Loading...
HomeMy WebLinkAbout20140230 Ver 1_401 Application_20140314March 6, 2014 Ms. Karen Higgins, Supervisor Wetlands Compliance and Permitting Unit NCDENR — Division of Water Resources Water Quality Program Stn Floor Archdale Building 512 North Salisbury Street Raleigh, North Carolina 27604 Dear Ms. Higgins: w cc H cr w LL) a � � U N ENGINEERING & 0U R TE�Y CnPY RE: Pre - Construction Notification Form Mill Creek Culvert Replacements Town of Highlands Macon County, North Carolina On behalf of the Town of Highlands, please find enclosed a Pre - Construction Notification Form and supporting documentation for the above referenced project for your information. The Town of Highlands will be requesting a Nationwide Permit for the construction from the United States Army Corps of Engineers. The project consists of the replacement of culverts currently in a state of disrepair with precast concrete 3 -sided bridges at three (3) locations as shown on the location map. The project falls below the requirements for a 401 permit according to General Certification 3883. Please feel free to contact our office if you have any questions or would like to discuss the project further. Sincerely, McGILL ASSOCIATES, .A. MICHAEL J. WARESAK, PE Senior Project Manager Enclosures cc: Robert A. Frye, Jr., Highlands Town Manager P: \2011\1 1.00304\Permits\CORPS\DWQ06mar 14. doc 55 Broad Strcct P.O. Box 2259 Asheville, North Carolina 28801 Asheville, North Carolina 28802 MAR 1 0 2014 r1 ph. 828.252.0575 � I f: 828.252.2518 www.mcgillengineers.com o18, wnrF9oG r Office Use Only. Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Pre - Construction Notification (PCN) Form p� A. Applicant Information COU �_ --,\c�%o0 1. Processing dun— U 1a. Type(s) of approval sought from the Corps: Q Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 3 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? I ❑ Yes ❑X No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ❑ 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑X Yes ❑ No For the record only for Corps Permit: ❑ Yes X❑ No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ❑X No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes Q No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes Q No 2. Project Information 2a. Name of project: Proposed Mills Creek Culvert Replacements 2b. County: Macon 2c. Nearest municipality / town: Highlands 2d. Subdivision name: 2e. NCDOT only, T.I P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): Bob Frye, Town Manager 3d. Street address: Post Office Box 460 3e. City, state, zip: Highlands NC 28741 3f. Telephone no.: (828) 526 -2118 3g. Fax no.: (828) 526 -2595 ZO 14 3h. Email address: bob.frye @highlandsnc.org MNR Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address- 5. Agent/Consultant Information (if applicable) 5a Name Mike Waresak, PE 5b Business name (if applicable): McGill Associates, P.A. 5c Street address: 55 Broad Street 5d City, state, zip: Asheville, NC 28801 5e. Telephone no.: (828) 252 -0575 -5f. Fax no.: (828) 252 -2518 5g. Email address- mike waresak @mcgillengineers.com Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property, identification no. (tax PIN or parcel ID): See Attached Sheet 1b. Site coordinates (In decimal degrees): Latitude, Longitude: 1c. Property size. acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Mill Creek -2b. Water Quality Classification of nearest receiving water. B; Tr. 2c River basin. Little Tennessee 3. Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Area is generally residential and light commercial 3b. List the total estimated acreage of all existing wetlands on the property: 0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 0 3d Explain the purpose of the proposed project - Replace deteriorated, fading road crossing culverts 3e. Describe'the overall project in detail, including the type of equipment to be used Replacement of corrugated metal culverts with precast bridges at three locations using rubber tire backhoe /front loader and trackhoe as required 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ❑ Yes ❑X No ❑ Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? E] Preliminary El Final 4c. If yes, who delineated the jurisdictional areas? Name (If known): Agency /Consultant Company: Other: 4d If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past El Yes Q No El Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ❑X No 6b. If yes, explain Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary la Which sections were completed below for your project (check all that apply): ❑ Wetlands ❑X Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number, Permanent (P) or Temporary T 2b Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 - Choose one Choose one Yes /No - W2 Choose one Choose one Yes /No - W3 Choose one Choose one Yes /No - W4 - Choose one Choose one Yes /No W5 Choose one Choose one Yes /No - W6 Choose one Choose one Yes /No 2g. Total Wetland Impacts: 2h. Comments: Not Applicable 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted 3a Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c Stream name 3d Perennial (PER) or intermittent (INT)? 3e Type of jurisdiction 3f Average stream width (feet) 3g. Impact length (linear feet) S1 T Excavation Mill Creek PER Corps 10 40 S2 T Excavation Mill Creek PER Corps 10 40 S3 T Excavation Mill Creek PER Corps 12 40 S4 Choose one - S5 - Choose one - S6 Choose one - 3h. Total stream and tributary impacts 120 3i Comments: Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then, individually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 - Choose one Choose O2 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: Not ApplicaMe 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a Pond ID number 5b Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: Not Applicable 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no- 5i. Expected pond surface area (acres): 51. Size of pond watershed (acres): 5k Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below If any impacts require mitigation, then you MUST fill out Section D of this form 6a. Project is in which protected basin? ❑ Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other. 6b. Buffer Impact number — Permanent (P) or Temporary T 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet ) 6g Zone 2 impact (square feet B1 Yes /No B2 - Yes /No B3 Yes /No B4 - Yes /No B5 - Yes /No B6 Yes /No 6h. Total Buffer Impacts: 6i. Comments. Not Applicable Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project Replacement of existing culverts is necessary Proposed construction of precast bridge sections will somewhat minimize the amount of stream bed required to be excavated Natural stream bed materials will be replaced after construction 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. All measures moll be taken to minimize the stream impacts during construction and only that required for the removal of existing culverts and placement of the proposed precast bridge sections will be utilized 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ❑X No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this projects ❑ Mitigation bank El Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b Credits Purchased (attach receipt and letter) Type: Choose one Type Choose one Type. Choose one Quantity: Quantity. Quantity. 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f Non - riparian wetland mitigation requested. acres 49. Coastal (tidal) wetland mitigation requested acres 4h. Comments: S. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? El Yes No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ❑X No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 2b. Does this project require a Stormwater Management Plan? ❑ Yes ❑X No 2c If this project DOES NOT require a Stormwater Management Plan, explain why: Low density criteria met. Disturbed area will be less than 24% impervious Areas disturbed during installation of sewer pipe will be restored to pre- existing ground cover conditions 2d If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan. 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? Not Applicable ❑ Phase II 3b. Which of the following locally - implemented stormwater management programs ❑ NSW apply (check all that apply): ❑ USMP ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑Coastal counties ❑HQW 4a. Which of the following state - implemented stormwater management programs apply ❑ORW (check all that apply): E] Session Law 2006 -246 ❑Other. 4b Has the approved Stormwater Management Plan with proof of approval been E] Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal /state /local) funds or the ❑X Yes ❑ No use of public (federal /state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑X No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c If you answered "yes "10 the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) Comments- 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ❑X No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after - the -fact permit application? El Yes ❑X No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ❑X No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non- discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or ❑ Yes ❑X No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑X Yes ❑ No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? North Carolina Natural Heritage Program website database indicates no known threatened or endangered (T &E) species occurrences within the proposed project area Project site has been previously disturbed and is generally within maintained road right -of -way 6. Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑X No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? National Marine Fisheries Service 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ❑X No status (e.g , National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? Desktop review of available website databases Project site has been previously disturbed and is generally within a maintained road right -of -way 8. Flood Zone Designation (Corps Requirement) -T-Z 8a. Will this project occur in a FEMA- designated 100 -year floodplain? Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: Project will improve flooding conditions by lowering the 100 -year flood elevations in the area A Conditional Letter of Map Revision (CLOMAR) has been submitted to the North Carolina Flood Mapping program and FEMA 8c. What source(s) did you use to make the floodplain determination? FEMA Map Number 3700754000J May 4, 2009 Pab ert4. Fr e l� 1 ✓ A pp licant/ 9 is Signature ° Applicant/Agent's Printed Name Date (Agent's signature is valid only if an authorization letter from the applicant is provided Page 10 of 10 ATTACHMENT PROPOSED MILL CREEK CULVERT REPLACEMENTS Mill Creek at N. 5th Street Crossing 35.0559538 N - 83.1934038 W Mill Creek at Laurel Street Crossing 35.0559698 N - 83.1946568 W Mill Creek at Spruce Street Crossing 35.0549198 N - 83.1955838 W BOTTOM 1 E PROPOSED 20'x26'x4' PRECAST CONCRETE 3 -SIDED BRIDGE / 3812 � 12" CMP EXPOSED PIPE 3811 (DO NOT DISTURB) 38p9 1� _ 38pg 31 / 387/ 1 0 \_ 30' b SANITARY SEWER MANHOLE --J/ TOP EL 3815 92' 8" DIP I E 3810 34' LP LAUREL STR EE APPLICANT TOWN OF HIGHLANDS POST OFFICE BOX 460 HIGHLANDS, NC 28741 PROPOSED CONSTRUCTION MILL CREEK CULVERT REPLACEMENTS / b Al 0 38j3\ 4 "� 38 13 Lj I / D h �i UP �� ry h� FnA �— 3811 O /p\ / / ? 0/p O 6 0/p /\ 20' �- EXISTING 3 - 48 "0 CORRUGATED METAL PIPE CULVERTS (TO BE REMOVED) /l_ I Q 14/ N. 5TH STREET CREEK IMPACT PROJECT. PROPOSED MILL CREEK CULVERT REPLACEMENTS ADJACENT PROPERTY OWNERS' LOCATION: MILL CREEK AT N. 5TH STREET: 35.055953 N, - 83193403 W amcG COUNTY STATE. A S S O C I A T E S MACON I NORTH CAROLINA ENGINEERING -PLANNING -FINANCE SCALE: 1"= 20' DATE: FEBRUARY 201 SHEET 2 OF 8 SSBROADS'rMM ASH9V=NC2=1 PH.(829)252-W5 FMMUCEVSEK-0459 SANITARY SEWER MANHOLE TOP EL 3811 76' LP rssw APPLICANT: TOWN OF HIGHLANDS POST OFFICE BOX 460 HIGHLANDS, NC 28741 PROPOSED CONSTRUCTION MILL CREEK CULVERT REPLACEMENT " OTIPF IQ I AEI • ♦ ry M� M� -- __ SANITARY SEWER MfNHOLE TOP EL 0 59' SHUT 381, 38i2 LAUREL STREET CREEK IMPACT PROJECT: PROPOSED MILL CREEK CULVERT REPLACEMENTS ADJACENT PROPERTY OWNERS: LOCATION • MILL CREEK AT LAUREL STREET- 35 055969 N, - 83194656 W McG COUNTY- STATE- A S S O C I A T E S MACON I NORTH CAROLINA ENGINEERING -PLANNING -FINANCE SCALE. 1"= 20' DATE: FEBRUARY 201 SHEET 3 OF 8 55BROADSntM ASHWLte, NCn8D> PILMS>zswsrs PRtMUCMSE#coass 1-112- Off 60 06, INN 38�0 SANITARY SEWER MANHOLE C�l TOP EL 3812 13' vr APPLICANT: TOWN OF HIGHLANDS POST OFFICE BOX 460 H|GHLAND5, NC 28741 PROPOSED CONSTRUCTION- MILL CREEK CULVERT REPLACEMENTS ` ` \ � � cp SPRUCE STREET CREEK IMPACT PROPOSED MILL CREEK CULVERT REPLACEMENTS ADJACENT PROPERTY OWNERS JAMES D OGLE HIGHLANDS COMMUNITY THEATER. INC. LOCATION MILL CREEK AT SPRUCE STREET 35054919 N, —83195583 W McG COUNTY STATE: MASSOCIATES MACON NORTH CAROLINA ENGINEERING -PLANNING -FINANCE D 6" THICK SIDEWALK (5TH STREET ONLY) ASPHALT OVERLAY 5' - SECTION B -B VARIES GUARDRAIL NATURAL CREEK BED AS REO D -F_ r - - - - - - - - - - - - - - - - - - - - - - - - - - - I- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - FOOTING SECTION A -A PRECAST CONCRETE 3 -SIDED BRIDGE DETAILS DIMENSIONS LOCATION A B N 5TH STREET 20' 4' -0" LAUREL STREET 26' 4' -6" SPRUCE STREET 24' 6' -6" APPLICANT. TOWN OF HIGHLANDS POST OFFICE BOX 460 HIGHLANDS, NC 28741 PROPOSED CONSTRUCTION MILL CREEK CULVERT REPLACEMENTS PROJECT PROPOSED MILL CREEK CULVERT REPLACEMENTS ADJACENT PROPERTY OWNERS LOCATION- MILL CREEK AT N. 5TH STREET: 35.055953 N, — 83.193403 W McG COUNTY STATE MASSOCIATES MACON NORTH CAROLINA ENGINEERING -PLANNING -FINANCE SCALE: NONE DATE. FEBRUARY 201 SHEET 5 OF 8 55BROAnSMM AMVRLE xcassm ex.(8U)252 -W5 IMMUM IK -0459 APPLICANT: TOWN OF HIGHLANDS POST OFFICE BOX 460 HIGHLANDS, NC 28741 PROPOSED CONSTRUCTION MILL CREEK CULVERT REPLACEMENTS MEDIUM CREEK CROSSING PROJECT: PROPOSED MILL CREEK CULVERT REPLACEMENTS ADJACENT PROPERTY OWNERS- LOCATION: • 1 —MILL CREEK AT N. 5TH STREET. 35055953 N, — 83193403 W 2 —MILL CREEK AT LAUREL STREET- 35 055969 N, —83194656 W 3 —MILL CREEK AT SPRUCE STREET 35 054919 N, — 83195583 W McG COUNTY: STATE: MASSOCIATES MACON NORTH CAROLINA EN GINEERING•PLANNING•FINANCE SCALE- NONE DATE- FEBRUARY 201 SHEET 6 OF 8 ssaxonDmm AsmmLLj,xcnwj M(M)25m75 FmmucENm#c-0a59 SAND BAG BERM EXISTING CREEK BANK SECTION AA TEMPORARY PIPE(S) AS REQUIRED (SIZED TO CARRY NORMAL FLOW) EXISTING CREEK BANK APPLICANT: TOWN OF HIGHLANDS POST OFFICE BOX 460 HIGHLANDS, NC 28741 PROPOSED CONSTRUCTION: MILL CREEK CULVERT REPLACEMENTS SECTION BB MEDIUM CREEK CROSSING ) AS REQUIRED NORMAL FLOW) .GS STREAM BED PROJECT. PROPOSED MILL CREEK CULVERT REPLACEMENTS ADJACENT PROPERTY OWNERS- LOCATION 1 —MILL CREEK AT N 5TH STREET. 35055953 N, — 83.193403 W 2 —MILL CREEK AT LAUREL STREET 35 055969 N, —83 194656 W 3 —MILL CREEK AT SPRUCE STREET. 35.054919 N, — 83195583 W McG COUNTY STATE A S S O C I A T E S MACON NORTH CAROLINA ENGINEERING -PLANNING -FINANCE SCALE NONE DATE FEBRUARY 201 SHEET 7 OF 8 sssxonDffRM ASM NCZeao1 PILMS)252-Ms FMMUO #C44s9 RESLOPE EXISTING STREAM BANK TO ORIGINAL CONTOURS AND STABILIZE WITH NATIVE PLANT SEED MIX PER EROSION CONTROL NOTES ORMAL STREAM LEVEL —1 S Y -6" I 1 =1 11 =1 11 =1 I - INSTALL MATTING ON DISTURBED SLOPE I =111 =111 I I i AREA USING NORTH AMERICAN GREEN =111 - 111-111-1' RESTORE STREAM BED TO ORIGINAL CONTOURS SC150 OR APPROVED EQUAL —I I �- 111 =111 - II1 =1I1— W/ EXCAVATED MATERIALS. RETURN ORIGINAL STREAM BED SURFACE GRAVEL TO PREVENT SCOURING. STREAM BANK PROTECTION (NO FERTILIZER TO BE USED WITHIN 10' OF BANK) APPLICANT. TOWN OF HIGHLANDS POST OFFICE BOX 460 HIGHLANDS, NC 28741 PROPOSED CONSTRUCTION. MILL CREEK CULVERT REPLACEMENTS PROJECT: PROPOSED MILL CREEK CULVERT REPLACEMENTS ADJACENT PROPERTY OWNERS: LOCATION• • 1 —MILL CREEK AT N 5TH STREET 35 055953 N, — 83.193403 W 2 —MILL CREEK AT LAUREL STREET. 35 055969 N, —83 194656 W 3 —MILL CREEK AT SPRUCE STREET 35 054919 N, —83195583 W 0mcG COUNTY STATE: A S S O C I A T E S MACON NORTH CAROLINA ENGINEERING -PLANNING -FINANCE SCALE- NONE DATE: FEBRUARY 201 SHEET 8 OF 8 55BROADSMM ASMML%NC2 1 PELMe)25ZO75 FEMUMeaC -0459 N N. 5TH STREET CREEK IMPACT' ► do[ . b IX LAUREL STREET CREEK IMPACT SPRUCE STREET 411 CREEK 4w via* ok '.,,tip S LOCATION MAP APPLICANT: PROJECT: TOWN OF HIGHLANDS PROPOSED MILL CREEK CULVERT REPLACEMENTS POST OFFICE BOX 460 HIGHLANDS, NC 28741 ADJACENT PROPERTY OWNERS: PROPOSED CONSTRUCTION: MILL CREEK CULVERT REPLACEMENTS LOCATION: 1-MILL CREEK AT N. 5TH STREET: 35.055953 N, -83.193403 W 2-MILL CREEK AT LAUREL STREET: 35.055969 N, -83.194656 W 3-MILL CREEK AT SPRUCE STREET: - 35.054919 N, -83.195583 W COUNTY: McG STATE: ASSOCIATES 0 T MACON _PNOTH CAROLINA ENGINEERING -PLANNING -FINANCE SCALE: 1"= 200' DATE: FEBRUARY 2011 SHEET 1 OF 8 55BROADSTRM ASHEMLENC28801 PIL(828)252-075 RRMUCHNSEK-0459