Farkas, Jim J
From:Farkas, Jim J
Sent:Wednesday, February 16, 2022 9:02 AM
To:Kiker, Matthew
Cc:cgrimmer@kolter.com
Subject:RE: \[External\] RE: SW3210301 - Cresswind Phases 2 & 3
Yes, I received them.
-Jim
From: Kiker, Matthew <kiker.m@tandh.com>
Sent: Wednesday, February 16, 2022 9:01 AM
To: Farkas, Jim J <Jim.Farkas@ncdenr.gov>
Cc: cgrimmer@kolter.com
Subject: RE: \[External\] RE: SW3210301 - Cresswind Phases 2 & 3
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Good morning Jim – these have been delivered to your office this morning.
MATTHEW KIKER, PE | Project Manager
THOMAS & HUTTON - TRANSFORMING COMMUNITIES FOR 75 YEARS!
p 980-521-5999
e kiker.m@tandh.com
a 1020 Euclid Avenue | Charlotte, NC 28203
vCard | Website | LinkedIn | Facebook | Twitter | Instagram
PRIVILEGED AND CONFIDENTIAL: This electronic message and any attachments are confidential property of Thomas &
Hutton. The information is intended only for the use of the person to whom it is addressed. Any other interception, copying,
accessing, or disclosure of this message is prohibited. If you have received this message in error, please immediately notify
Thomas & Hutton and purge the message received. Do not forward this message without permission.
From: Farkas, Jim J <Jim.Farkas@ncdenr.gov>
Sent: Tuesday, February 15, 2022 8:12 AM
To: Kiker, Matthew <kiker.m@tandh.com>
Cc: cgrimmer@kolter.com
Subject: RE: \[External\] RE: SW3210301 - Cresswind Phases 2 & 3
Looks good, and yes I do.
-Jim
From: Kiker, Matthew <kiker.m@tandh.com>
Sent: Tuesday, February 15, 2022 8:10 AM
To: Farkas, Jim J <Jim.Farkas@ncdenr.gov>
Cc: cgrimmer@kolter.com
Subject: RE: \[External\] RE: SW3210301 - Cresswind Phases 2 & 3
1
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Jim – see attached for updated agreements. I assume you need hard copies of these as well?
If so I can have these delivered today.
MATTHEW KIKER, PE | Project Manager
THOMAS & HUTTON - TRANSFORMING COMMUNITIES FOR 75 YEARS!
p 980-521-5999
e kiker.m@tandh.com
a 1020 Euclid Avenue | Charlotte, NC 28203
vCard | Website | LinkedIn | Facebook | Twitter | Instagram
PRIVILEGED AND CONFIDENTIAL: This electronic message and any attachments are confidential property of Thomas &
Hutton. The information is intended only for the use of the person to whom it is addressed. Any other interception, copying,
accessing, or disclosure of this message is prohibited. If you have received this message in error, please immediately notify
Thomas & Hutton and purge the message received. Do not forward this message without permission.
From: Farkas, Jim J <Jim.Farkas@ncdenr.gov>
Sent: Tuesday, February 15, 2022 8:03 AM
To: Kiker, Matthew <kiker.m@tandh.com>
Cc: cgrimmer@kolter.com
Subject: RE: \[External\] RE: SW3210301 - Cresswind Phases 2 & 3
They do not (see attached). It looks like the information was updated for the main pool, but not the forebay.
-Jim
From: Kiker, Matthew <kiker.m@tandh.com>
Sent: Tuesday, February 15, 2022 7:56 AM
To: Farkas, Jim J <Jim.Farkas@ncdenr.gov>
Cc: cgrimmer@kolter.com
Subject: RE: \[External\] RE: SW3210301 - Cresswind Phases 2 & 3
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Good morning Jim – that is weird because the copies I have that were sent to you showed this exact information (see
attached).
Can you confirm these are correct?
MATTHEW KIKER, PE | Project Manager
THOMAS & HUTTON - TRANSFORMING COMMUNITIES FOR 75 YEARS!
p 980-521-5999
e kiker.m@tandh.com
a 1020 Euclid Avenue | Charlotte, NC 28203
vCard | Website | LinkedIn | Facebook | Twitter | Instagram
PRIVILEGED AND CONFIDENTIAL: This electronic message and any attachments are confidential property of Thomas &
Hutton. The information is intended only for the use of the person to whom it is addressed. Any other interception, copying,
accessing, or disclosure of this message is prohibited. If you have received this message in error, please immediately notify
Thomas & Hutton and purge the message received. Do not forward this message without permission.
2
From: Farkas, Jim J <Jim.Farkas@ncdenr.gov>
Sent: Tuesday, February 15, 2022 7:49 AM
To: Kiker, Matthew <kiker.m@tandh.com>
Cc: cgrimmer@kolter.com
Subject: RE: \[External\] RE: SW3210301 - Cresswind Phases 2 & 3
Matt,
I was looking over the additional information you provided on February 14, 2022. The forebay information wasn’t
updated on the O&M Agreement Forms.
- O&M Agreement Forms:
o Wet Pond 3:
Forebay:
Temporary Pool – Use 566.95 (See earlier comment)
Sediment Storage Elevation – 559.5 (“Sediment Storage Forebay Exit” elevation)
NOTE: The cleanout depth should auto-calculate, but if not, use 5.5
o Wet Pond 4:
Forebay:
Temporary Pool – Use 568.69 (See earlier comment)
Sediment Storage Elevation – 563.0 (“Sediment Storage Forebay Exit” elevation)
NOTE: The cleanout depth should recalculate, but if not, use 4.0
Please revise. Everything else looks good.
-Jim
From: Kiker, Matthew <kiker.m@tandh.com>
Sent: Wednesday, February 9, 2022 9:04 AM
To: Farkas, Jim J <Jim.Farkas@ncdenr.gov>
Cc: cgrimmer@kolter.com
Subject: RE: \[External\] RE: SW3210301 - Cresswind Phases 2 & 3
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Good morning Jim,
Please find attached revised O&M Agreements, Water Quality Calculations, and EZ Form to address your comments
below.
Hardcopies will be mailed to your attention today.
Thanks,
MATTHEW KIKER, PE | Project Manager
THOMAS & HUTTON - TRANSFORMING COMMUNITIES FOR 75 YEARS!
p 980-521-5999
e kiker.m@tandh.com
a 1020 Euclid Avenue | Charlotte, NC 28203
vCard | Website | LinkedIn | Facebook | Twitter | Instagram
3
PRIVILEGED AND CONFIDENTIAL: This electronic message and any attachments are confidential property of Thomas &
Hutton. The information is intended only for the use of the person to whom it is addressed. Any other interception, copying,
accessing, or disclosure of this message is prohibited. If you have received this message in error, please immediately notify
Thomas & Hutton and purge the message received. Do not forward this message without permission.
From: Farkas, Jim J <Jim.Farkas@ncdenr.gov>
Sent: Tuesday, February 8, 2022 1:35 PM
To: Kiker, Matthew <kiker.m@tandh.com>
Cc: cgrimmer@kolter.com
Subject: RE: \[External\] RE: SW3210301 - Cresswind Phases 2 & 3
Matthew,
Good news/bad news. The good news is that the wet ponds, as designed, are compliant with the rules/requirements (so
a re-design is not required). The bad news is that there are some issues with the numbers/forms. I’m going to try and be
very detailed in my comments, but if you like, we can have a meeting to discuss any/all of the comments.
Please correct the following:
- Supplement-EZ Form, Wet Pond Page:
o Line 20 – The elevation of the excavated main pool bottom for wet pond 3 is shown as 559.0 (Basin
Bottom) on plansheet C3.23 (shown as 558.5 in the Supplement-EZ Form) and for wet pond 4 is shown
as 562.5 (Basin Bottom) on plansheet C3.23 (shown as 562.0 in the Supplement-EZ Form). Please change
the value for wet pond 3 from 558.5 to 559.0 and the value for wet pond 4 from 562.0 to 562.5 so that
the Supplement-EZ Form matches the plans.
o Line 21 – The elevation of the top of the sediment storage zone in the main pool for wet pond 3 is
shown as 559.5 (Sediment Storage Elev) on plansheet C3.23 (shown as 559.0 in the Supplement-EZ
Form) and for wet pond 4 is shown as 563.0 (Sediment Storage Elev) on plansheet C3.23 (shown as
562.5 in the Supplement-EZ Form). Please change the value for wet pond 3 from 559.0 to 559.5 and the
value for wet pond 4 from 562.5 to 563.0 so that the Supplement-EZ Form matches the plansheets.
o Line 25 – The temporary pool surface elevation for wet pond 3 is shown as 566.73 (per the Water
Quality Elevation calculations in the calculation booklet), but is calculated as 566.95 based on the
provided stage-storage table and for wet pond 4 is shown as 568.43 (per the Water Quality Elevation
calculations in the calculation booklet), but is calculated as 568.69 based on the provided stage-storage
table. Please change the value for wet pond 3 from 566.73 to 566.95 and the value for wet pond 4 from
568.43 to 568.69 so that the Supplement-EZ Form matches the provided stage-storage tables. NOTE:
The provided calculations use an incorrect cumulative storage volume for the maximum elevation (for
example, the calculations for wet pond 3 show the cumulative storage volume at elevation 571.0 as
364,728 cf, but the stage-storage table shows 368,433). I don’t know if that is what is causing the issue
or not, but interpolating the temporary pool elevation based on the provided stage storage table results
in a temporary pool surface elevation of 566.95 (elevation 566 has a cumulative volume of 51,955 cf,
elevation 567 has a cumulative volume of 107,894, therefore, a design volume of 105,187 cf results in an
elevation of 566.95).
o Line 27 – The volume of the main permanent pool for wet pond 3 is shown as 190,249 cf (per the
provided stage-storage table), but should be calculated as 177,337 cf based on the provided stage-
storage table (excluding the sediment storage area) and for wet pond 4 is shown as 74,522 cf (per the
provided stage-storage table), but should be calculated as 67,315 cf based on the provided stage-
storage table (excluding the sediment storage area). As mentioned in a previous comment, the top of
the sediment storage zone (per the plans) is at elevation 559.5 for wet pond 3 and at elevation 563.0 for
wet pond 4. The stage-storage table calculations incorrectly include the 0.5 ft deep sediment storage
zone in the volume calculations which accounts for the discrepancy. Please change the value for wet
pond 3 from 190,249 cf to 177,337 cf and the value for wet pond 4 from 74,522 cf to 67,315 cf so that
the Supplement-EZ Form matches the provided stage-storage tables (excluding the sediment storage
area).
4
o Line 28 – Since the main pool volumes are off, the average depth calculations are also off. The average
depth of the main pool for wet pond 3 is shown as 5.13 ft (per the Average Depth calculations in the
calculation booklet), but is calculated as 4.8 ft based on the previously calculated main pool volume and
for wet pond 4 is shown as 4.03 ft (per the Average Depth calculations in the calculation booklet), but is
calculated as 3.6 ft based on the previously calculated main pool volume. Please change the value for
wet pond 3 from 5.13 ft to 4.8 ft and the value for wet pond 4 from 4.03 ft to 3.6 ft so that the
Supplement-EZ Form matches the calculated value from the previously calculated main pool volume.
o Line 32 – Similar to the main pool, the forebays should exclude the sediment storage area (anything
below the “Sediment Storage Forebay Exit” elevation). Recalculating the forebay volumes using the
provided stage-storage tables results in a forebay volume for wet pond 3 as 28,876 cf (30,373 cf is
shown in the Supplement-EZ Form) and for wet pond 4 as 12,719 cf (13,816 cf is shown in the
Supplement-EZ Form). Please change the value for wet pond 3 from 30,373 cf to 28,876 cf and the value
for wet pond 4 from 13,816 cf to 12,719 cf so that the Supplement-EZ Form matches the provided stage-
storage tables (excluding the sediment storage area).
o Line 34 – The cleanout depth of the forebays is the distance from the permanent pool surface elevation
to the top of the sediment storage zone in the forebay (“Sediment Storage Forebay Exit” per the plans),
expressed in inches. The clean-out depth of the forebay for wet pond 3 is shown as 72” (in the
Supplement-EZ Form), but is calculated as 66 in (565.0’ – 559.5’ = 5.5’ = 66”) based on the provided
plans and for wet pond 4 is shown as 54” (in the Supplement-EZ Form), but is calculated as 48” (567.0’ –
563.0’ = 4.0’ = 48”) based on the provided plans. Please change the value for wet pond 3 from 72” to 66”
and the value for wet pond 4 from 54” to 48” so that the Supplement-EZ Form matches the provided
stage-storage tables.
- O&M Agreement Forms:
o Wet Pond 3:
Forebay:
Temporary Pool – Use 566.95 (See earlier comment)
Sediment Storage Elevation – 559.5 (“Sediment Storage Forebay Exit” elevation)
NOTE: The cleanout depth should auto-calculate, but if not, use 5.5
Main Pool:
Temporary Pool – Use 566.95 (See earlier comment)
NOTE: The cleanout depth auto-calculate, but if not, use 5.5
o Wet Pond 4:
Forebay:
Temporary Pool – Use 568.69 (See earlier comment)
Sediment Storage Elevation – 563.0 (“Sediment Storage Forebay Exit” elevation)
NOTE: The cleanout depth should recalculate, but if not, use 4.0
Main Pool:
Temporary Pool – Use 568.69 (See earlier comment)
NOTE: The cleanout depth should recalculate, but if not, use 4.0
- Calculation Booklets:
o Please update the “Water Quality Calculations” page and stage-storage table page (to remove the
sediment storage zone) of both calculation booklets. If you like, you can just provide the updated pages
since the rest of the calculation book should be OK.
Please provide hard copies of the requested items with the requested changes made and upload the revised electronic
files (https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload).
Hard copies should be mailed to me at the following address:
For FedEx/UPS:
Jim Farkas
512 N. Salisbury Street, Office 640E
Raleigh, NC 27604
5
For USPS:
Jim Farkas
1612 Mail Service Center
Raleigh, NC 27699-1612
I know this review took longer than anticipated, but I am going to keep this project at the front of the review queue so
that this next review will be very quick (I want to wrap this up as much as you do).
Jim Farkas
Environmental Engineer
North Carolina Department of Environmental Quality
Division of Energy, Mineral, & Land Resources – Stormwater Program
512 N. Salisbury Street
1612 Mail Service Center
Raleigh, NC 27699-1612
(919) 707-3646
Jim.Farkas@ncdenr.gov
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has
adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or
are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to
appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your
requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging
time.
From: Farkas, Jim J
Sent: Monday, November 1, 2021 10:48 AM
To: 'Kiker, Matthew' <kiker.m@tandh.com>
Cc: 'cgrimmer@kolter.com' <cgrimmer@kolter.com>
Subject: RE: \[External\] RE: SW210301 - Cresswind Phase 2
Matthew,
I was looking over the additional information you provided on September 27, 2021. Everything looks good except for a
few small issues:
6
Please correct the following:
- The forebay of wet pond 4 (15,291 cf) is more than 20% the size of the main pool (72,865 cf) of this wet pond
(Wet Pond MDC 5a). 15,291 cf / 72,865 cf = 20.9% > 20%. Please revise plans, calculations, Supplement-EZ Form,
& O&M Agreement Form, etc… as needed.
- There appears to be insufficient sediment storage provided in the forebays (Wet Pond MDC 3), please clearly
show the top elevation of the sediment storage zones in the cross-sections of the wet ponds (Please see
attached figure). The sediment storage zone must be provided above the excavated bottom of the forebay and
does not count towards the provided storage volume of the forebay (since it is designed to fill up with sediment
over time). The sediment storage zone must be at least 6 inches deep over the bottom of the forebay. Please
revise the plans, calculations, Supplement-EZ Form, & O&M Agreement Form as needed. NOTE: The sediment
storage/cleanout depth information as shown in the O&M Agreement Forms does not appear to match the
plans/Supplement-EZ Form.
- The Applicant information is missing from Section III, 1 of the Application. Please provide this information.
- The %BUA for this project (68%) does not appear to be calculated correctly (I got something closer to 40%).
Calculation information can be found in 15A NCAC 02H .1003(1). Please provide calculations showing how the
%BUA for the project site was determined. This information appears in both the Application (Section IV, 8) and
Supplement-EZ Form (Line 16 on the Drainage Areas Page).
- Please provide an electronic copy of all of the submittal items that were provided in hard copy form on 9/27/21
(These items do not appear to have been uploaded).
Hard copies should be mailed to me at the following address:
For FedEx/UPS:
Jim Farkas
512 N. Salisbury Street, Office 640E
Raleigh, NC 27604
For USPS:
Jim Farkas
1612 Mail Service Center
Raleigh, NC 27699-1612
Electronic copies should be uploaded at the following location:
https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload
Since these are really minor things, once I get the hard copies, anything else that may have changed from addressing
these issues, and the documents are uploaded to Laserfiche (Provided everything is still in order), we can issue the
permit without doing another formal 30-45 day review.
Let me know if you have any questions.
Jim Farkas
Environmental Engineer
North Carolina Department of Environmental Quality
Division of Energy, Mineral, & Land Resources – Stormwater Program
512 N. Salisbury Street
1612 Mail Service Center
Raleigh, NC 27699-1612
(919) 707-3646
Jim.Farkas@ncdenr.gov
7
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has
adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or
are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to
appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your
requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging
time.
From: Farkas, Jim J
Sent: Monday, October 25, 2021 10:35 AM
To: Kiker, Matthew <kiker.m@tandh.com>
Cc: cgrimmer@kolter.com
Subject: RE: \[External\] RE: SW210301 - Cresswind Phase 2
There are three projects ahead of this one in the review queue (plus the one I’m currently reviewing), so probably
sometime early next week.
-Jim
From: Kiker, Matthew <kiker.m@tandh.com>
Sent: Monday, October 25, 2021 10:32 AM
To: Farkas, Jim J <Jim.Farkas@ncdenr.gov>
Cc: cgrimmer@kolter.com
Subject: RE: \[External\] RE: SW210301 - Cresswind Phase 2
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Good morning Jim,
I just wanted to reach out and check on the status of this review. I know you had said you were understaffed so just
curious if you had an expected turnaround date?
Thanks!
MATTHEW KIKER, PE | Project Manager
THOMAS & HUTTON - TRANSFORMING COMMUNITIES FOR 75 YEARS!
p 980-521-5999
e kiker.m@tandh.com
a 1020 Euclid Avenue | Charlotte, NC 28203
vCard | Website | LinkedIn | Facebook | Twitter | Instagram
8
PRIVILEGED AND CONFIDENTIAL: This electronic message and any attachments are confidential property of Thomas &
Hutton. The information is intended only for the use of the person to whom it is addressed. Any other interception, copying,
accessing, or disclosure of this message is prohibited. If you have received this message in error, please immediately notify
Thomas & Hutton and purge the message received. Do not forward this message without permission.
From: Farkas, Jim J <Jim.Farkas@ncdenr.gov>
Sent: Wednesday, October 6, 2021 7:41 AM
To: Kiker, Matthew <kiker.m@tandh.com>
Cc: cgrimmer@kolter.com
Subject: RE: \[External\] RE: SW210301 - Cresswind Phase 2
Our other reviewer, Corey Anen, has recently and unexpectedly accepted a new job. While we are waiting to fill his
position, I will be responsible for reviewing all of his projects in addition to all of my projects. The review timeline I
initially stated will probably be impacted by this. I’ll see what I can do push this through, but the review time will
probably be closer to 30+ days.
-Jim
From: Kiker, Matthew <kiker.m@tandh.com>
Sent: Tuesday, October 5, 2021 4:09 PM
To: Farkas, Jim J <Jim.Farkas@ncdenr.gov>
Cc: cgrimmer@kolter.com
Subject: RE: \[External\] RE: SW210301 - Cresswind Phase 2
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Good afternoon Jim,
I just wanted to reach out and check on the review status for Cresswind Phase 2 and 3?
I know we had discussed a possible faster turnaround on this review. Please let us know if you need any additional
information from us to help you.
Thanks!
MATTHEW KIKER, PE | Project Manager
THOMAS & HUTTON - TRANSFORMING COMMUNITIES FOR 75 YEARS!
p 980-521-5999
e kiker.m@tandh.com
a 1020 Euclid Avenue | Charlotte, NC 28203
vCard | Website | LinkedIn | Facebook | Twitter | Instagram
PRIVILEGED AND CONFIDENTIAL: This electronic message and any attachments are confidential property of Thomas &
Hutton. The information is intended only for the use of the person to whom it is addressed. Any other interception, copying,
accessing, or disclosure of this message is prohibited. If you have received this message in error, please immediately notify
Thomas & Hutton and purge the message received. Do not forward this message without permission.
From: Farkas, Jim J <Jim.Farkas@ncdenr.gov>
Sent: Thursday, September 23, 2021 10:08 AM
To: Kiker, Matthew <kiker.m@tandh.com>
Cc: Moore, James <james.moore@ncdenr.gov>; cgrimmer@kolter.com
Subject: RE: \[External\] RE: SW210301 - Cresswind Phase 2
9
Laserfiche is currently down (we’re not sure when it’ll be back up). In the meantime, I’ve been having people email me
the electronic files (which you already did) and I’ll upload them once the issue is resolved.
-Jim
From: Kiker, Matthew <kiker.m@tandh.com>
Sent: Thursday, September 23, 2021 9:32 AM
To: Farkas, Jim J <Jim.Farkas@ncdenr.gov>
Cc: Moore, James <james.moore@ncdenr.gov>; cgrimmer@kolter.com
Subject: \[External\] RE: SW210301 - Cresswind Phase 2
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Jim – when I try and upload these to the webpage it asking for login information. I have not seen this before.
Can you provide this?
10
MATTHEW KIKER, PE | Project Manager
THOMAS & HUTTON - TRANSFORMING COMMUNITIES FOR 75 YEARS!
p 980-521-5999
e kiker.m@tandh.com
a 1020 Euclid Avenue | Charlotte, NC 28203
vCard | Website | LinkedIn | Facebook | Twitter | Instagram
PRIVILEGED AND CONFIDENTIAL: This electronic message and any attachments are confidential property of Thomas &
Hutton. The information is intended only for the use of the person to whom it is addressed. Any other interception, copying,
accessing, or disclosure of this message is prohibited. If you have received this message in error, please immediately notify
Thomas & Hutton and purge the message received. Do not forward this message without permission.
From: Kiker, Matthew
Sent: Thursday, September 23, 2021 9:30 AM
To: Farkas, Jim J <Jim.Farkas@ncdenr.gov>
Cc: Moore, James <james.moore@ncdenr.gov>; cgrimmer@kolter.com
Subject: RE: SW210301 - Cresswind Phase 2
11
Please disable any popup blockers and click the following link to download your files (this link will not work on mobile devices):
https://ftp.thomasandhutton.com:443/AHT/AHT_UI/public/index.html#/password?package=DRhdswmo1aYqSTSfp09C1qvVd4VY75
2mKGkSG0Fn%2fNzfbrcIPOIOKJDD52pEnl1XuEpk0uLfwT%2b%2fYaISI7%2bwjFxI487CY9XkG4bDRJkiTO0%3d
Good morning Jim,
Please use the link to download revised plans and related documents to address your comments. Hardcopies will be
delivered to you as well as uploads to the NCDEQ webpage.
Let us know if you have any questions.
Thanks!
MATTHEW KIKER, PE | Project Manager
THOMAS & HUTTON - TRANSFORMING COMMUNITIES FOR 75 YEARS!
p 980-521-5999
e kiker.m@tandh.com
a 1020 Euclid Avenue | Charlotte, NC 28203
vCard | Website | LinkedIn | Facebook | Twitter | Instagram
PRIVILEGED AND CONFIDENTIAL: This electronic message and any attachments are confidential property of Thomas &
Hutton. The information is intended only for the use of the person to whom it is addressed. Any other interception, copying,
accessing, or disclosure of this message is prohibited. If you have received this message in error, please immediately notify
Thomas & Hutton and purge the message received. Do not forward this message without permission.
From: Farkas, Jim J <Jim.Farkas@ncdenr.gov>
Sent: Wednesday, August 4, 2021 3:03 PM
To: Kiker, Matthew <kiker.m@tandh.com>; cgrimmer@kolter.com
Cc: Moore, James <james.moore@ncdenr.gov>
Subject: RE: SW210301 - Cresswind Phase 2
Good Afternoon,
The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater Management Permit Application
th
for the subject project on June 7, 2021. A review of that information has determined that the application is not
complete. Attached is a letter describing the items that need to be submitted. If you have any questions, please feel free
to contact me. My contact information is listed below.
Thank you,
Jim Farkas
Environmental Engineer
North Carolina Department of Environmental Quality
Division of Energy, Mineral, & Land Resources – Stormwater Program
512 N. Salisbury Street
1612 Mail Service Center
Raleigh, NC 27699-1612
(919) 707-3646
Jim.Farkas@ncdenr.gov
12
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has
adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or
are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to
appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your
requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging
time.
From: Farkas, Jim J
Sent: Monday, April 19, 2021 8:41 AM
To: Kiker, Matthew <kiker.m@tandh.com>; cgrimmer@kolter.com
Cc: Moore, James <james.moore@ncdenr.gov>
Subject: SW210301 - Cresswind Phase 2
Good Morning,
The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater Management Permit Application
th
for the subject project on March 10, 2021. A review of that information has determined that the application is not
complete. Attached is a letter describing the items that need to be submitted. If you have any questions, please feel free
to contact me. My contact information is listed below (I’ll be teleworking so email is the preferred way to reach me).
Thank you,
Jim Farkas
Environmental Engineer
North Carolina Department of Environmental Quality
Division of Energy, Mineral, & Land Resources – Stormwater Program
512 N. Salisbury Street
1612 Mail Service Center
Raleigh, NC 27699-1612
(919) 707-3646
Jim.Farkas@ncdenr.gov
13
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has
adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or
are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to