Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
GW1-2022-01696_Well Construction - GW1_20220131
WELL CONSTRUCTION RECORD For Internal Use ONLY: This form can be used for single or multiple wells 1.Well Contractor Information: 14.WATER ZO Sam Bowers FROM TONES DESCRIPTION Well Contractor Name ft. 3220 A NC Well Contractor Certification Number 15.OUTER CASING for multi-cased wells)OR LINE apycable) FROM TO DIAMETER TTHCKNESS MATERIAL Geological Resources, Inc. ft. ft. : in. I Company Name 16.INNER CASING OR TUBING(keother al closed-loop)'_'_'_ FROM TO DIAMETER THICKNESS MATERIAL 2.Well Construction Permit#: 0 ft 15 2 in. sch 40 PVC List all applicable well permits(i.e.County,State,Variance,Injection,etc) in. 3.Well Use(check well use): 17.SCREEN Water Supply Well: FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL DAgricultural OMunicipal/Pubfic 15 ft' 30 ft' 2 in. 0.010 Soh 40 PVC DGeothermal(Heating/Cooling Supply) DResidential Water Supply(single) ft. ft. in. 01ndustrial/Commercial OResidential Water Supply(shared) 18.GROUT FROM TO MATERIAL EMPLACEMENT METHOD&AMOUNT 0 Irrigation 0 ft' 12 ft- Grout Pour Non-Water Supply Well: ©Monitoring ORecovery 12 ft. 14 ft. B Pour Injection Well: 0 Aquifer Recharge OGroundwater Remediation 19.SAND/GRAVEL PACK if applicable) FROM TO MATERIAL EMPLACEMENT METHOD OAquifer Storage and Recovery 0 Salinity Barrier 14 30 Sand Pour ElAquifer Test El Stormwater Drainage ClExperimental Technology D Subsidence Control Sand 20.DRILLING LOG(attach additional sheets if necessary) DGeothermal(Closed Loop) OTracer FROM TO DESCRIPTION(color,hardness,soil/rock siz etc.) DGeothermal(Heating/Cooling Return) 00ther(explain under#21 Remarks) 0 0.5 Concrete 4.Date Well(s)Completed: 12/14/21 Red silt Well El)#MW-10 0.5 15 15 ft- 25 ft. Red medium sand 5a.Well Location: Daniel's Exxon 0-0009918 Facility/Owner Name Facility H)#(if applicable) ft. JAN 3 1 2027 115 East Central Avenue, Raeford, NC Physical Address,City,and Zip 14 21.REMARKS Hoke 6943-4100-1019 County Parcel Identification No.(PIN) 5b.Latitude and Longitude in degrees/minutes/seconds or decimal degrees: 22.Certification: (if field,one lattlong is sufficient) 34.9787508 N79.2231948 W 12/17/2021 Signature of Certified Well Contractor Date 6.Is(are)the well(s): ©Permanent or OTemporary By signing this form,I hereby certify that the well(s)was(were)constructed in accordance with 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a 7.Is this a repair to an existing well: OYes or E]No copy ofthis record has been provided to the well owner. If this is a repair,fill out known well construction information and explain the nature of the repair under#21 remarks section or on the back of this form. 23.Site diagram or additional well details: 1 You may use the back of this page to provide additional well site details or well 8.Number of wells constructed: construction details. You may also attach additional pages if necessary. For multiple injection or non-water supply wells ONLY with the same construction,you can submit one form. SUBMITTAL INSTUCTIONS 9.Total well depth below land surface: 30 ft.) 24a. For All Wells: Submit this form within 30 days of completion of well For multiple wells list all depths if different(example-3@200'and 2@100) construction to the following: 10.Static water level below top of casing: unknown -(ft) Division of Water Resources,Information Processing Unit, Ifwuter level is above casing,use"+" 1617 Mail Service Center, Center,Raleigh,NC 27699-1617 11.Borehole diameter: 6 (in.) 24b.For Iniection Wells ONLY: In addition to sending the form to the address in 24a above, also submit a copy of this form within 30 days of completion of well 12.Well construction method: Solid flight auger construction to the following: (i.e.auger,rotary,cable,direct push,etc.) Division of Water Resource S,Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service i Center,Raleigh,NC 27699-1636 13a.Yield(gpm) Method of test. 24c.For Water Supply&Injection Wells:I Also submit one copy of this form within 30 days of completion of 13b.Disinfection type: Amount: well construction to the county health department of the county where constructed. Form GW-I North Carolina Department of Environment and Natural Resources-Division of Water Resources Revised August 2013