Loading...
HomeMy WebLinkAboutSW6200904_Application Form_20220214 (2)IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater runoff from the developed areas of the site will be captured and treated in a stormwater vegetative swales to infiltration trenches. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW - 1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the Lumber & Cape Fear River basin. 4. Total Property Area: 524.24 acres Total Coastal Wetlands Area: 0 acres Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area':524.24 acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NHM line or Mean High Water (MHM line, and coastal wetlands landward from the NHW (or MHIO line. The resultant project area is used to calculate overall percent built upon area (B UA). Non -coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 4.42 9. How many drainage areas does the project have?8 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area 2 Drainage Area 3 Drainage Area 4 Receiving Stream Name Mill Creek Mill Creek Mill Creek Mill Creek Stream Class * C C C C Stream Index Number * 18-31-11 18-31-11 18-31-11 18-31-11 Total Drainage Area (sf) 212,925 80,165 111,705 185,040 On -site Drainage Area (sf) 212,925 80,165 111,705 185,040 Off -site Drainage Area (sf) Proposed Impervious Area** (sf) 113,469 48,933 81,750 117,141 Impervious Area** (total) 53.3 61.0 73.2 63.3 Impervious- Surface Area Drainage Area 1 Drainage Area 2 Drainage Area 3 Drainage Area 4 On -site Buildings/Lots (sf) 84,000 36,000 72,000 96,000 On -site Streets (sf) 24,767 11,589 9,750 15,796 On -site Parking (sf) On -site Sidewalks (sf) 4,702 1,344 Other on -site (sf) 5,345 Future (sf) Off -site (sf) Existing BUA*** (sf) Total (sf): 1 113,469 1 48,933 1 81,750 117,141 * Stream Class and Index Number can be determined at: http.i&ortal.ncdenr.or web/wg&s/csu/classi{ications Im ervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version 06Aug2012 Page 3 of 6 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater runoff from the developed areas of the site will be captured and treated in a stormwater vegetative swales to infiltration trenches. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW - 1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the Lumber & Cape Fear River basin. 4. Total Property Area: 524.24 acres Total Coastal Wetlands Area: 0 acres Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area':524.24 acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NHM line or Mean High Water (MHM line, and coastal wetlands landward from the NHW (or MHIO line. The resultant project area is used to calculate overall percent built upon area (B UA). Non -coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 4.42 9. How many drainage areas does the project have?8 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 5 Drainage Area 6 Drainage Area 7 Drainage Area 8 Receiving Stream Name Buffalo Creek Mill Creek Buffalo Creek Buffalo Creek Stream Class * C C C C Stream Index Number * 14-2.5 18-31-11 14-2.5 14-2.5 Total Drainage Area (sf) 96,006 113,711 182,260 201,552 On -site Drainage Area (sf) 96,006 113,711 182,260 201,552 Off -site Drainage Area (sf) Proposed Impervious Area** (sf) 81,698 24,000 134,033 167,080 Impervious Area** (total) 85.1 21.1 73.5 82.9 Impervious- Surface Area Drainage Area 5 Drainage Area 6 Drainage Area 7 Drainage Area 8 On -site Buildings/Lots (sf) 72,000 24,000 120,000 150,000 On -site Streets (sf) 9,698 14,033 17,080 On -site Parking (sf) On -site Sidewalks (sf) Other on -site (sf) Future (sf) Off -site (sf) Existing BUA*** (sf) Total (sf): 1 81,698 1 24,000 1 134,033 1 167,080 * Stream Class and Index Number can be determined at: http.i&ortal.ncdenr.or web/wg&s/csu/classi{ications Im ervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version 06Aug2012 Page 3 of 6