Loading...
HomeMy WebLinkAbout20220202 Ver 1_More Info Received_202112301 Anderson, Mitchell L From:Jeff Geisler <jgeisler@rumblingbald.com> Sent:Thursday, December 30, 2021 1:01 PM To:Boggs, Brandee C CIV USARMY CESAD (USA) Cc:Anderson, Mitchell L; Mike Williams; Givens, Dean Subject:Re: [External] Boat ramp repairs CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to  Report Spam.        Hello again,     I meant to put a #2 before the 2nd sentence.    The size of the cement pad that we want to refresh is 40’ x 15’.   What I outlined below is along the edges of the existing  pad (4’ x 40’ x 2 = 320).    Wishing everyone a happy and health New Year.    Jeff            To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internephoto Jeff Geisler General Manager, Rumbling Bald on Lake Lure   To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet. 828-694-3036 To help protect yMicrosoft Office pautomatic downlopicture from the jgeisler@rumblingbald.com To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet. 112 Mountains Blvd. | Lake Lure, NC 28746            To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet. On Dec 29, 2021, at 6:12 PM, Jeff Geisler <jgeisler@rumblingbald.com> wrote:    Hello Brandee,    1.  I talked to our cement contractor and he can do the poor the week of January 10.  I think the town is  going to start bringing the lake up February 1 so at 1’ per day from 12’ down, it will take about 8 days to  reach the bottom of the ramp.  That’s right at the margin.  I may be able to get the pour sooner.     2 Outside of the current ramp, we only need to place rock along the sides of the ramp, 3 or 4 feet on each  side for 40’, so about 320’ square.  This is to ensure that prop wash does not undermine the ramp song  the sides.     Does this make sense?    Jeff          On Dec 29, 2021, at 5:51 PM, Boggs, Brandee C CIV USARMY CESAD (USA)  <Brandee.C.Boggs@usace.army.mil> wrote:     And I’ll add my 2nd question to speed it up, how many more square feet are your  proposed new impacts? We only account for new/additional impacts below the full pool  elevation, so if you were to go over top of what is currently there, it would not count,  we only need to permit the additional area that is impacted below the full pool  elevation.  BB     From: Boggs, Brandee C CIV USARMY CESAD (USA)   Sent: Wednesday, December 29, 2021 5:46 PM  To: Jeff Geisler <jgeisler@rumblingbald.com>; Anderson, Mitchell L  <mitchell.anderson@ncdenr.gov>  Cc: Michael Williams <mwilliams@townoflakelure.com>; Givens, Dean  <loa@townoflakelure.com>  Subject: RE: [External] Boat ramp repairs     Hey Jeff,  My first question is‐ to do live concrete in Waters of the US, the concrete has  to completely cure which is considered 30 days. I was told (rumor mill) that TOLL is  bringing the lake back up at end of Jan, is that true? If so would you be able to meet that  timeline?  If so, lets continue discussing permitting options  BB     From: Jeff Geisler <jgeisler@rumblingbald.com>   Sent: Thursday, December 23, 2021 2:06 PM  To: Anderson, Mitchell L <mitchell.anderson@ncdenr.gov>  Cc: Boggs, Brandee C CIV USARMY CESAD (USA) <Brandee.C.Boggs@usace.army.mil>;  Michael Williams <mwilliams@townoflakelure.com>; Givens, Dean  <loa@townoflakelure.com>  Subject: [URL Verdict: Neutral][Non‐DoD Source] Re: [External] Boat ramp repairs         Hello Mitchell,      Thank you for the informative email regarding the process going forward.  We will begin  work accordingly once we have the NWP information.  3    Wishing all a very Merry Christmas and a happy and healthy holiday season.     Regards,  Jeff                          <image007.jpg> Jeff Geisler  General Manager, Rumbling Bald on Lake Lure    <image002.jpg> 828-694-3036  <image002.jpg> jgeisler@rumblingbald.com  <image002.jpg> 112 Mountains Blvd. | Lake Lure, NC 28746      <image008.jpg> <image008.jpg> <image008.jpg> <image008.jpg>         <image002.jpg>On Dec 22, 2021, at 2:45 PM, Anderson, Mitchell L  <mitchell.anderson@ncdenr.gov> wrote:     Hello Jeff,     I hope you are doing well and enjoying the holiday season.     The Unites States Army Corp of Engineers (USACE) must determine  which Nation Wide Permit (NWP) your project falls under before The  North Carolina Division of Water Resources (Division) can provide  specific details on permitting requirements.     Please let me know if a determination has been made at this time.     In the meantime, below is general information regarding the proposed  boat ramp work in Lake Lure (Classification B;Tr).     Most work in Lake Lure often falls under USACE NWP #3 for  maintenance or USACE Regional General Permit (RGP) #30 for work in  lakes and reservoirs.     The corresponding Water Quality Certification (WQC) for NWP #3 is  General Certification (GC) #4132. The corresponding WQC for RGP #30  is GC #4145     4 These general permits and certifications can be found  at https://deq.nc.gov/about/divisions/water‐resources/water‐quality‐ permitting/401‐buffer‐permitting/general‐certifications        As lake lure is designated as Trout waters, coverage under GC4145  requires written authorization from the Division for any permanent  impacts such as the use of fill, concrete, pavers, etc.     Coverage under GC4132 requires written authorization from the  Division for any impacts equal to or greater than 1/10 an acre.     Please use the link below to submit a PCN form to DWR for the  proposed projects.     Please note, the project must also meet all conditions listed within the  certification to be covered. If all conditions cannot be met, an individual  401 WQC may be required.      Online Submission:   https://deq.nc.gov/about/divisions/water‐resources/water‐quality‐ permitting/401‐buffer‐permitting/application‐forms‐help‐documents              Below are reference links for convenience:     NCDEQ online submission page. This page contains the above  submission information:  https://deq.nc.gov/about/divisions/water‐resources/water‐quality‐ permitting/401‐buffer‐authorization/application‐forms     NCDWR FAQs for 401 permitting:  https://deq.nc.gov/about/divisions/water‐resources/water‐quality‐ permitting/401‐buffer‐permitting‐branch/frequently  Please do not hesitate to ask any questions.     Thank you,  Mitchell Anderson        Mitchell Anderson  Environmental Specialist – Asheville Regional Office  Water Quality Regional Operations Section  NCDEQ – Division of Water Resources  2090 U.S. Hwy. 70  Swannanoa, N.C. 28778    828-296-4662 office  mitchell.anderson@ncdenr.gov  <image001.png>     Email correspondence to and from this address is subject to the  5 North Carolina Public Records Law and may be disclosed to third parties           From: Jeff Geisler <jgeisler@rumblingbald.com>   Sent: Wednesday, December 15, 2021 8:19 AM  To: brandee.c.boggs@usace.army.mil; Anderson, Mitchell L  <mitchell.anderson@ncdenr.gov>  Cc: Mike Williams <mwilliams@townoflakelure.com>; Givens, Dean  <loa@townoflakelure.com>  Subject: [External] Boat ramp repairs     CAUTION: External email. Do not click links or open attachments unless you  verify. Send all suspicious email as an attachment to Report Spam.        Hello Brandee, Mitchell,         Attached are pictures of the two boat ramps at Rumbling Bald which  we’d like to repair while the lake is down.     Main Ramp  Main ramp 1.jpg shows the significant drop from the top of the ramp to  where Roger Peterson (the guy in the red jacket) is standing.   Basically,  we’d like to pour cement on top of what’s there and level off the ramp.       Backup (Emergency) Ramp  Line 1 in the overhead photo of the emergency ramp is the path for  boats to enter the water as designed by the ramp which was installed  before the marina.  Line 2 is the path we need to smooth over by  busting out some concrete and replacing it with something with a  different slope.  The Backup ramp 2.jpg shows the current slope along  line 2 which makes for an interesting process to get a boat into the  water.     The immediate need is to rework the main ramp as it is used 98% of the  time during the season.       What I need to know is whether these changes are possible and what is  required to get approval to do this work.       Thanks in advance for any help you can provide our efforts and feel free  to call/email with any questions this request presents.     Regards,  Jeff              6 <image002.png>     <image003.jpg><image004.jpg>     <image009.jpg> Jeff Geisler  General Manager, Rumbling Bald on Lake Lure    <image010.jpg> 828-694-3036  <image011.jpg> jgeisler@rumblingbald.com  <image012.jpg> 112 Mountains Blvd. | Lake Lure, NC 28746      <image008.jpg> <image008.jpg> <image008.jpg> <image008.jpg>         <image015.jpg>