee ra ram
ro`ect'? � y p g
p �
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigatian Bank
3a. N�me af Mitigation Bank:
.
3b. �redits Purchased (attach receipt and letter} Type Quantity
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Appraval letter from in-lieu fee program is attached. ❑ Y�s
4b. Stream mitigation requested: linear feet
4c. If using stream mitigation, stream temperature: [] warm � coal ❑cold
4d. Buffer mitigation requested (DWQ only): squ�re feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Coastal (tidai) wetland mitigafiion requested: acres
4h. Comments:
5. Compiete if Using a Permittee Respansible Mitigation Plan
5a. If using a permittee responsible mitigation pfan, provide a descriptian af the proposed mitigation plan,
Page 6 of 1�
P�N Form -- Version 1.3 Dec�mber 'I 4, 2�08 Versior�
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) -- requireci by DWQ
6a. Will the praject result in an impact within a pratected riparian buffer that requires �] Yes � No
buffer mitigation?
6b. If yes, then identify the square feet of impact to each zone of the riparian bufiFer that requires mitigation. Calcui�te the
amount of mitigation required.
6c. 6d. 6e.
Zone Reason far impact Total impact Muitiplier Req�uired mitig�tion
{square feet) (square �eet)
Zone 1 3(2 far Catawba)
Zone 2 �.5
6f. To#al buffer mitigatian required.
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to privafie mitig�tion bank,
permittee respansible riparian buffer restaratian, payment into an �pproved in-lieu fee fund}.
6h. Gomments:
Page 7 c�f 1 �
PCN Form -- Versior� 1.3 December 14, 2�08 V�rsior�
,
E. Starmwater Management and Diffuse Flaw Plan (required by ClWQ)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to pratected riparian buffers identified � Y�$ �Q
within one of the NC Riparian Buffer Protection Rules? �
1 b. if yes, then is a diffuse flow plan inc[uded? If no, explain why.
❑ Yes ❑ No
Comments: '
2. Stormwater Mana ement Plan
2a. What is the overail percent imperviousness of this projecfi? °/fl
2b. Does this praject r�quire a Stormwater Managem�nt Plan? ❑ Yes � No
2c. If this praject D4ES N(JT require a Stormwater Management Plan, expiain why: �ess than 1 acre.
2d. If this project DC7ES require a Stormwater Management Plan, then provide a brief, narrative description of the pl�n:
❑ Certified Local (�overnmer�t
2e. Wha will be responsibie for the review of the Stormwater Management Plan? ❑ DWQ Starmwafier Prc�gr�m
❑ DWQ 4U1 Unit
3. Certified �ocal Government Stormwater Review
3a. in which local government's jurisdictian is this project?
� Phase i l
[� NSW
3b. Which of the foilowing locally-implemented stormwater managem�nt programs ����P
apply (check ail that apply):
� Water Supply W�tershed
[.] Other.
3c. Has the approved Stormwater Management Plan with proof af approval been ❑ Yes ❑ Na
attached?
4. DWQ �tormwater Pro ram Review
❑ Coastal caunties
❑ H��
4a. Which �of the following state-implemented stormwater management programs apply ����
(ch�ck all that apply}:
� Session Law 200�--246
[�] C�ther:
4b. Nas the approved Stormwater Management Plan w'rth proof af approv�l been -
attached? ❑ Yes [� No
5. DWQ 401 Unit Starmwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? 0��s 0��
5b. Have �II of the 401 Unit submittal requirements been met? � y�s 0 No
P�ge 8 c�f 1 Q
PGN Form -- Version 1.3 December 1U, 2008 Ver�ion
�
�. Supptementary lnfarmation
1. Enviranmental Dacumentation (DWQ Requirement)
1 a. Does the praject involve an expenditure of pubiic (federalist�te/local) funds c�r the Y
use of ubiic federal/state land? ��� ��°
p { )
1 b. If you answered "yes" to the above, daes the project require preparation of an
environment�l document pursuant to the requirements of the National or State � Yes � Na
(Nor�h Carolina} Environmental Policy Act (NEPA/�EPA}`?
1 co if you answer�d "yes" ta the above, has the document review be+�n finalized by the
�tate Clearing House? (If so, att�ch a copy of the NEPA or �EPA fina! approv�l
letter.) ❑ Yes � Na
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .Q50n), Isolated
Wetland Rules (15A R1GAC 2H .13��), DWQ Surface V1later or W�tland Standards, ❑ Yes � Na
or Riparian Buffer Rules (15A NCAC 26 .Q2Qa)?
2b. is this an after-the-fact permit applicatian'� � Yes [� No
2c. if you answered "yes" to one or both of the above questians, provide an explanatian of the violafiion(s): See letter
3. Cumulative Impacts {DWQ Requirement)
3a. Will this praject {based on past and reasanably anticipated future impacts} result in �,�� ��
�ddition�l develo ment, which could im act nearb downstream water ualit ? � �
P p Y q Y
�b. If you answered "yes" to the abave, submit a qualitative or quantitative cumulative impact analysis in accord�nce with the
most recent DWQ policy. If you answered "no," provide a shart narrative description.
4. Sewage Disposal (DWQ Requirement)
4a. Cle�rly detail the ultimate treatment methods and disposition (non-discharge or discharge} of was��water generated from
fihe prapos�d project, or available c�pacity of fihe subject facility.
N/A
Page 9 of 1 C�
PC�N Form -- V�rsion 1.3 Dec�rnber 1�►, 20�8 Versi�r�
�
5. Endangered Species and Designated Critical Habitat (Corp� Requirement)
5a. WiN this pro}ect occur in or near an area with federally pratected species or Y��
habitat? � � No
5b. Have you checked with the USFWS concerning Endangered Species Act Yes No
im acts? � �
p
❑ R�leigh
5c. if yes, indicate the USFWS Field Office you have contacted.
� asheville
5d. What data sources did you use to determine whether your site would impact Endangered �pecies or Designated �ritic�l
Habitat?
GIS and visual observation
6. Essential Fish Habitat (Corps Requirement)
6�. Will this project accur in ar near an area designated as essential fish habitat? 0 Yes �j No
6b. What data sources di+� you use t� determine whether your site wauld impact Essential Fish H�bitat?
WRC will camment
7. Historic or Prehistoric Cultural Resources (Corps Requir�ment�
7a. Will this project occur in or near an are� that the state, federal or tribal
governments have designated as having historic or cultural preservation � Y�� ���
st�tus (e.g., National Histaric Trust designation or properties significant in
North Carolina history and �rchaeology)?
7b. V1/hat data sources did you use to determine whether your site wauld impact historic or archeological re�nurc�s?
Praject is exempt due to scape. Operating within previously disturbed existing right-of-w�y.
8. Flood Zone Designation (Gorps Requirement)
8a. Will this project occur in a FEMA-design�ted 140-year floodplain? C] Yes � N+a
8b. If yes, explain how pr�ject meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination? ncfloodmaps
;F
��'°
J. I-�eath Slaughter . , �,�,��..�.. W___ �I19114
�
��
ApplicantJAgent's Printed Name Applicant/Agent`s Signa e D�te
(Agent's sig tur� is valid only if an authorization etter from the applicant
is provided.)
Page 1{� of 1�
PC�N Form — Versic�n 1.3 December 1 �, ��08 Versic�n
,
....._.,,___)....... ._.),..._}.......-...sc vim;
�
'--, -- , _\\
4,4111
f
I.
-.%
o���-
1 `" 3
1
1
I pis
r\- Y' • ' Fort''
, 4 7
:��
i•
4
`
en
��
j,
j
0., 903 '
�•
�
°'
�1
- - -
"\ -
O
jj b , s ` -
"
`�