Loading...
HomeMy WebLinkAboutNCC200587_NOT Signed Certification_20220210NCG01 Notice of Termination (NOT) Certification Form Directions: Print this form, complete, scan and upload to the electronic NOT (Rescission) form. Then, mail the original signed form to the NC DEMLR Stormwater Program at: Division of Energy, Mineral & Land Resources Stormwater Program 512 N. Salisbury Street, 61' Floor 1612 Mail Service Center Raleigh, NC 27699-1612 DO NOT MAIL THIS FORM UNTIL YOUR NOT REQUEST HAS BEEN REVIEWED AND APPROVED. THE FORM YOU MAIL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE (NOT DIGITAL) [40 CFR 122.221 General Permit Certificate of Coverage (COC) No. Name of Project v C c ) 0() 5-31 �fnrtiirv(c L' sc-hoal Per NC General Statute 143-215.66 (i), any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article ... shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($'10,000). Under penalty of law, I certify that: I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request, and to the best of my knowledge and belief, such information is true, complete, and accurate. Legally Responsible Organizational Entity: P C C�NsjP-VC 1`"''� G'rauP `t _5c VV1PPV- *Legally Responsible Person: Title of Legally nsi a Pe *Signature: Pi,,a / Le411 eY 2 1 22 Print Name and Title of Signed (only if authorized individual signing differs from Legally responsible Person): * IMPORTANT NOTE: This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCGO10000 permit. For more information on signatory requirements, see Part IV, Section 8, Item (6) of the NCGO10000 permit.