HomeMy WebLinkAbout20210297 Ver 1_Site Inspection 2.14.22 Br 182 Bell Hill Road_20220214Wetland Inspection Report
Inspection Type:
Reason for Inspection:
Inspection Date:
Site Owner Name:
Latitude:
County:
Project Name:
Project Num:
Location:
SW Plan Location:
20210297
NCDOT - Replace Bridge 182 on SR 1127
Cherokee
NCDOT - Replace Bridge 182 on SR 1127
NC DOT Division 14 - Sylva
2/14/2022
Routine
Site Inspection (DOT)
Version: 1 Status:Issued
Project Type:Replace bridge with bridge
Region:Asheville
Longitude:-84° 10' 51''+35° 03'
Inspection Contact Person:Title:Phone:
On-Site Representative(s):
Secondary Inspector(s):
Primary Inspector:Phone:Robert K Mitchell
Facility Compliance Status:Compliant Not Compliant
- Remove and stabilize spoils on top of bank of diversion.
- Stabilize areas of exposed/disturbed soils per NPDES groundcover requirements.
Program Areas: 401 (includes isolated/non-404)
Question Areas:
Permit (401 WQC)
Inspection Summary:
Site inspection was conducted by Kevin Mitchell with the Asheville Regional Office on February 14, 2022. Scott and
Blake Anderson were present during the inspection. Site is compliant with the Water Quality Certification with
additional conditions. NPDES records were up to date. The following are items that need attention:
page:1
Inspection Date:
Site Number:
Inspection Type:
Owner:
Reason for Visit:
20210297
2/14/2022
Blazer, Keith
Site Inspection (DOT)Routine
Permit (401 WQC)Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment:
page:2