Loading...
HomeMy WebLinkAbout20210723 Ver 1_Site Inspection 2.16.22 Cedar Creek Road Improvements_20220216Wetland Inspection Report Inspection Type: Reason for Inspection: Inspection Date: Site Owner Name: Latitude: County: Project Name: Project Num: Location: SW Plan Location: 20210723 NCDOT - SR 2793 Cedar Creek Road Improvements Buncombe NCDOT - SR 2793 Cedar Creek Road Improvements NC DOT Division 13 2/16/2022 Routine Site Inspection (DOT) Version: 1 Status:Issued Project Type:Road maintenance/repair/improveme ntsRegion:Asheville Longitude:-82° 12' 01''+35° 32' 19'' Inspection Contact Person:Title:Phone: On-Site Representative(s): Secondary Inspector(s): Primary Inspector:Phone:Robert K Mitchell Facility Compliance Status:Compliant Not Compliant Question Areas: Program Areas:401 (includes isolated/non-404) Permit (401 WQC) Site inspection was conducted by Kevin Mitchell with the Asheville Regional Office on February 16, 2022. Site is compliant with the 401 Water Quality Certification with additional conditions. Inspection Summary: page:1 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit: 20210723 2/16/2022 Bryan, Roger D Site Inspection (DOT)Routine Permit (401 WQC)Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment: page:2