SEDIMENT AND EROSION CONTROL & CONSTRUCTION STORMWATER
INSPECTION REPORT
Dear Sir or Madam:
Attached is a copy of the inspection report prepared following an onsite inspection of the project
referenced on the report. This report is intended to inform you of the project's compliance with
the North Carolina Sedimentation Pollution Control Act of 1973 and Construction NPDES
Stormwater General Permit.
Please review this report carefully as it may contain corrective actions needed and/or comments
which will assist you in meeting the required performance standards.
It is our desire that any and all possible problems be discussed and resolved at the earliest
possible time. To facilitate this effort, please contact me at the address/phone number below
should you have any questions.
Sincerely,
1
l
James B. Edwards
Environmental Senior Specialist
(252) 946-6481
Enclosure: Sediment/Construction Stormwater Inspection Report
North Carolina Departttient of Enviroritnerital Qtaalitp 1 Division of Energy, Llineral and Land Resources
y r- Washington Regional Office j 943 Washingzan Square 4ialt Washington, North Carolina 27889
oe�.,nme�!�temironmenur0ua .00ooz, 252a46.6481
North Carolina Department of Environmental Quality
Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481
County: Craven Project: New Aircraft Rescue and Firefighting
Person financially responsible: Coastal Carolina Regional Airport - Andrew Project #
Shorter
Address: 200 TERMINAL DR, NEW BERN NC 28562, New
1. Project Location: Terminal Drive, New Bern
Pictures: Yes - Digital
2. Weather and soil conditions: sunny, cool, dry
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes
5. Violations:
River basin: Neuse
CRAVE-2020-018
Initial inspection: No
If no, check violations below:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): Mr. Ed Martin
Inspection report: Sent Report
9. Corrective action needed: None at this time
Title: Operations Manager
Date given/sent: February 04, 2022
Permanent ground cover sufficient to restrain erosion has been established. No additional
self monitoring or self -inspections are required. Project is in compliance and released under the SPCA.
10. Comments: Termination of coverage under the NPDES General Stormwater Permit for Construction Activities
(NCGOI) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available
at: https:/Iedoes.deg.ne.gov/Forms/NCG01-Termination. Please note that this correspondence must be
uploaded as part of completing the NOT process.
Reported by: James Edwards Others present: Workers
Date of inspection: February 03, 2022 Time arriving on site: 12:00 PM Time leaving site: 12:40 PM
cc: