Loading...
HomeMy WebLinkAboutNCC220495_ESC Approval Submitted_20220217Project ID: GASTO-2021-012 County: Gaston City: Dallas Address: Dallas Stanly Highway River Basin: Catawba Stream Classification: Other Submitted. By: Spencer Mountain Road VFD Date Received by LQS: November 12, 2020 Plan Type: New Dear Mr. Flanary: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. __..As. of.March-1,.2019;-all -rc,v-construction..activities-are requiredti`complete and submit an.electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the. above named project. The NOI form may be accessed at deq.nc.gov/NCG0L Please direct questions about the NOI form: to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days.: Initially, DEMLR will not charge a fee for coverage under the NCGOI permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This.fee. is to be sent to the DEMLR Stormwater Central Office.in Raleigh. 1 North Carolina Department of Environmental Qua* I Division of Energy, Mineral and Land Rewurces D FMooresville Regional Office 1.610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115 704,663.1699 Letter of Approval Spencer Mountain Road VFD December 10, 2020 Page 2 of 2 Title 15A NCAC 4B .01 1 S(a) and the NCGOI permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 1 I3A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing riaturai resources and adjoining properties. if, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Si rely r , James Moore Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval NCGO1 Fact Sheet em: Jeff@Mc2eng,com cc -.Inspection Department O 4-j ctj O ,t cn `1 cn o Z I v cd v a�i W `n 4-4 CARpL N r-.� +' coCd U '61 cd �-' ct03 a� Cd O � U �;- o ! p� �z•� o 0 cn 0 . cn ,� U i cd cn ! O