HomeMy WebLinkAboutNCC211874_MODIFICATION Supporting Doc LOTS 191-194_20220210P,OY'COOPER.
Governor
EL[ZABETH; S.. B15ER
Secretary
MAN: WRENN
Dkedor
NORTH CAROLINA
Environmental Quatity
January 25, 2022
LETTER OF APPROVAL
NVR, Inc.
ATTN: Joe Schrnidtke, Vice President
5734 Trinity Road, Suite 200
Raleigh. NC 27606
RE: Project Name: Coble Farms —Lots 191, 192, 193, 194
Acres Approved: 1.25
Project ID: ' HA.RNE-2022-075
County: Harnett
City: Angier
Address: SR 1415
River Basin: Cape Fear
Stream Classification: Other .
Submitted by: NVR, Inc.
Date Received by LQS: December 28, 2021
Plan Type:' NEW - Residential
Dear W. Schmidtke:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and
hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan
shall expire three (3). years. following the date of approval, if no land disturbing activity has been undertaken, as
required by Title 15A NCAC 4B.0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of
Intent (eNOI) forth requesting a Certificate of Coverage (COC) under the NCG010000 Construction General
Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for
the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially
Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to
commencement of any land disturbing activity. The cNOI form may be accessed at de .nc. ov/NCG01. Please
direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the
owner/operator of this project changes in the future, the new responsible party must obtain a new COC.
.---�-
«p,� North Carolina Department of Environmental Quality I Divisiun:af Energy, Mineral and i.atid Resources
Fayetteville Regional f)t'fice 1 225 Green Street, Suire'714 i Fayetteville, North Carolina 28301
NGIH:FG:J'IG .
orn?n .orsw m ir�:iih. 910.4333300
Letter of Approval
NVR, Inc.
January 25, 2022
Title 15A NCAC 4B ,0118(a) and the NCGO1 permit require that the following documentation be kept on file at the
job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
This letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance
with the approved plan.
Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job
site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing.
natural resources and adjoining properties. If, following the. commencement of this project, it is determined that the
erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control
Act of 1973 (North Carolina General Statute I I3A-51 through 66), this office may require revisions to the plan and
implementation of the revisions to ensure compliance with the Act.
Acceptance and approval.. of this plan is conditioned upon your compliance with Federal and State water quality laws,
regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing
activity. This approval does not supersede any other permit or approval.
Please note that . this approval is based in part on the accuracy of the information provided in. the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change .in the
information included on the form. This permit allows for a land -disturbance, as called for on the application plan,
not to exceed the. approved acres. Exceeding the acreage will be a violation of this permit and would.require:a revised
plan and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting
date for this project. Please notify us if you plan to have a preconstruction conference.
Your cooperation is appreciated:
Sincerely,
Timothy L. LaBounty, PE
Regional Engineer
DEMLR
Enclosures: Certificate of Approval
NPDES NCGOI Fact Sheet
cc: Landon Chandler, Harnett County (via email)
Fayetteville Regional Office — DENILR file
North Carolina Department of Envirorimental Quality I DWISlon of Energy, Mlrieral and Labd Resources
Nyettevll[e-Re.g[onal offtee I -225 Green Street, Suite 741Fayetteville,North Carolina 283 t
urar= o-+, f;raan�rvn
a®GaantMFnwranmam�i Qain 910.433300