Loading...
HomeMy WebLinkAboutNCC200632_NOT Closeout Documents_20220215ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality SEDIMENT AND EROSION CONTROL & CONSTRUCTION STORMWATER INSPECTION REPORT Dear Sir or Madam: Attached is a copy of the inspection report prepared following an onsite inspection of the project referenced on the report. This report is intended to inform you of the project's compliance with the North Carolina Sedimentation Pollution Control Act of 1973 and Construction NPDES Stormwater General Permit. Please review this report carefully as it may contain corrective actions needed and/or comments which will assist you in meeting the required performance standards. It is our desire that any and all possible problems be discussed and resolved at the earliest possible time. To facilitate this effort, please contact me at the address/phone number below should you have any questions. Sincerely, 1 l James B. Edwards Environmental Senior Specialist (252) 946-6481 Enclosure: Sediment/Construction Stormwater Inspection Report North Carolina Departttient of Enviroritnerital Qtaalitp 1 Division of Energy, Llineral and Land Resources y r- Washington Regional Office j 943 Washingzan Square 4ialt Washington, North Carolina 27889 oe�.,nme�!�temironmenur0ua .00ooz, 252a46.6481 North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 County: Craven Project: New Aircraft Rescue and Firefighting Person financially responsible: Coastal Carolina Regional Airport - Andrew Project # Shorter Address: 200 TERMINAL DR, NEW BERN NC 28562, New 1. Project Location: Terminal Drive, New Bern Pictures: Yes - Digital 2. Weather and soil conditions: sunny, cool, dry 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: River basin: Neuse CRAVE-2020-018 Initial inspection: No If no, check violations below: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Mr. Ed Martin Inspection report: Sent Report 9. Corrective action needed: None at this time Title: Operations Manager Date given/sent: February 04, 2022 Permanent ground cover sufficient to restrain erosion has been established. No additional self monitoring or self -inspections are required. Project is in compliance and released under the SPCA. 10. Comments: Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGOI) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https:/Iedoes.deg.ne.gov/Forms/NCG01-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: James Edwards Others present: Workers Date of inspection: February 03, 2022 Time arriving on site: 12:00 PM Time leaving site: 12:40 PM cc: