HomeMy WebLinkAboutWQ0042458_More Information (Received)_20220211State of North Carolina
Department of Environmental Quality
Division of Water Resources
Division of Water Resources Flow Tracking for Sewer Extension Applications
(FTSE 10-18)
Entity Requesting Allocation: qua North carolina
Project Name for which flow is being requested: Ardmore at Flowers plantation
More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump 1
stations along the route of the proposer! wastewaterJlow. 1 e,
1. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: Neuse Colony
b. WWTP Facility Permit #: NCO064564
All flows are in MGD
c. WWTP facility's permitted flow 0.350 QCo 0.350) .vj CAV
d. Estimated obligated flow not yet tributary to the WWTP 0.2855
e. WWTP facility's actual avg_ flow 0.4756 k(AI
f. Total flow for this specific request 0.06885 fl,
g. Total actual and obligated flows to the facility 0.82995 �Lli
h. Percent of permitted flow used 119% _ C, l'
II. Complete this section for each pump station you are responsible for along the route of this proposed
wastewater flow.
List pump stations located between the project connection point and the WWTP
(A)
(B)
(C)
(D)=(B+C)
(E)=(A-D)
Design
Average
Approx.
Obligated,
Total
Pump
Pump
Daily
Current
Not Yet
Current
Station
Station
Finn
Flow"
Avg. Daily
Tributary
Flow Plus
(Name or
Permit
Capacity, *
(Firm / pl),
Flow,
Daily Flow,
Obligated
Available
Number)
No.
MGD
MGD
MGD
MGD
Flow
Capacity***
Hwy 42
W00024777 M
_ 0.2664
0.10656
.021768
.054232
0.076
0.03056
* The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow
that can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor
(pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity Is < 0.
Doix stream Facility N.une (Sewer): Aqua NC -Ilwy 42 Pump Station
Downstream Permit Number: WQ0024777 MOD
Page I of 6
FTSE 10-18
fR. Certification Statement:
I Michael A. Melton certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving
wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity
related sanitary sewer overflows or overburden any downstream pump station en route to the receiving
treatment plant under normal circumstances, given the implementation of the planned improvements
identified in the planning assessment where applicable. This analysis has been performed in accordance
with local established policies and procedures using the best available data. This certification applies to
those items listed above in Sections I and II plus all attached planning assessment addendums for which I
am the responsible party. Signature of this form certifies that the receiving collection system or treatment
works has adequate capacity to transport and treat the proposed new wastewater.
SJ�'ndL O�Jj`lclal.Slg i re
Michael A. Melton, Engineering Manager
Title of Signing Official
02 10 2022
Date
Page 2 of 6
FTSE 10- t 8
U.S. R[13A7REM a THE RAERIdi
A+�,,,w
15 41
FLOW rORANKI
..�...,..� �.,.
:rUSTapo
�.
1
-00
1.4
!
i-+w
e 1�,s �,r,•
r.n
I51
f n •
�
e
}
_
�- - _
- - - -
n1s
,� bwr
$CIL=OR
�h.M1.y`IMwltv�a�Yp�S'.rw {
nowEMC
A"