Loading...
HomeMy WebLinkAboutSW3210801_Plansheet G0.1 - Notes_20211124ABBREVIATIONS DBL DOUBLE FM FORCE MAIN (SANITARY SEWER) PC POINT OF CURVE TIC TOP OF CURB BOT BOTTOM FP FINISH PAD PH POST HYDRANT TH THROAT ELEVATION CB CATCH BASIN FIR FRAME PT POINT OF TANGENT TG TOP OF GUTTER CI CURB INLET GI GRATE INLET PVC POLYVINYL CHLORIDE TP TOP OF PAVEMENT CO CLEAN OUT GV GATE VALVE RCP REINFORCED CONCRETE PIPE TW TOP OF WALK CPP CORRUGATED PLASTIC PIPE HDPE HIGH DENSITY POLYETHYLENE RC ROLL CURB INLET TYP TYPICAL DBL DOUBLE HI HOODED INLET RCP REINFORCED CONCRETE PIPE VI VALLEY INLET DI DITCH INLET INV INVERT ELEVATION RI ROOF INLET W WATER DIP DUCTILE IRON PIPE JIB JUNCTION BOX RJP RESTRAINED JOINT PIPE W/ WITH EL ELEVATION LF LINEAR FEET R/W RIGHT-OF-WAY WV WATER VALVE ES END SECTION MAX MAXIMUM SO STORM DRAINAGE YI YARD INLET FES FLARED END SECTION MIN MINIMUM SDMH STORM DRAINAGE MANHOLE YI YARD INLET FG FINISH GRADE MH MANHOLE SF SQUARE FEET FH FIRE HYDRANT OC ON CENTER SS SANITARY SEWER DRAINAGE LEGEND DESCRIPTION EXISTING PROPOSED PIPE - - - - - - - DITCH CURB INLET (CI) CATCH BASIN (CB) 12 CURB INLET - RIGHT (CI) OR CATCH BASIN -RIGHT (CB) Q� OR OR CURB INLET - LEFT (CI) OR CATCH BASIN -LEFT (CB) OR OR CURB INLET - BOTH (CI) ) CATCH BASIN -LEFT (CB) OR � OR CONTROL STRUCTURE (CS) ❑ ■ DITCH INLET (DI) a GRATE INLET (GI) HOODED INLET (HI) lid OR ;III; a OR JUNCTION BOX (JB) a MANHOLE (SDMH) OQ O ROLL CURB INLET (RC) IIIII IIIII ROOF INLET (RI) YARD INLET (YI) a F FLARED END SECTION (FES) WATER LEGEND DESCRIPTION EXISTING PROPOSED WATER MAIN o"W 1011W SINGLE SERVICE LATERAL - - - - - - - - - - - - DOUBLE SERVICE LATERAL >- - - - - - VALVE AND BOX e FIRE HYDRANT W/VALVE & BOX POST HYDRANT /0-I I REDUCER ❑ ■ BACKFLOW PREVENTOR CROSS - TEE 900 BEND - HORIZONTAL 450 BEND - HORIZONTAL 22 i'z BEND - HORIZONTAL 11440 BEND - HORIZONTAL BEND - VERTICAL CAP 1 SEWER LEGEND DESCRIPTION EXISTING PROPOSED GRAVITY PIPE SINGLE SERVICE LATERAL DOUBLE SERVICE LATERAL MANHOLE • CLEANOUT a FORCEMAIN - - - 10"FM - - - - - 10"FM - - - - - - 10"FM - - - - - 10"FM - VALVE AND BOX e FLUSH HYDRANTI REDUCER ❑ BACKFLOW PREVENTOR CROSS TEE 900 BEND - HORIZONTAL 450 BEND - HORIZONTAL 22 ho BEND - HORIZONTAL IIi&° BEND - HORIZONTAL I BEND - VERTICAL PLUG \ CAP EX1.I,C1.0,C1.6,C2.0,EC1.0,EC2.0,C3.0 r ■ -- 21 I / I � I I C2.5,EC1.5,EC2.5,, 1.4,C2.4,EC1.4,EC2.4,c3.4� C1.5 I / / / I I OTHER UTILITIES LEGEND DESCRIPTION EXISTING NATURAL GAS UGG - UGG - TELEPHONE O H T O H T UNDERGROUND TELEPHONE UTL UTL ELECTRICITY O H P O H P UNDERGROUND ELECTRICITY UGP UGP - I CONTRACTOR SHALL COORDINATE TIE-IN OF NEW WATER AND SEWER FACILITIES WITH SALISBURY-ROWAN UTILITIES (SRU) 2 THE CONTRACTOR SHALL NOTIFY THE OWNER AND THE ENGINEER 48 HOURS IN ADVANCE OF ALL REQUIRED TESTS AND INSPECTIONS 3 SURVEYING AND BOUNDARY INFORMATION BY THOMAS a HUTTON 4 ALL ELEVATIONS SHOWN ARE BASED ON NAVD88 VERTICAL DATUM 5 TOPOGRAPHIC SURVEY BY THOMAS a HUTTON 6 CONTRACTOR IS TO VERIFY ACCURACY OF ANY TEMPORARY BENCHMARKS SHOWN PRIOR TO UTILIZING THEM FOR CONSTRUCTION 7 THE EXISTING UNDERGROUND UTILITIES SHOWN HEREON ARE BASED UPON AVAILABLE INFORMATION THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE EXACT LOCATION OF ALL UTILITIES OTHER THAN THOSE SHOWN ARE ENCOUNTERED DURING CONSTRUCTION , THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY AND TAKE STEPS TO PROTECT THE LINE(S) AND ENSURE CONTINUED SERVICE DAMAGE CAUSED TO EXISTING UTILITIES BY THE CONTRACTOR SHALL BE REPAIRED BY THE CONTRACTOR ADDITIONALLY, THE CONTRACTOR SHALL CONFIRM THE CONNECTION POINTS OF NEW UTILITIES TO EXISTING UTILITIES PRIOR TO BEGINNING NEW CONSTRUCTION 8 IF WORK IS SUSPENDED OR DELAYED FOR 14 DAYS, THE CONTRACTOR SHALL TEMPORARILY STABILIZE THE DISTURBED AREA AT NO ADDITIONAL COST TO THE OWNER 9 THE CONTRACTOR SHALL INSTALL ANY BARRICADES PRIOR TO BEGINNING CONSTRUCTION 10 THE CONTRACTOR SHALL INSTALL ALL EROSION CONTROL AND PREVENTION STRUCTURES SHOWN ON THE PLANS BOTH MUST BE APPROVED BY ROWAN COUNTY PRIOR TO BEGINNING ANY LAND DISTURBING ACTIVITIES II CONTRACTOR SHALL ADJUST EXISTING AND PROPOSED MANHOLE FRAMES, VALVE BOXES, FIRE HYDRANTS, ETC TO MATCH FINAL GRADE AT NO ADDITIONAL COST 12 ALL EROSION AND SEDIMENT CONTROL DEVICES SHALL BE CONSTRUCTED BEFORE THE DISTURBANCE OF THE LAND AND SHALL REMAIN FUNCTIONAL UNTIL THE CONTRIBUTING DISTURBED AREAS ARE STABILIZED CALL FOR INSPECTION AFTER INSTALLATION OF INITIAL EROSION CONTROL DEVICES A 'PASSED' INITIAL INSPECTION WILL GRANT APPROVAL FOR MASS GRADING SILT BARRIERS WILL BE INSTALLED AS SHOWN TO PREVENT SEDIMENTATION OF DOWNSTREAM AREAS CONTRACTOR SHALL GRADE AREAS TO DRAIN FOR POSITIVE FLOW PRIOR TO FINAL APPROVAL 13 ALL DRAINAGE WILL BE MADE FUNCTIONAL DAILY AS WORK PROGRESSES 14 EACH EXISTING ROAD WILL BE CLEANED UP AND RESTORED DAILY 15 NEW PAVEMENT TO BE FLUSH WITH EDGE OF EXISTING PAVEMENT 16 ALL STORM DRAIN PIPE INVERTS IN AND OUT ARE THE SAME AS THE BOX INVERT UNLESS OTHERWISE NOTED ON THE PLAN SHEETS AND/OR PROFILES 17 THERE SHALL BE NO TAPS, PIPING BRANCHES, UNAPPROVED BYPASS PIPING, HYDRANTS, FIRE DEPT CONNECTION POINTS, OR OTHER WATER -USING APPURTENANCES CONNECTED TO THE SUPPLY LINE BETWEEN ANY WATER METER AND ITS BACKFLOW PREVENTER 18 ALL WATER AND SANITARY SEWER SYSTEMS TO BE DONATED TO SRU (SALISBURY-ROWAN UTILITIES) SHALL CONFORM TO SRU'S STANDARDS AND SPECIFICATIONS 19 ALL PRIVATE WATER SYSTEMS SHALL MEET NORTH CAROLINA PLUMBING CODE REQUIREMENTS 20 CONTRACTOR SHALL REFER TO THE GEOTECHNICAL ENGINEERING REPORT PREPARED BY TERRACON, DATED APRIL 2021, TERRACON ID# 71215021 21 APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES WHEN FIELD CONDITIONS WARRANT OFF -SITE GRADING, PERMISSION MUST BE OBTAINED FROM THE AFFECTED PROPERTY OWNERS GENERAL NOTES 22 ALL TRAFFIC CONTROL SIGNS AND PAVEMENT MARKINGS SHALL BE IN ACCORDANCE WITH THE "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS" (MUTCD) AND PER N C D 0 T 23 ALL DRAINAGE WILL BE MADE FUNCTIONAL DAILY AS WORK PROGRESSES 24 EACH EXISTING ROAD WILL BE SWEPT, CLEANED, AND RESTORED DAILY 25 NEW PAVEMENT TO BE FLUSH WITH EDGE OF EXISTING PAVEMENT 26 "LOD" (LIMITS OF DISTURBANCE) LINEWORK IS SHOWN OFFSET FROM THE SILT FENCE LINEWORK FOR CLARITY IN THE DRAWINGS THE ACTUAL LIMITS OF DISTURBANCE AND IT'S CALCULATED ACREAGE SHOULD GENERALLY FOLLOW THE SILT FENCE LINEWORK IN AREAS WHERE SILT FENCE MAY NOT BE REQUIRED THEN THE LIMITS OF DISTURBANCE LINEWORK SHOULD BE USED 27 ALL SILT FENCE POSTS, CONSTRUCTION STAKES, EXPOSED STRUCTURAL REBAR, REBAR STAKES, ETC SHALL INCORPORATE PROTECTIVE SAFETY POST CAPS TO PREVENT PERSONAL INJURY FROM THE ENDS OF THE EXPOSED POSTS, STAKES, REBAR, ETC MAINTAIN AND REPLACE POST SAFETY CAPS AS NEEDED THROUGHOUT CONSTRUCTION 28 CONTRACTOR SHALL COORDINATE WITH THE GEOTECHNICAL ENGINEER FOR ALL FOUNDATION AND FILL AREAS AROUND MANHOLES 29 REFER TO THE LANDSCAPING PLANS FOR LANDSCAPING RELATED NOTES AND REQUIREMENTS 30 THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE FINAL RETAINING WALL DESIGN AND CONSTRUCTION THE CONTRACTOR SHALL PROVIDE THE OWNER, GEOTECHNICAL ENGINEER, AND SITE CIVIL ENGINEER ALL RELEVANT DESIGN DOCUMENTATION, PLANS, PROPOSED MATERIALS, CONSTRUCTION METHODS, AND OTHER RELEVANT INFORMATION FOR THE RETAINING WALL CONSTRUCTION FOR ACCEPTANCE BY THE OWNER PRIOR QTO D G E S S T C TR 10 R NI 31 FORKLIFT RAMPS AND EXTERIOR METAL STAIRWAYS ARE CONSIDERED ARCHITECTURAL COMPONENTS AND ARE DEPICTED FOR REFERENCE ONLY REFER TO ARCHITECT'S PLANS FOR FORKLIFT RAMP SLOPES, LENGTHS, AND CONSTRUCTION DESIGN FORKLIFT RAMP LENGTHS MAY VARY DEPENDENT ON PAVEMENT SLOPE AWAY FROM THE BUILDING 32 TEMPORARY AND PERMANENT SUBGRADE DRAIN (UNDERDRAIN) SYSTEMS ARE FOR MAINTAINING DRY SUBGRADE FOR PAVEMENT AREAS ONLY AT THE WESTERN END OF THE SITE AS COORDINATED WITH THE 3 DEVELOPER AND GEOTECHNICAL ENGINEER PERMANENT SUBGRADE DRAINAGE SYSTEMS FOR EXCESSIVE GROUNDWATER CONDITIONS ONSITE OR FOR BUILDING FOUNDATIONS AND SLABS SHOULD BE COORDINATED WITH THE GEOTECHNICAL ENGINEER AS MAY BE NEEDED AND/OR REQUIRED 33 ALL REINFORCED CONCRETE PIPE (RCP) SHALL MEET ASTM C76 SPECIFICATIONS ALL JOINTS SHALL HAVE GASKETS MEETING ASTM C443 SPECIFICATIONS 34 TONGUE 6; GROOVE RCP STORMWATER PIPES SEALED WITH BUTYL MASTIC JOINTS OR HDPE STORMWATER INDEX SCALE: I" = 300' PREPARED FOR: X%/\1r �r PIPES MAY BE PROVIDED UPON APPROVAL OF THE DEVELOPER AND DESIGN ENGINEER FOR PRIVATE STORMWATER PIPE SYSTEMS ON SITE 35 GRAVITY STORMWATER PIPES AND STRUCTURES TO BE DEDICATED TO N C D 0 T SHALL BE CONSTRUCTED IN ACCORDANCE WITH APPROVED AGENCY REQUIREMENTS THE GRADE OF THE GRAVITY STORMWATER PIPES SHALL BE MAINTAINED AT A CONSTANT SLOPE BETWEEN THE GIVEN INVERT ELEVATIONS SHOWN ON THE PROFILE 36 PRIVATE STORMWATER PIPE SYSTEMS ONSITE SHALL BE CONSTRUCTED AS DESIGNED AND DEPICTED ON PLAN AND PROFILE VIEWS 37 CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING PROPER DRAINAGE OF EXISTING STORM DRAINAGE PIPES AND CHANNELS DURING CONSTRUCTION WORK POND EMBANKMENT NOTES: I THE CONTRACTOR OR OWNER SHALL RETAIN THE SERVICES OF A GEOTECHNICAL CONSULTANT TO PERFORM SOIL TESTING OF THE SOILS TO BE USED TO CONSTRUCT THE EMBANKMENT AND PERFORM TESTING OF THE EXISTING SOILS IN THE LOCATION OF THE PROPOSED EMBANKMENT THE GEOTECHNICAL CONSULTANT WILL BE RESPONSIBLE FOR PROVIDING FINAL RECOMMENDATIONS FOR THE CONSTRUCTION OF THE EMBANKMENT INCLUDING FOUNDATION PREPARATION, CUT-OFF TRENCH, SOIL SUITABILITY, EMBANKMENT SEEPAGE CONTROLS, OUTLET PIPE SEEPAGE CONTROLS, COMPACTION, AND OTHER RELATED DESIGN ASPECTS OF THE EMBANKMENT SYSTEM THAT MAY BE APPLICABLE 2 SOILS USED FOR THE EMBANKMENT SHALL BE SPECIFIED BY THE GEOTECHNICAL CONSULTANT, WHICH MAY BE ONSITE SOILS OR MAY REQUIRE IMPORTING OF APPROPRIATE SOILS 3 REMOVE ALL ORGANICS, ROOTS, STUMPS, AND TOPSOIL FOR THE FOUNDATION SYSTEM OF THE EMBANKMENT AND PREPARE THE AREA AS RECOMMENDED BY THE GEOTECHNICAL CONSULTANT 4 PLACE FILL FOR THE EMBANKMENT AS RECOMMENDED BY THE GEOTECHNICAL CONSULTANT 5 THE CONTRACTOR SHALL CONSULT THE GEOTECHNICAL CONSULTANT AND THE ENGINEER OF RECORD IF ALTERNATE PRODUCTS, MATERIALS, ETC ARE CONSIDERED FOR THE EMBANKMENT AND POND SYSTEMS ONSITE AND SHALL OBTAIN WRITTEN APPROVAL TO USE ANY ALTERNATES THIS MAY REQUIRE ADDITIONAL SUBMITTALS TO THE LOCAL AND/OR STATE AGENCIES HAVING JURISDICTION OVER THE PROJECT SITE FOR THEIR REVIEW AND APPROVAL NP 185 COMMERCE CENTER INDUSTRIAL, LLC GENERAL INFORMATION 4825 NW 41ST STREET RIVERSIDE, MO 64150 COUNTY ROWAN OWNER: NP 185 COMMERCE CENTER INDUSTRIAL, LLC (816) 888-7380 TOWN SALISBURY 4825 NW 41ST STREET SURVEYOR: THOMAS & HUTTON RIVERSIDE, MO 64150 50 PARK OF COMMERCE WAY ZONING CBI PHONE: (816) 888-7380 SAVANNAH, GA 31405 (912) 234-5300 ENGINEER: THOMAS & HUTTON 1020 EUCLID AVENUE UTILITY: DUKE ENERGY CHARLOTTE, NC 28203 700 EAST RITCHIE ROAD, (980) 201-5505 SALISBURY, NC 28146-1381 (704)-638-4050 I I11111111,,,I'' i T, a0Lu u) C N co m %NN N a Fm w \ CIA N N Q m==} 3 z z m U)U) 3 3 W W w w It Ir a a w w z z (D(D U) (1) w w U) 0 0 z 0 m m �n- cn cn > F w z z W W 0 W 0 0 0 U W ~ U) � 0 W W z U U z z J w W a cD cD < a a W z w 0� w w W c� rL a M N - Z L0 CD L0 vl Z Lq o E 0 Q O N � O U � 00 N o Q N � co `2 T� N w U oZ Ln 0 E C4 O o 7- 3 0 3 U cr p W z F W Z w 0 W W V JN Go z J W J z U o U J� w Q �a_m W U) J a W w ~ O Z O m oU UpLd J .30 Ln ir OD W I - Z W Z 0 JOB NO: J- 29101 0000 DATE: II-19-2021 DRAWN: NH DESIGNED: NH REVIEWED: WBS APPROVED: WBS SCALE: NOTED GOol