HomeMy WebLinkAboutNCC200786_NOT Closeout Documents_20220210North Carolina Department of Environmental Quality
Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481
County: Jones Project: Trent River Solar River basin: Neuse
Person financially responsible: Pine Gate Renewables, LLC - Ben Catt, Project #: JONES-2020-004
Authorized Person
Address: 130 Roberts Street, Asheville, NC 28801
1. Project Location: NC Hwy 58 S., Pollocksville
Pictures: No
2. Weather and soil conditions: 70 degrees, sunny, dry Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): Joey Locklear Title:
Inspection report: Sent Report Date given/sent: November 05, 2021
9. Corrective action needed:
Permanent ground cover sufficient to restrain erosion has been established. No additional self -
monitoring or self -inspections are required. The project is in compliance and released under the
10. Comments: SPCA. The permittee must request termination of coverage under the NPDES General Stormwater
Permit for Construction Activities (NCGO1) via a Notice of Termination (NOT). The NOT is available
at https:Hedocs.deq.nc.gov/Forms/NCGOI-Termination. Please note that this correspondence must be
uploaded as part of completing the NOT process.
Reported by: Scott Graboski Others present:
Date of inspection: November 02, 2021 Time arriving on site: 10:30 AM Time leaving site: 11:50 AM
cc: