HomeMy WebLinkAboutSW3200101_Supplement-EZ Form_20220216SUPPLEMENT-EZ COVER PAGE
=ORMS LOADED
PROJECT INFORMATION
1
1 Project Name
Project Area ac
Cresswind - Phase 1
2
79.6
3
Coastal Wetland Area ac
0
0.4
4
Surface Water Area ac
5
Is this project High or Low Density?
High
6
Does this project use an off -site SCM?
No
COMPLIANCE WITH 02H .1003(4)
7
Width of vegetated setbacks provided feet
30
8
Will the vegetated setback remain vegetated?
Yes
9
Is BUA other that as listed in .1 0034 c-d out of the setback?
Yes
10
Is streambank stabilization proposed on this project?
No
NUMBER AND TYPE OF SCMs:
11
Infiltration System
0
12
Bioretention Cell
0
13
Wet Pond
2
14
Stormwater Wetland
0
15
Permeable Pavement
0
16
ISand Filter
0
17
Rainwater Harvesting RWH
0
18
Green Roof
0
19
Level Spreader -Filter Stri LS-FS
0
20
Disconnected Impervious Surface (DIS)
0
21
Treatment Swale
0
22
1 Dry Pond
0
23
StormFilter
0
24
Silva Cell
0
25
Ba filter
0
26
Filterra
0
FORMS LOADED
DESIGNER CERTIFICATION
27
Name and Title:
Matthew S. Kiker
28
Organization:
Thomas & Hutton
29
Street address:
1020 Euclid Avenue
30
City, State, Zip:
Charlotte, NC 28203
31
Phone numbers :
980-201-5507
32
Email:
kiker.m@tandh.com
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or
supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and
that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent
with the information provided here.
glll''''
Q�aFESS/o�q<
E lS
04a480
'''����9 %' • F/VG IN FER •'���`���`
T H 0 M A S
& HUTTON
ENGINEERING
CO
F .• No. F-0811 0
'''11 llllllllll10O````
Z 4 P. - - - 4- 14,01
gnature of Designer
In,q-Al
Date
DRAINAGE AREAS
1
Is this a high densityproject?
Yes
2
If so, number of drainage areas/SCMs
2
3
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
DRAINAGE AREA INFORMATION
Entire Site
1
2
4
Type of SCM
N/A
Wet Pond
Wet Pond
5
Total BUA in project (sq ft
1603569 sf
177474 sf
1426095 sf
6
New BUA on subdivided lots (subject to permitting)
(sq ft
685000 sf
135000 sf
550000 sf
7permitting)
New BUA outside of subdivided lots (subject to
s
473355 sf
42474 sf
430881 sf
8
Offsite -total area (sq ft
sf
sf
445214 sf
9
Offsite BUA (sq ft
sf
sf
445214 sf
10
Breakdown of new BUA outside subdivided lots:
- Parking (sq ft
sf
sf
sf
-Sidewalk (sft
66500 sf
10118 sf
56382 sf
- Roof (sq ft
sf
sf
sf
- Roadway s ft
217469 sf
32356 sf
185113 sf
- Future (sq ft
189386 sf
sf
189386 sf
- Other, please specify in the comment box
below (sq ft
sf
sf
sf
11
New infiltrating permeable pavement on
subdivided lots (sq ft
sf
sf
sf
12
New infiltrating permeable pavement outside of
Isubdivided lots (sq ft
sf
sf
sf
13permitting)
Exisitng BUA that will remain (not subject to
s ft
sf
sf
sf
14
Existing BUA that is already permitted (sq ft
sf
sf
sf
15
Existing BUA that will be removed (sq ft
sf
sf
sf
16
Percent BUA
31 %
38%
57%
17
Design storm inches
1 in
1 in
18
1 Design volume of SCM cu ft
15237 cf
117369 cf
19
1 Calculation method for design volume
Simple
Simple
ADDITIONAL INFORMATION
20
Please use this space to provide any additional information about the
drainage area(s):
The future area draining to Pond #2 is intended to account for a future
amenity center. The offsite drainage in the post development condition is
assumed to be 100% impervious to address the instance of future
development effecting the capacity of the Pond #2.
WET POND
H1 Drainage area number 1 2
2 Design volume of SCM (cu ft) 15237 cf 117369 cf
GENERAL MDC FROM 02H .1050
3 Is the SCM sized to treat the SW from all surfaces at build -out? Fes y__s
4
Is the SCM located away from contaminated soils?
Yes
Yes
5
What are the side slopes of the SCM (H:V)?
3:1
3:1
6
Does the SCM have retaining walls, gabion walls or other engineered
side slopes?
No
No
7
Are the inlets, outlets, and receiving stream protected from erosion
(10-year storm)?
Yes
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
design volume?
Yes
Yes
9
What is the method for dewatering the SCM for maintenance?
Drawdown Orifice
Drawdown Orifice
10
If applicable, will the SCM be cleaned out after construction?
Yes
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC (10)?
No
No
141
Is there an O&M Agreement that complies with General MDC (11)?
Yes
Yes
15
Is there an O&M Plan that complies with General MDC (12)?
Yes
Yes
161
Does the SCM follow the device specific MDC?
Yes
Yes
17 Was the SCM designed by an NC licensed professional?
WET POND MDC FROM 02H .1053 r
181 Method used
Yes
SA/DA
Yes
SA/DA
19
Has a stage/storage table been provided in the calculations?
Yes
Yes
20
Elevation of the excavated main pool depth (bottom of sediment
removal) (fmsl)
570.50
581.50
21
Elevation of the main pool bottom -(top of sediment removal) (fmsl)
571.00
582.00
22
Elevation of the bottom of the vegetated shelf (fmsl)
574.50
585.50
231
Elevation of the permanent pool (fmsl)
575.00
586.00
24
Elevation of the top of the vegetated shelf (fmsl)
575.50
586.50
25
Elevation of the temporary pool (fmsl)
575.61
587.81
26
Surface area of the main permanent pool (square feet)
17608
49082
27
Volume of the main permanent pool (cubic feet)
60068 cf
175476 cf
28
Average depth of the main pool (feet)
3.64 ft
3.58 ft
29
Average depth equation used
Equation 3
Equation 2
301
If using equation 3, main pool perimeter (feet)
550.0 It
31
If using equation 3, width of submerged veg. shelf (feet)
3.0 It
-
32
Volume of the forebay (cubic feet)
9721 cf
29611 cf
33
Is this 15-20% of the volume in the main pool?
Yes
Yes
34
Clean -out depth for forebay (inches)
48 in
48 in
35
Design volume of SCM (cu ft)
15237 cf
117369 cf
36
Is the outlet an orifice or a weir?
Orifice
Orifice
371
If orifice, orifice diameter (inches)
2. in
4. in
38
If weir, weir height (inches)
39
If weir, weir length (inches)
-
-
40
Drawdown time for the temporary pool (days)
3
3
41
Are the inlet(s) and outlet located in a manner that avoids short-
circuiting?
Yes
Yes
42
Are berms or baffles provided to improve the flow path?
No
No
431
Depth of forebay at entrance (inches)
60 in
60 in
441
Depth of forebay at exit (inches)
54 in
54 in
45
Does water flow out of the forebay in a non -erosive manner?
Yes
Yes
46
Width of the vegetated shelf (feet)
6 It
6 It
47
Slope of vegetated shelf (H:V)
6:1
6:1
48
Does the orifice drawdown from below the top surface of the
permanent pool?
Yes
Yes
491
Does the pond minimize impacts to the receiving channel from the 1-
yr, 24-hr storm?
Yes
Yes
50
Are fountains proposed? (If Y, please provide documentation that
MDC(9) is met.) No
Is a trash rack or other device provided to protect the outlet system? Yes
No
51
Yes
52
Are the dam and embankment planted in non -clumping turf grass?
Yes
Yes
531
Species of turf that will be used on the dam and embankment
Bermuda
Bermuda
541
Has a planting plan been provided for the vegetated shelf?
Yes Yes
1
ADDITIONAL INFORMATION
55
Please use this space to provide any additional information about the
wet pond(s):
6:11 AM 12/9/2021