Loading...
HomeMy WebLinkAbout20140229 Ver 1_401 Application_20140314MAR Q 7 2014 February 24, 2014 U.S. Army Corps of Engineers Regulatory Field Office 2407 West Fifth Street Washington, NC 27889 Attention: William Wescott 20140229 MAR - 4 2014 IV Subject: Request for a NW i Permit and corresponding DWQ 401 certification for the placement of 0.095 acres of wetland fill, associated with lot improvements to Mrs. Julia C. Hutcherson's property in Ocracoke, Hyde County. This letter is requesting the issuance of a NW 18 permit for the proposed filling of 0.095 acres of wetland on property owned by Mrs. Julia C. Hutcherson in Ocracoke, Hyde County. The permanent fill is being proposed to level the project area grade, which will enhance the properties suitability for placement of a small commercial retail Greenhouse business. The current project area, consist of two upland areas divided by a wetland bay draw, which is illustrated on the provided wetland plat. The wetland is characterized as a shrub /pine woodland. It appears to have some history of being cleared in the past and utilized as a storage area for scrap items. That use has not occurred for some time and it has been allowed to re- vegetate to its current state. In order to use the lot effectively for the proposed retail business, it will be necessary to connect the two upland grade elevations for a consistent level project area. This will be done by bringing in suitable fill material to be placed within 0.095 acres of low wetland, and raise the grade to match the adjacent upland elevations. The proposed fill area will be clearly marked and stabilized to prevent any off site erosion beyond the permitted boundaries. Included with this letter are the location map, PCN, and proposed permit fill plat. If you have questions or need additional information, please call me at (252) 312 -3692. Sincerely, Clay Willis Cc: Anthony Scarborough, DWQ Greenhouse Project - Jennifer Rich (Julia C. Hutcherson Property) .�'1 � i +' '� 1 i -� •~ `' •�w1. ���ti.� � -'� 1 j1�tl '¢+�� �•1• , "may.. �, '/Ael AA YJ It i; f ,fti •4* ' *' �ir� Ile -,tit. - ','I •�• • • ,l �._.:, �:"'. '* ' i 1• , ' • �.- * �`� •' t`'c'bj�etrLo�atiorr. ;i:,�•f �tt�— -,.. fr r - - 75.976 � :. .. : ' .•.. ,`� - --� _. - ter - • • - - • `' •' .�; -i; ' °. - .� � ' �••'.. 33 1 Q844 7. ILA •;w- � II •'.: � � . � •� /. � •` '- - '� - 0 0.125 0.25 0.5 Miles III l l l i l 11 I 1 i 1 I approximate carna line/flags Flags Al - AIO (confirmed by CAMA) • • A 1C Proposed Wetland Fill Area 0.095 acres , > X. of 1�t Q M-fclftbg Q-4vift kx"4 AP i �Y 04 i i 1-4,j �c / /f/ -A Ui (000='X < 0 (.)0 C:) 0 9 W cli , co 00 —c) > m CL 0 N 03 0) — L N 0 H t b 0 E E , - 5 E 05 ! Z � L) � Z Z z 0 U - mz (D F c: (� C: Q 6 3: o o Paz oe z 21 E E § E $ ,K C K o "F 0 70 x. LL If u c Q w. w c 02 1 �b-, (2) Cl) c C) C') ': Lo 0, OiU) 0- � OMA ),o Cn•.- 0 CD c).— 0 4, Cx— m C. C: m m (L) 0) CY) 013' M C) > > > CL) (L) -i - - -OC 713§ 0 U)'(6 Q),.T CL) 0-- 41 C) to N Z z Cf) U-) 0 . I "t W Lu ER C) -A Ui (000='X < 0 (.)0 C:) 0 9 W cli , co 00 —c) > m CL 0 N 03 0) — L N 0 H t b 0 E E , - 5 E 05 ! Z � L) � Z Z z 0 U - mz (D F c: (� C: Q 6 3: o o Paz oe z 21 E E § E $ ,K C K o "F 0 70 O�OryV4yATT �'q Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Page 1 of 10 PCN Form — Version 1.4 January 2009 Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: X Section 404 Permit Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: NW 18 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? X Yes No 1 d. Type(s) of approval sought from the DWQ (check all that apply): 401 Water Quality Certification — Regular X Non -404 Jurisdictional General Permit 401 Water Quality Certification — Express Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: X Yes No For the record only for Corps Permit: Yes X No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. Yes X No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. X Yes No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes X No 2. Project Information 2a. Name of project: Jennifer Rich — Greenhouse Project 2b. County: Hyde 2c. Nearest municipality / town: Ocracoke 2d. Subdivision name: Not Applicable 2e. NCDOT only, T.I.P. or state project no: Not Applicable 3. Owner Information 3a. Name(s) on Recorded Deed: Julia C. Hutcherson (Tommy Hutcherson) 3b. Deed Book and Page No. Deed Book # 147, page 850 3c. Responsible Party (for LLC if applicable): 3d. Street address: P.O. Box 247 3e. City, state, zip: Ocracoke, NC 27960 3f. Telephone no.: 252 - 921 -0282 3g. Fax no.: 3h. Email address: Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information.(if different from owner) 4a. Applicant is: Agent Other, specify: 4b. Name: 4c. Business'name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: rt 5. Agent/Consultantlnformation'(if applicable) 5& Name: Clay Willis 5b. Business name (i(applicable): 5c. Street address: 208 Olde Colony Drive 5d. City; state, zip: Edenton, NC „27932 5e. Telephone =.: 252 -312 -3692 5f. Faz no.: 5g. Email address: cwsalmoncreek @gmail.com Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property, identification no. (tax PIN or parcel ID,): 9500 -48 =0045 1b. Site coordinates (in decimal degrees): I Latitude: 35.10844 Longitude: - 75.9,7673 1 c. Property size: 3.82 acres 2. Surface Waters 2a. Name of,nearest body of water to proposed project: Pamlico Sound / Ocracoke Inlet 2b. Water Quality Classification of nearest receiving water: PA 'HQW 2c. River basin: ar -, ,Pamlico River Basin 3. Project Description 3a. Describe the existing conditions on the site;and the general land use in the vicinity of the project.at the time of this application: The project site islocated within an existing- residential / business area along NC 12 (Irvin Garrish Highway) in Ocracoke. This property abuts developed lots to the north and west. TheFeast and southern side of the project area is undeveloped marsh. Currently, the project area is a forested shrub /pine woodland. There is some evidence of previous disturbance and property use, butahe land has been allow. ed,to vegetate and become a shrub %pine woodland. The�adjacent properties area commercial grocery and residential home site. 3b. List the total estimated acreage of-all existing wetlands on the property: 2 acres (87120 so. feet) is an approximate estimate, which includes the entire surveyed property boundary. 3c. List;the total estimated linear feet of all existing,streams (intermittent,and,perennial) on the property: Approximately 80 feet of open water man -made ditch along the eastern side of the property. This ditch continues on beyond the property. 3d. Explain.the, purpose.of the proposed project: To provide °adequate fill /grade on the site, rraking',it suitable for the,pl'acement,of a small,locally,owned,Greenhouse Business. 3e. Describe the overall project, in, detail,, including the,type of equipment to.be -used: The project intends'to haul suitable fill'material on to the project site, provide leveling ofahe,defined''low areas and adequate'grade for a,small retail commercial site. This will be accomplished by ,@ truck hauling fill material on to the lot and grading with a backhoe or skid steer type of equipment. The area to be filled will „not,exceed 0:-10 acres within the delineated wetland area. 4. Jurisdictional, Determinations 4a. Have jurisdictional wetland:or stream Aetermi nations .by the X Yes No Unknown ,Corps or State beenirequestedor'obtained,for this property'/ Comments: project incl6din all prior hases in the ast? 4b. Ifthe Corps made the jurisdictional determination; whattype X Preliminary tFinal of determination was, made? 4c. If'yes, who,delineated the jurisdictional -areas? Agency /Consultant Company_: Name (if known): Clay Willis 4d. If'yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. USACOE conf rmed the delineated wetland line,on,2 /19/2014 5'. .Project History 5a. Have permits or certifications been requested or obtained for Yes X No Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to'"help file' instructions., .6. Future. Project, Plans 6a. Is this a phased project? Yes X No Page 3 of 10 PCN Form —Version 1.4. January 2009 66. If'yes, explain. i Page '4 of'1 :0 PCN Form —Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sectionswere completed below for ,your project-.(check all that,apply): X Wetlands Streams — tributaries Buffers Open Waters Pond Construction 2. Wetland]mpacts, If'there are wetland impacts proposed on the -site„ then complete this question for each wetland area impacted. '2a. Wetland impact number or Permanent (P) or Tem ora (P)- . 2b. Type of`impact 2c: Type of wetland 2d. Forested 2e. Type of jurisdiction, Corps (404,10) or DWQ (401, other) 2f.;Area " -of 'impact . (acres) Permanent Fill Shrub /Pine Yes Corps 404 0.095 W2 W3 W4 W5 W6 2g. Total Wetland Impacts: 0:095 2h. Comments: 3. Stream Impacts 'If there are,pecennial or intermittent;stream impacts (including temporary;impacts) proposed on the site, then complete this question for,all stream sites'impacted. NONE'PROPOSED 3a. Stream impact number Permanent (P) or Temporary (,T). 3b. Type of impact 3c. Stream name '3d. Perennial (PER) or intermittent (NT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact . length (linear feet) S1 S2 S3 S4 S5 S6 3h.. Total stream and tributary impacts 9i. Comments: Page ,5, of ,10 PCN Form — Version 1.4 January 2009 ,4. Open Water•tmpacts If'there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any otheropen•water of the U.S. then individually list all open-water impacts below, NONE PROPOSED 4a. Open water impact number Permanent (P) or Temporary T 4b. Name•of'waterbody (if °applicable 4c. Type�of impact 4d. Waterbody type 4e.. Area of impact (acres) 01 02 03 04 4f. Total,open water'impacts 4g. Comments: 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. NONE PROPOSED _ 5a. Pond ID number 5b. Proposed,use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream,impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 P2• 5f: Total: 5g. Comments: - 5h. Is a dam high hazard permit required? Yes No If "yes,, permit ID no: 5i., Expected pond surface, area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts. (for DWQ) Projectsite is not,subject;to the Tar- Pamlico,Buffer Rules If'projecfwill, impact;a protected riparian, buffer,, then complete,the,chart below. If yes, then individually,list all buffer'impacts below. If any impacts require. miti ation, then you MUST, fill outSectiob:D of this:form. 6a. Project is 'in which protected basin? Neuse Tar - Pamlico Catawba Randleman Other: 6b. Buffer Impact number— Permanent,(P) or T.em ora T 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required, ?, 6f. Zone 1 impact, (square feet ) '6g. Zone'2 irnpact= (square feet 61 .62. • B3' B4 B5 B6 6h. Total Buffer Impacts: 6i. Comments: Page,�5 of 10 D. Impact Justification and Mitigation 1. AvoidanewandWinimization 1a., Specificallytdescribe measures taken to;avoidor,minimize the proposed impacts in desighing''project. The proposed; wetland fill area is the amount needed to provide adequate useable-space for the ksmall scale retail. greenhouse: The current lot grade is low within the central part of the lot, making it difficult to effectively use,the. property": Fill will'only be Placed within the area needed to effectively utilize the property for the greenhouse business. 1b. Specifically describe measures taken to avoid or minimize the, proposed impacts,through construction techniques. Vegetation disturbance will be kept to the minimum •amount necessary,for the, lot improvements. The project will, install erosion control measures during the. 'fill activity to,el ninate >any off -site sedimentation. Adjacent wetlands can be clearly marked to avoid any potential unintended disturbance. 2. Compensatory Mitigation for Im act&to- Waters of the U.S.- or'Waters of the'State 2a. Does the'project; require .Compensatory Mitigation for impacts to Waters of the U.S. or Waters-of the'State? Yes X No 2b. If yes, mitigation is required by (check.all,,that apply): DWQ ,Corps 2c: If'yes, which mitigation optionwill be,used for Phis project? Mitigation bank, Paymenttoiin -lieu fee program Perm ittee Responsible Mitigation 3. Complete ifUsing a Mitigation Bank NOT APPLICABLE 3a. Name of Mitigation. Bank: 3b: Credits Purchased (attach receipt and �letter) , Type: Type: Type: Quantity: Quantity: Quantity:, 3c. Comments: 4. Com leteif,Makin a Pa ment,to In -lieu Fee Program NOT APPLICABLE 4a. Approval letter from in -lieu fee program is attached. 4b. Stream mitigation requested: linear,feet 4c. lfusing:stream mitigation ,,stream'temperature:, 4d. Buffer mitigation:requested (DWQ only): squarefeet 4e. Riparian wetland-mitigation requested: acres 4f. Non - riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation,requested: acres 4h. Comments: 5. Complete if'Using atPermittee Responsible Mitigation Plan NOT APPLICABLE 5a. If -using ta, permittee:respon'sible mitigation plan`, provide a description ofthe proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4,January 2009 6. Buffer- Mitigation,(State Regulated Riparian;Buffer Rules),— required'by DWQ 6a. Will'the project result in an impact within a protected riparian buffer that requires buffer,mitigation? Yes X No 6b. If'yes, then identify the °square feet of,impact to each zone of the riparian buffer that requires mitigation. Calculate the amounf.of mitiigatiomrequired. Zone ,6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone'2, 1.5 6f. Total buffer mitigation required: 6g. If buffermitigation is required; discuss what type of mitigation is proposed (e.g., payment.to private mitigation bank, permittee.responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. -Comments: Page 7 of 10 E. Stormwater Management and Diffuse flow Plan (re(tuired by DWQ) 1. Diffuse Flow Plan la. Does•the project include or is it adjacent to protected riparian Yes X No buffers identified within oneof the NC Riparian: Buffer 1 b. If yes, then is,a diffuse flow plan included? If "no, explain why. Yes No 2. Stormwater Management Plan 2'a. What is the overall percent imperviousness )of this project? Project•creates less than 1%a.of impervious'surfacwon the lot 2b. Does.this project.require a Stormwater Management Plan? Yes 'X No 2c.. If this project DOES,NOT'require a Stormwater Management Plan, explain why: The proposed development will account for'no more'than approximately 0.35 acres of disturbance. This will,be below,the threshold of land ,disturbance requiring a Sediment and Erosion �Control,Plan: Proposed �projecYwill not require,a�CAMA major permit: 2d. If'this project DOES require.a Stormwater Management, Plan, then provide a brief, narrative description of the plan: Not Applicable r 2e. Who,will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater,Review 3a. In which local government's,'urisdiction is,this, project? Hyde, Count Phase II NSW USMP 3b. Which of the following locally - implemented stormwater Water Supply: Watershed Other: management programs a PP I Y ( check all that-apply): _ 3c. Has the approved Stormwater Management Plan with proof Yes X No of approval been attached? 4. DWQ Stormwater Program Review Coasta[counties HQW ORW 4a. 'Which,of the following state - implemented stormwater management Session Law 2006 =246 programs apply Other: (check all that apply): 4b. Has the approved Stormwater Management Plan with proof Yes No of approval beemcittached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate Yes No requirements? 5b. Have all of the 401 Unit,submittal requirements been met? Yes No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1& Does the project,involve an expenditure,of public (federal /state /local) funds or the Yes X' No ,use of public (federal /state) land? 1 b. If "you answered "yes" to the above, does the project require preparation of an environmental, document pursuant "to the requirements of the National or State Yes No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes' to the above, has the document review been finalized by the. State Clearing House? (If so, attach a copy of the NEPA;or SEPA final approval No letter.) Yes Comments: 2. Violations-(DWQ Requirement) 2a. Is the site in violation oUDWQ'WeiIand Rules;(15A NCAC -2H .0500),; Isolated Wetland Rules (15A NCAC -2H .1 300), DWQ Su face; Wateraor Wetland °Standards, Yes X No 'or rRiparian Buffer Rules (45XNCAG2B'.0200)? 2b. Is this an'after-,the -fact permit application? Yes X No 2c. If you answered "yes" to one or both of the above, questions, provide an, explanation of the violation(s): 3: Cumulative Impacts,(DWQsRequirement) 3a. Will this project (based oh °past and', ,;reasonably,anticipaied'future impacts), result in Yes X N'o, additional development, which could impact-nearby downstream .water quality? 3b. If you answered "yes" to the above,; submit;a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ,Requirement) 4a. Clearly detail the,ultimate treatment methods and dispositiom(non- discharg&or discharge) of wastewatergenerated from the; proposed ,project, .or aVailable,capacity of the subject'facility: No wastewater will .result.from°the proposed fill activities associated with this permit application. Page 9 of 40' RCN Form,— Version 1,.4 January 2009 5. Endangered Species and Designated Critical Habitat(Corps Requirement) 5a. Will this project occur in or-near-an area with federally protected species or Yes X No habitat? 5b. Have you checked with the USFWS, concerning Endangered,Species Act Yes X No impacts.. ?, 5c. If yes, indicate the. USFWS Field'Office you have contacted: 5d. What data sources did you us_ a to determine,whether your site would impact Endangered Species or Designated Critical Habitat? Review the project area habitat for listed species in Hyde County and the NO Natural Heritage Database. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? Yes X No 6b. What data:sources did you use to determine whether your,site,would impact Essential Fish Habitat? NMFS Essential Fish Habitat`resource list 7. Historic or'Prehistoric Cultural Resources,(Corps Requirement) 7a. Will this project occur in or near an area thatthe state, federal or tribal governments have designated as having historic or,cultural preservation Yes X, No status (e.g., National Historic Trust designation or properties,significanf,in North Carolin&history-and archaeology)? 7b. What data sources did you use•to determine whether,your site would impact,,, historic or archeological resources? NO State•Historic Preservation Maps — The project area is outside the Listed Historic District. 8. Flood'Zone Designation (Corps Requirement) 8a. Will this project.occur in a,FEMA- designated 1 00-year floodplain? X Yes No 8b. If yes, explain,how project meets FEMA requirements: The proposed 0 :095,acres of fill will not impact the FEMA floodplain designation. The proposed work will follow_ local building, codes as defined by the building permits and Flood, zone requirements. 8c. What :source(s) did 'you use to make the floodplain determination? NO Flood plain mapping program *�signa�tlure Applicant/Agent' Printed Name Date ent's at a (A ent's orily if an authoriza tion letter licant'is rovided. M Page 16 of 10