Loading...
HomeMy WebLinkAbout20210798 Ver 3_Approval Letter_20220211DocuSign Envelope ID: 231 DB7FE-9D80-4C31-A1 B5-74F5BDF312E4 ROY COOPER Governor ELIZABETH S. BISER Secretary S. DANIEL SMITH Director February 11, 2022 NORTH CAROLINA Environmental Quality Rachelle Shannon Kurtz and Jim A. Wagner 109 Plyersmill Road Cary, NC 27519 (Delivered via email to rshannonk@gmail.com) DWR # 20210798 v3 Franklin County Subject: APPROVAL OF TAR-PAMLICO RIVER BASIN RIPARIAN BUFFER IMPACTS WITH EXCEPTION (MINOR VARIANCE) WITH ADDITIONAL CONDITIONS 113 Chuckwagon Drive, Bunn Dear Ms. Kurtz and Mr. Wagner: You have our approval for the impacts listed below for the purpose described in your application dated December 13, 2021, and received by the Division of Water Resources (Division) December 13, 2021. These impacts are covered by the Tar -Pamlico River Buffer Rules and the conditions listed below. This Buffer Authorization does not relieve the permittee of the responsibility to obtain all other required Federal, State, or Local approvals before proceeding with the project, including those required by, but not limited to, Sediment and Erosion Control, Non -Discharge, Water Supply Watershed, and/or Stormwater regulations. The following impacts are hereby approved, provided that all of the Conditions listed below, and all of the conditions of the Tar -Pamlico River Buffer Rules are met. No other impacts are approved, including incidental impacts. [15A NCAC 02B Tar -Pamlico .0611(b)(2)] Type of Impact Amount Approved (units) Permanent Amount Approved (units) Temporary Buffers — Zone 1 B 1: Retaining Wall 40 (square feet) 0 (square feet) Buffers — Zone 2 B2: Retaining Wall 100 (square feet) 0 (square feet) D_E NORTH CAROLINA Department of Environmental Ouali\ e/ North Carolina Department of Environmental Quality I Division of Water Resources Raleigh Regional Office 13800 Barrett Drive I Raleigh, North Carolina 27609 919.791.4200 DocuSign Envelope ID: 231 DB7FE-9D80-4C31-A1 B5-74F5BDF312E4 113 Chuckwagon Drive, Bunn DWR# 2021472 Buffer Exemption Certificate Page 2 of 3 Compensatory Mitigation Using the Division of Mitigation Services Mitigation must be provided for the proposed impacts as specified in the table below. The Division has received an acceptance letter from the NC Division of Mitigation Services (DMS) to meet this mitigation requirement. Until the DMS receives and clears your payment, and proof of payment has been provided to this Office, no impacts specified in this Authorization Certificate shall occur. For accounting purposes, this Authorization Certificate authorizes payment to the DMS to meet the following compensatory mitigation requirement [15A NCAC 02B .0295 (f) & (g)]: Compensatory Mitigation Required Bank Sponsor River & Sub -basin Number Buffer -Zone 1 (Zone 1 @ 3:1) 40 (square feet) DMS Tar -Pamlico: 03020101 Buffer -Zone 2 (Zone 2 @ 1.5:1) 100 (square feet) DMS Tar -Pamlico: 03020101 Total: 270(square feet) Justification: A project that affects waters shall not be permitted unless the existing uses, and the water quality to protect such uses, are protected. In determining that the proposed activity will comply with state water quality standards (including designated uses, numeric criteria, narrative criteria and the state's antidegradation policy), the project must provide for replacement of existing uses through compensatory mitigation. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of this Authorization Certificate. If you change your project, you must notify the Division and you may be required to submit a new application package. If the property is sold, the new owner must be given a copy of this Authorization Certificate and is responsible for complying with all conditions. [15A NCAC 02B .0611(b)(2)] If you are unable to comply with any of the conditions below, you must notify the Raleigh Regional Office within 24 hours (or the next business day if a weekend or holiday) from the time the permittee becomes aware of the circumstances. The permittee shall report to the Raleigh Regional Office any noncompliance with the conditions of this Authorization Certificate and/or any violation of state regulated riparian buffer rules [15A NCAC 02B .0734]. Information shall be provided orally within 24 hours (or the next business day if a weekend or holiday) from the time the applicant became aware of the circumstances. This approval and its conditions are final and binding unless contested. [G.S. 143-215.5] Upon the presentation of proper credentials, the Division may inspect the property. This Authorization Certificate can be contested as provided in Chapter 150B of the North Carolina General Statutes by filing a Petition for a Contested Case Hearing (Petition) with the North Carolina Office of Administrative Hearings (OAH) within sixty (60) calendar days. Requirements for filing a Petition are set forth in Chapter 150B of the North Carolina General Statutes and Title 26 of the North Carolina Administrative Code. Additional information regarding requirements for filing a Petition and Petition forms may be accessed at http://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000. DocuSign Envelope ID: 231 DB7FE-9D80-4C31-A1 B5-74F5BDF312E4 A party filing a Petition must serve a copy of the Petition on: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 113 Chuckwagon Drive, Bunn DWR# 2021472 Buffer Exemption Certificate Page 3 of 3 If the party filing the Petition is not the permittee, then the party must also serve the recipient of the Authorization Certificate in accordance with N.C.G.S 150B-23(a). This Authorization Certificate neither grants nor affirms any property right, license, or privilege in any lands or waters, or any right of use in any waters. This Authorization Certificate does not authorize any person to interfere with the riparian rights, littoral rights, or water use rights of any other person, nor does it create any prescriptive right or any right of priority regarding any usage of water. This Authorization Certificate shall not be interposed as a defense in any action respecting the determination of riparian or littoral rights or other rights to water use. This Authorization shall expire five (5) years from the date of this letter. This letter completes the review of the Division under the Tar -Pamlico River Riparian Buffer Rules as described in 15A NCAC 02B .0734. Please contact Colleen Cohn at 919-791-4258 or Colleen.Cohn@ncdenr.gov if you have any questions or concerns. Sincerely, DocuSigned by: Sc �t 0). BCDA9D825D4A46D... Scott Vinson, Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office Division of Water Resources, NCDEQ cc: DWR 401 & Buffer Permitting via Laserfiche