HomeMy WebLinkAboutNCC203706_NOT Closeout Documents_20220211Sedii11e11tcatioll/COIIStl-LICtIOII Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 (704) 663-1699
County: Cabarrus Project: Cabarrus County Operations Center
Person financially responsible: Cabarrus County - Kyle Bilafer, General Services Project #:
Director
Address: Post Office Box 707, 65 Church Street, Concord, NC 28026
1. Project Location: 484 Cabarrus avenue West, Concord
Pictures: No
2. Weather and soil conditions: Cloudy, Workable Soils
River basin: Yadkin-PeeDee
CABAR-2021-011
Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements?
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): No one on site Title:
Inspection report: Sent Report Date given/sent: February 04, 2022
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance and released under
the SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities (NCGO 1) must be requested by the permittee via a Notice of
Termination (NOT). The NOT is available at:
https://edocs.deq.nc.gov/Forms/NCGO 1-Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process.
All projects that have been approved prior to April 01, 2019, under the old permit system, are
not required to take any additional actions. The stormwater permit is terminated at the same
time as the termination of this erosion control permit.
Reported by: Kenny Llywelyn Others present:
Date of inspection: February 02, 2022 Time arriving on site: 3:45 PM Time leaving site: 3:50 PM
cc:
Yes