Loading...
HomeMy WebLinkAboutSW6211001_Plansheet (C-3.0-4) - Grading/Drainage Plan_20220210G1. INDEPENDENCE Q OO�p� GRADING NOTES OPERATION. WgysraE RQ 7. ALL CUT AND FILL SLOPES SHOULD BE INVESTIGATED BOTH ��� 1. ALL ELEVATIONS SHOWN ARE IN REFERENCE TO THE DURING AND AFTER GRADING BY THE CONTRACTOR TO / QPe�. BENCHMARK AND MUST BE VERIFIED BY THE GENERAL DETERMINE IF ANY SLOPE STABILITY PROBLEMS EXIST. IF IT CONTRACTOR.ALL SPOT ELEVATIONS ARE TO THE FINISHED IS DETERMINED THAT THERE IS A SLOPE STABILITY GRADE OF THE CURB, UNLESS OTHERWISE NOTED. PROBLEM THE ENGINEER OF RECORD SHOULD BE NOTIFIED. 2. ALL SIDEWALKS AND PEDESTRIAN WALKING SURFACES 8. STOCKPILE AREAS THAT WILL EXCEED 10' IN HEIGHT SITE SHALL HAVE A CROSS SLOPE NO STEEPER THAN 2% AND SHOULD BE GRADED WITH 3:1 SLOPES AND SURROUNDED LONGITUDINAL SLOPE NO STEEPER THAN 5%. BY SILT FENCE. 3. THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ALL 9. APPROVED COPIES OF THE GRADING AND EROSION CONTROL LAND DISTURBING ACTIVITIES AND ENSURE COMPLIANCE PLANS SHALL BE ON THE PERMITTED SITE WHILE WORK IS WITH THE APPROVED EROSION AND SEDIMENTATION I IN PROGRESS. CONTROL PLAN. THE CONTRACTOR SHALL INSPECT AND 10. ALL EXISTING DRAINAGE COURSES THROUGH THIS SITE Y MAINTAIN ALL EROSION CONTROL DEVICES AND CLEAR ANY SHALL REMAIN IN A CONDITION SUCH THAT THEY CAN 0 o DEBRIS LEAVING THE SITE ON NEIGHBORING ROADS. I TRANSPORT THE NATURAL DRAINAGE UNTIL FACILITIES TO Q m 4. EXISTING GROUND UPON WHICH FILL OR BASE IS TO BE HANDLE THE STORM WATER ARE CONSTRUCTED. THE PLACED SHALL BE CLEARED OF WEEDS, DEBRIS, TOPSOIL, CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE AND ALL OTHER DELETERIOUS MATERIALS; NO FILL SHALL I DUE TO OBSTRUCTING NATURAL DRAINAGE PATTERNS. U BE PLACED UNTIL PREPARATION OF THE EXISTING GROUND 11. ANY DEVIATION FROM THE APPROVED GRADING PLAN HAS BEEN COMPLETED SHOULD BE REPORTED TO THE ENGINEER OF RECORD PRIOR 5. PROTECTIVE MEASURES SHALL BE TAKEN BY THE I TO IMPLEMENTATION OF THE CHANGE. CONTRACTOR AND THE OWNER TO PROTECT ADJACENT 12. ALL SLOPES 3:1 OR STEEPER THAT EXTEND TEN FEET OR \ PROPERTY, THE PUBLIC AND UTILITIES DURING GRADING OPERATIONS. THE CONTRACTOR ASSUMES ALL LIABILITY FORT MORE SHALL BE LINED WITH NORTH AMERICAN GREEN S75 TEMPORARY EROSION CONTROL BLANKET OR EQUAL FAYETTEVILLE RD. �� WO ODB I THE UNDERGROUND UTILITY PIPES CONDUITS OR SUBSTITUTE. J m STRUCTURES WHETHER SHOWN OR NOT ON THE PLAN 13 STORM PIPE DISTANCES SHOWN ARE TO THE CENTER OF NOTIFICATION OF COMBINED SELF -MONITORING AND SELF -INSPECTION FORM: THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND -DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TOOK EFFECT OCTOBER 1, 2010. TO SIMPLIFY DOCUMENTATION OF SELF -INSPECTION REPORTS AND NPDES SELF -MONITORING REPORTS, DWQ AND DEMLR DEVELOPED A COMBINED FORM. THE SELF -INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY SELF -MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF -INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES ACCORDING TO THE APPROVED PLAN. THE INSPECTIONS SHOULD BE CONDUCTED AFTER EACH PHASE OF THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED. THE FORM CAN BE ACCESSED AT: HTTP: //PORTAL.NCDENR.ORG/WEB/LR/EROSION IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM, NORTH 6. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE BOX FOR ALL STRUCTURES UNLESS OTHERWISE NOTED. BE REQUESTED BY THE PERMITTEE VIA A NOTICE OF PLEASE CONTACT THE FAYETTEVILLE REGIONAL OFFICE AT (910) THE LOCATION OF ALL UTILITIES OR STRUCTURES ABOVE 14. CONTRACTOR SHALL VERIFY LOCATIONS OF DOWNSPOUTS ` TERMINATION (NOT). THE NOT IS AVAILABLE AT: 433-3300. CONSTRUCTION SEQUENCE 1. OBTAIN ALL NECESSARY PERMITS AND APPROVALS AND HOLD PRE CONSTRUCTION CONFERENCE. 2. INSTALL STONE CONSTRUCTION ENTRANCE, TEMPORARY SILT FENCE, AND DIVERSION BERMS WHERE SPECIFIED. 3. CONSTRUCT TEMPORARY SEDIMENT & SKIMMER BASINS. 4. CLEAR AND GRUB THE SITE AS NEEDED. 5. ROUGH GRADE THE SITE AND APPLY TEMPORARY SEEDING TO AREAS TO REMAIN GRASSED. 6. INSTALL TEMPORARY CHECK DAMS IN SWALES AS SHOWN. 7. INSTALL UTILITIES. 8. INSTALL INLET PROTECTION ON ALL NEW STORM WATER INLETS. 9. PERFORM FINE GRADING. 10. INSTALL AND PREPARE BASE COURSE. 11. PAVE ROADWAYS AND PARKING LOTS. 12. FERTILIZE, SEED AND MULCH ALL REMAINING DISTURBED AREAS. 13. UPON SITE STABILIZATION, SEEK NCDEQ APPROVAL TO REMOVE ALL TEMPORARY MEASURES. 14. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED AS OUTLINED IN THE DETAILS WITHIN THE PLANS AND ACCORDING TO THE NCDEQ EROSION CONTROL MANUAL. 15. TERMINATION OF COVERAGE UNDER THE NPDES GENERAL STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES MUST GROUND STABILIZATION CHART SITE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITHCES 7 DAYS NONE AND SLOPES HIGH QUALITY WATER (HQW) 7 DAYS NONE ZONES IF SLOPES ARE 10' OR SLOPES STEEPER 7 DAYS LESS IN LENGTH AND ARE THAN 3:1 NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR 7-DAYS FOR SLOPES FLATTER 14 DAYS GREATER THAN 50 FEET ' IN LENGTH NONE ALL OTHER AREAS (EXCEPT FOR WITH SLOPES FLATTER 14 DAYS PERIMETERS AND THAN 4:1 HQW ZONES) AND BELOW GROUND, SHOWN OR NOT SHOWN ON THESE USING THE ARCHITECTURAL PLANS PRIOR TO HTTPS: //EDOCS.DEQ.NC.GOV/FORMS/NCG01-TERMINATION. VICINITY MAP PLANS. THEY WILL BE HELD RESPONSIBLE FOR ALL DAMAGE CONSTRUCTION. \ PLEASE BE OPLOADED THE CLOSE PART OOU OMPLETICN6 THEENOT CE 1/2„ " 1/2 TO ANY UTILITIES OR STRUCTURES CAUSED BY HIS „ ERB i OF TERMINATION PROCESS. ERB NOT TO SCALE N 468,258.762 1 11/2" 1/2 1 /2„ 1 /2„ E 1,96D N 7.819 O O EIR EIRO ERB ERB D 83 (2011) 1" X 1 /2" , 1„ X 1 /2„ IRON BAR ., ..., �" IRON BAR 1 / - - , D 1 L 2 264 �\ _� 265 r- 264 = SF r O 1 v G/ ❑ �O O V s v 257 c6, o ✓N �7 rn ^� o 1/2„O 1u, zss N-..-..- -SOUTH POINTE DRIVE..-..-. -..-..-..-..-..-. -.._ ERB U 250 ii/� hb 262 - 263�� �6S - O �I , 247 ti � 2- ✓/V N /o ID N 468,307.054 N N oN v N N E 1,967,712.709 1 �� / �I JAI NC GRID NAD 83 I " O 5F o � �h DIV EXISTING ��,. �� �001 ANGLE APARTMENT BUILDING A APARTMENT BUILDING B APARTMENT BUILDING C� ��O 5 RON � APARTMENT BUILDING D n , 24 UNITS 24 UNITS 3 STORY o 264 24 UNITS 3 STORY 3 STORY 3 STORY � �� ����� ✓� J �� / I FFE. 263.55 FFE: 264.65 FFE: 266.35' FFF �FF24 T��� ADJACLN I HKOHILK I Y LINL d 1 'r, G) . . - 111 13 11 ;W YA"XEIP 1? i RIGHT-OF-WAY -fin 1 N - - - - - - \ TB4 8.16 61 -- -- --- -SETBACK LINE �! --- - 2s ! „�, �67,409.464 t, 26� "; 2s3 26 J © /% AEV 263.76 SO STORM DRAINAGE 1 s 2� _ s L i o s r C GRID NAD 83 -UFO UNDERGROUND FIBER OPTIC \� �o SOUTH POINTE DRIVE- r r , �O j'' �J /f 4111 • (2011) OVERHEAD UTILITY c �i9 L 26� �,' ��,�� NAVD 88 X FENCE LINE ❑ ❑ WOODEN FENCE/�' e 8; TREE LINE �.,,�, . o- x 208.47'SPOT ELEVATION58 BENCHMARK � I" X 1 /2 / s SIGN , - �� ASS 4g S� '% �, �.; .,,.. � �co �co'� IRON BAR' � � a� BOLLARD N �S FF M� MAILBOX /2 ECM EI Fj� �tS� EB ELECTRICAL BOX LIGHT POLE \ " 260 J RR• UTILITY POLE N 262 z6a - �,, EIP C LOC --z63 i C GUY WIRE %,.� �� ZS�2S6 ��� 262 263 265 ���� �� 265 263 JJ ,� 001 ❑T TELEPHONE PEDESTAL " �� 2 �a 266 EROSION CONTROL NOTES CONSTRUCTION OPERATIONS ARE NOT ACTIVELY UNDERWAY © CABLE PEDESTAL 3EIP ..� 257 SF ss 6� ��� / �65 �OOI OOl OOl 001 AGAINST EROSION DUE TO RAIN, WIND AND RUNNING WATER N WATER VALVE / _ 64 �701 1 MAINTENANCALL OE TLET AND FAIOLUERE IOEACHILL ACB VE DAY ON SE CHECKED OR WITHIN 14 DAYS. ITE. CONTROL MATTING, USESEEDING ODDIDNG ANDSTAKING FIRE HYDRANT i EANc h� 2 / N SEDIMENT WILL BE REMOVED FROM THE SEDIMENT TRAP GREEN SPACE AREAS AND OTHERWISE APPROPRIATE Y . " 0O� G IRON ❑ WATER METER �� AND INLET PROTECTION DEVICES WHEN THE STORAGE MEASURES. USE EARLY APPLICATION OF GRAVEL BASE ON \ V �'O 257 ��� ^ / CAPACITY HAS BEEN APPROXIMATELY 50% FILLED. GRAVEL AREAS TO BE PAVED. OS SANITARY SEWER MANHOLE TREE 0O1 �� �; 7 WILL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL 9. DO NOT REMOVE ANY EROSION AND SEDIMENT CONTROL ►? �G/ f NCDOT ?ss '2s3 L ry' NO LONGER DRAINS PROPERLY. SEDIMENT WILL BE DEVICES AFTER THE PROTECTED AREA HAS UNDERGONE SHRUB s, R/W ��� O `;i ; REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT FINAL STABILIZATION AND PERMANENT VEGETATION HAS ASPHALT` ,. ECM BECOMES ABOUT 0.5' DEEP AT THE FENCE. THE SEDIMENT BEEN ESTABLISHED, IT IS RECOMMENDED THAT NCDEQ CONCRETE " \ FENCE WILL BE REPAIRED AS NEEDED TO MAINTAIN A APPROVE THE ACTION PRIOR TO REMOVAL. `� ' �r5 ' �k PROPER BARRIER. 10. THE CONSTRUCTION ENTRANCE SHALL BE INSTALLED ... GRAVEL ��1, -- �s3 � V ��, 2. TEMPORARY EROSION CONTROL FACILITIES AND/OR CONCURRENTLY WITH THE INITIATION OF CONSTRUCTION BUILDINGS g\ti�'' l �' l�jkROq �„ HOC PERMANENT FACILITIES INTENDED TO CONTROL EROSION OF ACTIVITY. AND EARTH DISTURBANCE OPERATION SHALL BE INSTALLED 11. THE INSTALLATION OF EROSION CONTROL MEASURES SHALL - HOC- HOC- LIMITS OF CONSTRUCTION �?,°' 2s4 pUg 6SR.� "" \ BEFORE ANY EARTH DISTURBANCE OPERATIONS TAKE PLACE TAKE PRECEDENCE OVER ALL OTHER CONSTRUCTION - SF - sF - SILT FENCE LINE G��O,, L/C ST 3�)� OC OR AT THE EARLIEST POSSIBLE POINT DURING ACTIVITIES. �G REET �., CONSTRUCTION. 12. THE PERMITTEE SHALL BE HELD RESPONSIBLE FOR THE - JN - JN - JUTE NETTING / ACTIONS AND PERFORMANCE OF ANY OTHER PARTIES _ 7 C 26 � � / � � 3. TEMPORARY &PERMANENT EROSION CONTROL MEASURES -Div-Div- DIVERSION BERM p % \ PERFORMING WORK ON THIS PROJECT. „,,, � 1/2' /:, 1 j2' - SHALL BE CONSTRUCTED PER THE DETAILS HEREIN, OR , ........... 1 2� 1" x 3/4' "" ERB ERB SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE NORTH 13. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE 0INLET PROTECTION ► 2s5 me �i i % ► \ _ _ N AND SEDIMENT CONTROL PLANNING AND -- C CAROLINA EROSIO CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY - � DESIGN MANUAL. RUNOFF -PRODUCING RAINFALL BUT IN NO CASE LESS THAN O 268 ""` ' 4. THE CONTRACTOR MUST NOTIFY THE APPROPRIATE NCDEQ ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE �� OFFICE A MINIMUM OF 48 HOURS PRIOR TO BEGINNING ANY IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. S 4� _� 269 / LAND DISTURBING ACTIVITIES. 910-433-3300 14. PURSUANT TO G.S. 113A-57(2), THE ANGLE FOR GRADED \ ",..... 5. REMOVE ALL SOILS AND SEDIMENTS TRACKED OR SLOPES AND FILLS SHALL BE NO GREATER THAN THE _ �f \ COVER OR OTHERWISE DEPOSITED ONTO PUBLIC AND PRIVATE ANGLE THAT CAN BE RETAINED BY VEGETATIVE �, , ",,, PAVEMENT AREAS. REMOVAL SHALL BE ON A DAILY BASISOTHER ADEQUATE EROSION CONTROL DEVICES OR i14 001 001 3/a' _ _ _ _.' WHEN TRACKING OCCURS. STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, 1 1 1 /2" - - - 6. LOCATE SOIL STOCKPILES NO LESS THAN FIFTY RA AFEET WITHIN 7 OR 14 CALENDAR DAYS OF COMPLETION OF ANY EIP " PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED FROM ANY PUBLIC OR PRIVATE ROADWAY OR DRAINAGE GE (BENT) CHANNEL IF REMAINING FOR MORE THAN SEVEN DAYS, WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES STABILIZE THE STOCKPILES BY VEGETATIVE COVER TARPS,OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. ENL WITH \ EIR wirNEss OR OTHER MEANS. CONTROL EROSION FROM ALL PURSUANT TO G.S. 113A-57(3), PROVISIONS FOR STOCKPILES BY PLACING SILT BARRIERS AROUND THE PILES. PERMANENT GROUND COVER SUFFICIENT TO RETAIN EROSION / \ TEMPORARY STOCKPILES LOCATED ON PAVED SURFACES MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN MUST BE NO LESS THAN FIVE FEET FROM THE 90 CALENDAR DAYS FOLLOWING COMPLETION OF / DRAINAGE/GUTTER LINE AND SHALL BE COVERED IF LEFT CONSTRUCTION OR DEVELOPMENT. C3■1 C3.2 ® ' / ++,. MORE THAN 24 HOURS. 15. CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL EROSION / GRAPHIC SCALE \ 7. MAINTAIN ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHOWN AND ANY ADDITIONAL C3.4 CONTROL DEVICES IN PLACE UNTIL THE CONTRIBUTING MEASURES REQUIRED TO CONTROL THE SEDIMENT DURING 60 0 30 60 120 240 �"^�.' \ DRAINAGE AREA HAS BEEN STABILIZED. INSPECT THE COURSE OF CONSTRUCTION. / TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES ON 16. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS / \ A DAILY BASIS AND REPLACE DETERIORATED, DAMAGED, OR NECESSARY, AND MULCHED ACCORDING TO THE DETAILS C3.3 Know what's below. / ROTTED EROSION CONTROL DEVICES IMMEDIATELY. HEREIN. / >�, 8. TEMPORARILY OR PERMANENTLY STABILIZE ALL DENUDED 17. THE CONTACT PERSON FOR EROSION CONTROL ISSUES THAT Call before you dig. IN FEET / ( ) AREAS WHICH HAVE BEEN FINISH GRADED, AND ALL ARISE ON SITE IS DINO HACKETT. CONTACT 336-674-2443. SHEET KEY 1 inch = 60 ft. X 1/2" DENUDED AREAS IN WHICH GRADING OR SITE BUILDING / / IRON BAR / (BENT) THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED IIII ■ IIII aolutuonat civil engineering an surveying 409 Chicago Drive, Suite 112, Fayetteville, INC 28306 office 1910 426-6777 fax 1910 426-5777 license number I C 2354 wwwAD site solutions.com IN CARp Zz// % SEA • 0274 z • ......• oaiamma�aoum oumw.muuuuuuuuuuuuuuuuuum,,,,,,, REVISIONS PROJECT NAME SOUTH POINTE AT WAYSIDE OVERALL GRADING AND EROSION CONTROL PLAN CLIENT HACKETT PROPERTIES, INC. 200-D Pomona Drive Greensboro, North Carolina 27407 Phone: (336) 674-2443 Fax : (336) 674-2443 PROJECT INFORMATION DESIGNED BY: CALEB DRAWN BY: CALEB CHECKED BY: SCOTT PROJECT NUMBER: 927 DRAWING SCALE HORIZONTAL: 1 "=60' oa31,90o um uumwemuuuuuuuuu DATE RELEASED FEBRUARY 9, 2022 oaiammaaoum uumwemuuuuuuuuu SHEET NUMBER C-3mO clq2 '0 �G LEGEND: � 4D TRAVERSE POINT ECM® ECM -EXISTING CONCRETE MONUMENT EIP 0EIP-EXISTING IRON PIPE � i O EIR OO EIR-EXISTING IRON ROD / ` ` EIS O EIS -EXISTING IRON STAKE S ��arrriir�, / \ ERBO ERB-EXISTING REBAR �W, 1/2" 1/2" 1/2" N/F - NOW OR FORMERLY ���EIR ERB ERB SHEET KEY RIGHT OF WAY ........................ olo ° i i E ..,;,.. REINFORCED YTLINE P 1, ' � � RCP REINFOR ADJACENT PROPERTY LINE 1 1 � LIMITS OF CONSTRUCTION . I � - RIGHT-OF-WAY (16.9 AC) TEMPORARY DIVERSION BERM - - so-STORMCDRANAGE / SILT FENCE (TYP) TO BE SEEDED WITHIN 7 DAYS (TYP) 1 / uFo UNDERGROUND FIBER OPTIC 1 L6e LOE t6C Lam- YI-50 _L�_`� YI-51 _ LOC�BE LI YI-52 ILOC�BE YI-53 _ L8E L . // OVERHEAD UTILITY 1 *MAINTENANCE SHELF r SF TOP: 261.07 cF �����TOP: 261.07 S�cF S!-t� cF S5 -TOP: 262.20- �F SFsTOP. 262.18z �cF SFo SHALL HAVE 2% MAXIMUM I O DIV IDIV [HIV IV INV: 258.65 6" PVC @ 1% MIN INV: 259.37 INV: 259.75 INV: 260.48 263 X FENCE LINE 6" PVC @ 1% MIN 261.55� 261.55� 62.65- bu 262.65-0 WOODEN FENCE , CROSS -SLOPE 61.45 264 (>E �o 69-9- LOG 69r 261.5 62.0 62.0 63.1 263.1 x 2oa.a�'SPOT ELEVATION LINE ACCESS & MAINTENANCE EASEMENT '" 260.98 GI 262.0 62.29 63.1 63.33 264.06 I �C10' MAINTENANCE SHELF 61.30 261.3 �� 262.6 62.65 263.91 � BENCHMARK / L=16' W=6'/18; 2 0.3 260.86 25 262.0 c 262.10 262.85 263.20 2 9 Ism]SIGN 62.05 263.1 63.15 � RIP RAP DISSIPATER 261.09 261.75 WATER SURFACE: 249.70' ( CLASS 1 22.5" THICK_ 60.80 1.55 262. 45 263.26 a BOLLARD PERMANENT WET POND #1 Dw=10 DmAx-15 2 1 8 62.05 261.99 62.96 63.09 263.76 1 ©MAILBOX 262.0563.15 263.15 2bb T, _ 260. 0 61.50 261.86 DI-15 262 59 26 9 EB ELECTRICAL BOX HIGH WATER: 255.42 10YR 2 9.20 c ( ) i „ CP 260.38 " TOP OF POND: 259.20 'f59.4 R _SOUTH POINTE DRIVE - - - - FES-17 59. 110.68 LF ®3.79% 24 DI-16 157.75 LF 0 0.57% 24" RCP U - 187.46 LF 0 0.53% 24" RCP 1/2 INVERT OF POND: 245.20' , � 261.1 20 UTILITY EASEMENT PPS L IGHT POLE ERe 260.81 262.35 0 63 / 263.76 1 TOP FOREBAY BERM: 249.70'250 ���f� - 2 • UTILITY POLE � 59.40, 262 263.83 C GUY WIRE u ti� 261.36 262.46 8.33% RISER: ,� �9.88 261.05 0 ❑T TELEPHONE PEDESTAL 1 to TOP OF BERM 247 /s / 5•0% 62.46 5.0% MAX5.0% TOP 257.80' RIP RAP DISSIPATER 364 - - 8.33% - - - - --MAX' - - - © CABLE PEDESTAL MAX- �- -8.33% - 1 N ELEV: 249.70' GF o °MAX WV U a L=12' W=4.5'/13.5' c� 59.2 261.86 MAX 262.32 262.59 62.68 cn� 262. 6 MAX 263.45 263.98 X WATER VALVE * 'L / 3 . DI-21 0 261.58 INV 249.70' >' CLASS B RIP 9 i 26 .30 AFTER SITE IS STABILIZED o LO 0 RAP TO LINE CLASS 1 22.5" THICK 78w 259.d1 N FIRE HYDRANT 262.37 262.47 262.96 - 263.50 263.57 264.07 264.57 � CONVERT SEDIMENT BASIN J r N RCp 1 �� YI-54 z YI-5� ' �- � SLOPES AS � �,� 0" p � � L�J WATER METER TO \ AS PERMANENT WET POND SHOWN VC 19 261.8 .26 .5 62.56 2262 94 62.97 INV: 260.30P: 262.36�263.1 63.28 26 6 63866PVC ®1% MIN 2264. 4 64 INV: 263.4 � SANITARY SEWER MANHOLE 1SHOWNINV: 253.40 8" PVC C�➢ 1% MIN n TREE SC263.1 bu 263.1 g51• S1264.2 5U 264.2 64r.�L0 FOREBAY WEIR �Co h J 260.0 263.0 263.0 264. 5 264.15 SHRUB 63.0 263. 5 264.15 264.15 TEMPORARY SEDIMENT BASIN #1 N LENGTH: 10' tih tih / 260 1 26 263.05 264. 5 64.15 ' ASPHALT 63.55 2 3.55 63. 5 2 3.5 63. 5 263.55 62.53 64.65 2 4.65 64. 5 • 2 4.6 64. 5 264.65 3.63 \ L=180', W=150', D=T N N ELEV. 249.20' '. CONCRETE 1 SIDE SLOPES= 2:1 �.... .\ BOTOTOM P OF OB BASIN2 9.20' ' o TOP SHELF: 250.20' WET'" �� ryh� �� / / 0 GRAVEL of {� I o• a \ 15' EMERGENCY SPILLWAY: 258.20' I I 111� F. POND #1 0 BUILDINGS 1 ® - uoc- uoc- LIMITS OF CONSTRUCTION INVERT OF SKIMMER: 249.70' N BOTTOM SHELF: 249.20' 1 SIDE SLOPES OF BASIN ARE TO 11 a / / - sF sF - SILT FENCE LINE "� . APARTMENT BUILDING A APARTMENT BUILDING B BE SEEDED WITHIN SEVEN DAYS. - - o• 3 STORY 2 •87 2 3'47 3 STORY 264.87 JN JN JUTE NETTING 1 **ATTACH A 2.5" FAIRCLOTH SKIMMER (OR EQUAL) vo / / 63.54 - DIV DIV - DIVERSION BERM 1 WITH 2.0" ORIFICE FOR DEWATERING THE dl, 24 UNITS 24 UNITS 63.97 1 ' SEDIMENT BASIN DURING CONSTRUCTION. (n FFE:263.55' FIFE: 264.65' ' 0INLET PROTECTION 258. / %I tI r/iv .258. 01259.4 ` 29.2 LP 1 259.11 0 /2„ 1 � 58.00 15 EMERGENCY SPILLWAY N �- ELEV: 258.20' DI-19 i RIP TO BE SODDED 5$.89 263.1 ERB 2y9 '`s6 25g•5 I 263.55 2 3.55 263. 5 2 3.55 263.5 263.55 264.65 2 4.65 264. 5 2 4.65 264.6 264.65 RAP DISSIPATER CONCRETE % 2 7 '�s 263.05 263.0 '* 6a 264. 64.1 3.63 N 57.99 250 60.09 \ / L=24' W=9'/27' �_O ANTI -SEEP 9 p RI-26 �. 63.05, 63.05 263.05 63.05� - - 264.15 64.15 264.15 64.15 1 2 _ 263. 3:10- - .. - 63.10 - - .. - 0S 4.2 64.2 0S 264.20 64.20 C� IRON Dw-10" DmAx 15" COLLAR 59.4� 252 9.40 ® YI-63 0S 20' UTILITY EASEMENT ' THICK/ ^RCP 253 9• 259.65 o INV: 256.30 TOP: 261.45 8" PVC (6 1% MIN _ INV: 257.75 HOOK CLASS 1 22.5" 36 s ° 8 PVC C�? 1% MIN J4.61 54 0a�% 255 9.65 ' 2 1.09 INV: 254.02 l 2 26 J /262.16 262.43 262.51 262.2 YI-56 264.57 w 261.16 26 .1 62.16 62.53 262.5 262.11 262.38 262.46 262.18 2 3.49 63.61 264.03 64.07 TOP: 263.45 264.50 Ld 260.0 260.5 262.1 63.78 63. INV: 261.25 Cn 57' ono JB-18 62.1 62.49 - - 262.00262.49 - - - - 6 .44 263.70 264.03 G 259 I I 0 _ 2. 5 10 PVC ® 1% MIN 653.51 263.97 �p � �S-27 _...._.... 2 0• 26�. 3 �62.25 ®rn 12" PVC @ 1% MIN (9 a) 62.1 INV: 256.00 Ld 7 ' 260.51 - 62.10 - 2.27 w G �; 52 60.17 ® 261.90 261.90 YI-64 262.1 6 .25 262.58 YI-65 (n O5 62.58 'TOP: 261.25 � s -o ° � 62.25 fl\2� TOP: 261.55262.40 62.27 n n� 1 y I YI-83 INV: 258.03 o INV: 255.02 v GRAVEL, �` N 8.MAX a 2 TOP: 261.59 26 .65 263.101 � 63.18 w o> / DIVERSION MAX (o I INV: 255.48 26 .65 2 .58 z ./ I POOL ELEV: 262.45' 6 n ` BERM �` 'A,CI-23 26L85 MAX 262.40 L. 262.25 26 62.65 6 .65 � `� J \ 0 262.19 ao 262.92 INV: 248.68 C 2 1. 0J62.40 - 262.92 6 .4 = 55.30 59.43 raj C INLET 26'0./1 260.98 262.32 262.34 63.42 23.00 LF CAA 0.52% 15" RCP 26 .34 6363 41 ti Q v PROTECTION 260.52 261 N CLUBHOUSE POOL HOUSE ® 261.67. 263.4 0 \ > M (TYP) 260.73 261. 8 FFE: 262.40' FFE: 262.65' o N CI-24 260.6 62.321263.42 263.42 263.42 263.49 � 26 .34 255.30 1 262 3 63 42 • 4 � 2 63.48 - - - 259.43 - _ 62.40 _ 2 2.92 tn61 TEMPORARY 26d.8 260.9 261.90 62.40 262.19 262.25 262.65 262.6500 262.9 62.65r 6 .42 vCONSTRUCTION \, o ENTRANCE �° - 63 TRENCH DRAIN > ' N2531 TRENCH DRAIN TOP• 26210 YI 82 „�;2 262.40 TOP: 262.10 INV: 261.10 TOP: 261.59 262.65 0 / 06 262.40 INV: 261.10 INV: 259.39 a o UTILITY EASEMENT <F 7� I 262.40262.40 262�27 262.25 62.15 o 7 ® / � s9g 9� 98" I 2 1.90 - - - 262.18 62.65 261.9 20' UTILITY EASEMENT �� 6 1 YI-66 - - �24.8f,j \ .� 10 MAINTENANCE SHELF ° 7Sy rn 262.25 262.10 262. 5 I V: 259.50 264.41 264.48 \ N , / R o S 2.53 TOP: 261.36 ... Cp INV: 25262:2 62.1 SD 62.48 61.97 264.24 264.26 %0•9.60 / 6 59.47 261.20 261.68 261.44 1OC 2 4 262.76 INV: 258.76 OC `L S 261.63 264.18 264.18 264.69 259. 26b.55 261.57 261.68 262.0 62.08262.01 262.0 61.9 . 62.00 262.01 262,1 262.3 2.46 � 262.69 263.99 264.11 264.11 264.13 264.62 G 7 2525 5 0 DI �20 O '� d 257.00 1�158.40 61.4 61.63 61.36 62.01 261.90 261.90 261.90 261.90 262.2 .41 26 .0 w, 264.0 64.00 4. 264.57 > ,OO r INV: 248.30 15' EMERGENCY SPILLWAY 5 2 59.5 60.98 61.70 10" PVC ®0.5% MIN 262.12 262.20 10" PVC @ 1% MSSIN �64.36 ELEV: 257.20'�TT 261.70 062.1 262.10 262.10 6L��°" 0264.20 � 6 .05 26 .05 6 .05 2 2.05 4.15 264.15264.15 264.15 TO BE SODDED TOP SHELF: 252.20' \ INV�256.68 w l"�"' RAP DISSIPATER \ 260.16 262.05 262.05 5 \\ 59 57 61.12, 264. 5 64.1 ��i7p2 L=12' W=T/20' 257. 0 5 258.9 261.70 62.55 2 2.5 62. 5 2 2.5 62. 5 262.5 61.52 64.65 2 4.6 64. 5 2 4.6 64. 5 264.6 6 .61 'Dw=10" DmAx--15" 258.4 RI-28 BOTTOM SHELF: 251.20' YI-67 YI-68 YI-71 TOP: 263.46 CLASS. 1 22.5" THICK 61. 0 V. TOP: 261.62 TOP: 261.35 N YI-70 INV: 261.30 \` RIP RAP DISSIPATER "� 75y 30" RCp 58 6 \ 261.35 INV: 257.06 INV: 257.40 TOP: 263.72 / L=12' W=4.5'/13.5 g0 LF ® 2 61.28 INV: 260.61 Dw=10" DmAx--15" 119. �� 58.90 ® �CLASS 1 22.5" THICK` �� 260.87 SF a 1 r cr U APARTMENT BUILDING E APARTMENT BUILDING F FES 30 SF 5�00 I n o > 26 .87 62.92 262.99 3 STORY 64.82 CONCRETE � �s 3 STORY ANTI -SEEP m 24 UNITS b 24 UNITS COLLAR ' �� so 63.97 FIFE: 262.55' FFE: 264.65' 26 .1 v7 U) o o 259.73 TEMPORARY SEDIMENT BASIN #2 t� 6 262.55 2 2.55 262. 5 2 2.55 262. 5 262.55 ' 2 1 52 264.65 2 4.65 264. 5 264.65 264. 5 264.65 SIDE SLOPES= 2:1 �N \ 262.05 264. TOP OF BASIN: 258.20' 62.0 62.05 62.05� 64.15 64.1 264.1 3.63 259.0 INV: 255.77 26 .0 ��262.05 64.15 M\N . 5 62.10 � 62.10 � Know what's b@IOW. BOTTOM OF BASIN: 251.70' \ �% \ S 62.1 cn 6 .1 2.83 262.90 S 6 263.E p-8" PVC 1 % M64.2 26 40 r �264.78 ' 15' EMERGENCY SPILLWAY: 257.20' v DI-4 pqC 260.74 261.51 8" PVC Ca? 1% MIN261 9 62.01 263.62 64.04 p �, A0 261.34 261.55 261.92 262.03 YI-69 262.79 262.93 _ 263.48 263.56 263. 64.08- YI-72 264.75 Call before you dig. �� INVERT OF SKIMMER: 251.70' >11p s z °' � 5�.25 � � TOP: 261.37 � TOP: 263.46 1 SIDE SLOPES OF BASIN ARE TO N 6 .04. 61.4 INV: 259.30 INV: 261.30 BE SEEDED WITHIN SEVEN DAYS. �1 58 46 P 260.1 b� **ATTACH A 2.5" FAIRCLOTH SKIMMER (OR EQUAL) of a )jO 60.47 60:87 261.33 5 �20 6 .3 ® 262.97 263.39 2 4.19 WITH 1.9 ORIFICE FOR DEWATERING THE s 3 - J - 262.10 - - - 1 o WET 29 <F 8.33% 5.0% C) - . SEDIMENT BASIN DURING CONSTRUCTION. an, 78 ® 259.89 260.37 MAX MAX MAX POND #2 RCp MAX �MA� 26j 8.33% 0 2s3 263.89 - \ 260. 60.28 - - - - - MAX 261.97 �s2 �- - - - - - 20' ACCESS & �63.78 / \ 0 260.49 SOUTH POINTE DRIVE 260.85 261.76 262.63 MAINTENANCE EASEMENT 262 99 263.57 PE MA NENT WET POND 2 PER MA �, �, 59.79 260.14 / WATER SURFACE: 251.70 58•4 155.48 LF 0 0.78% 24" RCP DI-3 191.00 LF ® 1.00% 24" RCP HIGH WATER: 255.13 (10YR) )�6o DI-79 260.82 261.01 261.36 261.75 262.08 262.33 263.0� 263.13 263.19 �\ TOP OF POND: 258.20' I ` / 2Ao 258.20 259.89 260. 7 61.1 - �61.10 260.47 26T52 261.80 262.12 - 262.59 263.20 - 263.20 63.65 INVERT OF POND: 247.20 0l 261.23 262./ 262.89 L TOP FOREBAY BERM: 251.70' 260.66 61.10 61.10 63.2 263.20 62.70 n / 60.6 60.60 261.66 261.96 62.27 262.61 62.7 CI-6 RISER: / w� 260.03 260.7 I 6 .03 262.9 13.57 LF ®I 5.23% 1v5" RCP TOP 256.70' I 262. 262.82 263.20 INV 251.70' cal 261.1 261.10 p 25 261.88 8 33% 62 263.2 PO_81 ' o MAX INV: 261.08 '0nn TOP OF BERM 60.6 260.60------ 61.65 5.0% 62.77 263.10 62.70.... ..... 262.70 ! 26 39 \ r *AFTER SITE IS STABILIZED ELEV: 251.70' ®� 25 259'8 MAX 2 96 61.98 CONVERT SEDIMENT BASIN \ 5820 - �s 61./6 62.08 62. 7 263.2 263.3 263.85 TO PERMANENT WET POND \ s� �s� �s� CLASS B RIP M 61.89 R SLOPES IAS m� GRAPHIC SCALE � "` 'AS SHOWN. •40 258 LO � \\ SHOWN 255 0�58.40 26 13 263.45 30 0 15 30 so 120 p,l 26L.0 263.40 263.58 *MAINTENANCE SHELF SHALL HAVE 2% MAXIMUM � �49 a 25a 5 .20 262.00 263.45 1 CROSS -SLOPE S� �� FOREBAY WEIR 24s O�� ,,,... ( IN FEET ) 247 ES-5� RIP RAP DISSIPATER ' LENGTH: 5' f L=20' W=7.5'/22.5' 262.13 263.58 1 inch = 30 ft. J� ' �248 _ -15" ELEV: 251.20o " CLASS 1 22.5" THICK ��, 63.38 �64.08 r s� MATCH LINE SEE SHEET C 3.3 2 8.2 \ 1 61 It 64.11 THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED 411,'Dsim ■ te S;uions civliu engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1910-426-6777 fax 1910-426-5777 license number I C-2354 www.4Dsitesolutions.com REVISIONS PROJECT NAME SOUTH POINTE AT WAYSIDE DETAILED GRADING AND EROSION CONTROL PLAN CLIENT HACKETT PROPERTIES, INC. 200-D Pomona Drive Greensboro, North Carolina 27407 Phone: (336) 674-2443 Fax : (336) 674-2443 PROJECT INFORMATION DESIGNED BY: CALEB DRAWN BY: CALEB CHECKED BY: SCOTT PROJECT NUMBER: 927 DRAWING SCALE HORIZONTAL: 1 "=30' DATE RELEASED FEBRUARY 9, 2022 SHEET NUMBER C-3m 1 LEGEND: L� 4D TRAVERSE POINT ECM® ECM —EXISTING CONCRETE MONUMENT EIP 0 EIP—EXISTING IRON PIPE EIR Oa EIR—EXISTING IRON ROD EIS O EIS —EXISTING IRON STAKE ERBO ERB—EXISTING REBAR N/F — NOW OR FORMERLY R/W — RIGHT OF WAY RCP — REINFORCED CONCRETE PIPE PROPERTY LINE ADJACENT PROPERTY LINE — — RIGHT—OF—WAY — - — - — - — — SETBACK LINE so STORM DRAINAGE uFo UNDERGROUND FIBER OPTIC // OVERHEAD UTILITY X FENCE LINE WOODEN FENCE TREE LINE x 208.47' SPOT ELEVATION BENCHMARK 51GN SIGN ED BOLLARD ® MAILBOX EI3 ELECTRICAL BOX 0 LIGHT POLE PP UTILITY POLE C- GUY WIRE ❑T TELEPHONE PEDESTAL © CABLE PEDESTAL Wv N WATER VALVE FIRE HYDRANT ❑❑ WATER METER O SANITARY SEWER MANHOLE TREE SHRUB ASPHALT 0 CONCRETE 0 GRAVEL BUILDINGS — HOC HOC— LIMITS OF CONSTRUCTION — SF — SF — SILT FENCE LINE — ,1N JN — JUTE NETTING — Div — Div — DIVERSION BERM 0INLET PROTECTION Know what's below. Call before you dig. 1 1 V i SLOPE TO BE REINFORCED LIMITS OF CONSTRUCTION (17.7 AC) DITCH #2 TO BE REINFORCED WITH NAG SC150BN MATTING IMMEDIATELY UPON CONSTRUCTION 1" X 1 /2" IRON BAR TEMPORARY SILT FENCE (TYP) IP RAP DISSIPATER L=3' W=1'/3' Dw=8" DuNc=12" \0 TEMPORARY SKIMMER BASIN #3 \ L=100', W=60', D=4' SIDE SLOPES= 2:1 TOP OF BASIN: 259.00' BOTTOM OF BASIN: 255.00' 10' EMERGENCY SPILLWAY: 258.00' INVERT OF SKIMMER: 255.50' SIDE SLOPES OF BASIN ARE TO BE SEEDED WITHIN SEVEN DAYS O/V 258.33 I **ATTACH A 2.5" FAIRCLOTH SKIMMER (OR EQUAL) J \ ✓N �' WITH 2.1" ORIFICE FOR DEWATERING THE 17 Dl V �� jN p SEDIMENT BASIN DURING CONSTRUCTION. v C) \ N �f �JN �n / o / �d� r OFF —SITE DRAINAGE DITCH °C, / o TO BE DIVERTED AROUND V c� SKIMMER BASIN / r i 264.62 264.75 1 S, F 64.62 r0 OG `' 58.85 41; / 64.75°G� r V 00 / N 59.04 17°G/ DITCH #3 7 p TO BE REINFORCED WITH X5F NAG SC150BN MATTING � . IMMEDIATELY UPON CONSTRUCTION / po^ 1" / EIP ID 259.30 �6 / O^ / / SHEET KEY 30 0 4/S OV N468, 54 NC GRID NAD (2011) GRAPHIC SCALE 15 30 60 120 ( IN FEET ) 1 inch = 30 ft. 11 Ioi SolutionsDsimte civiiu engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1910-426-6777 fax 1910-426-5777 license number I C-2354 www.4Dsitesolutions.com REVISIONS PROJECT NAME SOUTH POINTE AT WAYSIDE DETAILED GRADING AND EROSION CONTROL PLAN CLIENT HACKETT PROPERTIES, INC. 200-D Pomona Drive Greensboro, North Carolina 27407 Phone: (336) 674-2443 Fax : (336) 674-2443 PROJECT INFORMATION DESIGNED BY: CALEB DRAWN BY: CALEB CHECKED BY: SCOTT PROJECT NUMBER: 927 DRAWING SCALE HORIZONTAL: 1 "=30' DATE RELEASED SEPTEMBER 27, 2021 SHEET NUMBER � �_.,���° _ � MATCH LINE — SEE SHEET C-3.3 � = = � = = iii1/dE(-1'1i% = ii. = ii. THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED C-302 FI 1 LEGEND: L� 4D TRAVERSE POINT ECM® ECM —EXISTING CONCRETE MONUMENT EIP 0 EIP—EXISTING IRON PIPE EIR Oa EIR—EXISTING IRON ROD EIS O EIS —EXISTING IRON STAKE ERBO ERB—EXISTING REBAR N/F — NOW OR FORMERLY R/W — RIGHT OF WAY RCP — REINFORCED CONCRETE PIPE PROPERTY LINE ADJACENT PROPERTY LINE — — RIGHT —OF —WAY —•—•—•—•—SETBACK LINE so STORM DRAINAGE uFo UNDERGROUND FIBER OPTIC // OVERHEAD UTILITY X FENCE LINE WOODEN FENCE TREE LINE x 208"47' SPOT ELEVATION BENCHMARK 51GN SIGN ED BOLLARD M� MAILBOX EB ELECTRICAL BOX 0 LIGHT POLE PP UTILITY POLE C- GUY WIRE ❑T TELEPHONE PEDESTAL © CABLE PEDESTAL WV N WATER VALVE FIRE HYDRANT 0 WATER METER O SANITARY SEWER MANHOLE TREE SHRUB ASPHALT 0 CONCRETE 0 GRAVEL BUILDINGS — roc— roc— LIMITS OF CONSTRUCTION — SF — SF — SILT FENCE LINE — jN jN — JUTE NETTING — Div — Div — DIVERSION BERM 0INLET PROTECTION %/ o/o/o/o 7 0 OS aV MATCH LINE — SEE SHEET C-3.1 & C-3.2 ,, � - /264..... ......47�64 264.10 r `f 1 0 64.28 f;,,, EIP /G/G%%%//////G//G///// aiii,v, ,. 58.4 %//////i /l//<,,,, I j 264. 8 //� , ,M, , r Know what's below. Call before you dig. C3.1 C3. vv■v SHEET KEY C3.4 Riw RO•q p t ` s xs 35s& �0�� T V p� �SR. v� a41C ���� I N V: 262.46 A�� • `�`" vim,,. i nlTCH A6 GRAPHIC SCALE 0 15 30 60 r 5 IN FEET ) N/F 1 inch = 30 ft. KEVIN T. BELL, AND MOTHER, BARBARA S. BELL DB 567, PG 501 PB 301, PG 001 THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED 120 11 Iol SolutionsDsimte civiiu engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1910-426-6777 fax 1910-426-5777 license number I C-2354 www.4Dsitesolutions.com �yI, CARO lZ./* SS • �•'•• ••'/��ii�� Q SEA _ 0274 - V// �� CO 1 REVISIONS PROJECT NAME SOUTH POINTE AT WAYSIDE DETAILED GRADING AND EROSION CONTROL PLAN CLIENT HACKETT PROPERTIES, INC. 200-D Pomona Drive Greensboro, North Carolina 27407 Phone: (336) 674-2443 Fax : (336) 674-2443 PROJECT INFORMATION DESIGNED BY: CALEB DRAWN BY: CALEB CHECKED BY: SCOTT PROJECT NUMBER: 927 DRAWING SCALE HORIZONTAL: 1 "=30' DATE RELEASED FEBRUARY 9, 2022 SHEET NUMBER C-3m3 001 LEGEND: L� 4D TRAVERSE POINT M� MAILBOX ECM® ECM —EXISTING CONCRETE MONUMENT EB ELECTRICAL BOX EiP Oa EIP—EXISTING IRON PIPE 0 LIGHT POLE EiR 0 EIR—EXISTING IRON ROD PP • UTILITY POLE EIS O EIS —EXISTING IRON STAKE (- GUY WIRE ERBO ERB—EXISTING REBAR ❑T TELEPHONE PEDESTAL N F — NOW OR FORMERLY © CABLE PEDESTALWv R/W — RIGHT OF WAY N WATER VALVE O 2t RCP — REINFORCED CONCRETE PIPE �p?r FIRE HYDRANT PROPERTY LINE ❑❑ WATER METER �G ADJACENT PROPERTY LINE (DS SANITARY SEWER MANHOLE _`i) — — RIGHT—OF—WAY (D TREE — - — - — - — — SETBACK LINE SHRUB So STORM DRAINAGE 0 ASPHALT O uFo UNDERGROUND FIBER OPTIC CONCRETE // OVERHEAD UTILITY 0 GRAVEL �4 1 S Cl v X FENCE LINE 0 BUILDINGS WOODEN FENCE — uoC uoC— LIMITS OF CONSTRUCTION 7� T TREE LINE — SF — SF — SILT FENCE LINE � SQT T OOti TMOO xza�BENCHMARK TION—oiv—oiv—DIV RSION�BERM �FNF('Q9,Qy �qR/ FgF�iFRy ti m SIGN 0INLET PROTECTIONi✓T e� P q ED BOLLARD SF�1F�4F E T TC T TCE TCE TCE TCE T T T TCEE TCE TCE TCE CE TCE TCE TCE CE E E T E Lg� Lg��� �� Lg� L�� Lg� L�� Lg� Lg� L Lg L L O z .. o t oo�z00_ _ . . I � ....oO0� ��, 000 ��C"�o-��. oz... ri 1 BROCK ROAD (SR 1317) m 60' R/W — PUBLIC STREET m i Y Know what's below. Call before you dig. SHEET KEY �..._ .......... E — TCEEOC...,; — TCLOC TCELOC TCE LOC TCE LOC TCE LOC TCE ..LOC TCE LOCTCE LOCTCE LOC E LUGE Q� T SF SF SF SF_. SF SF SF SF oo� � 0L , o 0 f, 4/S OV GRAPHIC SCALE 00 30 0 15 30 60 120 ( IN FEET ) 1 inch = 30 ft. 11 ioi SolutionsDsimte civiiu engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1910-426-6777 fax 1910-426-5777 license number I C-2354 www.4Dsitesolutions.com CARO � `99 • Q SEA - 0274 - �� CO 1 1111X� REVISIONS PROJECT NAME SOUTH POINTE AT WAYSIDE DETAILED GRADING AND EROSION CONTROL PLAN CLIENT HACKETT PROPERTIES, INC. 200-D Pomona Drive Greensboro, North Carolina 27407 Phone: (336) 674-2443 Fax : (336) 674-2443 PROJECT INFORMATION DESIGNED BY: CALEB DRAWN BY: CALEB CHECKED BY: SCOTT PROJECT NUMBER: 927 DRAWING SCALE HORIZONTAL: 1 "=30' DATE RELEASED SEPTEMBER 27, 2021 SHEET NUMBER THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED C-304