HomeMy WebLinkAboutNC0021661_Annual Performance_20220214 MOteeto4 of edah and'(/u ewate'L rJ) eat 7 ent Plant APIM1
P.O.Box 249 Laurinburg, NC 28353 LAU RI N BURG
910 277 0214 �11 b 4Q 'a•Melyli*Rooted
February 8,2022
NC Division of Water
1617 Mail Service Center
Raleigh,NC 27699
To: NC Division of Water
Please find enclosed our Annual Performance reports for 2021. This will include
4 Facilities: City of Laurinburg Water Treatment Plant,Pilkington Wastewater Plant,
Leith Creek Wastewater Plant and City of Laurinburg Collections.
If you need any additional information,please contact our office.
Sincerely,
RECEIVED
Michele Grooms FEB 1 4 2022
Records and Lab Aide
City of Laurinburg Water Treatment Plant DEQ-WATER RESOURCES
910-277-0214 401 &BUFFER PERMITTING
Annual Performance Report 2021
General Information
Facility/System Name: City of Laurinburg Water Treatment Plant
Responsible Entity: City of Laurinburg
Person In Charge/Contact: Dixon Medlin, Treatment Plants Director
Applicable_P_ermit(s)____-________NC0.l36_7_7_3
Description of Filter Backwash Discharge System
The City of Laurinburg operates a 8.0 MGD Water Treatment Facility at 603
Lauchwood Drive. The wastewater that is generated at this facility is the water that
is used to backwash the three rapid sand filters, this water is discharged into Big
Branch Creek.
Summary of System Performance for Calendar Year 2021
The discharge from the City of Laurinburg's Water Treatment Plant met all permit
requirements-except-for--toxicity for--May and-November—We are-working with- - --
the regional office and the toxicity lab in Raleigh with this issue. We also exceeded
the fluoride limit in January due to a filter out of service for maintenance this has
been corrected.
Notification
This Annual Performance Report will appear on the City of Laurinburg's web site
http://www.laurinburq.orq and a statement on our Consumer Confidence Report
(CCR) will inform citizens that the Annual Report is available via internet or upon
request.
Certification
I certify under penalty of law that this report is complete and accurate to the best of
my knowledge. I further certify that this report has been made available to the users
or customers of the named system and that those users have been notified of its
availability.
Dixon Medlin
Treatment Plants Director
City of Laurinburg
Annual Performance Report 2021
General Information
Facility/System Name: Pilkington North American Wastewater Plant
Responsible Entity: City of Laurinburg
Person In Charge/Contact: Dixon Medlin, Treatment Plants Director _ _ __ __ _ _ _
Brianne Murray, ORC
Applicable Permit(s) NC0021661
Description of Wastewater System
The Pilkington North American Wastewater Treatment Plant is a 30,000 gallons per day
wastewater facility with the following components: extended aeration, anaerobic sludge
digesters, clarifier and post chlorination. This facility treats only the domestic waste
from Pilkington North American Plant.
Summary of System Performance for Calendar Year 2021
The discharge from the Pilkington North American Wastewater Treatment Plant met all
permit requirements for 2021.
Notification
This Annual Performance Report will appear on the City of Laurinburg's web site
http://www.laurinburq.orq and a statement on our Consumer Confidence Report (CCR)
will inform citizens that the Annual Report is available via internet or upon request.
Certification
I certify under penalty of law that this report is complete and accurate to the best of my
knowledge. I further certify that this report has been made available to the users or
customers of the named system and that those users have been notified of its
availability.
%I_ 'I_-
Dixon Medlin, Treatment Plants Director
Treatment Plants Director
City of Laurinburg
Annual Performance Report 2021
General Information
Facility/System Name: City of Laurinburg Leith Creek Wastewater Plant
Responsible Entity: City of Laurinburg
Person in Charge/Contact: Dixon Medlin, Director/ORC
Applicable Permit(s) NC0020656 /WQ002526
Description of Leith Creek Wastewater Plant
Our Leith Creek Plant consist of two types of treatment, one extended aeration plant,
consisting of 2 aeration basins, 2 clarifiers, 2 chlorine contact chambers and one return
sludge pump station with 3 pumps, total capacity 2.0 million gallons per day (MGD).
The second plant is an oxidation ditch style with 1 clarifier, 1 chlorination point and 1
return sludge pump station with 3 dual speed pumps, total capacity 2.0 MGD, for a total
treatment capacity of 4.0 MGD. The facility has 2 aerobic digesters, (1) 150,000-gallon
tank and (1) 650,000-gallon tank with course air diffusers.
The City of Laurinburg is now participating in an effort to make available educational
information regarding sources of household mercury and appropriate use/disposal
practices. This program will facilitate public awareness regarding community collection
points for mercury-containing products from residents/customers for proper disposal.
Periodic reminders of such collection programs will be provided as part of the City of
Laurinburg's Leith Creek WWTP.
Summary of System Performance for Calendar Year 2021
The discharge from the City of Laurinburg's Leith Creek Wastewater Treatment Plant
met all permit requirements except for the following months.
I certify under penalty of law that this report is complete and accurate to the best of my
knowledge. I further certify that this report has been made available to the users or
customers of the named system and that those users have been notified of its
availability.
• Annual Average Daily Flow - 2,780,000 (gallons per day)
• Maximum Daily Flow/Date - 5,668,000 gallons February 21, 2021
• Total Annual Flow - 1,107,464,000 Gallons
Certification
I certify under penalty of law that this report is complete and accurate to the best of my
knowledge. I further certify that this report has been made available to the users or
customers of the named system and that those users have been notified of its
availability.
fr -
Dixon Medlin, Treatment Plants Director
City of Laurinburg
Annual Performance Report 2021
General Information
Facility/System Name: City of Laurinburg Collections
Responsible Entity: City of Laurinburg
Person In Charge/Contact Stacey McQuage/Collections ORC
Applicable Permit(s) WQCS00062
Description of Collection system -
The City of Laurinburg's Collection system consists of 35 pump stations
located throughout the system. There are 123.7 miles of gravity sewers and 24
miles of force mains. All our systems are electronically monitored (SCADA)
24 hrs. We inspect and clean 10% of gravity sewer lines per year.
No violations for the collection system for 2021.
•
Dixon Medlin, Treatment Plants Director
City of Laurinburg
Summary of System Performance for Calendar Year 2021
The discharge from the City of Laurinburg's Leith Creek Wastewater Treatment Plant
met all Permit requirements except for the following months:
DATE LOCATION VOLUME ENVIRONMENTAL INPACT CORRECTIVE MEASURES TAKEN
1/1/2021 WWTP 5.8 NONE We exceeded our monthly effluent
flow average for the month due to
rain totals for January 2021 was 7
inches and December 2020 we had
— — 4-inches--of-rain. -- -
2/1/2021 WWTP 5.36 NONE We exceeded our monthly effluent
flow average for the month due to
rain totals for January 2021 was 7
inches and February 2021 was
5.89 inches of rain.
2/15/2021 WWTP 900,000 NONE Discharge without valid permit
testing& repairs are being
addressed to correct overflows
Notification
This Annual Performance Report will appear on the City of Laurinburg's web site
http://www.laurinburg.orq and a statement on our Consumer Confidence Report (CCR)
will inform citizens that the Annual Report is available via Internet or upon request.
Certfication
I certify under penalty of law that this report is complete and accurate to the best of my
knowledge. I further certify that this report has been made available to the users or
customers of the named system and that those users have been notified of its
availability.
(Nt_c6LL
Dixon Medlin, Treatment Plants Director
City of Laurinburg