HomeMy WebLinkAboutSW3210301_Add Info_20210804ROY COOPER
Governor
DIONNE DELLI-GATTI
Secretary
BRIAN WRENN
Director
Matthew S. Kiker, PE
1020 Euclid Avenue
Charlotte, NC 28203
NORTH CAROLINA
Environmental Quality
August 4, 2021
Subject: Request for Additional Information
Stormwater Permit No. SW3210301
Cresswind — Phases 2 & 3 (Formerly Phase 2)
Union County
Dear Mr. Kiker:
The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater
Management Permit Application for the subject project on June 7, 2021 and agreed to combine
the Phase 2 submission (SW3210301) and Phase 3 submission (SW3210501) into a single
project on August 2, 2021. A review of that information has determined that the application is
not complete. The following information is needed to continue the stormwater review:
1. Please refer to the attached document for comments.
2. Provide pdfs of all revisions, 2 hardcopies of revised plan sheets, and 1 hardcopy of other
documents.
a. Pdfs must be uploaded using the form at:
https: [/edocs.deq.nc.gov/Forms/SW-Supplemental-Upload
b. Hard copies must be mailed or delivered to the following address:
i. For FedEx/UPS:
Suzanne McCoy
512 N. Salisbury Street, Office 640K
Raleigh, NC 27604
ii. For LISPS:
Suzanne McCoy
1612 Mail Service Center
Raleigh, NC 27699-1612
D E Q�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
512 North Salisbury Street 1 1612 Mail Service Center I Raleigh, North Carolina 27699-1612
NORTH OAROLINA _
Depar ntofEnvimnmmdlDoellry 919.707.9200
Please note that this request for additional information is in response to a preliminary review.
The requested information should be received by this Office prior to September 3, 2021, or
the application will be returned as incomplete. The return of a project will necessitate
resubmittal of all required items, including the application fee. Please reference the State
assigned project number SW3210301 on all correspondence.
If you need additional time to submit the information, please submit your request for a time
extension to the Division at the contact below. The request must indicate the date by which you
expect to submit the required information. The Division is allowed 90 days from the receipt of
a completed application to issue the permit.
The construction of any impervious surfaces, other than a construction entrance under an
approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject
to enforcement action pursuant to NCGS 143-215.6A.
If you have any questions concerning this matter please feel free to contact me at
Jim.Farkas@ncdenr.gov or (919) 707-3646.
Sincerely,
Jim Farkas
Environmental Engineer
Stormwater Program
cc: Mooresville Regional Office