HomeMy WebLinkAboutNCC220737_ESC Approval Submitted_20220215Approval - Idolwood Subdivision EN2000097
From: Matthew Osborne (matthewo@cityofws.org)
To: encompass.surveyengineering@gmail.com; ndm_eng@yahoo.com
Cc: kentw@cityofws.org
Date: Monday, February 7, 2022, 02:14 PM EST
Application Type: 04.02) Grading/Erosion Control Permit
Workflow: 04.02) Grading & Erosion Control
Project: Idolwood Subdivision
AT #: EN2000097
Acreage to be Disturbed: 14.00
https:Hwinston-salem.idtplans.com/secure/�P-roj t/? roj ectid=398818
Hello Clayton Properties Group, Inc.,
Thank you for submitting your project to City of Winston-Salem. Review of the plans for this project have been completed. The design is adequate to meet the
ordinance standards and the plans have been approved.
If you have not already done so, please provide an original signed and notarized Financial Responsibility/Ownership (FRO) form as applicable. This document is
required prior to the issuance of the Grading/Erosion Control Permit. If this has already been provided, then please disregard this statement. Reminder that a completed
FRO form is not required in the instance where a project qualifies to use the HB 489 Sketch Erosion Control Plan document.
If this project will disturb more than 1 acre or is part of a larger common plan of development, the Grading/Erosion Control Permit cannot be issued until
documentation is provided that coverage under the NCGO1 Construction Stormwater Permit (NPDES) has been obtained. Please obtain coverage under the permit at
the following website (https.//edocs.deq.nc.gov/Forms/NCGOl-NOI). Once coverage is obtained please upload a copy to the project documents in the electronic plan
review system. The Grading/Erosion Control Permit will not be issued until proof of coverage under NCGO1 is provided.
As outlined in the Unified Development Ordinances (UDO) of Winston-Salem/Forsyth County, Village of Clemmons, Town of Lewisville, and Town of Walkertown,
Erosion Control Division staff may periodically inspect sites of land disturbing activity to determine compliance with the Erosion Control ordinances and the approved
Erosion Control Plan. No person shall willfully resist, delay, or obstruct an authorized representative, employee, or agent of the Erosion Control Division while that
person is inspecting or attempting to inspect a land disturbing activity under the ordinance.
Should you have any questions as you move forward please feel free to contact Matthew Osborne at 336-462-7480 or matthewo@cityofws.org.
Matthew Osborne, CFM, CPESC
Erosion Control/Floodplain Program Manager
City Of Winston-Salem
Field Operations Department
Erosion Control Division
PO Box 2511 (Mailing)
100 E. First Street, Suite 328 (Physical)
Winston-Salem, NC 27101
Office: 336-747-7453
Mobile: 336-462-7480
Fax 336-727-2792
Electronic Plan Review Application Portal:
https://winston-salem.iq!plans.com/secure/
Electronic Plan Review Application Instructions:
https://winston-salem.idtplans.com/secure/training/Manual/
NOTICE: Beginning May 1, 2018, all Grading/Erosion Control, Floodplain Development, and Watershed Protection Permit Submittals MUST be submitted electronically.
City of Winston-Salem
ONE TEAM
Committed to Excellence
All a -mails including attachments sentto and from this address are subjectto being released tothe media and the public in accordance with the North Carolina Public Records taw.