Loading...
HomeMy WebLinkAbout20140252 Ver 1_Riparian Buffer Authorization_201403170 ARCADIS Infrastructure -Water � Environment • Buildings Transmittal Letter To: Karen Higgins NCDWR — 401 & Buffer Permitting Unit 512 N. Salisbury Street Raleigh, NC 27604 From: Emily Christy Subject: Marathon Buffer Authorization Submittal — Selma, NC We are sending you: Copies: Date: March 14, 2014 ARCADIS Project No.: T044P903.CDEF.000PM 201 4025 2 ARCADIS U.S., Inc. 100 E Campus View Blvd Suite 200 Columbus Ohio 43235 -1447 Tel 614 985 9100 Fax 614 985 9170 ECEIVE MAR 1 7 2014 0 Attached ❑ Under Separate Cover Via the Following Items: ❑ Shop Drawings ❑ Plans ❑ Specifications ❑ Prints ❑ Samples ❑ Copy of Letter E Other: See below. ❑ Change Order ❑ Reports Copies Date Drawing No. Rev. Description Action* 3 3/14/2014 Riparian Buffer Authorization Form 3 3/14/2014 8.5 x 11 USGS Map 3 3/14/2014 8.5 x 11 Soil Map 3 3/14/2014 Plans Action* ❑ A Approved ❑ AN Approved As Noted ❑ AS As Requested ❑ Other: Mailing Method ❑ U.S. Postal Service is` Class ❑ Certified /Registered Mail ❑ Other: Comments: ❑ CR Correct and Resubmit ❑ F File ❑ FA For Approval ❑ Resubmit Copies ❑ Return Copies ❑ Review and Comment ❑ Courier /Hand Delivery E FedEx Priority Overnight ❑ FedEx 2 -Day Delivery ❑ United Parcel Service (UPS) ❑ FedEx Standard Overnight ❑ FedEx Economy Page: c:\usem\chollobaugh\desktop\tmnsnftaI letter 03132014 dwr.docx 1 /1 D_ State of North Carolina //��-- �-•-..- � Department of Environment and Natural Resources Division of Water Resources Division of Water Resources 15A NCAC 0213.0233 (8)(b), .0243 (8)(b), .0250 (11)(b), .0259 (8)(b), .0267 (11)(c), .0607 (e)(2) - Buffer Authorization FORM: BA 10 -2013 Riparian Buffer Authorization Form A. Applicant Information 1. Project Information 1 a. Name of project: Butane Blending Project - Marathon Terminal 1 b. County: Johnston County 1c. Nearest municipality: Selma 1d. Subdivision name: Not applicable 1 e. Is the project located in any of North Carolina's twenty coastal counties. If yes, answer 1f below. ❑ Yes ® No 1f. Is the project located within a NC Division of Coastal Management Area of Environmental Concern (AEC)? Yes No ® 2. Owner Information 2a. Name on Recorded Deed: Marathon Petroleum Company LLC. 2b. Deed Book and Page No. Book 3466, Pages 946 -950 2c. Map Book and Page No. (include a copy of the recorded map that indicates when the lot was created): Not registered 2d. Responsible Party (for Corporations): Timothy J. Aydt 2e. Street address: 539 South Main Street 2f. City, state, zip: Findlay p �-k 2g. Telephone no.: 419 - 422 -2121 2h. Fax no.: 419 - 429 -2455 2i. Email address: tjaydt @marathonpetroleum.com 3. , Applicant Information (if different from owner) 3a. Applicant is: ❑ Agent ❑ Other, specify: 3b. Name: 3c. Business name (if applicable): 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: 3h. Email address: 4. Agent/Consultant Information (if applicable) 4a. Name: 4b. Business name (if applicable): 4c. Street address: 4d. City, state, zip: 4e. Telephone no.: 4f. Fax no.: 4g. Email address: FORM: BA 10 -2013 Page 1 of 5 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 14054038 1 b. Site coordinates (in decimal degrees): Latitude: 35.55197 Longitude: - 78.31054 1 c. Property size: 21.73 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Unnamed tributary to Mill Creek then to Neuse River 2b. Water Quality Classification of nearest receiving water: Mill Creek: WS -IV; NSW Neuse River: WS -IV; NSW, CA 2c. River basin: Neuse River Basin 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Land is developed and is an existing terminal. Surrounding properties are also generally developed industrial properties. However, the land to the southwest of the site is a highway which beyond is undeveloped land. 3b. Attach an 8'/ x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site 3c. Attach an 8'/2 x 11 excerpt from the most recent version of the published County NRCS Soil Surrey Map depicting the project site 3d. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: Zero 3e. Explain the purpose of the proposed project: The project is located at the Marathon Petroleum Facility located at 2555 W. Oak Street in Selma, North Carolina. The project entrails making improvements to the west portion of the site by installing butane blending equipment and piping and making other site improvements. 3f. Describe the overall project in detail, including the type of equipment to be used: The project includes installing a butane blending system including equipment and piping. Additional site improvements will also be completed, including but not limited to rehabilitating existing asphalt parking lot, widening the existing driveway and installation of underground and overhead conduit, fire pump house, electrical building, analyzer building, and shed. General large construction equipment will be used. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the ® Yes ❑ No ❑ Unknown Corps or State been requested or obtained for this property/ Comments: project (including all prior phases) in the past? 4b. If yes, who delineated the jurisdictional areas? Agency/ Consultant Company: NCDWR Name (if known): James Graham Other: 4c. If yes, list the.dates of the Corps jurisdictional determinations or State determinations and attach documentation. 2/28/2014 — letter has not been received as of 3/10/2014 5. Project History 5a. Have permits or certifications been requested or obtained for this ® Yes ❑ No ❑ Unknown project (including all prior phases) in the past? 5b. If yes, explain and detail according to "help file" instructions. Coverage under the NPDES General Construction Activity is in process 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ® No 6b. If yes, explain. FORM: BA 10 -2013 Page 2 of 5 C. Proposed Impacts Inventory 1. Buffer Impacts 1 a. Project is in which protected basin? ® Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Jordan ❑ Goose Creek, 1 b. Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. Buffer impact number— Permanent (P) or Temporary T Reason for impact Type of impact (exempt, allowable, allowable w/ mitigation) Stream name Buffer mitigation required? Zone 1 impact (sq ft) Zone 2 impact (sq ft) B1 ❑. P ® T Proposed site activities/ construction/ grading Allowable Unnamed tributary to Mill Creek then to Neuse River ❑ Yes ® No 22,800 15,200 B2 ❑ P ❑ T ❑ Yes [:]No B3 ❑ P ❑ T ❑ Yes ❑ No B4 ❑ P ❑ T ❑ Yes ❑ No B5 ❑ P ❑ T ❑ Yes ❑ No B6 ❑ P [:IT ❑ Yes ❑ No Total buffer impacts 22,800 15,200 1c. Comments: FORM: BA 10 -2013 Page 3 of 5 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Construction activity to remain within zone 2, activity within zone 1 to be avoided. Silt fencing will be place and maintained near the construction activity to collect sedimentation and prevent it from reaching the stream. Silt fencing runs parallel to the stream. The area will be re- graded within the original footprint. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Silt fence will be place and maintained near the. construction activity to collect sedimentation from reaching the stream that runs parallel to the silt fence. The silt fence will also prevent flow into zone 1. Also, heavy equipment will be located on the high -side, away from the buffer zones. 2. Buffer Mitigation 2a. Will the project result in an impact within a protected riparian buffer that requires buffer [Ell Yes ® No mitigation? 2b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation and calculate the amount of mitigation required in the table below. Zone Reason for impact Total impact Multiplier Required mitigation (square feet (square feet Zone 1 3 (2 for Catawba) Zone 2 1.5 Total buffer mitigation required: 2c. If buffer mitigation is required, is payment to a ❑ Yes ❑ No mitigation bank or NC EEP proposed? 2d. If yes, attach the acceptance letter from the mitigation bank or NC EEP. 2e. If no, then discuss what type of mitigation is proposed. 2f. Comments: FORM: SSGP3080 8 -13 Page 4 of 5 E. Diffuse Flow Plan All buffer impacts and high ground impacts require diffuse flow or other form of ® Diffuse flow stormwater treatment. Include a plan that fully documents how diffuse flow will be ❑ Other BMP maintained. If a Level Spreader is proposed, attach a Level Spreader Supplement Form. 1a. If due to site constraints, a BMP other than a level spreader is proposed, please provide a ❑ Yes ® No plan for stormwater treatment as outlined in Chapter 8 of the NC Stormwater BMP public (federal /state) land? Manual and attach a BMP Supplement Form. 1 b. F. Supplementary Information by First Class Mail via the US Postal Service: 1. Environmental Documentation OR NC DWR, Transportation Permitting Unit 1a. Does the project involve an expenditure of public (federal /state /local) funds or the use of ❑ Yes ® No Raleigh, INC 27604 public (federal /state) land? For all other projects send by delivery service 1 b. If you answered "yes" to the above, does the project require preparation of an ❑ Yes ❑ No OR Karen Higgins environmental document pursuant to the requirements of the National or State (North NCDWR — 401 & Buffer Permitting Unit 1650 Mail Service Center Carolina) Environmental Policy Act (NEPA/SEPA)? Raleigh, NC 27699 - 1650 1 c. If you answered "yes" to the above, has the document been finalized by the State ❑ Yes ❑ No Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) Comments: 2. Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland ❑ Yes ® No Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)? 2b. Is this an after - the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): Marathon Petroleum Company LP By: MPC Investment LLC, its General Partner 1 By: Angela S. Brown J I I Deputy Assistant Secretary Applicant/Agent's Printed Name Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Send this completed form and accompanying documents to the following: For government transportation projects send For government transportation projects send by First Class Mail via the US Postal Service: by delivery service (UPS, FedEx, etc.): NC DWR, Transportation Permitting Unit OR NC DWR, Transportation Permitting Unit 1650 Mail Service Center 512 N. Salisbury Street Raleigh, NC 27699 - 1650 Raleigh, INC 27604 For all other projects send by First Class Mail For all other projects send by delivery service via the US Postal Service (UPS, FedEx, etc.): Karen Higgins OR Karen Higgins NCDWR — 401 & Buffer Permitting Unit NCDWR — 401 & Buffer Permitting Unit 1650 Mail Service Center 512 N. Salisbury Street Raleigh, NC 27699 - 1650 Raleigh, NC 27604 FORM: BA 10 -2013 Page 5 of 5 MARATHON - SELMA, NC TERMINAL BUTANE BLENDING 1000 0 low 2000 3[00 4000 sow 6000 7000 6000 6000 l0000 FEET VICINITY MAP USGS QUANDRANGLE MAP SELMA QUADRANGLE NORTH CAROLINA - JOHNSTON COUNTY MARATHON - SELMA, NC TERMINAL BUTANE BLENDING lODU 10U1i 1 UYU U 1 0001- . NRCS SOIL SURVEY MAP SHEET NO. 7 JOHNSTON COUNTY, NORTH CAROLINA LIMITS OF DISTURBED AREA