Loading...
HomeMy WebLinkAboutNCC200786_NOT Closeout Documents_20220210North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 County: Jones Project: Trent River Solar River basin: Neuse Person financially responsible: Pine Gate Renewables, LLC - Ben Catt, Project #: JONES-2020-004 Authorized Person Address: 130 Roberts Street, Asheville, NC 28801 1. Project Location: NC Hwy 58 S., Pollocksville Pictures: No 2. Weather and soil conditions: 70 degrees, sunny, dry Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Joey Locklear Title: Inspection report: Sent Report Date given/sent: November 05, 2021 9. Corrective action needed: Permanent ground cover sufficient to restrain erosion has been established. No additional self - monitoring or self -inspections are required. The project is in compliance and released under the 10. Comments: SPCA. The permittee must request termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) via a Notice of Termination (NOT). The NOT is available at https:Hedocs.deq.nc.gov/Forms/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Scott Graboski Others present: Date of inspection: November 02, 2021 Time arriving on site: 10:30 AM Time leaving site: 11:50 AM cc: