Loading...
HomeMy WebLinkAboutNCC220814_ESC Approval Submitted (2)_20220217ROY COOPER Governor JOHN NICHOLSON Interim Secretary BRIAN WRENN Director New London Investments Attention: Susan Saunders 181 Random Drive New London, North Carolina 28217 Y QIUQU 2 M M1 NORTH CAROLINA Environmental Quality June 29, 2021 LETTER OF APPROVAL RE: Project Name: Fiberon 1NL Eastern Drainage Improvements Acres Approved: 2.0 Project ID: STANL-2021-028 County: Stanly City: New London Address: Random Drive River Basin: Yadkin Stream Class: Other Submitted By: New London Investments Date Received by LQS: June 9, 2021 Plan Type: New Dear Ms. Saunders: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of March 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO 10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCGOI. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office in Raleigh. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO 1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Mooresville Regional Office 1 610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115 704-663-1699 er4 Letter of Approval New London Investments June 29, 2021 Page 2 of 2 Also, this letter gives the notice required by G.S. 113A-61.l(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. IfJollowing the commencement of this project, the erosion and - sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land - disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Ja es Moore Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval NCGO1 Fact Sheet em: smith.b@tandh.com cc:Inspection Department CERTIFICATE OF PLAN APPLOVkT., NE STATF QUAM Nd`7 The posting of this certificate certifies that an erosion and sedimentation control plan has been approved for this project by the North Carolina Department of Environment and Natural Resources in accordance with North Carolina General Statute 113A — 57 (4) and 113A — 54 (d) (4) and North Carolina Administrative Code, Title 15A9 Chapter 4B.0107 (c). This certificate must be posted at the primary entrance of the J ob site before construction begins and until establishment of permanent groundcover as required by North Carolina Administrative Code, Title 15A9 Chapter 4B.0127 (b). L) srPCk3V CmeaS Project Name and Location FTWA Date of Plan Approval Nf-4. Regional Engineer v�� 2cl NCDENR