Loading...
HomeMy WebLinkAbout20140196 Ver 1_More Info Letter_20140318��i'� ��i�9 �EF�-� (�ri�c�e� �e�c� G�siv�rfs, �ac�� � c�f �� Z. CULVERTS ` � This section not applicable a. Number of culverts proposed: c. Type of culvert (construction material): b. Water body in which the culvert is to be placed: < Form continues on back> d. (i) Will proposed culvert replace an existing bridge? e. (i) Will proposed culvert replace an existing culvert? ❑Yes ❑No ❑Yes ❑No If yes, (ii) Length of existing bridge: (iii) W idth of existing bridge: (iv) Navigation clearance underneath existing bridge: _ (v) W ill all, or a part of, the existing bridge be removed? (Explain) f. Length of proposed culvert: h. Height of ihe top of the proposed culvert above the NHW or NWL. j, Wiil the proposed culvert afFect navigation by reducin or increasing Ehe exis#ing navigable opening? �Yes ❑No If yes, explain: If yes, (ii) Length of existing culvert(s): (iii} Width of existing culvert(s):< (iv) Height of the top of the existing culvert above the NHW or NW L: (v) W ill afl, or a part of, the existing culvert be removed? (Explain) g. Width of proposed culvert: i. Depth of culvert to be buried below existing bottom contour. k. Will the proposed culvert affect exisfing water flow? ❑Yes ❑No if yes, explain: 3. EXCAVATION and FILL ❑This section not applicable a. (i} W ill the placement of the proposed bridge or culvert require any excavation below the NHW or NW L? ❑Yes �No if yes, (ii) Avg. length of area to be excavated: (iii) Avg. width of area to be excavated: (iv) Avg. depth of area to be excavated: (v} Amount of material to be excavated in cubic yards: b. (i) W ill the piacement of the proposed bridge or culvert require any excavation within coastal wetiands/marsh (CW ), submerged aquatic vegetation (SA�, shell bottom (SB), or other wetlands (W L)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB �WL 5�#1- ❑None Z�J'-� 1�v�n 3/�7/�� (ii) Describe the purpose of the excavation in these areas: This excavation in wetlands is to make a smooth transitional tie in ofthe relocated unnamed tributary to Colly Creek with the wetland area leading up to Coily Creek. Z5'�-8�3-28f38 :� 1-���-4E�CCiAs'F` :: iF,�EM�v_.r�cev�st�!r�san�gemctt�.ned revised:'[tF/2�/G�