HomeMy WebLinkAboutNC0082694_Application (FTSE)_20220210United States Environmental Protection Agency
E PA Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code
1 IN I 2 L
21IIIIII
NPDES yr/mo/day Inspection
3 I NC0082694 111 121 22/01/25 117
Type
1810I
IIIIIIIIIII
Inspector Fac Type
191S I 2011
IIIIIIIIIIIIIIIIII I IIIIII
P6
Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved
67I2.0 I 70I2 I 71IN I 72 I N I 731 1 74 751
I I 1
I I I I I I 180
l
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
Dallas WTP
1342 Dallas Stanley Hwy
Dallas NC 28034
Entry Time/Date
11:15AM 22/01/25
Permit Effective Date
15/10/01
Exit Time/Date
12:45PM 22/01/25
Permit Expiration Date
20/07/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Michael Wayne Hurt/ORC/704-736-8970/
Zackary L Foreman//704-922-1309 /
Other Facility Data
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
James M Palenick,210 N Holland St Dallas NC 280342749/Interim Town
Manager/704-922-3176/7049224701 No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Flow Measurement Operations & Maintenar Records/Reports
Self -Monitoring Progran Sludge Handling DispoFacility Site Review Effluent/Receiving Wate
Laboratory
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and
OriATuvia
Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers
,-DocuSigned by:
C -_4� DWR/MRO WQ/704-663-1699/
BB057A2DE017498...
Date
2/10/2022
Signature of Man
Andrew Pitne
@Frt'OAROviewer Agency/Office/Phone and Fax Numbers Date
7.'`' H"xb/R/MRO WQ/704-663-1699 Ext.2180/ 2.10.22
F161 FB69A2D84A3...
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page# 1
NPDES yr/mo/day
31 NC0082694 111 121 22/01/25
I17
Inspection Type
18 [j
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Page# 2
Permit: NC0082694
Inspection Date: 01/25/2022
Owner - Facility: Dallas WTP
Inspection Type: Compliance Evaluation
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new MODE
application?
Is the facility as described in the permit? • ❑ ❑ ❑
# Are there any special conditions for the permit? El • El El
Is access to the plant site restricted to the general public? • ❑ ❑ ❑
Is the inspector granted access to all areas for inspection? • ❑ ❑ ❑
Comment: The subject permit expired on 7/31/2020. The facility has submitted a permit renewal
and is operating under the expired permit in the meantime.
Record Keeping
Are records kept and maintained as required by the permit?
Is all required information readily available, complete and current?
Are all records maintained for 3 years (lab. reg. required 5 years)?
Are analytical results consistent with data reported on DMRs?
Is the chain -of -custody complete?
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Are DMRs complete: do they include all permit parameters?
Has the facility submitted its annual compliance report to users and DWQ?
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified
operator on each shift?
Is the ORC visitation log available and current?
Is the ORC certified at grade equal to or higher than the facility classification?
Is the backup operator certified at one grade less or greater than the facility
classification?
Is a copy of the current NPDES permit available on site?
Facility has copy of previous year's Annual Report on file for review?
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
❑ • ❑ ❑
• ❑ ❑ ❑
•
• ❑ ❑ ❑
❑ ❑ • ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
❑ ❑ • ❑
Page# 3
Permit: NC0082694
Inspection Date: 01/25/2022
Owner - Facility: Dallas WTP
Inspection Type: Compliance Evaluation
Record Keeping Yes No NA NE
Comment: at the time of the inspection it was discovered that the facility has been reporting Iron
levels in uq/I without conversion from mg/L. EDMR's need to be amended to reflect the
change. Otherwise, the records reviewed during the inspection were organized and
well maintained. Discharge Monitoring Reports (DMRs), Chain of Custodies (COCs),
ORC logs and Calibration logs, were reviewed for the period September 2021 through
November 2021.
Laboratory
Are field parameters performed by certified personnel or laboratory?
Are all other parameters(excluding field parameters) performed by a certified lab?
# Is the facility using a contract lab?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0
degrees Celsius)?
Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees?
Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees?
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
Comment: On -site field analyses (pH and total residual chlorine) are performed under field
laboratory certification #5606. K&W Labs (total suspended solids, metals, turbidity,
fluoride) and Meritech Labs (toxicity) have also been contracted to provide analytical
support
Effluent Sampling Yes No NA NE
Is composite sampling flow proportional? ❑ ❑ • ❑
Is sample collected below all treatment units? • ❑ ❑ ❑
Is proper volume collected? ■ ❑ ❑ ❑
Is the tubing clean? ❑ ❑ • ❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 ❑ ❑ • ❑
degrees Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type ❑ ❑ • ❑
representative)?
Comment: The subject permit requires effluent grab samples. At the time of the ispection the
chlorine curve was out of date and was last done in 2019.
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? ❑ • ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable • ❑ ❑ ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment: At the time of the inspection it was discovered that the Waste Water Treatment
backwash lagoon was overflowing and bypassing the treatment units.
The process control measurements (pH and total residual chlorine levels prior to drying
beds) were being properly documented and maintained on -site
Page# 4
Permit: NC0082694
Inspection Date: 01/25/2022
Owner - Facility: Dallas WTP
Inspection Type: Compliance Evaluation
Operations & Maintenance Yes No NA NE
Lagoons Yes No NA NE
Type of lagoons?
# Number of lagoons in operation at time of visit? 2
Are lagoons operated in? Series
# Is a re -circulation line present? El El • El
Is lagoon free of excessive floating materials? ■ El El El
# Are baffles between ponds or effluent baffles adjustable? • El El El
Are dike slopes clear of woody vegetation? • El El El
Are weeds controlled around the edge of the lagoon? • El El El
Are dikes free of seepage? El • El El
Are dikes free of erosion? • El El El
Are dikes free of burrowing animals? • El El El
# Has the sludge blanket in the lagoon (s) been measured periodically in multiple El El • El
locations?
# If excessive algae is present, has barley straw been used to help control the growth? El El ▪ El
Is the lagoon surface free of weeds? El • El El
Is the lagoon free of short circuiting? • El El El
Comment: At the time of the inspection it was discovered that the Waste Water Treatment
backwash lagoon was overflowing and bypassing the treatment units.
The facililty is equipped with two settling ponds (1-primary and 1-overflow). Overflow
pond was covered with weeds. The facility is equipped with dual pumps at the primary
pond to pump the wastewater onto the drying beds.
Drying Beds
Is there adequate drying bed space?
Is the sludge distribution on drying beds appropriate?
Are the drying beds free of vegetation?
# Is the site free of dry sludge remaining in beds?
Is the site free of stockpiled sludge?
Is the filtrate from sludge drying beds returned to the front of the plant?
# Is the sludge disposed of through county landfill?
# Is the sludge land applied?
(Vacuum filters) Is polymer mixing adequate?
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
❑ ❑ • ❑
❑ ❑ • ❑
Page# 5
Permit: NC0082694
Inspection Date: 01/25/2022
Owner - Facility: Dallas WTP
Inspection Type: Compliance Evaluation
Drying Beds Yes No NA NE
Comment: The facility is equipped with two drying beds (alternated). At the time of the inspection it
was evident the drying beds are in need of maintenance, the drying bed walls had
visible cracks and one of the drying beds was full of vegetation.
Flow Measurement - Effluent
# Is flow meter used for reporting?
Is flow meter calibrated annually?
Is the flow meter operational?
(If units are separated) Does the chart recorder match the flow meter?
Yes No NA NE
❑ ❑ • ❑
❑ ❑ • ❑
❑ ❑ • ❑
Comment: Instantaneous flows are based on calculations that include number of pumps, flow rate,
and pump run time
Effluent Pipe
Is right of way to the outfall properly maintained?
Are the receiving water free of foam other than trace amounts and other debris?
If effluent (diffuser pipes are required) are they operating properly?
Comment: Did not examine during the inspection.
Yes No NA NE
Page# 6