Loading...
HomeMy WebLinkAboutSW3200202_Supplement-EZ Form_20220216SUPPLEMENT-EZ COVER PAGE PROJECT INFORMATION 1 JProjectName Subdivision Phases 11-14 86.84 2.56 5 Ils this project High or Low Density? High 6 1 Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided feet 30 8 IWII the vegetated setback remain vegetated? Yes Yes 9 lif BUA is proposed in the setback, does it meet NCAC 021-1.1003 4 c-d ? 10 Is streambank stabilization proposed on this ro'ect? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 0 12 Bioretention Cell 0 13 Wet Pond 1 14 1 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting: RWH 0 18 Green Roof 0 19 Level Spreader -Filter Strip LS-FS 0 20 Disconnected Im ervious Surface (DIS) 0 21 Treatment Swale 0 22 D Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Ba filter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Marc Van Dine, PLS, PE 28 Organization: McAdams 29 Street address: 3430 Torin don Way, Suite 110 30 Ci State Zip: Charlotte NC 28277 31 Phone numbers : Email: 704-527-0800 32 vandine@mcadamsco.com Certification Statement I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form Is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. 0 ,11�1111111►11to �O FYI CAP? ��•i SEAL 036289 ray•-��t;IN�F�' •�� ,.' q• Vt„ S Palk 0/be . S14 Drs1g 2 I 2z Date DRAINAGE AREAS 1 'Is this a hig density ro act? Yes 2 If so number of drainage areas/SCMs 1 3 Does this 2roject have low density areas? Yes 4 If so number of low density drainage areas 1 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site i LD 1 4 Type of SCM N/A Wet Pond Bypass Area 5 Total drainage area (sq ft 2552616 1591284 961332 6 Onsite drainage area (sq ft 2552616 1591284 961332 7 Offsite drainage area (sq ft) Total BUA in ro'ect (sq ft 0 0 0 8 810660 sf 779083 sf 31577 sf 9permitting) New BUA on subdivided lots (subject to s ft 545920 sf 530360 sf 15560 sf 10permitting) New BUA not on subdivided lots (subject to s 264740 sf 248723 sf 16017 sf 11 Offsite BUA (sq ft sf sf sf 12 Breakdown of new BUA not on subdivided lots: Parking (sq ft 14080 sf 14080 sf sf Sidewalk (sq ft 71408 sf 65708 sf 5700 sf - Roofs ft sf sf sf Roadway_(sg ft 179252 sf 168935 sf 10317 sf Future (pq.t,. sf sf _ sf Other, please specify in the comment box below Lsg ft) sf sf sf 13 New infiltrating permeable pavement on subdivided lots (sq ft New infiltrating permeable pavement not on subdivided lots (sq ft N/A N/A N/A 14 N/A N/A N/A 15permitting) Existing BUA that will remain (not subject to s ft N/A N/A N/A 16 Existing BUA that is already permitted (sq ft N/A N/A N/A 17 Existing BUA that will be removed (scL N/A N/A N/A 18 Percent BUA 32% 49% 3% 19 Design storm #nchgs NIA 1.0.in N/A 20 10asign volume of SCM cu ft N/A 65062 cf N/A 21 lCalculation method for desi n volume N/A SA/DA N/A ADDITIONAL INFORMATION 22 Please use this space to provide any additional information about the drainage area(s): WET POND 1 Drainage area number 1 2 Minimum required treatment volume cu ft 65062 cf Is.the SCM sized to treat the SW from all surfaces at build out? No _3 4 Is the SCM located awa from contaminated soils? Yes 5 What are the side slopes of the SCM H: ? 3:1 6 Does the SCM have retaining walls, gabion walls or other side slopes? No _engineered 70- Are the inlets, outlets, and receiving stream protected from erosion 1ear storm ? Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes 9 What is the method for dewatering the SCM for maintenance? Pum referred 10 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access cam I with General MDC (8)? Yes 12 Does the drainage easement comply with General MDC (9)? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC 10 ? No 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 15 Is there an O&M Plan that complies with General MDC 12 ? Yes 16 Does the SCM follow the devicespecific MDC? Yes 17 Was the SGM designed Int an NC licensedprofessional? Yes ND 18 Sizing method used SAIDA 19 Has a stage/storage table been provided in the calculations? Yes 20 Elevation of the excavated main pool depth (bottom of sediment removal) (fmsl 591.00 21 Elevation of the main pool bottom (top of sediment removal) (fmsl) 592.00 22 Elevation of the bottom of the vegetated shelf fmsl 596.50 23 Elevation of the permanent pool fmsl 597.00 24 Elevation of the top of the vegetated shelf fmsl 597.50 25 Elevation of the temporary pool fmsl 598.04 26 Surface area of the main permanent pool s uare feet 44579 27 Volume of the main eermanent pool cubic feet 183133 cf 28 Average depth of the main pool feet 4.11 ft E uation 2 29 Avera a depth euation used 30 If using a uation 3, main pool perimeter feet N/A 31 If using equation 3, width of submerged veg. shelf feet N/A 32 Volume of the foreba cubic feet 35650 cf 33 Is this 15-20% of the volume in the mainpool? Yes 34 Clean -out depth for forebay Cinches)46 in 35 Design volume of SCM Lou ft 66482 cf 36 Is the outlet an orifice or a weir? Orifice 37 If orifice orifice diameter inches 4.5 in 381 If weir, weir height inches N/A 39 If weir, weir length inches N/A 40 Drawdown time for the temporary pool (days) 2.95 41 Are the inlet(s) and outlet located in a manner that avoids short- circuiting? Yes 42 Are berms or baffles provided to improve the flowpath? No 43 Depth of forebay at entrance inches 60 in 44 Depth of forebay at exit inches 54 in 451 Does water flow out of the forebay in a non -erosive manner? Yes 46 Width of the vegetated shelf feet loft 47 Slope of vegetated shelf H: 10:1 48 Does the orifice drawdown from below the top surface of the permanentpool? Yes 49 Does the pond minimize impacts to the receiving channel from the 1- r, 24-hr storm? Yes 50 Are fountains proposed? Of Y. please provide documentation that MDC 9 is met. No 51 Is a trash rack or other device provided to protect the outlet system? Yes 52 Are the dam and embankment planted in non -clumping turf grass? Yes 53 Species of turf that will be used on the dam and embankment Tall Fescue 54 Has a planting plan been pirovided for the vegeWed shelf? Yes ADDITIONAL INFORMATION 55 Please use this space to provide any additional information about the wet pond(s): Wet Pond 1 3:08 PM 2/7/2022