Loading...
HomeMy WebLinkAboutNCC205105_Annual Fee NOD Letter_20220218RCY COOPER Gownx ELIZABETH S. BISER 5 , f-Y BRIAN WRENN rxrq�-Xr 2/18/2022 Crosswind Development, Inc. Attn: William Wynn 2550 Capitol Drive, Suite 105 Creedmoor, NC 27522 Subject: Notice of Deficiency - Failure to Pay Annual Fee Invoice No. NCC205105-2022 Dear Permittee: You are receiving a Notice of Deficiency because the annual fee of $100.00 for coverage under NPDES General Stormwater Permit NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4). The annual fee was billed on 1/3/2022 and was due on 2/3/2022. The annual fee applies to the following construction site: Berklee Estates Subdivision, Phase II - Lots 25 & 26 3609 and 3613 Legato Lane, Wake Forest, NC Wake County Certificate of Coverage No. NCC205105 NC Reference No. NCG01-2020-5105 If the project was closed out prior to the invoice date, please request a Notice of Termination. Follow the instructions on the NPDES Construction Program website (deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice date, please pay the permit fee using the Stormwater ePayment website (deq.nc.gov/SW-ePayments). Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil penalty assessment of up to $25,000 per day for failing to maintain permit coverage. If you have any questions or concerns, please contact Aziza Selkane at aziza.selkane@ncdenr.gov or me at toby.vinson@ncdenr.gov. Sincerely, William E. Vinson, Jr. Chief of Program Operations Division of Energy, Mineral, and Land Resources Yu„ NIria Utpaffmemor @WVMffleMCd1Qohlity I ❑IVISICM^&gWeal BnALand Rteartes11E 512 NanhSalin6ury &rEI1612 AfH5rVioC&mI "Amigh.1orthCErolin92764-1h12 914.707.9200